Planning Application Status

PL2020052




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2020052
SAINT LUKE'S EAST HOSPITAL (FLEX CAPACITY EXPANSION
Commercial Final Development Plan
Commercial Final Development Plan
Approved
02/26/2020
SAINT LUKES EAST HOSPITAL
Locations
Contacts
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
ACI BOLAND, Address:1421 EAST 104TH ST; SUITE 100, Phone:(816) 763-9600  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 05/14/2020 05/12/2020
Loic Nguinguiri, E.I.
DE C&O #11 Pavement Thickness
Corrective Action Required
05/12/2020

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
05/12/2020

Contact the Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Future Repair Work
Corrective Action Required
05/12/2020

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
DE Engineers Estimate
Corrective Action Required
05/12/2020

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $46,066.74
Planning Review Approved with Conditions 05/14/2020 05/11/2020
Hector Soto Jr.
Corrective Action Required
05/11/2020

UTILITY EASEMENTS. Based on the fact that there are no utilities located within the easements proposed to be vacated, staff is willing to allow "at risk" approval of the FDP while the vacation of easement approval process runs its course. The City has received the vacation of easement application.
Corrective Action Required
05/11/2020

MECHANICAL EQUIPMENT. The response letter indicates that the architectural plans submitted for building permit reflect the use of the required roof-top mechanical screening. Staff shall review the building permit plans for compliance.
Traffic Review No Comments 05/14/2020 05/11/2020
Michael Park
Fire Review Approved with Conditions 05/14/2020 05/08/2020
Jim Eden
Code Statement
Informational
05/07/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Misc.
Resolved
05/08/2020

The current FDC/ for the facility shall be relocated per the approved plan prior to any access impediment to the existing FDC. 4/10/2020- Will the new FDC location be permanent? If not, where will the new FDC be located? FDC's shall be acessible and located within 100 feet of a fire hydrant. 4/27/2020- Show the location of the permanent FDC on the Site PLan or Utility plan. Sheets P1.2 and P0.2 are not part of the FDP submittal. 5/8/2020 Shown on revised plans.
Misc.
Resolved
05/08/2020

Sheet C501 shows two 4" fire lines. What are these lines going to? 4/10/2020- Will the 4" fire line for the the existing ER and flex facility be large enough to support the expanded building sprinkler system and standpipe system for the future second floor expansion? 4/27/2020- Confirm the size of the main supplying the upsized 6" main going to the new B building. The revised drawing (C501) still shows a 4" valve going to a 6" main. 5/8/2020 Corrected on revised plans.
Building Codes Review No Comments 05/14/2020 05/08/2020
Joe Frogge
Engineering Review Corrections 05/01/2020 05/01/2020
Loic Nguinguiri, E.I.
Corrective Action Required
05/01/2020

• Please provide an EOOPCC (Cost Estimate) along with the resubmittal, as previously requested.
Corrective Action Required
05/01/2020

• Please revise/clarify if the 6” concrete (snow melt area) is intended to replace the 4” concrete (sidewalk) top layer in the two drawings of the concrete walkway detail on page C601.
Corrective Action Required
05/01/2020

• On sheet C203, light and heavy duty asphalt pavement(s) hatchings look almost the same. Therefore, they are barely distinguishable. Please revise to make them look as different as possible. Also, it would make more sense to have a lighter tone for the light duty asphalt pavement.
Corrective Action Required
05/01/2020

• On sheet C501, please revise/improve the water and fire connections setup. Feel free to reach out, as necessary, for clarification.
Corrective Action Required
05/01/2020

• Please indicate/provide the construction standard detail associated with every single curb type listed in the legend: _ Dry Curb and Gutter _ Transition Curb _ Curb and Gutter _ Flush Curb
Traffic Review No Comments 05/01/2020 04/30/2020
Michael Park
Fire Review Corrections 05/01/2020 04/27/2020
Jim Eden
Code Statement
Informational
04/24/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Misc.
Corrective Action Required
04/24/2020

The current FDC/ for the facility shall be relocated per the approved plan prior to any access impediment to the existing FDC. 4/10/2020- Will the new FDC location be permanent? If not, where will the new FDC be located? FDC's shall be acessible and located within 100 feet of a fire hydrant. 4/27/2020- Show the location of the permanent FDC on the Site PLan or Utility plan. Sheets P1.2 and P0.2 are not part of the FDP submittal.
Misc.
Corrective Action Required
04/24/2020

