Summary
PL2019016
STREETS OF WEST PRYOR - MASS GRADING & STORM SEWER PLANS
Engineering Plan Review
Engineering Plan Review
Complete
01/17/2019
WEST PRYOR VILLAGE LLC
Locations
Contacts
WEST PRYOR VILLAGE LLC, Address:12701 METCALF AVE STE 100  
KAW VALLEY ENGINEERING, Address:2319 JACKSON, Phone:(785) 341-9747  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 07/15/2020 07/14/2020
Sue Pyles, P.E.
Engineering Review Corrections 08/02/2019 08/05/2019
Sue Pyles, P.E.
Corrective Action Required
08/05/2019

Revise Engineer's Estimate of Probable Construction Costs based on comments provided under separate cover.
Engineering Review Corrections 07/12/2019 07/17/2019
Sue Pyles, P.E.
Corrective Action Required
07/17/2019

Remove the cost information from the Summary of Quantities table, it should only include quantity information. Only include items that are a part of this plan set in the table.
Corrective Action Required
07/17/2019

Structure C-5 does not meet the City's minimum length requirement. Please revise.
Corrective Action Required
07/17/2019

Label C-1 thru C-7 as Public Storm Sewer in a clear, easily seen manner. The response letter indicated it was shown in the Profile view, but it does not seem to be there.
Corrective Action Required
07/17/2019

Show rip-rap at Structure S-1 in the profile view.
Corrective Action Required
07/17/2019

It appears that baffles for the sediment basin will be Option A - Rock with Weir. However, the detail shows one placement location. Please review the sediment basin detail for required baffle design and provide complete installation details.
Engineering Review Corrections 06/04/2019 06/12/2019
Sue Pyles, P.E.
Corrective Action Required
06/12/2019

ESC Plan: Sediment Basin details must be included in plans, not provided by the contractor.
Corrective Action Required
06/12/2019

Sheet C-1: • Update the month in the project title. • Include a Summary of Quantities table on this sheet or elsewhere within the plan set.
Corrective Action Required
06/12/2019

Sheet C-2: Retaining walls are not permitted within public easements. As discussed, either relocate walls outside of platted easements or adjust easements by vacation to remove walls from easements.
Corrective Action Required
06/12/2019

Sheet C-11: Several Line IDs have “*” next to them. Please indicate what the asterisk denotes.
Corrective Action Required
06/12/2019

Sheet C-15: • Please include wall elevations elevations for Retaining Wall F. • Relocate the wall elevations overlapping the riprap west of Lot 1 for clarity. • Please include the hatching used west of the spillway in the Legend.
Corrective Action Required
06/12/2019

Sheet C-16: • Please remove the temporary inlet opening note on Lot 3. • The shading and the building footprint outline don’t seem to match on Lot 6. Please revise.
Corrective Action Required
06/12/2019

Sheet C-27: • Line C will be public from C-7 to C-1, please revise the note to clearly indicate this. • Revise C-5 to a City standard curb inlet since it is within the public portion of Line C.
Corrective Action Required
06/12/2019

Sheet C-29: Indicate L x W for the proposed riprap at R-1, not just total square yards.
Corrective Action Required
06/12/2019

Sheet C-30: Provide calculations verifying that outlet protection is not required at S-1, or add protection and provide calculations verifying the protection is adequate for the outfall velocity.
Corrective Action Required
06/12/2019

Sheet C-35: Label the spillway elevation.
Corrective Action Required
06/12/2019

Sheet C-37: Provide enough dimensional information that the riprap shown on this sheet can be constructed as designed.
Corrective Action Required
06/12/2019

Sheet C-43: Revise Detail 402 to require 4000 psi concrete.
Corrective Action Required
06/12/2019

Prior to approval of this plan set, an Engineer's Estimate of Probable Construction Costs or the contract amount from the project contract documents. This must be an itemized list of unit prices and quantities, with quantities matching the approved plan set.
Engineering Review Corrections 02/08/2019 02/06/2019
Sue Pyles, P.E.
Corrective Action Required
02/06/2019

Add to plans: • Developer’s contact information. • Note stating that all construction shall follow the Design and Construction Manual. • Contractor to notify Development Engineering Inspection at 816-969-1200 at least 48 hours prior to starting construction. • Summary of Quantities Table. • Storm sewer inlet calculations.
Corrective Action Required
02/06/2019

Storm Sewer: • Retaining walls are not allowed within public easements. Therefore, Line C will have to be revised to avoid the retaining wall on Lot 2. • There are several instances of private storm sewer being in close proximity to retaining walls. If any repairs are required to the storm sewers, the integrity of the retaining walls could be compromised. Wall failure could endanger the public, therefore the City recommends that the “wall design area” behind the wall be kept clear of any kind of pipes.
Corrective Action Required
02/06/2019

