Planning Application Status

PL2018133




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2018133
LOT 295, NEWBERRY LANDINGS, 1ST PLAT
Commercial Final Development Plan
Commercial Final Development Plan
Approved
08/02/2018
CASE ENTERPRISE LLC
Locations
Contacts
CASE ENTERPRISE LLC, Address:31000 E WEBSTER RD  
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review Approved with Conditions 11/26/2018 11/16/2018
Shannon McGuire
Corrective Action Required
11/15/2018

All light fixtures on properties that do not adjoin residential uses and/or districts shall not exceed 28 feet.
Corrective Action Required
11/15/2018

All landscaping used as screening for ground mounted equipment must be at a minimum the same height as the equipment being screened at the time it is planted.
Engineering Review Approved with Conditions 11/26/2018 11/15/2018
Mike Weisenborn
DE C&O #11 Pavement Thickness
Corrective Action Required
11/15/2018

Private parking lots shall follow Article 12 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
11/15/2018

Contact the Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Engineers Estimate
Corrective Action Required
11/15/2018

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $11,924.41
DE Future Repair Work
Corrective Action Required
11/15/2018

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Fire Review Approved with Conditions 11/26/2018 11/15/2018
Mike Weisenborn
Code Statement
Informational
11/15/2018

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Dumpsters
Informational
11/19/2018

IFC 304.3.3 - Dumpsters and containers with an individual capacity of 1.5 cubic yards [40.5 cubic feet (1.15 m3)] or more shall not be stored in buildings or placed within 5 feet (1524 mm) of combustible walls, openings or combustible roof eave lines. Dumpster enclosure not shown.
Knox Locks
Informational
11/19/2018

IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official. Knox padlock required on gate.
Traffic Review No Comments 11/26/2018 11/15/2018
Mike Weisenborn
Building Codes Review No Comments 11/26/2018 11/15/2018
Mike Weisenborn
Engineering Review Approved with Conditions 11/02/2018 11/02/2018
Sue Pyles, P.E.
DE C&O #11 Pavement Thickness
Corrective Action Required
11/02/2018

Private parking lots shall follow Article 12 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
11/02/2018

Contact the Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Engineers Estimate
Corrective Action Required
11/02/2018

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $11,924.41
DE Future Repair Work
Corrective Action Required
11/02/2018

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Traffic Review No Comments 11/02/2018 11/01/2018
Michael Park
Building Codes Review Approved with Conditions 11/02/2018 11/01/2018
Joe Frogge
Corrective Action Required
11/01/2018

2012 IPC 708.3.5 Building drain and building sewer junction. There shall be a cleanout near the junction of the building drain and the building sewer. The cleanout shall be either inside or outside the building wall and shall be brought up to the finished ground level or to the basement floor level. (see code for additional information) Action required: Provide cleanout at point where sewer leaves building. 9/28/18 - not addressed in submittal. Deferred to building permit submittal.
Planning Review Corrections 11/02/2018 11/01/2018
Shannon McGuire
Corrective Action Required
11/01/2018

Per comment 7 from the applicant’s letter dated August 16, 2018 and comment 3 from the applicant’s letter dated October 2, 2018, please provide the manufacturer’s specification sheets for all proposed exterior lighting to include both parking lot pole mounted and wall mounted fixtures. The specification sheets shall indicate the exact fixture to be used. Please ensure details are submitted for the proposed to include details on the base and pole height.
Corrective Action Required
11/01/2018

Per comment 10 from the applicant’s letter dated August 16, 2018 and comment 4 from the applicant’s letter dated October 2, 2018, where will the mechanical equipment be located? If it will be roof top mounted please show the location, size and materials to be used in all screening of rooftop mechanical equipment. A dashed line indicating the roof line and rooftop mechanical equipment will be required as well. If it is ground mounted please provide the screening details.
Corrective Action Required
11/01/2018

Please provide a new photometric plan sheet. The one most recently submitted has the lines so grayed out it is unreadable.
Corrective Action Required
11/01/2018

Please ensure a digital copy of all plans is submitted as one was not submitted with the most recent resubmittal.
Fire Review Approved with Conditions 11/02/2018 10/30/2018
Jim Eden
Code Statement
Informational
10/30/2018

