Planning Application Status

PL2017258




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2017258
SPRINT COLLOCATION KC25XC198
Commercial Final Development Plan
Commercial Final Development Plan
Approved
12/18/2017
TELECOM TOWERS LLC
Locations
Contacts
TELECOM TOWERS LLC, Address:PO BOX 723597  
SPRINT, Address:6615 TOWPATH ROAD, Phone:(843) 345-3330  
SSC INC, Address:9900 W 109TH ST, STE 300, Phone:(913) 438-7700  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Review Approved with Conditions 01/22/2018 01/12/2018
Shannon McGuire
Code Statement
Corrective Action Required
01/12/2018

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Traffic Review No Comments 01/22/2018 01/12/2018
Shannon McGuire
Engineering Review No Comments 01/22/2018 01/12/2018
Shannon McGuire
Planning Review No Comments 01/22/2018 01/12/2018
Shannon McGuire
Planning Review Corrections 01/18/2018 01/11/2018
Shannon McGuire
Corrective Action Required
01/11/2018

I was able to pull the ATC Tower Inspection Form that was submitted with the most recent SUP renewal application. Per the Unified Development Ordinance requirements a tower inspection is required to be performed every 3 years. The inspection report we have on file is dated December 12, 2014. Please submit an inspection report conducted within the last 3 years that meets the UDO requirements.
Engineering Review No Comments 01/18/2018 01/11/2018
Shannon McGuire
Fire Review Approved with Conditions 01/18/2018 01/11/2018
Shannon McGuire
Code Statement
Corrective Action Required
01/10/2018

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Traffic Review No Comments 01/18/2018 01/11/2018
Shannon McGuire
Engineering Review No Comments 01/04/2018 01/04/2018
Gene Williams, P.E.
Planning Review Corrections 01/04/2018 01/03/2018
Shannon McGuire
Corrective Action Required
01/03/2018

To ensure the structural integrity of the telecommunication towers, and ensure that the tower is maintained in compliance with standards contained in the International Building Code and the applicable standards for towers that are published by the Telecommunications Industry Association/Electronic Industries Association, please submit a tower inspection report that has been completed within the last three years.
Corrective Action Required
01/03/2018

Please include the property legal description and the area of land (feet & acers) for the site on the plan cover sheet.
Corrective Action Required
01/03/2018

Section 7.230 requires that a photometric plan be submitted for all new development, redevelopment, parking lot development or expansion where outdoor lighting is proposed. The photometric plan shall be prepared by a lighting professional that is certified by the National Council on Qualifications for the Lighting Professions (NCQLP), or a State licensed professional engineer, architect, landscape architect or land surveyor.
Corrective Action Required
01/03/2018

Sheet E-5 shows that you are proposing a halogen work light. Halogen lights are expressly prohibited by Section 7.220 of the UDO. Metal halide or light emitting diodes (LED’s) shall be the approved light source for all outdoor lighting. Additionally, all lighting fixture shall utilize full cut-off fixtures. Please propose a lighting fixture that complies with the UDO requirements.
Traffic Review No Comments 01/04/2018 12/22/2017
Michael Park
Fire Review Approved with Conditions 12/04/2017 12/18/2017
Jim Eden
Code Statement
Corrective Action Required
12/18/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 12/22/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home