Planning Application Status

PL2025207




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2025207
East Village - PDP
Commercial Preliminary Development Plan
Commercial Preliminary Development Plan
In Plan Review
08/05/2025
LS INDUSTRIAL LLC
120-acre mixed use development. Includes a big box retailer with fuel sales, apartments, commercial pad sites, civic space, and parkland.
Locations
Contacts
LS INDUSTRIAL LLC, Address:4 E FRANKLIN  
PFIZER INC, Address:150 E 42ND ST FL 38TH  
Engineering Solutions, Address:50 SE 30th St, Phone:(816) 623-9888  
MATT SCHLICHT, Address:50 SE 30TH ST, Phone:(816) 623-9888  
East Village Investors, LLC, Address:5841 W 135th St  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review Corrections 09/05/2025 09/05/2025
Grant White
Corrective Action Required
09/05/2025

STREETS. Label ROW widths for all proposed public streets.
Corrective Action Required
09/05/2025

EASEMENTS. Show, label and dimension all existing and proposed U/Es.
Corrective Action Required
09/05/2025

EXISTING CONDITIONS. Provide a plan sheet showing existing conditions of site improvements on the subject property. This primarily relates to the existing Zoetis building and associated site improvements. Also identify all surrounding property owners, land uses and existing zoning for existing surrounding properties located within 185' of the subject development site.
Corrective Action Required
09/05/2025

LOT INFORMATION. Label all proposed lot dimensions and more clearly identify the lot lines due to the number of lines of similar line weight used on the plans.
Corrective Action Required
09/05/2025

SIDEWALKS. Sidewalks shall be provided along both sides of all proposed streets. It appears that no sidewalk is proposed along the frontage of Lots 14-18 and Tract F. Additionally, to promote additional pedestrian connectively, sidewalk connections shall be provided from the streets into each of the individual lots.
Corrective Action Required
09/05/2025

BUILDING FOOTPRINTS. Dimension all proposed building footprints. Also dimension all distances between the proposed building footprints to the surrounding property lines.
Corrective Action Required
09/05/2025

LIGHTING. Provide photometric plans for the proposed development in accordance with UDO Section 8.230. All proposed lighting shall comply with the requirements of UDO Sections 8.220, 8.250, 8.260, 8.270, 8.280 and 8.290 as applicable.
Corrective Action Required
09/05/2025

PHASING. Provide a phasing plan for the development.
Corrective Action Required
09/05/2025

DEVELOPMENT DATA TABLE. Complete the blank FAR; blank required parking ratio and required parking number information; and impervious coverage information for the entire development on Sheet C.101.
Corrective Action Required
09/05/2025

APARTMENT UNIT BREAKDOWN. Provide a breakdown of the number of units in each apartment site by the number of bedrooms. The UDO bases the number of required spaces per multi-family dwelling unit by the number of bedrooms. See Table 8-1 under UDO Section 8.530 for the required parking calculations for multi-family.
Corrective Action Required
09/05/2025

Corrective Action Required
09/05/2025

REZONING. The majority of the subject acreage south of SE Bailey Rd is zoned PI (Planned Industrial) and requires rezoning. Submit an exhibit and legal description of the property to be rezoned from PI to PMIX (to match the rest of the subject development area). The subject application shall be converted to a Rezoning and Preliminary Development Plan application. The additional rezoning application is subject to an additional application fee.
Corrective Action Required
09/05/2025

LAND USES. The subject site will be developed under PMIX zoning. Since the PMIX zoning district has no standard list of allowable land uses, add a note to the plans listing the allowable land uses for the site found under UDO Section 5.560.A, 5.560.D, and the additional land uses for which the applicant appealed and received approval for the following land uses: automotive/truck related uses; retail--big box in excess of 80,000 sq. ft. on one level; car washes; and daycares.
Corrective Action Required
09/05/2025

LANDSCAPING--STREET FRONTAGE. Specific to the wholesale warehouse site, the street frontage tree and shrub landscaping calculations also apply to the US 50 Hwy frontage along the north property line.
Corrective Action Required
09/05/2025