Sheet C501 shows two 4" fire lines. What are these lines going to? 4/10/2020- Will the 4" fire line for the the existing ER and flex facility be large enough to support the expanded building sprinkler system and standpipe system for the future second floor expansion? 4/27/2020- Confirm the size of the main supplying the upsized 6" main going to the new B building. The revised drawing (C501) still shows a 4" valve going to a 6" main.
Planning Review Approved with Conditions 05/01/2020 04/24/2020
Hector Soto Jr.
Corrective Action Required
04/24/2020

UTILITY EASEMENTS. The vacation of any easements that conflict with the proposed building location shall be approved and recorded with the County prior to approval of the FDP.
Corrective Action Required
04/24/2020

MECHANICAL EQUIPMENT. The response letter indicates that the architectural plans submitted for building permit reflect the use of the required roof-top mechanical screening. Staff shall review the building permit plans for compliance.
Building Codes Review No Comments 05/01/2020 04/24/2020
Joe Frogge
Engineering Review Corrections 04/15/2020 04/15/2020
Loic Nguinguiri, E.I.
Corrective Action Required
04/15/2020

• General : Pages E101 and E102 are included in the list of contents but can not be found in the set plans. Please include them in the resubmittal. If not, please remove from the list of contents.
Corrective Action Required
04/15/2020

• General : The bottom of the legend from sheet C403 to sheet C408 appears to have incomplete/missing information. Please revise.
Corrective Action Required
04/15/2020

• Sheet 501: The two (2) existing DWS lines are both 4” contrary to what is shown on the enlargement plan. While updating the plans to two (2) 4” domestic water service lines, please specify the pipe material(s) and the size(s) for all portions of pipe shown.
Corrective Action Required
04/15/2020

• Sheet 501: As previously mentioned, the City strongly recommends 6” fire service lines. While revising, please make sure to use different line patterns to dissociate overlapping water and fire line connections in the water service line enlargement. Make sure to refer to sheet C401 for precision.
Corrective Action Required
04/15/2020

• Sheet 408: Please revise overlapping elevation information.
Corrective Action Required
04/15/2020

• General : Please match the six (6) pavement hatchings listed in the construction legend on sheet C203 with the construction details shown on sheet C601. Feel free to rename the construction details if necessary.
Corrective Action Required
04/15/2020

• General : Please provide an EOOPCC (cost estimate) along with the resubmittal.
Fire Review Corrections 04/14/2020 04/10/2020
Jim Eden
Code Statement
Informational
04/10/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Misc.
Corrective Action Required
04/10/2020

The current FDC/ for the facility shall be relocated per the approved plan prior to any access impediment to the existing FDC. 4/10/2020- Will the new FDC location be permanent? If not, where will the new FDC be located? FDC's shall be acessible and located within 100 feet of a fire hydrant.
Misc.
Informational
04/10/2020

All temporary exiting plans shall be submitted for review and approval.
Misc.
Resolved
04/10/2020

Two light poles are shown next to the helipad. Consult with the air ambulance service or FAA regarding obstructions around the pad.
Misc.
Corrective Action Required
04/07/2020

On sheet C501 it shows two 4" fire lines. What are these lines going to? 4/10/2020- Will the 4" fire line for the the existing ER and flex facility be large enough to support the expanded building sprinkler system and standpipe system for the future second floor expansion?
Planning Review Approved with Conditions 04/14/2020 04/08/2020
Hector Soto Jr.
Corrective Action Required
04/08/2020

UTILITY EASEMENTS. The vacation of any easements that conflict with the proposed building location shall be approved and recorded with the County prior to approval of the FDP.
Corrective Action Required
04/08/2020

MECHANICAL EQUIPMENT. The response letter indicates that the architectural plans submitted for building permit reflect the use of the required roof-top mechanical screening. Staff shall review the building permit plans for compliance.
Building Codes Review No Comments 04/14/2020 04/07/2020
Mike Weisenborn
Traffic Review No Comments 04/14/2020 04/07/2020
Mike Weisenborn
Engineering Review Corrections 03/11/2020 03/11/2020
Mike Weisenborn
Corrective Action Required
03/11/2020