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Dumpsters
Corrective Action Required
10/30/2018

IFC 304.3.3 - Dumpsters and containers with an individual capacity of 1.5 cubic yards [40.5 cubic feet (1.15 m3)] or more shall not be stored in buildings or placed within 5 feet (1524 mm) of combustible walls, openings or combustible roof eave lines. Dumpster enclosure not shown.
Knox Locks
Corrective Action Required
10/30/2018

IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official. Knox padlock required on gate.
Planning Review Corrections 10/01/2018 10/02/2018
Shannon McGuire
Corrective Action Required
10/02/2018

The parking stalls adjacent to the building are labeled as being 17’ deep. As the adjacent side walk is less the 6’ these stalls must be 19’ deep. Additionally. The parking stalls adjacent to SE Broadway Dr. appear to be labeled as 17’ to the back of the curb. All measurements shall be labeled to the face of the curb. Please update the plans to meet the minimum UDO requirements.
Corrective Action Required
10/02/2018

Thank you for submitting the lighting plan as requested. Per the plan submitted the northern parking stalls show a foot candle level of 0.0. Please add additional parking lot lighting that illuminates all parking stalls as required by the UDO.
Corrective Action Required
10/02/2018

Per comment 7 from the applicant’s letter dated August 16, 2018, please provide the manufacturer’s specification sheets for all proposed exterior lighting to include both parking lot pole mounted and wall mounted fixtures. The specification sheets shall indicate the exact fixture to be used. If you will be proposing pole mounted lights please ensure details are provided.
Corrective Action Required
10/02/2018

Per comment 7 from the applicant’s letter dated August 16, 2018, where will the mechanical equipment be located? If it will be roof top mounted please show the location, size and materials to be used in all screening of rooftop mechanical equipment. A dashed line indicating the roof line and rooftop mechanical equipment will be required as well.
Corrective Action Required
10/02/2018

Thank you for the additional information regarding the gravel area and the fence surrounding it. Please explain what the use of this area will be. As explained in the previous Applicant’s Letter any proposed outdoor storage area shall be screened in accordance with UDO section 8.140.C. If this area is intended for the outside storage of materials, it must be screened by means of a solid, sight-obscuring fence, not less than six (6) feet in height. A living screen may be substituted for the fence providing said screen shall provide a solid screen at planting. Please provide a standard detail for the proposed fence.
Corrective Action Required
10/02/2018

By my calculations the proposed project is required to provide 13 standard parking stalls and 1 van accessible ADA stall. The proposed plan shows you are providing the correct number of required parking stalls however the required parking note on sheet c.001 incorrectly stated 15 stalls are required. Please update the plans to reflect the correct (14) number of required stalls.
Engineering Review Corrections 10/01/2018 10/01/2018
Sue Pyles, P.E.
Corrective Action Required
10/01/2018

Sheet C.001: The building lines and easements labels have been added, but the lines are now so scaled back that they are barely visible. Please revise the line weight for clarity.
Corrective Action Required
10/01/2018

Sheets C.051-C.052: Include inlet protection for the existing curb inlet near the south property line.
Corrective Action Required
10/01/2018

Sheet C.100: Remove commercial entrance and curb & gutter details from this sheet, the City’s standard details have been added to the plan set.
Corrective Action Required
10/01/2018

Sheet C.200: The plans show existing buildings and parking lot on the adjacent lot to the south. Nothing has been built there, please remove.
Corrective Action Required
10/01/2018

Sheet C.400: Include the size of the sanitary sewer service line and existing stub.
Corrective Action Required
10/01/2018

Estimate: • The quantity shown for Geogrid and Base don’t seem to match up with the quantity for Asphalt Paving. Please verify and revise as needed. • The quantities shown for 12” and 15: HDPE don’t match what is shown in the plans. Please verify and revise as needed. • Please revise the Inlet Protection quantity based on above comments.
Traffic Review No Comments 10/01/2018 10/01/2018
Michael Park
Building Codes Review Approved with Conditions 10/01/2018 09/28/2018
Joe Frogge
Corrective Action Required
09/28/2018

