Permit Application Status

PRSUBD20252429


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSUBD20252429
Public Infrastructure
In Plan Review
DEVELOPMENT COMPLETE
Retreat at Bailey Farms 2nd Plat - sanitary, storm, land disturbance, waterline
06/11/2025
Locations
Contacts
Schlagel & Associates, PA, Address:14920 W. 107th Street  
JIM LONG, Address:SCHLAGEL ASSOCIATES, Phone:(913) 322-7146  
  
SCHLAGEL & ASSOCIATES, Address:14920 W 107TH ST, Phone:(913) 492-5158  
  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review - Street and Storm No Comments 07/30/2025 07/30/2025
Mike Weisenborn
Miscellaneous Correction
Resolved
07/30/2025

Sheet 10: a. Recommend a review of Table LS-2 under the City of Lee's Summit specifications for thickness of subgrade. It has changed for residential streets to a lesser quantity of aggregate subgrade in the event geogrid is used, and the chemically-stabilized thickness has increased. b. Ensure KCMMB mix design is called-out on this sheet, despite the note on the front cover sheet.
Miscellaneous Correction
Resolved
07/24/2025

Sheet 12: a. Standard detail for storm lids has changed. Use the new standard detail.
Miscellaneous Correction
Resolved
07/24/2025

Informational Comment: An itemized and sealed cost estimate is required prior to formal approval.
Miscellaneous Correction
Resolved
07/30/2025

Sheet 10: a. subgrade design does not match Table LS-2 in terms of aggregate thickness and chemically-stabilized subgrade. Review Table LS-2 and ensure the aggregate thickness and chemically-stabilized subgrade option matches Table LS-2.
Engineering Review - Sanitary No Comments 07/30/2025 07/30/2025
Mike Weisenborn
Engineering Review - Water No Comments 07/30/2025 07/30/2025
Mike Weisenborn
Engineering Review - Sanitary Corrections 07/08/2025 07/08/2025
Gene Williams, P.E.
Engineering Review - Water Corrections 07/08/2025 07/08/2025
Gene Williams, P.E.
Engineering Review - Street and Storm Corrections 07/08/2025 07/08/2025
Gene Williams, P.E.
Miscellaneous Correction
Corrective Action Required
07/08/2025

Sheet 10: a. Recommend a review of Table LS-2 under the City of Lee's Summit specifications for thickness of subgrade. It has changed for residential streets to a lesser quantity of aggregate subgrade in the event geogrid is used, and the chemically-stabilized thickness has increased. b. Ensure KCMMB mix design is called-out on this sheet, despite the note on the front cover sheet.
Miscellaneous Correction
Corrective Action Required
07/08/2025

Sheet 12: a. Standard detail for storm lids has changed. Use the new standard detail.
Miscellaneous Correction
Corrective Action Required
07/08/2025

Informational Comment: An itemized and sealed cost estimate is required prior to formal approval.
Engineer Review - Grading No Comments 07/08/2025 07/08/2025
Gene Williams, P.E.
Traffic Review - Streets No Comments 06/27/2025 06/23/2025
Erin Ralovo
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
06/11/2025 Plans ESC and Mass Grading_REV 0_PRSUBD20252429
06/11/2025 Plans Street, Storm, and MDP_Rev 0_PRSUBD20252429
06/11/2025 Plans Sanitary_Rev 0_PRSUBD20252429
06/11/2025 Plans Water_Rev 0_PRSUBD20252429
07/09/2025 Letter SUBD Comment Letter
07/16/2025 Plans Water_Rev 1_PRSUBD20252429
07/16/2025 Plans Sanitary_Rev 1_PRSUBD20252429
07/16/2025 Plans Street, Storm, and MDP_Rev 1_PRSUBD20252429
07/16/2025 Plans ESC and Mass Grading_REV 1_PRSUBD20252429
07/16/2025 Engineers Estimate Cost Estimate_Rev 0_PRSUBD20252429
07/16/2025 Letter Response to Comments_Rev 0_PRSUBD20252429
07/24/2025 Plans STREET, STORM, MDP FINAL REV
07/30/2025 Activity Document FeeWorksheetRetreatBailey2ndAllPublicInfrastructure
07/30/2025 Approved Plans APPROVED STREET_STORM_MDP
07/30/2025 Approved Plans APPROVED MASS GRADING ESC
07/30/2025 Approved Plans APPROVED SANITARY
07/30/2025 Approved Plans APPROVED WATER
07/30/2025 Letter SUBD Comment Letter
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home