Summary
PL2020007
DTLS APARTMENTS - Public Stormwater and On-Site Public Sanitary Sewer
Engineering Plan Review
Engineering Plan Review
Approved
01/09/2020
THE UNITED METHODIST CHURCH OF LEES SUMM
Locations
Contacts
THE UNITED METHODIST CHURCH OF LEES SUMM, Address:114 SE DOUGLAS ST  
HDR ENGINEERING, INC, Address:P O BOX 80600, Phone:(317) 596-3260  
Reviews
Review Type Outcome Est. Completion Date Completed
Record Drawings Review No Comments 01/17/2023 01/13/2023
Gene Williams, P.E.
Record Drawings Review Corrections 09/20/2022 09/20/2022
Gene Williams, P.E.
Engineering Review Approved with Conditions 07/15/2020 07/14/2020
Gene Williams, P.E.
Engineering Review No Comments 04/15/2020 04/15/2020
Gene Williams, P.E.
Engineering Review Corrections 03/25/2020 03/25/2020
Gene Williams, P.E.
Corrective Action Required
03/25/2020

It was our understanding that insert-tees were going to be eliminated, in terms of the number, to the extent practical. It does not appear that any of these were eliminated.
Corrective Action Required
03/25/2020

Why is storm line 4 extended so far along Main St.? Our records show the top of the watershed is near the intersection of 1st and Main. In other words, the extension of the storm line to the distance shown, does not appear to serve any public purpose.
Corrective Action Required
03/25/2020

Why are junction boxes still called-out along Main St., rather than curb inlets? This would include #50, #53, #46, and #32.
Corrective Action Required
03/25/2020

Where is the retaining wall in relation to the sanitary sewer? The sanitary sewer cannot be installed beneath the retaining wall.
Engineering Review Corrections 01/24/2020 01/24/2020
Gene Williams, P.E.
Corrective Action Required
01/24/2020

The letter dated Jan. 7, 2020 from HDR (hereinafter referred to as "the revised sanitary sewer study") appeared to contain a typographical error. Page on the revised sanitary sewer study states that the original study analyzed 178 total units. It appears the original study actually studied 278 units. Please reconcile.
Corrective Action Required
01/24/2020

The revised sanitary sewer study shows additional surcharging to the north (i.e., the Cedar Creek Watershed). This surcharging is currently being evaluated internally.
Corrective Action Required
01/24/2020

It does not appear there was any evaluation of the downstream effects of the sanitary sewer surcharging discussed in the above comment. For instance, what effect would the surcharging have on existing homes and businesses? Of particular concern is: 1) 13 NW Lakeview Blvd., 2) 15 NW Lakeview Blvd., 3) 16 NW Lakeview Blvd., 4) 500 NW Little Ave., 5) 502 NW Little Ave., 6) 16 NW Main St. The hydraulic grade line for the proposed conditions in the vicinity of these addresses are above the existing conditions.
Corrective Action Required
01/24/2020

The alignment of the sanitary sewer in the middle of the road is not currently allowed by the Design and Construction Manual. If allowed, a waiver is required. As a condition of this waiver (if allowed by Public Works and Water Utilities), a full-width mill and overlay would likely be required.
Corrective Action Required
01/24/2020

The sanitary sewer appears to be installed at minimum slope (i.e., 0.60% slope). The preference would be to design a bit more slope, in order to account for installation tolerance. The City will not accept any sanitary sewer less than 0.60%, so it may be beneficial to increase the slope slightly.
Corrective Action Required
01/24/2020

A doghouse manhole is proposed. These are specifically prohibited within the City of Lee's Summit, and a waiver to this requirement would not be supported by Development staff, nor Water Utilities.
Corrective Action Required
01/24/2020

The standard detail for the sanitary sewer wye connections and tracer wire was missing.
Corrective Action Required
01/24/2020

Details were missing for the City of Lee's Summit frame and lid.
Corrective Action Required
01/24/2020

Please remove the "Approved - City of Lee's Summit, Missouri" note on the cover sheet. The City will provide a red stamp when the plans are approved.
Corrective Action Required
01/24/2020

If a waiver is granted for the installation of the sanitary sewer beneath pavement, a temporary traffic control permit must be obtained from Public Works. This will require a separate application and plan, to be submitted to Public Works. Please see the City of Lee's Summit website for the form "Temporary Traffic Control Permit" under the Public Works tab. Please allow for ample review time by Public Works staff in relation to this permit.
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home