Summary


PRSUBD20235090
Public Infrastructure
Final Acceptance
DEVELOPMENT COMPLETE
SUMMIT ORCHARD WEST - RIGHT AND LEFT TURN LANE INSTALLATION ON WARD ROAD TO 700 NW WARD RD
10/04/2023
10/04/2023
04/26/2024
Locations
Contacts
Brandon Beavers, Address:140 Walnut St  
  
EMERY SAPP AND SONS INC, Address:2301 I-70 DR NW, Phone:(573) 445-8331  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Paved Surface Inspection Fee $5,631.17 $5,631.17 Paid 10/04/2023
$5,631.18
Right of Way Permit Fee $85.00 $85.00 Paid 10/04/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Site Visit Partial 11/7/2023 11/7/2023 11/07/2023
Misc
Informational
11/07/2023
11/07/23 Tuesday JMJ (ESS) No work on turn lanes today or yesterday, but contractor did demo curbs vegetation parkway area and install some of the rock aggregate last week.
Site Visit Partial 11/27/2023
Misc
Informational
11/07/2023
11/07/23 Tuesday JMJ (ESS) No work on turn lanes today or yesterday, but contractor did demo curbs vegetation parkway area and install some of the rock aggregate last week. 11-17-23 Dustin A, Nick with Emery called for a proof roll. Met out there at 1030 and preformed proof roll for the lanes and curb. It passed but did inform him if it rained over the weekend( chance to do so) would need to redo the proof roll. Nick called back and said his concrete guys could not make it next week so would reschedule another proof roll at a later date . 11-20-23 Dustin A, . No work on site due to rain 11-21-23 Dustin A, No work due to we conditions, i did talk to Nick and said they may try to proof roll again next monday. 11-27-23 Dustin A, Larry from ESS called this morning. Decided to cancel the proof roll due to the wet conditions. 11-29-23 Dustin A, Proof rolled . Passed/
Site Visit Partial 11/30/2023
Misc
Informational
11/27/2023
11/07/23 Tuesday JMJ (ESS) No work on turn lanes today or yesterday, but contractor did demo curbs vegetation parkway area and install some of the rock aggregate last week. 11-17-23 Dustin A, Nick with Emery called for a proof roll. Met out there at 1030 and preformed proof roll for the lanes and curb. It passed but did inform him if it rained over the weekend( chance to do so) would need to redo the proof roll. Nick called back and said his concrete guys could not make it next week so would reschedule another proof roll at a later date . 11-20-23 Dustin A, . No work on site due to rain 11-21-23 Dustin A, No work due to we conditions, i did talk to Nick and said they may try to proof roll again next monday. 11-27-23 Dustin A, Larry from ESS called this morning. Decided to cancel the proof roll due to the wet conditions. 11-29-23 Dustin A, Proof roll Passed 11-30-23 Dustin A, ESS on site , poured curbs on both sides . 12-5-23 Dustin A, ESS poured east and middle side. As well as working on stamped section.
Pavement-Curb Construction Passed 12/04/2023
Misc
Informational
12/04/2023
11-30-23 Dustin A, ESS installing curbs on all turn lanes
Pavement-Aggregate Base Passed 12/04/2023
Misc
Informational
12/04/2023
11-29-23 Dustin A, Proof roll. Aggregate is compacted and geo grid is installed . Passed
Pavement-Proof Roll Passed 12/04/2023
Misc
Informational
11/29/2023
11-29-23 Dustin A, Met with Larry (ESS), performed proof roll for curb an concrete. Proof roll passed.
Pavement-Proof Roll Passed 12/05/2023
Misc
Informational
11/29/2023
11-29-23 Dustin A, Met with Larry (ESS), performed proof roll for curb an concrete. Proof roll passed.
Pavement-Stabilized Subgrade Passed 11/2/2023 11/2/2023 12/06/2023
Misc
Informational
11/02/2023
10/31/23 Tuesday JMJ ( ESS ) (Summit Fair Second Plat Lot 10C Ward Road Improvement) Contractor are demo curbs & median on Ward Road to install new turn lanes. 11/02/23 Thursday JMJ ( ESS) Contractor tor continues to work on median removal of existing curbs and preparing subgrade for installation of geogrid . 12-6-23 Dustin A. This was passed on 11-28-23 , Aggregate was put on at end of day for proof roll on 11-29-23
Site Visit Partial 12/07/2023
Misc
Informational
11/30/2023
11/07/23 Tuesday JMJ (ESS) No work on turn lanes today or yesterday, but contractor did demo curbs vegetation parkway area and install some of the rock aggregate last week. 11-17-23 Dustin A, Nick with Emery called for a proof roll. Met out there at 1030 and preformed proof roll for the lanes and curb. It passed but did inform him if it rained over the weekend( chance to do so) would need to redo the proof roll. Nick called back and said his concrete guys could not make it next week so would reschedule another proof roll at a later date . 11-20-23 Dustin A, . No work on site due to rain 11-21-23 Dustin A, No work due to we conditions, i did talk to Nick and said they may try to proof roll again next monday. 11-27-23 Dustin A, Larry from ESS called this morning. Decided to cancel the proof roll due to the wet conditions. 11-30-23 Dustin A, ESS on site , poured curbs on both sides . 12-7-23 Dustin A, No Activity today 12-11-23 Dustin A, No activity today 12-19-23 Dustin A, Met with Nick. Finishing up some grade work and said he was waiting on his sign guys. Supposed to be here today. Hoping to do a walk through this week top open up lanes by xmas. Supposed to call when signs are up so we can schedule with public works. 12-20-23 Dustin A, Met with Ryan and Nick From ESS. After meeting with public works informed them to reopen the rd they would need crosswalk closed signs on both sides of Ward and Chipman. Since the crosswalk signs are backordered. Once closed signs are up on ada ramps . They are good to reopen rd for the holidays per public works
Sidewalk Inspection Partial 12/12/2023
Misc
Informational
12/12/2023
12-12-23 Dustin A, prepping for sidewalk on east side of ward. Hoping to pour tomorrow 12-13. Hoping to have lanes opened by next wed
Sidewalk Inspection Partial 12/13/2023
Misc
Informational
12/12/2023
12-12-23 Dustin A, prepping for sidewalk on east side of ward. Hoping to pour tomorrow 12-13. Hoping to have lanes opened by next wed 12-13-23 Dustin A, SW is was framed and aggregate is compacted. Slopes are in compliance at this time. Approved to pour.