General: • Revise all sanitary easements to match the Final Plat and remove all easements and easement dimensions not used. • These comments may be revised based on review of other plan sets for this overall development. • Review plans for overlapping text and relocate text as needed for clarity. Stationing quite often makes information hard to read.
Corrective Action Required
02/06/2019

Erosion and Sediment Control (ESC) Plan: • Include separate ESC plan sheets for prior to construction, during construction, and after completion of the work. Each of those may be phased if needed. • Include the “temporary ditch” shown on the grading plan. How will the ditch be sized? What erosion control will be used with the ditch ? • The Sediment Basin standard details include the design information but not specific design of the basin. As indicated on the detail, construction plans must provide specific site construction arrangements. Include enough detail to construct the basin, baffles, skimmer, outlet structure, etc.
Corrective Action Required
02/06/2019

Submit: • SWPPP • Engineer’s Estimate of Probable Construction Costs
Corrective Action Required
02/06/2019

Sheet C-1: • Revise “Mass Grading Plan” to “Mass Grading and Storm Sewer Improvements” in the project title. • Revise the Water and Sanitary contact information to Water Utilities at 816-969-1900. • For other City contact information, use Public Works at 816-969-1800 and/or Development Engineering at 816-969-1200. • The information for Sheets C-29 & C-30 is reversed in the Index of Sheets. • The information shown for Sheet C-34 is incorrect in the Index of Sheets.
Corrective Action Required
02/06/2019

Sheet C-2: Include street plans in the boxed note reference to other plans on this sheet and throughout the plan set.
Corrective Action Required
02/06/2019

Sheet C-10: • The drainage area to Structure A-3 should be shaded. Please revise. • If there is no Structure J-5, please remove the label. • Please separate the Structure B-2 drainage area label from the street label for clarity.
Corrective Action Required
02/06/2019

Sheet C-11: The sheet number is incorrect, please revise.
Corrective Action Required
02/06/2019

Sheet C-15: • Revise the sheet numbers included in the Sheet Index schematic on this and all grading sheets, they are incorrect. • Why are some elevations for some retaining walls shown as Top/Toe while others are Top/GR? Please use one labeling system for clarity and revise the legend if needed on this and all grading sheets. • The ground elevation at the Sta. 5+85 (approx.) bend of Retaining Wall E does not appear to match the contours. Please review and revise if needed. • It is unclear if building footprints are being shown or if contours are being shown which look like building footprints. Please clarify on this and all grading sheets.
Corrective Action Required
02/06/2019

Sheet C-16: • There appears to be a retaining wall shown on the west side of Lot 6, just south of Retaining Wall J that isn’t shown anywhere else in the plans. Please show throughout the plan set and label it on this sheet. • Include wall elevations for Retaining Walls C & D. • Revise overlapping text near the east end of Retaining Wall D for clarity. • It is unclear when and how the temporary inlet opening will be provided. Include this information as a part of the Erosion and Sediment Control Plan, rather than a part of the grading plan.
Corrective Action Required
02/06/2019

Sheet C-17: • Revise overlapping text near the west end of Retaining Wall L for clarity. • Please review the Toe elevations at the southeast corners of Retaining Walls K & L and the southwest end of Retaining Wall L. They don’t appear to match contours. Revise if needed. • Label the proposed ditches as a temporary drainage way and refer to the ESC plans on this and all grading sheets.
Corrective Action Required
02/06/2019

Sheet C-18: • The Toe elevation at the Sta. 583+80 (approx.) bend of Retaining Wall P does not appear to match the contours. Please review and revise if needed.
Corrective Action Required
02/06/2019

Sheet C-24: • Indicate the Class of RCP required in the Profile view on this and all applicable sheets. • Show existing grade in the Profile view upstream of Sta. 205+00. • Label Line B in the Plan view. • Label Structure A-4 in the Plan view. • Revise the flowlines in the Profile view so that the incoming flowlines are shown on the upstream side of the flowline label and the outgoing flowlines are shown on the downstream side of the flowline label on this and all Profile views throughout the plan set. • Include station equations where multiple lines connect to a structure on this sheet and all profile views throughout the plan set. • Revise the Profile view to show the existing grade along the entire profile. • Include station equations where multiple lines join together on this and all applicable sheets.
Corrective Action Required
02/06/2019

Sheet C-25: • Please label Structure A-6 in the Plan view. • Structure A-8 is missing from the Profile view. Please revise. • Structure A-9 stationing is missing from the Profile view. Please revise. • Include the following note on any profile sheet applicable: “Compacted Fill shall be placed to a minimum 18” above the top of the pipe prior to installation.” • Show and label the limits of the compacted fill placement in the Profile view. Use hatching for clarity.
Corrective Action Required
02/06/2019