LANDSCAPING--GENERAL. To provide year-round visual interest and foliage coverage, a mix of deciduous and coniferous landscaping shall be provided on all of the proposed commercial and residential sites. This comment is informational only at this point and shall be reviewed for approval at the final development plan stage.
Corrective Action Required
09/05/2025

LANDSCAPING--PARKING ISLANDS. 1) Specific to the wholesale warehouse site, every four (4) rows of parking shall include a landscape island of at least ten (10) feet in width to break up the large expanses of parking lot hardscape with landscaped open space. 2) All tree planting areas shall be no less than ten (10) feet in width, with no tree planted less than four (4) feet from the back of curb.
Corrective Action Required
09/05/2025

PARKING LOT SETBACKS. Ensure that all proposed parking lots comply with the minimum 20' setback from all rights-of-way.
Corrective Action Required
09/05/2025

TRASH ENCLOSURES. Each trash enclosure shall be constructed of masonry walls or steel architecturally designed walls with either a solid steel opaque gate painted to be compatible with the color of the masonry or steel walls and building it is to serve or a steel framed semi-opaque gate with a screen mesh material approved by the Director that provides an appropriate visual barrier.
Corrective Action Required
09/05/2025

BUILDING ELEVATIONS. 1) The wholesale warehouse elevations label each elevation as the "South Elevation" on page 7 of the 14-page documents. Correct the labels. 2) Elevations for all four sides of the proposed townhomes is required sot be submitted.
Corrective Action Required
09/05/2025

GENERAL SITE LAYOUT--WHOLESALE WAREHOUSE. 1) The orientation of the of the gas station shall be flipped 180-degrees to avoid the queues backing up and conflicting with the main entrance to the site. 2) Staff recommends pushing the wholesale warehouse building further to the east and turning the orientation 180-degrees so the loading dock is on the railroad side of the site and the building entrance is on the southwest building corner. In other words, similar to the orientation and layout seen at the wholesale warehouse site off M-152 Hwy/Platte Purchase Dr.
Corrective Action Required
09/05/2025

OPEN SPACE--MULTI-FAMILY. A minimum 30% useable open space is required to be provided for each multi-family residential development.
Corrective Action Required
09/05/2025

TRAFFIC CIRCULATION--LOTS 19 AND 20. Staff continues to have concern regarding the intermingling of vehicular access to Lot 20 through Lot 19. Staff recommends the applicant further investigate a better means of separating the residential and commercial traffic.
Corrective Action Required
09/05/2025

OVERFLOW PARKING. It appears that the parking lot south of Tract D is intended to be overflow parking for the townhomes. A more centralized location for the parking lot, or alternatively dispersion of said spaces into smaller pockets throughout the development, will maximize its utility as overflow parking. The parking lot appears to be an approximately 790' walk (measured along the walkable path) to the center of the townhome area.
Corrective Action Required
09/05/2025

COMMERCIAL/TOWNHOME INTERFACE. Staff continues to have concern over the westernmost row of townhomes facing the back side/loading dock area of the inline retail building across the street to the west. The landscape plan for this area (Sheet L.102) shows no landscape buffering/screening along the rear of the retail building to provide a physical and visual screen between the dissimilar uses. A combination of decorative landscaping and a wall/fence shall be installed as a buffer.
Corrective Action Required
09/05/2025

PUBLIC GATHERING SPACES. 1) What is the intended use and programming visioin for Lot 12? 2) Early discussions on the proposed development included the intent for the open area around and between the buildings on Lots 4 and 5 to be public gathering spaces for passive use. Does this continue to be the intent? Feedback from staff at the time was that the layout and proximity of said space doesn't seem conducive or read as public gathering space, but rather patio/outdoor space for the use of Lots 4 and 5.
Corrective Action Required
09/05/2025

DOG PARK AREA. 1) Is the intent for the dog parks to be exclusive to townhomes and apartment residents of the development? 2) It appears that this area includes a pool and possibly a clubhouse or similar shelter. Please confirm. Also, provide elevations of the clubhouse/shelter.
Corrective Action Required
09/05/2025

