Summary


PRSUBD20230660
Public Infrastructure
Final Acceptance
MIDWEST DIVISION LSH LLC
DEVELOPMENT COMPLETE
LEES SUMMIT MEDICAL CENTER, AMBULATORY SURGICAL CENTER- PUBLIC SANITARY AND WATER
02/16/2023
08/03/2023
09/16/2024
Locations
Contacts
MIDWEST DIVISION LSH LLC, Address:PO BOX 80610  
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
BRADY MYERS, Address:JE DUNN, Phone:(602) 300-9631  
MIDWEST DIVISION LSH LLC, Address:PO BOX 80610  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 08/04/2023 08/03/2023
Mike Weisenborn
LSMC - ASC
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $1,993.50 $1,993.50 Paid 08/03/2023
91100C9-Water Insp Fee $555.00 $555.00 Paid 08/03/2023
9110071-Site Grading Fee $39.90 $39.90 Paid 08/03/2023
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 08/03/2023
9110069-After Hours Inspections (Public Works)(Per Hour) $50.00 $50.00 Paid 07/29/2024
9110069-After Hours Inspections (Public Works)(Per Hour) $150.00 $150.00 Paid 07/29/2024
9110069-After Hours Inspections (Public Works)(Per Hour) $150.00 $150.00 Paid 07/29/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sanitary Sewer Construction Inspection Partial 09/21/2023
Misc
Informational
09/21/2023
9-21-23 BR Contractor installed (A-1) pre-cast concrete manhole into live sewer line. Also 30' of 8'' PVC was installed from MH (A-1) 9-25-23 BR Contractor installed 30' of 8'' PVC to 8x6 service line wye to the first clean out line 9-26-23 BR Contractor installed 100' of 8'' PVC to second clean out line. 9-26-23 BR Contractor installed 100' of 8'' PVC to second clean out line. 9-28-23 BR Contractor installed 100' of 8'' PVC to MH (A-2) 10-3-23 BR Contractor installed 170' of 8'' PVC from MH (A-2) to MH (A-3)
Sanitary Sewer Construction Inspection Partial 09/26/2023
Misc
Informational
09/21/2023
9-21-23 BR Contactor installed (A-1) pre-cast concrete manhole into live sewer line. Also 30' of 8'' PVC was installed from MH (A-1) 9-25-23 BR Contractor installed 30' of 8'' PVC to 8x6 service line wye to the first clean out line 9-26-23 BR Contractor installed 100' of 8'' PVC to second clean out line. 9-28-23 BR Contractor installed 100' of 8'' PVC to MH (A-2) 10-3-23 BR Contractor installed 170' of 8'' PVC from MH (A-2) to MH (A-3) 10-4-23 BR Contractor installed 80' of 8'' PVC to MH (A-3). Also contractor installed a temporary pump around for MH (A-3) to get placed.
Sanitary Sewer - Air Test Passed 10/5/2023 10/5/2023 10/05/2023
Misc
Informational
10/05/2023
10-5-23 BR Contractor preform a presure test on Manholes. MH (A-2) to MH (A-3) passes. MH (A-2) to MH (A-1) passes.
Sanitary Sewer - Mandrel Passed 10/5/2023 10/5/2023 10/05/2023
Misc
Informational
10/05/2023
10-5-23 BR Contractor perform a mandrel test on manholes. MH (A-2) to MH (A-3) MH (A-2) to MH (A-3)
Sanitary Sewer - Vacuum Passed 10/5/2023 10/5/2023 10/05/2023
Misc
Informational
10/05/2023
10-5-23 BR Contractor perform a vacuum test on manholes. MH (A-1), MH (A-2), MH (A-3)
Grading/Excavation/Fill Inspection Partial 10/12/2023 10/12/2023 10/12/2023
Misc
Informational
10/12/2023
10-12-23 PS Contractor performing grading and compaction of soil for areas of removed sanitary and water lines. Contractor also removing demo water and sanitary from site
Erosion Control Inspection Partial 10/16/2023 10/16/2023 10/16/2023
Misc
Informational
09/21/2023
9-21-23 BR Erosion control is up and working order. 10-2-23 BR Erosion control is up and working order. 10-10-23 BR Erosion control is up and working order. 10-16-23 BR Erosion control is up and working order. 10-23-23 BR Erosion control is up and working order. 10-31-23 BR Erosion control is up and working order
Storm Sewer Construction Inspection Partial 10/17/2023 10/17/2023 10/18/2023
Misc
Informational
10/18/2023
10-16-23 BR Contractor installed both storm sewer inlets in both detention basin locations.
