Planning Application Status

PL2019019




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2019019
Lakewood Business Park Lot 35
Commercial Preliminary Development Plan
Commercial Preliminary Development Plan
Void
01/18/2019
SALLEE REAL ESTATE INVESTMENTS LLC
Mike Weisenborn 05/20/2021 9:38 AM - Voided the application as a revised PDP has been approved.
Locations
Contacts
SALLEE REAL ESTATE INVESTMENTS LLC, Address:3730 NE TROON DR  
SCHLAGEL & ASSOCIATES, Address:14920 W 107TH ST, Phone:(913) 492-5158  
RL SALLEE REAL ESTATE INVESTMENTS LLC, Address:3730 NE TROON DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review Approved with Conditions 03/04/2019 03/07/2019
Shannon McGuire
Fire Review Approved with Conditions 03/04/2019 02/28/2019
Jim Eden
Code Statement
Informational
02/19/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code. Action required: The location of the proposed hydrant does not meet the 100 foot distance requirement to the FDC. It is recommended that the proposed hydrant be located at the end of either of the islands on the south end of the parking lot. This will meet the FDC requirement.
FDC
Resolved
02/28/2019

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official.
Fire Lanes - Marking
Informational
02/28/2019

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
Traffic Review No Comments 03/04/2019 02/27/2019
Michael Park
Engineering Review Approved with Conditions 03/04/2019 02/22/2019
Gene Williams, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
02/22/2019

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
02/22/2019

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #06 Land Disturbance
Corrective Action Required
02/22/2019

A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #11 Pavement Thickness
Corrective Action Required
02/22/2019

Private parking lots shall meet the Unified Development Ordinance for pavement thickness and base requirements.
DE C&O #12 Cut & Fill
Corrective Action Required
02/22/2019

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
Engineering Review Corrections 02/04/2019 02/04/2019
Gene Williams, P.E.
Corrective Action Required
02/04/2019

A backflow vault is required for this project, outside the building and located adjacent to the public main. A gate valve is required immediately preceeding the vault. The water meter should be placed immediately before the gate valve, which eliminates the street crossing for the domestic water line.
Corrective Action Required
02/04/2019

It appears the maximum water surface elevation within the detention basin will be too close to the property boundary on the east side of the basin. A minimum of 20 feet is required, and only 15 is shown.
Corrective Action Required
02/04/2019

The pavement section for asphalt does not meet the Unified Development Ordinance (UDO) in terms in required thickness, or subgrade. It may be better to eliminate this detail until the Final Development Plan.
Planning Review Corrections 02/04/2019 01/31/2019
Shannon McGuire
Corrective Action Required
01/31/2019

Please provide details for all proposed exterior lighting, including parking lot lights and wall-mounted fixtures, including fixture type, location, height and intensity. Please also submit the manufacturer’s specification sheets for all proposed lighting.
Corrective Action Required
01/31/2019

Parking lots containing 11 or more parking spaces shall provide parking lot lighting. Please update the plans to comply with this requirement.
Corrective Action Required
01/31/2019

Are you requesting any modification to any UDO requirements? If so, please submit a narrative statement that explains the need and justification for modification of the applicable zoning district regulations.
Corrective Action Required
01/31/2019

Open space trees are calculated on the total site area (124,458.3 sq. ft.) minus the building footprint (24,000) divided by 5000. By my calculation, 20 trees are necessary to meet the open space requirement.
Corrective Action Required
01/31/2019

Open space shrubs are calculated on the total site area (124,458.3 sq. ft.) minus the building footprint (24,000) divided by 5000 then multiplied by 2. By my calculation, 40 shrubs are necessary to meet the open space requirement. Parking lot screening shrubs are separate from open yard shrubs and are calculated independently from each other.
Corrective Action Required
01/31/2019

Please provide a detailed drawing of the enclosure and screening methods to be used in connection with trash storage containers on the property.
Corrective Action Required
01/31/2019

Please label the width of the tree planting area south of the parking stalls.
Corrective Action Required
01/31/2019

How was the required parking calculated for this project? Will there be office space or any other use in this building other than warehouse?
Corrective Action Required
01/31/2019