ENVISION LS OVERLAY--DESIGN STANDARDS. The subject development is located within the boundaries of the EnVision LS overlay and as such is subject to the design standards for multi-family and commercial development found under UDO Section 5.640. A modification to said standards was sought and approved for the Oldham Village development tp the west. A modification request outlining the justification for this and any other modificiaton request shall be provided.
Engineering Review Corrections 09/05/2025 09/05/2025
Gene Williams, P.E.
Corrective Action Required
09/03/2025

A waiver to the stream buffer requirement is being sought. A waiver shall be submitted on forms provided by the City, along with supporting documentation to justify the waiver.
Corrective Action Required
09/03/2025

Off-site sanitary to serve businesses along 16th St. will likely be required. Water Utilities shall be providing additional comments concerning this requirement, as well as other off-site improvements to the sanitary sewer.
Corrective Action Required
09/03/2025

Stormwater Study Comments: 1) I do not agree the existing stream channels within the site are located in areas of "limited vegetation". It appears these streams are located in areas of extensive vegetation. 2) it would appear the south detention basin should discharge via an underground pipe system across the adjacent property, and then under 16th St. 3) a junction box(s) or other structure should be installed on the line(s) described above to demarcate the public and private portion of the storm line(s). 4) emergency spillway for the south detention basin appears to be pointed toward a business along 16th St. An alternative location should be selected. 5) Exhibit L is shown in the appendix of the report, but only the cover sheet is included.
Corrective Action Required
09/05/2025

Water line improvements to be reviewed separate by Water Utilities.
Corrective Action Required
09/05/2025

A phasing plan should be presented within the Preliminary Development Plan showing: 1) the phasing of off-site sanitary sewer improvements, 2) the phasing of off-site water line improvements, 3) the phasing of detention basin construction, 4) the phasing of street construction, 5) the phasing of stormwater improvements, and 6) the phasing of on-site and off-site traffic improvements.
Corrective Action Required
09/05/2025

It was my understanding off-site improvements to 16th St. (i.e., to the south of this development along the Maddox Acres subdivision) was to be undertaken from M-291 to the east near the Watt Acres subdivision. This shall be discussed at the meeting next week.
Corrective Action Required
09/05/2025

Additional comments on the water lines and sanitary sewer lines are forthcoming.
Traffic Review Corrections 09/05/2025 09/05/2025
Erin Ralovo
Corrective Action Required
09/03/2025

Counts were performed when Oldham Road was already closed and may not be accurate.
Corrective Action Required
09/03/2025

Final Condition recommendations should be summarized for each phase and Figures provided as extra documentation.
Corrective Action Required
09/03/2025

Table 4 Lots 12 and 13 are flipped compared to the map.
Corrective Action Required
09/05/2025

A signal will not be allowed as shown on Oldham. The City's Access Management Guide states that a minimum of 1/4 miles is required between signal. Staff would consider a signal at the far east entrance but not closer.
Corrective Action Required
09/05/2025

Overflow parking will need to be provided for the townhome area in the SE corner of phase 3.
Corrective Action Required
09/05/2025

The main entrance should not dead end into a parking island. Rows should be adjusted to allow for vehicles to enter further into the sight.
Corrective Action Required
09/05/2025

The access to the gas pumps on lot one will not be accepted. The station should be flipped and entrance to the pumps should be on the far east side.
Corrective Action Required
09/05/2025

Please take a look at throat lengths for the shared access points on the west side.
Corrective Action Required
09/05/2025

Parking spaces should not be directly across from the entrances at lots 17 and 18.
Corrective Action Required
09/05/2025

Staff plans to meet with MODOT officials to discuss the plans and the connections to MO219. Additional comments will be coming after that meeting.
Corrective Action Required
09/05/2025

Applicant must provide proof that the Railroad was given sufficient opportunity to review the submitted plans as you are in close proximity of the tracks.
Corrective Action Required
09/05/2025

The entrance to the Townhomes development still conflicts with the retail space traffic.
Fire Review Corrections 09/05/2025 09/02/2025
Jim Eden
Code Statement
Informational
09/02/2025

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Dead Ends
Corrective Action Required
09/02/2025

IFC 503.2.5 - Dead-end fire apparatus access roads in excess of 150 feet (45 720 mm) in length shall be provided with an approved area for turning around fire apparatus. Privide turn-arounds at the end of the dead ends on Lot 20.
Miscellaneous Correction
Corrective Action Required
09/02/2025