2012 IPC 708.3.5 Building drain and building sewer junction. There shall be a cleanout near the junction of the building drain and the building sewer. The cleanout shall be either inside or outside the building wall and shall be brought up to the finished ground level or to the basement floor level. (see code for additional information) Action required: Provide cleanout at point where sewer leaves building. 9/28/18 - not addressed in submittal. Deferred to building permit submittal.
Fire Review Corrections 10/01/2018 09/25/2018
Jim Eden
Code Statement
Informational
09/25/2018

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Fire Lane Required
Resolved
10/30/2018

IFC 503.1.1 - Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet (45 720 mm) of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. Exception: The fire code official is authorized to increase the dimension of 150 feet (45 720 mm) where: 1. The building is equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1, 903.3.1.2 or 903.3.1.3. 2. Fire apparatus access roads cannot be installed because of location on property, topography, waterways, nonnegotiable grades or other similar conditions, and an approved alternative means of fire protection is provided. Action required: The building is no longer being provided with an automatic fire sprinkler system. Provide approved fire lanes that meet the required width and are able to carry the imposed weight of a fire truck to meet the requirements of this section.
Fire Lanes
Resolved
10/30/2018

IFC 503.2.1 - Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm), exclusive of shoulders, except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm)
Imposed Loads
Resolved
10/30/2018

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
Knox Locks
Corrective Action Required
09/25/2018

IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official. Action required: A know lock will be required on the gate
Dumpsters
Corrective Action Required
09/25/2018

IFC 304.3.3 - Dumpsters and containers with an individual capacity of 1.5 cubic yards [40.5 cubic feet (1.15 m3)] or more shall not be stored in buildings or placed within 5 feet (1524 mm) of combustible walls, openings or combustible roof eave lines. Action required: Will a dumpster enclosure be provided?
Traffic Review No Comments 08/16/2018 08/16/2018
Mike Weisenborn
Building Codes Review Corrections 08/16/2018 08/16/2018
Joe Frogge
P708.3.2 Building sewers
Corrective Action Required
08/16/2018

2012 IPC 708.3.5 Building drain and building sewer junction. There shall be a cleanout near the junction of the building drain and the building sewer. The cleanout shall be either inside or outside the building wall and shall be brought up to the finished ground level or to the basement floor level. (see code for additional information) Action required: Provide cleanout at point where sewer leaves building.
Planning Review Corrections 08/16/2018 08/16/2018
Shannon McGuire
Corrective Action Required
08/15/2018

Please label the width of the sidewalk between the parking stalls and proposed building.
Corrective Action Required
08/15/2018

Please label the location and width of all proposed easements.
Corrective Action Required
08/15/2018

Please label the required parking lot and building setback lines with dimensions.
Corrective Action Required
08/15/2018

Please label the width of the proposed curb cut/driveway.
Corrective Action Required
08/15/2018

Sheet C.100 shows details for a retaining wall but none seem to be proposed on the plans. Please check this and update the sheets accordingly.
Corrective Action Required
08/15/2018

All parking lots that contain 11 or more stall shall provide lighting. Please provide the location, height, intensity and type of outside lighting fixtures for buildings and parking lots. See UDO section 7.250 for requirements. Please also submit a photometric diagram indicating the foot candle levels throughout the site and at the property lines.
Corrective Action Required
08/15/2018

Please provide the manufacturer’s specification sheets for proposed exterior lighting to include both parking lot pole mounted and wall mounted fixtures. The specification sheets shall indicate the exact fixture to be used. If you will be proposing pole mounted lights please ensure details are provided.
Corrective Action Required
08/15/2018

Are any freestanding signs being proposed? If so please provide the details.
Corrective Action Required
08/15/2018

Sheet A200 only shows 3 out of the 4 elevations of the proposed building. Additionally, the “side elevation” is missing labels indicating what materials are being proposed. Please submit elevations that are accurately labeled with the proposed colors/material to be used and accurately depict all elevations of the proposed building.
Corrective Action Required
08/15/2018

Where will the mechanical equipment be located? If it will be roof top mounted please show the location, size and materials to be used in all screening of rooftop mechanical equipment. A dashed line indicating the roof line and rooftop mechanical equipment will be required as well.
Corrective Action Required
08/15/2018

Please add the number of required and proposed parking spaces to the land use table on sheet C.001. Please include information on the breakdown used to calculate the required parking, i.e. Sq. ft. of office vs. sq. ft. of warehouse.
Corrective Action Required
08/15/2018

