Review Type |
Outcome |
Est. Completion Date |
Completed |
Planning Review
|
Approved with Conditions
|
03/04/2019
|
03/07/2019
|
|
Shannon McGuire
|
|
|
Fire Review
|
Approved with Conditions
|
03/04/2019
|
02/28/2019
|
|
Jim Eden
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Action required: The location of the proposed hydrant does not meet the 100 foot distance requirement to the FDC. It is recommended that the proposed hydrant be located at the end of either of the islands on the south end of the parking lot. This will meet the FDC requirement.
|
|
FDC
IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official.
|
|
Fire Lanes - Marking
IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
|
|
|
Traffic Review
|
No Comments
|
03/04/2019
|
02/27/2019
|
|
Michael Park
|
|
|
Engineering Review
|
Approved with Conditions
|
03/04/2019
|
02/22/2019
|
|
Gene Williams, P.E.
|
|
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #11 Pavement Thickness
Corrective Action Required
Private parking lots shall meet the Unified Development Ordinance for pavement thickness and base requirements.
|
|
DE C&O #12 Cut & Fill
Corrective Action Required
Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
|
|
|
Engineering Review
|
Corrections
|
02/04/2019
|
02/04/2019
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
A backflow vault is required for this project, outside the building and located adjacent to the public main. A gate valve is required immediately preceeding the vault. The water meter should be placed immediately before the gate valve, which eliminates the street crossing for the domestic water line.
|
|
Corrective Action Required
It appears the maximum water surface elevation within the detention basin will be too close to the property boundary on the east side of the basin. A minimum of 20 feet is required, and only 15 is shown.
|
|
Corrective Action Required
The pavement section for asphalt does not meet the Unified Development Ordinance (UDO) in terms in required thickness, or subgrade. It may be better to eliminate this detail until the Final Development Plan.
|
|
|
Planning Review
|
Corrections
|
02/04/2019
|
01/31/2019
|
|
Shannon McGuire
|
|
Corrective Action Required
Please provide details for all proposed exterior lighting, including parking lot lights and wall-mounted fixtures, including fixture type, location, height and intensity. Please also submit the manufacturer’s specification sheets for all proposed lighting.
|
|
Corrective Action Required
Parking lots containing 11 or more parking spaces shall provide parking lot lighting. Please update the plans to comply with this requirement.
|
|
Corrective Action Required
Are you requesting any modification to any UDO requirements? If so, please submit a narrative statement that explains the need and justification for modification of the applicable zoning district regulations.
|
|
Corrective Action Required
Open space trees are calculated on the total site area (124,458.3 sq. ft.) minus the building footprint (24,000) divided by 5000. By my calculation, 20 trees are necessary to meet the open space requirement.
|
|
Corrective Action Required
Open space shrubs are calculated on the total site area (124,458.3 sq. ft.) minus the building footprint (24,000) divided by 5000 then multiplied by 2. By my calculation, 40 shrubs are necessary to meet the open space requirement. Parking lot screening shrubs are separate from open yard shrubs and are calculated independently from each other.
|
|
Corrective Action Required
Please provide a detailed drawing of the enclosure and screening methods to be used in connection with trash storage containers on the property.
|
|
Corrective Action Required
Please label the width of the tree planting area south of the parking stalls.
|
|
Corrective Action Required
How was the required parking calculated for this project? Will there be office space or any other use in this building other than warehouse?
|
|
Corrective Action Required
Please extend the curb adjacent to the south façade to the end of the proposed concrete wall.
|
|
Corrective Action Required
Parking stalls depths are to the face of the curb. The label of the east row of parking looks as it is pointing to the back of the curb. Please update this.
|
|
Corrective Action Required
The 24’ minimum width of the driveway and entrance into the parking area should not include the curb gutter. As proposed the driveway and parking entrance width is 23’. Please update the plans to comply the 24’ minimum.
|
|
Corrective Action Required
Please relocated the ADA stalls to be centrally located in relation to the building.
|
|
Corrective Action Required
As proposed there does not appear to be an accessible route from the ADA parking as curbing is shown along the full length of the ADA aisle.
|
|
Corrective Action Required
All ADA signs must be of the R7-8 style and be mounted on a pole or other structure, located between 3’ and 5’ above the ground measured from the bottom of the sign, at the head of the parking space. Please update the details on sheet 3 to reflect this.
|
|
Corrective Action Required
Are any signs being proposed? If so, please provide details.
|
|
Corrective Action Required
Will there be any ground or roof mounted mechanical equipment? If so how will it be screened?
|
|
Corrective Action Required
What material will the “Prefinished Wall Panels” be?
|
|
Corrective Action Required
Please label the elevations with what colors are being proposed.
|
|
Corrective Action Required
Please relabel the elevations so that the façade that they correlate to can be identified.
|
|
Corrective Action Required
Please note, a 6’ setback will be required along the north property line when the existing parking lot is removed.
|
|
Corrective Action Required
The proposed façades are lacking the required architectural elements. Buildings shall incorporate four-sided architecture. Horizontal and vertical elements shall extend completely around the building and utilize the same or similar materials. Please incorporate additional architectural elements (projections, breaks in roofline, windows, etc.) on all sides of the proposed building. Please limit the use of EFIS to 30% or less on any given façade.
|
|
|
Traffic Review
|
No Comments
|
02/04/2019
|
01/29/2019
|
|
Michael Park
|
|
|
Fire Review
|
Corrections
|
02/04/2019
|
01/25/2019
|
|
Jim Eden
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Action required: The location of the proposed hydrant does not meet the 100 foot distance requirement to the FDC. It is recommended that the proposed hydrant be located at the end of either of the islands on the south end of the parking lot. This will meet the FDC requirement.
|
|
FDC
Corrective Action Required
IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official.
|
|
Fire Lanes - Marking
Corrective Action Required
IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
|
|
|