Parking will only be allowed on one side of the street in the multi-family housing in Lot 20.
Miscellaneous Correction
Corrective Action Required
09/02/2025

All addresses in this part of the city are in the SE quadrant. Correct the Oldham street name and provide prelininary names for the other streets.
UST's
Corrective Action Required
09/02/2025

The installation of underground fuel storage tanks (UST’s) shall comply with the 2018 International Fire Code and the requirements of the Missouri Department of Natural Resources.
Water Supply
Corrective Action Required
09/02/2025

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction.
FDC
Corrective Action Required
09/02/2025

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. All sprinklered buildings shall have a hydrant within 100 feet of the FDC. Costco- Show the location of the FDC.
Miscellaneous Correction
Corrective Action Required
09/02/2025

Costco- What size is the water main going to the hydrant a the fuel station?
Hydrants
Corrective Action Required
09/02/2025

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Provide a public and private hydrant plan.
Miscellaneous Correction
Corrective Action Required
09/02/2025

For access around the apartment buildings: D105.1 Where required. Where the vertical distance between the grade plane and the highest roof surface exceeds 30 feet (9144 mm), approved aerial fire apparatus access roads shall be provided. For purposes of this section, the highest roof surface shall be determined by measurement to the eave of a pitched roof, the intersection of the roof to the exterior wall, or the top of parapet walls, whichever is greater. D105.2 Width. Aerial fire apparatus access roads shall have a minimum unobstructed width of 26 feet (7925 mm), exclusive of shoulders, in the immediate vicinity of the building or portion thereof. D105.3 Proximity to building. One or more of the required access routes meeting this condition shall be located not less than 15 feet (4572 mm) and not greater than 30 feet (9144 mm) from the building, and shall be positioned parallel to one entire side of the building. The side of the building on which the aerial fire apparatus access road is positioned shall be approved by the fire code official. Correct all applicable around the apartment buildings.
Fees
Paid Fees Amount Paid Owing Date Paid
Commercial Preliminary Development Plan fee $2,900.00 $2,900.00 Paid 09/05/2025
Legal Notice Publishing Charge $165.00 $165.00 Paid 09/05/2025
Legal Notice Publishing Charge $165.00 $165.00 Paid 09/05/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 10/23/2025 5:00 PM Council Chambers 10/23/2025 05:00 PM
Agenda Item
Pending
10/23/2025
City Council Public Hearing 11/18/2025 6:00 PM Council Chambers 11/18/2025 06:00 PM
Agenda Item
Pending
11/18/2025
City Council Ordinance 2nd Reading 12/02/2025 6:00 PM Council Chambers 12/02/2025 06:00 PM
Agenda Item
Pending
12/02/2025
Documents & Images
Date Uploaded File Type Document Name
08/08/2025 Application Form Application Form_Drake north_signed_PL2025207
08/08/2025 Application Form Application Form_Odell South_signed_PL2025207
08/08/2025 Application Form Application Form_NEC Bailey and 291_signed_PL2025207
08/08/2025 Plans Apartment 1 Elevation_PL2025207
08/08/2025 Plans Apartment 2 Elevation_PL2025207
08/08/2025 Plans Townhome Elevation_PL2025207
08/08/2025 Letter Narrative_Lot 1_PL2025207
08/08/2025 Plans Elevations and Renderings_Lot 1_PL2025207
08/08/2025 Plans Monument Sign Elevation_PL2025207
08/10/2025 Engineer Report/Study Storm Study_PL2025207
08/11/2025 Plans East Village Architectural Elevations_PL2025207
08/20/2025 Plans Civil Plans_Rev 0_PL2025207
08/20/2025 Engineer Report/Study Traffic Impact Study_Rev 0_PL2025207
08/20/2025 Engineer Report/Study TIS_Appendix A Only_PL2025207
09/05/2025 Public Notice Document Notification list_East Village_PL2025207
09/05/2025 Receipt Receipt_PL2025207
09/05/2025 Letter Applicant Letter_Rev 0_PL2025207
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home