| Review Type |
Outcome |
Est. Completion Date |
Completed |
|
Planning Review
|
No Comments
|
11/15/2022
|
11/16/2022
|
|
|
Hector Soto Jr.
|
|
|
|
|
Fire Review
|
Approved with Conditions
|
11/15/2022
|
11/15/2022
|
|
|
Jim Eden
|
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Action required- Correct the listed code edition.
|
|
|
Hydrants
IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official.
Action required- Provide a utility plan.
|
|
|
Misc.
Correct the address on the plans to Lee's Summit, MO.
|
|
|
Misc.
The plans call for the buildings to be fully sprinklered. Show the location of the fire main and a hydrant within 100 feet of the FDC.
|
|
|
|
|
Traffic Review
|
No Comments
|
11/15/2022
|
11/15/2022
|
|
|
Brad Cooley, P.E., RSPI
|
|
|
|
|
Engineering Review
|
Approved with Conditions
|
11/15/2022
|
11/11/2022
|
|
|
Sue Pyles, P.E.
|
|
|
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
|
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
|
|
|
DE C&O #09 FDP Reviews
Corrective Action Required
Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
|
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
|
|
|
Traffic Review
|
Approved with Conditions
|
11/04/2022
|
11/04/2022
|
|
|
Brad Cooley, P.E., RSPI
|
|
|
Corrective Action Required
Please provide documentation of coordination with MoDOT on any improvements to 40 Hwy.
|
|
|
|
|
Engineering Review
|
Corrections
|
11/04/2022
|
11/03/2022
|
|
|
Sue Pyles, P.E.
|
|
|
Corrective Action Required
The City doesn’t allow an existing swimming pool to be infilled, there are some additional requirements. For the purposes of this PDP, please add “per City requirements” to the swimming pool note throughout the plan set to avoid any confusion regarding the requirements in the future.
|
|
|
|
|
Planning Review
|
Corrections
|
11/04/2022
|
11/01/2022
|
|
|
Hector Soto Jr.
|
|
|
Corrective Action Required
SPECIAL USE PERMIT EXPLANATION. Page 4 of the four-page SUP narrative from HFA references standards (Section 280) and a development ordinance (Ord. No. 715) that ceased to exist in November of 2001 and thus are not applicable to the subject application.
The proposed SUP shall be subject to the general requirements of the Unified Development Ordinance (UDO), Article 6, Division III, Subdivision 1 and also Sec. 6.870 within said Article.
|
|
|
|
|
Fire Review
|
Corrections
|
11/04/2022
|
10/31/2022
|
|
|
Jim Eden
|
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Action required- Correct the listed code edition.
|
|
|
Hydrants
Corrective Action Required
IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official.
Action required- Provide a utility plan.
|
|
|
Misc.
Corrective Action Required
Correct the address on the plans to Lee's Summit, MO.
|
|
|
Misc.
Corrective Action Required
The plans call for the buildings to be fully sprinklered. Show the location of the fire main and a hydrant within 100 feet of the FDC.
|
|
|
|