Please extend the curb adjacent to the south façade to the end of the proposed concrete wall.
Corrective Action Required
01/31/2019

Parking stalls depths are to the face of the curb. The label of the east row of parking looks as it is pointing to the back of the curb. Please update this.
Corrective Action Required
01/31/2019

The 24’ minimum width of the driveway and entrance into the parking area should not include the curb gutter. As proposed the driveway and parking entrance width is 23’. Please update the plans to comply the 24’ minimum.
Corrective Action Required
01/31/2019

Please relocated the ADA stalls to be centrally located in relation to the building.
Corrective Action Required
01/31/2019

As proposed there does not appear to be an accessible route from the ADA parking as curbing is shown along the full length of the ADA aisle.
Corrective Action Required
01/31/2019

All ADA signs must be of the R7-8 style and be mounted on a pole or other structure, located between 3’ and 5’ above the ground measured from the bottom of the sign, at the head of the parking space. Please update the details on sheet 3 to reflect this.
Corrective Action Required
01/31/2019

Are any signs being proposed? If so, please provide details.
Corrective Action Required
01/31/2019

Will there be any ground or roof mounted mechanical equipment? If so how will it be screened?
Corrective Action Required
01/31/2019

What material will the “Prefinished Wall Panels” be?
Corrective Action Required
01/31/2019

Please label the elevations with what colors are being proposed.
Corrective Action Required
01/31/2019

Please relabel the elevations so that the façade that they correlate to can be identified.
Corrective Action Required
01/31/2019

Please note, a 6’ setback will be required along the north property line when the existing parking lot is removed.
Corrective Action Required
01/31/2019

The proposed façades are lacking the required architectural elements. Buildings shall incorporate four-sided architecture. Horizontal and vertical elements shall extend completely around the building and utilize the same or similar materials. Please incorporate additional architectural elements (projections, breaks in roofline, windows, etc.) on all sides of the proposed building. Please limit the use of EFIS to 30% or less on any given façade.
Traffic Review No Comments 02/04/2019 01/29/2019
Michael Park
Fire Review Corrections 02/04/2019 01/25/2019
Jim Eden
Code Statement
Informational
01/25/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code. Action required: The location of the proposed hydrant does not meet the 100 foot distance requirement to the FDC. It is recommended that the proposed hydrant be located at the end of either of the islands on the south end of the parking lot. This will meet the FDC requirement.
FDC
Corrective Action Required
01/25/2019

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official.
Fire Lanes - Marking
Corrective Action Required
01/25/2019

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Commercial Preliminary Development Plan fee $1,800.00 $1,800.00 Paid 01/18/2019
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 01/18/2019
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 01/18/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 03/14/2019 05:00 PM Council Chambers 03/14/2019 05:00 PM
Public Hearing Review
Approved
03/14/2019
City Council Public Hearing 04/02/2019 06:00 PM Council Chambers 04/02/2019 06:00 PM
Public Hearing Review
Approved
04/02/2019
City Council Ordinance 04/16/2407 6:00 PM Council Chambers 04/16/2407 06:15 PM
Public Hearing Review
Approved
04/16/2019
Documents & Images
Date Uploaded File Type Document Name
01/18/2019 Receipt Receipt for transaction: 2019-000197
01/18/2019 Plans 18-222-PDP-SUBMITTAL
01/18/2019 Plans Complete 18-222-Preliminary Stormwater Management Plan
01/18/2019 Plans Revised Preliminary Development Plan Checklist
01/18/2019 Letter Routing Sheet
02/04/2019 Letter Applicant Letter - Dev. Apps (DRCP)
02/19/2019 Plans 20190218-18-222-PDP SUBMITTAL
02/19/2019 Plans Complete 18-222-Preliminary Stormwater Management Plan
02/19/2019 Plans Response to City PDP Comments 02042019
02/19/2019 Plans 18-222-PDP-VARIANCE LETTER
02/19/2019 Letter Resubmittal Routing Sheet
03/07/2019 Plans Apdated PDP
03/07/2019 Engineer Report/Study PL2019019 LBP Lot 35 TIA
03/07/2019 Plans PDP
04/22/2019 Ordinance Signed Ordinance
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home