Sidewalk Inspection Passed 12/19/2023 12/19/2023 12/18/2023
Misc
Informational
12/13/2023
12-12-23 Dustin A, prepping for sidewalk on east side of ward. Hoping to pour tomorrow 12-13. Hoping to have lanes opened by next wed 12-13-23 Dustin A, SW is framed, aggregate is compacted and slopes are in compliance. Approved to pour. 12-18-23 Dustin A, SW is poured slopes are in compliance. passed
Pavement-Surface Passed 12/19/2023
Misc
Informational
12/05/2023
12-4-23 Dustin A, ESS started pouring concrete for west side of ward as well inner middle 12-5-23 Dustin A ESS is working on stamped middle and is installing hardware for east lane 12-19-23 Dustin A, Pavement/Concrete is in , and appears to meet city standards
Install Street and Stop Signs Partial 12/20/2023
Misc
Informational
12/20/2023
12-20-23 Dustin A, All signs have been installed except for crosswalk signs
Grading/Excavation/Fill Inspection Passed 03/06/2024
Misc
Informational
12/08/2023
12-8-23 Dustin A , Dirt work is being done around the turn lanes 3-6-24 Dustin A, dirt work is finished
Grading/Excavation/Fill Inspection Passed 03/06/2024
Misc
Informational
12/08/2023
12-8-23 Dustin A , Dirt work is being done around the turn lanes
Pavement-Stabilized Subgrade Passed 03/06/2024
Misc
Informational
11/02/2023
10/31/23 Tuesday JMJ ( ESS ) (Summit Fair Second Plat Lot 10C Ward Road Improvement) Contractor are demo curbs & median on Ward Road to install new turn lanes. 11/02/23 Thursday JMJ ( ESS) Contractor tor continues to work on median removal of existing curbs and preparing subgrade for installation of geogrid .
Site Visit Complete 03/06/2024
Misc
Informational
12/07/2023
11/07/23 Tuesday JMJ (ESS) No work on turn lanes today or yesterday, but contractor did demo curbs vegetation parkway area and install some of the rock aggregate last week. 11-17-23 Dustin A, Nick with Emery called for a proof roll. Met out there at 1030 and preformed proof roll for the lanes and curb. It passed but did inform him if it rained over the weekend( chance to do so) would need to redo the proof roll. Nick called back and said his concrete guys could not make it next week so would reschedule another proof roll at a later date . 11-20-23 Dustin A, . No work on site due to rain 11-21-23 Dustin A, No work due to we conditions, i did talk to Nick and said they may try to proof roll again next monday. 11-27-23 Dustin A, Larry from ESS called this morning. Decided to cancel the proof roll due to the wet conditions. 11-30-23 Dustin A, ESS on site , poured curbs on both sides . 12-7-23 Dustin A, No Activity today
Documents & Images
Date Uploaded File Type Document Name
09/14/2023 Approved Plans Summit Orchard West Lot 10C Public Street Improvements Approved 09 14 23
09/14/2023 Activity Document Fees PL2023177 Summit Orchard West Street
09/08/2023 Engineers Estimate 230908 Lot 10C Ward Road Improvments Opinion of Cost
10/04/2023 Receipt Receipt for transaction: 2023-007531
11/02/2023 Letter INSPECTION SUMMARY
11/07/2023 Letter INSPECTION SUMMARY
11/27/2023 Letter INSPECTION SUMMARY
11/29/2023 Letter INSPECTION SUMMARY
11/29/2023 ward turn lane proof roll
11/30/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/05/2023 Letter INSPECTION SUMMARY
12/05/2023 Letter INSPECTION SUMMARY
12/06/2023 Letter INSPECTION SUMMARY
12/06/2023 Letter INSPECTION SUMMARY
12/07/2023 Letter INSPECTION SUMMARY
12/08/2023 Letter INSPECTION SUMMARY
12/11/2023 Letter INSPECTION SUMMARY
12/12/2023 Letter INSPECTION SUMMARY
12/13/2023 Letter INSPECTION SUMMARY
12/18/2023 Letter INSPECTION SUMMARY
12/19/2023 Letter INSPECTION SUMMARY
12/19/2023 Letter INSPECTION SUMMARY
12/20/2023 Letter INSPECTION SUMMARY
12/20/2023 Letter INSPECTION SUMMARY
03/06/2024 Letter INSPECTION SUMMARY
03/06/2024 Letter INSPECTION SUMMARY
03/06/2024 Letter INSPECTION SUMMARY
03/06/2024 Letter INSPECTION SUMMARY
04/05/2024 Letter DE-Certificate of Substantial Completion Single Lot
04/05/2024 Letter DE-Punch List
04/05/2024 Plans Submitted Record Drawings - Street_Rev 0_PL203177
04/05/2024 Security Document Ward Turn Lanes - Maintence Bond
04/26/2024 Activity Document Summit Orchard West Turn Lanes Addition Certificate of Substantial Completion - Final Affidavit
04/26/2024 Letter DE-Certificate of Final Acceptance (Commercial)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home