Sheet B-26: • Show and label the “temporary ditch” in both Plan and Profile views on this sheet and all other applicable sheets throughout the plan set. • Show and label and “Compacted Fill” areas due to “temporary ditch” grading in the Profile view on this sheet and all other applicable sheets throughout the plan set. • Revise the Profile view to show the existing grade along the entire profile. • Labels for Structures B-6 & B-7 refer to an incorrect detail, please revise.
Corrective Action Required
02/06/2019

Sheet C-27: • Line C will be public between Structures C-1 & C-7. Please revise the note indicating the public line location and make it more prominent for clarity. • There is an interim channel referenced in the Profile view between Structures C-4 & C-5, but there is no channel shown in that location anywhere else in the plan set. Please revise as needed. • There is a note between Structures C-4 & C-5 indicating the storm sewer should coordinate with the mass grading project. Please remove the note or clarify the meaning since the storm sewer and mass grading are both a part of the same project. • Label Structure C-11 in the Plan view. • The label for Structure C-4 refers to an incorrect detail, please revise. • Include the retaining wall between Structures C-4 & C-5 in the Profile view.
Corrective Action Required
02/06/2019

Sheet C-28: There is a note between Structures C-12 & C-13 indicating the storm sewer should coordinate with the mass grading plan. Please remove the note or clarify the meaning since the storm sewer and mass grading are both a part of the same project.
Corrective Action Required
02/06/2019

Sheet C-29: • Relocate the label for Structure S-2 in the Plan view for clarity. • Verify the sanitary sewer crossing Line S, it appears separation could be a problem. • Show enough in the Plan view to be able to tell that Structure S-1 is located in the West detention basin. • Why does Structure S-2 extend above the proposed grade so far? • If riprap is shown in the Plan view, include it in the Profile view. • The Profile view and the note above the Profile view each label the South Detention Basin outlet structure differently. Please reconcile. • Review the orifice cardinal directions for the outlet structure, they appear incorrect. • The 4” diameter orifice opening information does not match the Final Stormwater Report submitted. Please reconcile.
Corrective Action Required
02/06/2019

Sheet C-30: • If riprap is shown in the Plan view, include it in the Profile view on this sheet and throughout the plan set. • Include calculations showing the riprap is adequate for the discharge velocity. • Include riprap dimensions.
Corrective Action Required
02/06/2019

Sheet C-31: • Show and label the detention basin in the Plan view. • The Plan view shows Structure W-2 as having a double grate inlet while the outlet note shows a solid top. Please reconcile.
Corrective Action Required
02/06/2019

Sheet C-32: • Review and revise this sheet for clarity, it is very hard to read due to overlapping text as well as everything being the same line weight. • Labels for Structure A-10 refers to detail ???, please revise.
Corrective Action Required
02/06/2019

Sheet C-33: Delete the extraneous pipe information in the lower portion of the Line C-13 Profile view.
Corrective Action Required
02/06/2019

Sheet C-35: • Show and label the overflow spillway length and location. The proposed contours must match the spillway elevation. • What does the 973.5 spot elevation refer to? The elevation does not match the proposed contours. • Relocate the tract label, as shown it looks like the name of the basin. • Label the basin.
Corrective Action Required
02/06/2019

Sheet C-36: • Include size (D(50)) and thickness design information for the detention basin riprap. • The 100-year WSE shown does not match the Final Stormwater Report. Please reconcile. • Include a typical section through the overflow spillway each way. • Design information for the material required in the bottom of the basin must be included.
Corrective Action Required
02/06/2019

Sheet C-37: • Relocate the tract label, as shown it looks like the name of the basin. • Label the basin and forebay.
Corrective Action Required
02/06/2019

Sheet C-38: • The Toe of Embankment label is missing a dimension. • Design information for the material required in the bottom of the basin must be included. • Include a typical section through the overflow spillway each way. • Include the forebay in the basin typical section along the centerline perpendicular to the typical section shown.
Corrective Action Required
02/06/2019

Sheet C-39: • Proposed Retaining Wall G profile is missing the wall. • Delete the extraneous wall label above the Wall G Profile view. • Include profiles for retaining walls A & L. • Delete the Proposed Retaining Wall “M” label in the Proposed Retaining Wall Index on this sheet and all applicable sheets.
Corrective Action Required
02/06/2019

Sheets C-42 – C-57: • Special designs are required for inlets exceeding 7’-0” in depth, measured as shown on the standard details. Please include and reference them throughout the plan set as applicable. • The Lee’s Summit Junction Box standard detail, STM-3, is included in the plan set as required. Remove Detail 403. If a grate inlet or double grate inlet standard detail is required, please base it on the City’s standard details. • Sheet C-53 is blank. It appears APWA ESC-10 was intended to be on this sheet.
Corrective Action Required
02/06/2019

Due to the number of comments on this review, the resubmittal review tome will be extended beyond 5 days. Due to inlet calculations not included in the plan set, a more complete review of the storm sewer will be done when the calculations are furnished.
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home