• General : Please provide an EOOPCC (Cost Estimate), along with the resubmittal.
Corrective Action Required
03/11/2020

• General : Please revise and update list of contents. o Actual page order must match the one shown on the sheet index. o Only relevant and related pages must be included. o Sheets C101, C102, C103, C104, C201 and C202 belong to the land disturbance permit application. Please remove them. o Cover sheet C001 must appear on top of set of plans.
Corrective Action Required
03/11/2020

• General : Please update/upgrade sheet C002.
Corrective Action Required
03/11/2020

• General : Vicinity map on sheet C001 contains all the information needed. Please consider removing vicinity map(s) on every other sheet, if not necessary.
Corrective Action Required
03/11/2020

• Sheet C408 : Please revise bottom of retaining wall B profile to eliminate gasp(s).
Corrective Action Required
03/11/2020

• Sheet C501 : Please label the existing MH on sanitary line 1 in plan view.
Corrective Action Required
03/11/2020

• Sheet C501 : Plan shows as domestic water service, enlargement shows as fire. Please clarify. If fire, the City strongly recommends 6" fire service line(s) instead of 4" fire service line(s).
Corrective Action Required
03/11/2020

• Sheet C501 : Please provide explanation for the water meter(s) being installed in series, or revise.
Corrective Action Required
03/11/2020

• Sheet C501 : Please label all water line size(s).
Corrective Action Required
03/11/2020

• Sheet C501 : Sanitary Line 2 connection to existing line should be by cut-in wye. Please revise both plan(s) and profile label(s).
Corrective Action Required
03/11/2020

• Sheet C601 : Please refer to City’s UDO section 8.620 to revise Light and Heavy duty asphalt pavement(s) details.
Corrective Action Required
03/11/2020

• Sheet C601 : Please include nyloplast inlet standard detail.
Corrective Action Required
03/11/2020

• Stormwater report : Please provide stormwater data analyses for 2-year, 10-year and 100-year events.
Corrective Action Required
03/11/2020

• Stormwater report : Additional review comments will be issued when resubmitted.
Fire Review Corrections 03/11/2020 03/11/2020
Mike Weisenborn
Code Statement
Corrective Action Required
03/11/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Misc.
Corrective Action Required
03/04/2020

The current FDC/ for the facility shall be relocated per the approved plan prior to any access impediment to the existing FDC.
Misc.
Corrective Action Required
03/04/2020

All temporary exiting plans shall be submitted for review and approval.
Misc.
Corrective Action Required
03/04/2020

Two light poles are shown next to the helipad. Consult with the air ambulance service or FAA regarding obstructions around the pad.
Misc.
Corrective Action Required
03/10/2020

On sheet C501 it shows two 4" fire lines. What are these lines going to?
Planning Review Corrections 03/11/2020 03/10/2020
Hector Soto Jr.
Corrective Action Required
03/10/2020

UTILITY EASEMENTS. Show the location of all proposed and existing easements. It appears that the proposed building expansion encroaches into existing (public) general utility easements. Any easements that conflict with the building addition shall be vacated under separate application.
Corrective Action Required
03/10/2020

DRIVE WIDTH. Drive aisles shall have a minimum 24' of pavement width (28' from back-of-curb to back-of-curb). The pavement width for the drive at the south end of the proposed parking lot addition is 23' (26.89' b-c to b-c).
Corrective Action Required
03/10/2020

LANDSCAPE PLAN. The minimum caliper size for the maple and serviceberry trees shall be 3" in order to comply with City standards at the time of planting.
Corrective Action Required
03/10/2020

MECHANICAL EQUIPMENT. Neither the building elevations nor the site plans appear to indicate the use of any roof-mounted or ground-mounted mechanical equipment for the building addition. Please show any such equipment on the elevations or site plan to the extent possible. Ground-mounted mechanical equipment shall screened from view using evergreen shrubs at least equal in height to the equipment being screened. Roof-mounted equipment shall be screened from view using parapet walls at least equal in height to the units being screened.
Building Codes Review No Comments 03/11/2020 03/06/2020
Joe Frogge
Traffic Review No Comments 03/11/2020 03/03/2020
Michael Park
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $1,000.00 $1,000.00 Paid 02/26/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home