Is a trash dumpster being proposed to server this property? If so please provide a detailed drawing of the enclosure and screening methods to be used in connection with trash storage containers.
Corrective Action Required
08/15/2018

All parking stall shall be 9’ wide x 19’ deep. A stall may be 9’ wide x 17’ deep parking spaces the parking space abuts a 6’ wide sidewalk or when abutting a curbed open green/landscaped space. These measurements are measured to the face of the curb. Sheet C.101 appears to show the stalls as measured to the back of the curb. Please update the plans to comply with the UDO requirements.
Corrective Action Required
08/15/2018

Please provide information and details on what the gravel area on the north side of the building will be used for.
Corrective Action Required
08/15/2018

Sheet C.100 appears to show a fence is being proposed to enclose the gravel area on the north side of the building however no details are provided. Please submit information and details on what is being proposed. Any proposed outdoor storage area shall be screened in accordance with UDO section 8.140.C.
Corrective Action Required
08/16/2018

Industrial buildings shall incorporate 4 sided architecture. Horizontal and vertical elements shall extend completely around the building and utilize the same or similar materials on all building facades. Please update the proposed elevations to meet this UDO requirement.
Corrective Action Required
08/16/2018

The planting schedule on sheet C.100 has a note about phasing of the landscaping. Nothing on the plan seems to indicate that the project will be done in more than a single phase. Please update the plan to reflect consistent information.
Engineering Review Corrections 08/16/2018 08/15/2018
Sue Pyles, P.E.
Corrective Action Required
08/15/2018

Sheet C.001: • Label building lines and easements on this sheet and throughout the plan set. • Show and label the 40-hr extended detention basin on this sheet and throughout the plan set. • Show and label the Max WSE for the 40-hr extended detention basin throughout the plan set. • Revise the Oil – Gas Well note to reflect the correct source. The Impact Study referred to is by Edward Alton May, Jr., not Edward Alton. Please update this in your system, as this comment has been made many times on your plans. • Revise the Sanitary Sewer Service note, the existing sanitary is located on the south side of the property. • Revise the Storm Sewer note, 40-hr extended detention is included.
Corrective Action Required
08/15/2018

Sheet C.051-C.052: Include inlet protection for the existing inlets on the street.
Corrective Action Required
08/15/2018

Sheet C.100: • A retaining wall detail is included. Where is a retaining wall located on this project? • Include the City’s standard details for Commercial Drive and Curb & Gutter in the plan set.
Corrective Action Required
08/15/2018

Sheet C.200: • There is a 997 proposed contour just north of the basin that appears incorrect. Please revise on all applicable sheets. • Please extend the existing contours across the property line to the north to more clearly understand the existing conditions on all sheets showing contours. • Please extend the view to the south to more clearly see how the proposed contours tie back into existing contours.
Corrective Action Required
08/15/2018

Sheet C.300: • Revise this sheet to match any revisions to the Storm Water Drainage Study. • How will erosion be prevented at the roof drain outlet? Is the intent to have an end section at this location? • Show and label the overflow spillway, along with provided freeboard to top of embankment. Verify the design volume can pass over the spillway in case of a clogged outlet.
Corrective Action Required
08/15/2018

Sheet C.301: • Include note that “Doghouse Structures” are not allowed. • Add pipe information for the existing pipe downstream of JB 1-1 in the Profile view. • Include the design storm HGL in the Profile view. • Include storm sewer calculations.
Corrective Action Required
08/15/2018

Sheet C.400: Label the sanitary stub as “Existing.”
Corrective Action Required
08/15/2018

Sheet C.401: • Replace the APWA storm sewer details with the City’s standard details. • Add the backflow preventor vault standard detail to the plan set. • Add APWA Erosion and Sediment Control standard details to the plan set.
Corrective Action Required
08/15/2018

