Planning Application Status

PL2011007




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2011007
CVS Pharmacy on 3rd Street
Commercial Final Development Plan
Commercial Final Development Plan
Approved
01/20/2011
COLT & GARRETT LLC
Replacing the Sinclair Gas Station
Locations
Contacts
COLT & GARRETT LLC, Address:6520 W 110TH ST STE 200  
CEDARWOOD DEVELOPMENT, Address:1765 MERRIMAN RD  
Land Plan Engineering, Address:1600 Genessee St, Suite 400  
MO CVS PHARMACY LLC, Address:1 CVS DRIVE, MC 2320  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 02/24/2012 02/28/2012
Hector Soto Jr.
Fire Review Complete 02/24/2012 02/23/2012
Jim Eden
Code Statement
Corrective Action Required
02/23/2012

Fire Department-All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Engineering Review No Comments 02/24/2012 02/22/2012
Gene Williams, P.E.
Traffic Review No Comments 02/16/2012 02/17/2012
Michael Park
Engineering Review No Comments 04/22/2011 05/03/2011
Hector Soto Jr.
Planning Review Corrections 04/22/2011 04/21/2011
Hector Soto Jr.
Planning Correction
Corrective Action Required
04/21/2011

There are no further comments on the site plan or building elevations. Staff is prepared to approve the final development plan. However, a building permit cannot be issued until the following two outstanding items are addressed.
Planning Correction
Corrective Action Required
04/21/2011

The minor plat titled "Colt & Garrett" has yet to be recorded. Staff cannot release a building permit until the plat is recorded and the City receives the necessary number of copies of the recorded plat.
Planning Correction
Corrective Action Required
04/21/2011

Staff cannot release a building permit until such time as a copy of the recorded cross-access easement between the CVS property and the abutting Lee's Summit Clinic property to the east is provided to the City.
Traffic Review No Comments 04/22/2011 04/18/2011
Michael Park
Fire Review Complete 04/20/2011 04/15/2011
Jim Eden
Code Statement
Corrective Action Required
04/15/2011

Fire Department-All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Planning Review Corrections 04/20/2011 04/15/2011
Hector Soto Jr.
Planning Correction
Corrective Action Required
04/15/2011

CROSS-ACCESS EASEMENT. A recorded copy of the cross-access easement for the shared driveway along 3rd Street shall be provided for the City's records. The final development plan cannot be approved without the cross-access easement being recorded and a copy of the recorded document being submitted to the City.
Planning Correction
Corrective Action Required
04/15/2011

ARCHITECTURE. No building elevations have been submitted for this application. The final development plan cannot be approved without review and acceptance of the building elevations.
Planning Correction
Corrective Action Required
04/15/2011

TRASH ENCLOSURE. Provide a detail of the proposed trash enclosures. Enclosures shall have masonry walls of a color compatible to the building and solid steel panels so as to fully screen the dumpsters from view.
Planning Correction
Corrective Action Required
04/15/2011

MECHANICAL EQUIPMENT. The preliminary development plan showed the HVAC equipment as roof-mounted. Manuafacturer specifications for the HVAC equipment shall be submitted for review to ensure the equipment is fully screened from view by the pitched roof element.
Engineering Review No Comments 04/20/2011 04/13/2011
Tony Reames
Planning Review Corrections 02/03/2011 02/08/2011
Hector Soto Jr.
Planning Correction
Corrective Action Required
01/26/2011

ARCHITECTURE. No building elevations were provided with the application submittal.
Planning Correction
Corrective Action Required
01/26/2011

WHEEL STOPS. Wheel stops are only permitted at the head of accessible spaces where the adjacent sidewalk is at the same grade as the parking stall. However, they will be allowed for the two parking spaces on either side of the landscape island at the northeast building corner so as to avoid a conflict between vehicle overhang on these adjacent spaces. All other wheel stops shall otherwise be removed. See the parking lot curbing comment that follows.
Planning Correction
Corrective Action Required
01/27/2011

PARKING LOT CURBING. It appears the parking bays on the north and west side of the building are at the same grade as the sidewalk along the building and thus the reason wheel stops are shown. The boundaries of all parking lots are required to have CG-1 curbing except for accessible parking spaces where the adjacent sidewalk is designed to be at the same grade as the accessible spaces in order to provide access to said sidewalk.
Planning Correction
Corrective Action Required
02/08/2011

