Review Type |
Outcome |
Est. Completion Date |
Completed |
Fire Review
|
Complete
|
06/04/2024
|
06/03/2024
|
|
Jim Eden
|
|
Hydrants
IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official.
The distance to a hydrant exceeds 300 feet.
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
|
Planning Review
|
No Comments
|
06/04/2024
|
05/29/2024
|
|
Ian Trefren
|
|
Miscellaneous Correction
Parking lot closest to eastern property line will require a modification as part of the PDP as it does not meet the 20' setback requirement. No action is required at this time.
|
|
Miscellaneous Correction
Corrective Action Required
Please provide clarification on if RTU or ground-mounted mechanical equipment will be installed, and specifics of screening materials. Some form of external screening of what is assumed to be ground-mounted equipment is depicted on architectural renderings but not shown on civil set.
|
|
Miscellaneous Correction
Modification will be needed for the number of signs proposed as it exceeds the maximum permissible attached wall signs set forth by the UDO
|
|
|
Engineering Review
|
Approved with Conditions
|
05/10/2024
|
05/09/2024
|
|
Susan Nelson, P.E.
|
|
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #09 FDP Reviews
Corrective Action Required
Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
|
|
DE C&O #11 Pavement Thickness
Corrective Action Required
Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
|
Planning Review
|
Corrections
|
05/10/2024
|
05/09/2024
|
|
Ian Trefren
|
|
Miscellaneous Correction
Parking lot closest to eastern property line will require a modification as part of the PDP as it does not meet the 20' setback requirement. No action is required at this time.
|
|
Miscellaneous Correction
Corrective Action Required
Please provide clarification on if RTU or ground-mounted mechanical equipment will be installed, and specifics of screening materials. Some form of external screening of what is assumed to be ground-mounted equipment is depicted on architectural renderings but not shown on civil set.
|
|
Miscellaneous Correction
Modification will be needed for the number of signs proposed as it exceeds the maximum permissible attached wall signs set forth by the UDO
|
|
|
Traffic Review
|
No Comments
|
05/10/2024
|
05/08/2024
|
|
Erin Ralovo
|
|
|
Fire Review
|
Corrections
|
05/10/2024
|
05/07/2024
|
|
Jim Eden
|
|
Hydrants
Corrective Action Required
IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official.
The distance to a hydrant exceeds 300 feet.
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
|