Storm Water Drainage Study: • Please proofread the body of the report prior to resubmission. Many of the sentences contain incorrect wording, making them difficult to read. • Detention is required for this lot unless a waiver is requested and approved. The report will need to provide calculations that you will then use to explain why a waiver should be granted. • A waiver must be requested and approved if any onsite drainage flows offsite undetained. DA 3 will require a waiver as designed. • The report contradicts itself on whether or not APWA 5600 requirements have been met. They are required to be met except where waivers are granted. • Please expand the narrative to clarify that 40-hr extended detention is being provided for the water quality storm event. Is this basin intended to serve any other purpose? If so, how does that impact the detention waiver request? • The minimum single outlet orifice size allowed is 4 inches. Please revise the 2 inch orifice accordingly. • Include calculation summaries in the narrative, as well as the maximum water surface elevation for the proposed basin. • Exhibits listed as included, drainage map and detention plan, have not been included. • Please differentiate more clearly throughout the report between detention for peak attenuation and 40-hr extended detention for the water quality event.
Corrective Action Required
08/15/2018

Submit the SWPPP and Engineer’s Estimate of Probable Construction Costs.
Fire Review Corrections 08/16/2018 08/02/2018
Jim Eden
Code Statement
Informational
08/02/2018

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
FDC
Resolved
09/25/2018

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required: Show the location of the FDC on the building. If the FDC is located near the NW Corner of the building, the FDC will be within 100' of a public hydrant and the private hydrant can be eleminated.
Dumpsters
Corrective Action Required
08/02/2018

IFC 304.3.3 - Dumpsters and containers with an individual capacity of 1.5 cubic yards [40.5 cubic feet (1.15 m3)] or more shall not be stored in buildings or placed within 5 feet (1524 mm) of combustible walls, openings or combustible roof eave lines. A dumpster enclosure is not shown. Will there be one?
Knox Locks
Corrective Action Required
08/02/2018

IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official. A Knox box will be required over the FDC.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 08/02/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
08/02/2018 Receipt Receipt for transaction: 2018-005426
08/02/2018 Letter Routing Sheet - FDP
08/16/2018 Letter Applicant Letter - FDP (DFDP)
09/24/2018 Letter Resubmittal Routing Sheet - FDP
09/24/2018 Plans E.100
10/02/2018 Letter Applicant Letter - FDP (DFDP)
10/26/2018 Letter Resubmittal Routing Sheet - FDP
11/02/2018 Letter Applicant Letter - FDP (DFDP)
11/15/2018 Plans C.100 - SITE PLAN
11/15/2018 Plans C.101 - DIMENSION PLAN
11/15/2018 Plans C.200 - GRADING PLAN
11/15/2018 Plans C.201 - SPOT ELEVATIONS
11/15/2018 Plans C.202 - PRE-DEVELOPMENT DRAINAGE PLAN
11/15/2018 Plans C.203 - POST-DEVELOPMENT DRAINAGE PLAN
11/15/2018 Plans C.300 - ROOF DRAINAGE PLAN
11/15/2018 Plans C.301 - STORM PLAN AND PROFILE
11/15/2018 Plans C.400 - UTILITY PLAN AND GENERAL LAYOUT
11/15/2018 Plans C.401 - DETAIL SHEET
11/15/2018 Plans C.600 - EROSION CONTROL DETAILS
11/15/2018 Plans CALC 1445 BROADWAY REV E 10 14 18 GG (2)
11/15/2018 Plans DSX1-LED_pdf
11/15/2018 Plans DSXW1_pdf
11/15/2018 Plans DSXW2
11/15/2018 Plans L.100
11/15/2018 Plans Louisville
11/15/2018 Plans PinnacleEX3BWET_LED_SPEC
11/15/2018 Plans POLE-SSS_PDF (1)
11/15/2018 Plans Spec sheet hvac
11/15/2018 Plans spec sheet indoor heater
11/15/2018 Plans 2018-165_E200_2018-08-02_ GPG_24x36-FULL (1)
11/15/2018 Plans A100 (3)
11/15/2018 Plans A200 (2)
11/15/2018 Plans C.001 - COVER SHEET
11/15/2018 Plans C.050 - ESC PHASE 1 PLAN
11/15/2018 Plans C.051 - ESC PHASE 2 PLAN
11/15/2018 Plans C.052 - ESC PHASE 3 PLAN
11/15/2018 Letter Resubmittal Routing Sheet - FDP
11/19/2018 Letter Applicant Letter - FDP (DFDP)
11/27/2018 Activity Document Fees PL2018133 Lot 295 Newberry Landings 1st Plat FDP
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home