Summary
PL2019183
STREETS OF WEST PRYOR- PRIVATE ROAD PLANS
Commercial Final Development Plan
Commercial Final Development Plan
Approved
05/20/2019
Locations
Contacts
DRAKE DEVELOPMENT, LLC, Address:7200 West 132nd Street; Suite 150  
KAW VALLEY COMPANIES INC, Address:5600 KANSAS AVE, Phone:(913) 281-9950  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 07/15/2020 07/14/2020
Sue Pyles, P.E.
DE Contact Field Eng. Inspector
Corrective Action Required
07/08/2020

Contact the Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Engineers Estimate
Corrective Action Required
07/08/2020

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee of $37,958.25 (which is based on 3% of the total infrastructure cost) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit.
DE Future Repair Work
Corrective Action Required
07/08/2020

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Traffic Review No Comments 08/12/2019 08/09/2019
Dawn Bell
Resolved
08/09/2019

The three (3) right turn arrows shown on Private Road A approaching Pryor Road (across from Summit Woods Xing) should be deleted from the plans. The lane is not a right-turn only, but rather a shared through-right lane.
Engineering Review Approved with Conditions 08/05/2019 08/05/2019
Dawn Bell
DE Contact Field Eng. Inspector
Corrective Action Required
08/09/2019

Contact the Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Engineers Estimate
Corrective Action Required
08/09/2019

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee of $37,958.25 (which is based on 3% of the total infrastructure cost) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit.
DE Future Repair Work
Corrective Action Required
08/09/2019

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Building Codes Review No Comments 08/12/2019 08/05/2019
Dawn Bell
Fire Review Approved with Conditions 08/12/2019 08/05/2019
Dawn Bell
Code Statement
Corrective Action Required
08/05/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Misc.
Corrective Action Required
08/05/2019

Additional hydrants and access may be required as the Final Developement Plan (FDP)is completed for each lot.
Planning Review Approved with Conditions 08/12/2019 08/05/2019
Dawn Bell
Corrective Action Required
08/05/2019

The proposed north and south wall signs will require separate review and approvals through a sign permit application. A building permit would also be required if the sign wall is over 6-foot in height.
Engineering Review Corrections 07/12/2019 07/24/2019
Sue Pyles, P.E.
Miscellaneous Correction
Corrective Action Required
07/19/2019

Label sanitary sewer service line connections as "Cut-In Wye".
Miscellaneous Correction
Corrective Action Required
07/19/2019

90 degree bends are not allowed. Please revise the water line to replace the 90 degree bend with two 45 degree bends, or similar.
Miscellaneous Correction
Corrective Action Required
07/19/2019

The City prefers that no casing pipe be used for water line street bores. Please revise the plans to delete the casing pipe.
Miscellaneous Correction
Corrective Action Required
07/19/2019

Engineer’s Estimate of Probable Construction Costs: Internal Roads and Water: • Items 1-4: Are these items included in the scope of this set of plans? If so, the item should be on this estimate. If not, please remove from the estimate. • Item 5: It was my understanding that the storm sewer adjustments were no longer included. If so, please delete this item. Water Main: • Item 12: Delete this item. • Item 17: Delete this item. Revise other quantities as needed based on deletion of 90 degree bend. Sanitary Sewer: Please add a line item for Wyes. Gas, Telephone & Electric: Delete this section, they are not included in the Engineering Plan Review and Inspection Fee calculation. Street Lights: Delete this section, there are no street lights included on this project. Added Item: Please add a line item for the Stop Signs included on this project.
Planning Review Approved with Conditions 07/12/2019 07/16/2019
Jennifer Thompson
Corrective Action Required
07/15/2019

The proposed north and south wall signs will require separate review and approvals through a sign permit application. A building permit would also be required if the sign wall is over 6-foot in height.
Traffic Review Approved with Conditions 07/12/2019 07/11/2019
Michael Park
Corrective Action Required
07/11/2019

The three (3) right turn arrows shown on Private Road A approaching Pryor Road (across from Summit Woods Xing) should be deleted from the plans. The lane is not a right-turn only, but rather a shared through-right lane.
Building Codes Review No Comments 07/12/2019 07/09/2019
Joe Frogge
Fire Review Approved with Conditions 07/12/2019 07/09/2019
Jim Eden
Code Statement
Corrective Action Required
07/05/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Misc.
Corrective Action Required
07/05/2019

Additional hydrants and access may be required as the Final Developement Plan (FDP)is completed for each lot.
Engineering Review Corrections 06/10/2019 06/12/2019
Sue Pyles, P.E.
Corrective Action Required
06/12/2019

Please label sidewalk widths and clearly indicate what sidewalks are being constructed with this project and what ones are being constructed with other projects.
Corrective Action Required
06/12/2019

Prior to approval of this plan set, submit an Engineer's Estimate of Probable Construction Costs or the contract amount from the project contract documents. This must be an itemized list of unit prices and quantities, with quantities matching the approved plan set.
Corrective Action Required
06/12/2019

Sheet C-1: • Update the month in the project title. • Include a Summary of Quantities table on this sheet or elsewhere within the plan set.
Corrective Action Required
06/12/2019

Sheet C-2: Revise Construction Note 20 to only refer to Lee’s Summit specifications. Any applicable APWA specifications are incorporated by reference in the Lee’s Summit specifications.
Corrective Action Required
06/12/2019

Sheet C-4: The bottom left and right Typical Sections include asphalt surface and base information that differs from the rest of the sections. Is this intentional? If not, please revise accordingly.
Corrective Action Required
06/12/2019

Sheets C-6 – C-14: • Label the private streets in a consistant manner throughout the plan set. • Verify that private and public roads are labeled on each sheet. • The plans call for a number of structures to have rims adjusted to match grade. As all of these projects are a part of the same development, please coordinate to ensure rims don’t need adjustment. Revise plans accordingly if f needed.
Corrective Action Required
06/12/2019

Sheet C-17: Revise notes to remove KDHE reference.
Planning Review Corrections 06/10/2019 06/12/2019
Jennifer Thompson
Corrective Action Required
06/12/2019

It had been mentioned this final development plan was to include the overall lighting proposal for the development. Lighting Specifications were not part of this submittal, please clarify.
Corrective Action Required
06/12/2019

Please see Engineer's comment regarding sidewalks.
Traffic Review Corrections 06/10/2019 06/11/2019
Michael Park
Corrective Action Required
06/11/2019

The lane configuration for West Private Road (aligns with Summit Woods Xing at Pryor Road) should be two left-turn lanes and a shared through/right lane approaching Pryor Road as stipulated in the conditions of approval. This will also align lanes appropriately with the westbound approach to the intersection. Update associated marking plan sheets accordingly for review.
Corrective Action Required
06/13/2019

Add a sidewalk on Private Road B along the west side from NW Lowenstein Dr to Sta. 43+17.
Fire Review Approved with Conditions 06/10/2019 06/07/2019
Jim Eden
Code Statement
Corrective Action Required
06/07/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Misc.
Corrective Action Required
06/07/2019

Additional hydrants and access may be required as the Final Developement Plan (FDP)is completed for each lot.
Building Codes Review No Comments 06/04/2019 06/05/2019
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $1,000.00 $1,000.00 Paid 05/20/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.