MECHANICAL EQUIPMENT. The preliminary development plan showed the HVAC equipment as roof-mounted. Provide manufacturer specifications for the HVAC equipment for review to ensure the equipment is fully screened from view by the pitched roof element.
Planning Correction
Corrective Action Required
02/08/2011

SITE DATE TABLE. Provide a site data table that lists the lot area, building area, impervious coverage, parking spaces (required and provided).
Planning Correction
Corrective Action Required
02/08/2011

ACCESSIBLE PARKING SIGN. The sign posted at the head of every accessible space shall be Type R7-8 (white background, green border, green text and blue box wheelchair symbol) as identified in the MUTCD. The sign shall be mounted on a pole or other structure between 36 and 60 inches above the ground, measured to the bottom of the sign.
Planning Correction
Corrective Action Required
02/08/2011

TRASH ENCLOSURE. Provide a detail of the proposed trash enclosures. Enclosures shall have masonry walls of a color compatible to the building and solid steel gates with steel panels so as to screen the dumpsters from view.
Planning Correction
Corrective Action Required
02/08/2011

LIGHTING FIXTURES. Provide manufacturer specifications of all proposed light fixtures for review. Provide parking light pole heights for review.
Engineering Review Corrections 02/03/2011 02/07/2011
Tony Reames
Corrective Action Required
02/07/2011

On the cover sheet under the water general notes, the water utilities operations number is 816-969-1940, and the public works inspections is 816-969-1800.
Corrective Action Required
02/07/2011

Sheet C400, the proposed location of the water meter has been cleared by water utilities and meter services.
Corrective Action Required
02/07/2011

Sheet C400, our records indicate that the existing waterman is 6”, not 12” as shown on the plan.
Corrective Action Required
02/07/2011

Sheet C400, label manhole size.
Corrective Action Required
02/07/2011

Sheet C400, the proposed monument sign shall be located outside of utility easements. The small signs near the driveways are the exception.
Corrective Action Required
02/07/2011

Sheet C400, show proposed easements on this plan.
Corrective Action Required
02/07/2011

Submit final stormwater report.
Corrective Action Required
02/07/2011

A sealed Engineer’s Opinion of Probable Construction Costs should accompany your final submittal copies. Public Works’ review and inspection fee is based on that cost. The following items, both materials and installation, should be included in the itemized estimate • Any water line larger than 2” in diameter, valves, hydrants, and backflow preventer with vault, if outside the building • All storm water piping 6” or larger, structures, and detention/retention facilities • All grading for detention/retention ponds • All sanitary sewer manholes and piping between manholes, including private mains • The connection of the building sewer stub to the public main • All public infrastructure, both onsite and offsite • All private street construction, excluding parking lots, drive approaches and sidewalks • All erosion control devices
Traffic Review No Comments 02/03/2011 01/31/2011
Michael Park
Fire Review Complete 02/03/2011 01/27/2011
Jim Eden
UST Comment
Corrective Action Required
01/27/2011

Fire Department- The removal of underground fuel storage tanks (UST’s) shall comply with the 2006 International Fire Code and the requirements of the Missouri Department of Natural Resources.
FDC's
Corrective Action Required
01/27/2011

Fire Department-A fire hydrant shall be located within 100 feet of the fire department connection (FDC).
Code Statement
Corrective Action Required
01/27/2011

Fire Department-All building and life safety issues shall comply with the 2006 International Fire Code and local amendments as adopted by the City of Lee’s Summit.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 01/20/2011
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
01/20/2011 Letter Admin Route Sheet FDP
02/08/2011 Letter Applicant Letter (DFDP)
04/06/2011 Letter Admin Re-Route FDP
04/15/2011 Letter Applicant Letter (DFDP)
04/15/2011 Letter Admin Re-Route FDP
05/03/2011 Letter Applicant Letter (FDP)
02/16/2012 Letter Admin Re-Route FDP
02/22/2012 CVS 621 3rd St Fee Worksheet.xls
02/22/2012 Letter Approval Letter (Administrative)
02/22/2012 Letter Approval Letter (Administrative)
02/28/2012 Letter Applicant Letter (FDP)
06/20/2013 Letter Applicant Letter - FDP (DFDP)
06/21/2013 Letter PW-Approval Letter (Administrative) (OLD)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home