Summary
PRCOM20234101
Building Permit - Commercial
Certificate of Occupancy
EVANS JOHN S & AR AM I LP
CHANGE OF TENANT
CHANGE OF TENANT FOR CHIROPRACTOR OFFICE
08/21/2023
10/05/2023
03/03/2024
12/22/2023
Locations
Contacts
EVANS JOHN S & AR AM I LP, Address:208 SW ASPEN  
ENVIROTECH HEATING & COOLING, Address:11003 W 59TH TERRACE, Phone:(913) 268-6700  
CRH ELECTRIC INC, Address:4020 E 137TH TER, Phone:(816) 761-1433  
Prodesign Contractors LLC, Address:918 E Warren, Phone:(785) 433-1561  
ACI Build Group, Address:4917 Woodstock Street  
Taylor Aycock/ACI Build Group, Phone:(816) 699-0855  
Multis Design, Address:5611 Norwood St, Phone:(913) 645-3954  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 09/19/2023 09/20/2023
Joe Frogge
LC - MEP Subs
Corrective Action Required
09/12/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (Envirotech not currently licensed with us) 9/13/23 - not addressed
Building Plan Review Approved 09/19/2023 09/20/2023
Joe Frogge
Project cost
Resolved
09/20/2023

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is informational. 9/13/23 - not addressed
Gen - Plan submittals 2018 codes
Resolved
09/13/2023

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit. Action required: Revise code year (should be 2018) at plumbing riser note at detail G6/A1.
NEC Article 517.13 Grounding of receptacles patient care
Resolved
09/13/2023

2017 NEC Article 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Spaces. Wiring in patient care spaces shall comply with 517.13(A) and (B). (A) Wiring methods. All branch circuits serving patient care spaces shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118. (B) Insulated Equipment Grounding Conductors and Insulated Equipment Bonding Jumpers. (1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is clearly identified along its entire length by green insulation and installed with the branch circuit conductors in the wiring methods as provided in 517.13(A). 1. The grounding terminals of all receptacles other than isolated ground receptacles. 2. Metal outlet boxes, metal device boxes, or metal enclosures. 3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts. (see code for exceptions) (2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122. Action required: Modify drawings to show that all circuits in patient care areas will have redundant ground system.
Fire Plan Review Approved 09/19/2023 09/18/2023
Jim Eden
Fire Plan Review Approved 08/31/2023 08/31/2023
Jim Eden
Building Plan Review Rejected 08/31/2023 08/30/2023
Joe Frogge
Project cost
Corrective Action Required
08/30/2023

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is informational.
Gen - Plan submittals 2018 codes
Corrective Action Required
08/30/2023

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit. Action required: Revise code year (should be 2018) at plumbing riser note at detail G6/A1.
NEC Article 517.13 Grounding of receptacles patient care
Corrective Action Required
08/30/2023

2017 NEC Article 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Spaces. Wiring in patient care spaces shall comply with 517.13(A) and (B). (A) Wiring methods. All branch circuits serving patient care spaces shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118. (B) Insulated Equipment Grounding Conductors and Insulated Equipment Bonding Jumpers. (1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is clearly identified along its entire length by green insulation and installed with the branch circuit conductors in the wiring methods as provided in 517.13(A). 1. The grounding terminals of all receptacles other than isolated ground receptacles. 2. Metal outlet boxes, metal device boxes, or metal enclosures. 3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts. (see code for exceptions) (2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122. Action required: Modify drawings to show that all circuits in patient care areas will have redundant ground system.
Zoning Review Approved 08/31/2023 08/30/2023
Joe Frogge
Licensed Contractors Rejected 08/31/2023 08/30/2023
Joe Frogge
LC - MEP Subs
Corrective Action Required
08/30/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (Envirotech not currently licensed with us)
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $520.00 $520.00 Paid 09/20/2023
$9,652.50
7232302-Commercial License Tax Fee $4,826.25 $4,826.25 Paid 08/21/2023
$4,826.25
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Failed 10/9/2023 10/9/2023 10/09/2023
Misc
Corrective Action Required
10/09/2023
Provide pressure testing of plumbing
Underslab Plumbing Inspection - Commercial Passed 10/10/2023 10/10/2023 10/10/2023
Misc
Resolved
10/10/2023
Provide pressure testing of plumbing
In-wall Inspection Failed 10/20/2023 10/20/2023 10/20/2023
Misc
Corrective Action Required
10/20/2023
-provide solid blocking for Ada grab bars in restroom -boca plate protection at top of restroom wall for dwv -provide compliant electrical in all patient care areas per code section 517.12 of 2017 NEC
In-wall Inspection Passed 10/26/2023 10/26/2023 10/26/2023
Misc
Resolved
10/26/2023
-provide solid blocking for Ada grab bars in restroom -boca plate protection at top of restroom wall for dwv -provide compliant electrical in all patient care areas per code section 517.12 of 2017 NEC
Above Ceiling Inspection Failed 12/13/2023 12/13/2023 12/13/2023
Misc
Corrective Action Required
12/13/2023
-Close open electrical j-box -Provide wiring method to the ceiling light complying with NEC 517.13 A&B for patient care area -Securely fasten MC cable within 12” of boxes. If securing to wire, the securing device must be listed (bat wing device, not zip tie) -Complete bath fan exhaust to outside. Shall use 4” flexible ducting. Flexible duct cannot exceed 14 ft per label **Electrical issue inside sub panel: separate bonding conductor and equipment grounding conductor from the neutral bus bar
Above Ceiling Inspection Passed 12/15/2023 12/15/2023 12/15/2023
Misc
Resolved
12/15/2023
-Close open electrical j-box -Provide wiring method to the ceiling light complying with NEC 517.13 A&B for patient care area -Securely fasten MC cable within 12” of boxes. If securing to wire, the securing device must be listed (bat wing device, not zip tie) -Complete bath fan exhaust to outside. Shall use 4” flexible ducting. Flexible duct cannot exceed 14 ft per label **Electrical issue inside sub panel: separate bonding conductor and equipment grounding conductor from the neutral bus bar
Occupancy Inspection - Fire Passed 12/22/2023 12/22/2023
Occupancy Inspection - Codes Commercial Full C of O 12/22/2023 12/22/2023
Misc
Resolved
12/22/2023
-Fire approval required -Receptacle located within 6 ft of sink must be gfci-protected
Documents & Images
Date Uploaded File Type Document Name
08/21/2023 Application Form Lee_Summit_permit_app_signed finished
08/21/2023 Plans Mommy & Me Building Permit 230817
09/05/2023 Letter DS P/R Corrections Document
09/12/2023 Plans Mommy & Me Permit Permit Resubmittal 230908
09/20/2023 Approved Plans approved - Mommy & Me Permit Permit Resubmittal 230908
09/20/2023 Letter License Tax Bill
09/20/2023 Receipt Receipt for transaction:2023-007201
10/09/2023 Letter DS Building Permit
10/09/2023 Letter INSPECTION SUMMARY
10/10/2023 Letter INSPECTION SUMMARY
10/20/2023 Letter INSPECTION SUMMARY
10/26/2023 Letter INSPECTION SUMMARY
12/13/2023 Letter INSPECTION SUMMARY
12/15/2023 Letter INSPECTION SUMMARY
12/22/2023 Letter Field Certificate of Occupancy
12/22/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home