Erosion Control Inspection Partial 10/31/2023 10/31/2023 10/31/2023
Misc
Informational
10/16/2023
9-21-23 BR Erosion control is up and working order. 10-2-23 BR Erosion control is up and working order. 10-10-23 BR Erosion control is up and working order. 10-16-23 BR Erosion control is up and working order. 10-31-23 BR Erosion control is up and working order 11-7-23 BR Erosion control is up and working order 11-28-23 BR Erosion control is up working order 12-5-23 BR Erosion control is up and working order 12-19-23 BR Erosion control is up and working order 12-28-23 BR Erosion control is up and working order 1-4-24 BR Erosion control is up and working order 1-11-24 BR Erosion control is up and working order 1-23-24 BR Erosion control is up and working order
Water Line - Construction Inspection Passed 10/31/2023 10/31/2023 12/01/2023
Misc
Informational
10/31/2023
10-27-23 BR Contractor install backflow vault. 10-31-23 BR Contractor install fire line from vault to building. 11-6-23 BR Contractor install service line from water tap to building. 11-30-23 BR Contractor performed Hydrostatic test on the fire line & domestic water line with pass to LS specifications..
Erosion Control Inspection Partial 12/05/2023
Misc
Informational
10/31/2023
9-21-23 BR Erosion control is up and working order. 10-2-23 BR Erosion control is up and working order. 10-10-23 BR Erosion control is up and working order. 10-16-23 BR Erosion control is up and working order. 10-31-23 BR Erosion control is up and working order 11-7-23 BR Erosion control is up and working order 11-28-23 BR Erosion control is up working order 12-5-23 BR Erosion control is up and working order 12-19-23 BR Erosion control is up and working order 12-28-23 BR Erosion control is up and working order
Erosion Control Inspection Partial 12/28/2023
Misc
Informational
12/05/2023
9-21-23 BR Erosion control is up and working order. 10-10-23 BR Erosion control is up and working order. 10-16-23 BR Erosion control is up and working order. 10-31-23 BR Erosion control is up and working order 11-7-23 BR Erosion control is up and working order 11-28-23 BR Erosion control is up working order 12-5-23 BR Erosion control is up and working order 12-19-23 BR Erosion control is up and working order 12-28-23 BR Erosion control is up and working order 1-4-24 BR Erosion control is up and working order 1-11-24 BR Erosion control is up and working order 1-23-24 BR Erosion control is up and working order 1-30-24 BR Erosion control is up and working order
Sanitary Sewer Construction Inspection Passed 10/4/2023 10/4/2023 02/07/2024
Misc
Informational
09/26/2023
9-21-23 BR Contactor installed (A-1) pre-cast concrete manhole into live sewer line. Also 30' of 8'' PVC was installed from MH (A-1) 9-25-23 BR Contractor installed 30' of 8'' PVC to 8x6 service line wye to the first clean out line 9-26-23 BR Contractor installed 100' of 8'' PVC to second clean out line. 9-28-23 BR Contractor installed 100' of 8'' PVC to MH (A-2) 10-3-23 BR Contractor installed 170' of 8'' PVC from MH (A-2) to MH (A-3) 10-4-23 BR Contractor installed 80' of 8'' PVC to MH (A-3). Also contractor installed a temporary pump around for MH (A-3) to get placed. 2-7-24 BR Sanitary s sewer is constructed to the plans.
Water Line - Hydrostatic Test Passed 02/07/2024
Misc
Informational
02/07/2024
2-7-24 BR Contractor perform hydrostatic on the water main which was successful.
Erosion Control Inspection Partial 06/18/2024
Misc
Informational
09/21/2023
9-21-23 BR Erosion control is up and working order. 10-2-23 BR Erosion control is up and working order. 10-10-23 BR Erosion control is up and working order. 10-16-23 BR Erosion control is up and working order. 10-31-23 BR Erosion control is up and working order 11-7-23 BR Erosion control is up and working order 11-28-23 BR Erosion control is up working order 12-5-23 BR Erosion control is up and working order 12-19-23 BR Erosion control is up and working order 12-28-23 BR Erosion control is up and working order 1-4-24 BR Erosion control is up and working order 1-11-24 BR Erosion control is up and working order 1-23-24 BR Erosion control is up and working order 1-30-24 BR Erosion control is up and working order 2-2-24 BR Erosion control is up and working order 2-7-24 BR Erosion control is up and working order. 2-19-24 BR Erosion control is up and working order 2-29-24 BR Erosion control is up and working order 3-8-24 BR Erosion control is up and working order. 3-15-24 BR Erosion control is up and working order. 3-20-24 BR Erosion control is up and working order. 3-27-24 BR Erosion control is up and working order. 4-3-24 BR Erosion control is up and working order. 4-11-24 BR Erosion control is up and working order. 4-15-24 BR Erosion control is up and working order. 4-23-24 BR Erosion control is up and working order. 5-2-24 BR Erosion control is up and working order. 5-6-24 BR Erosion control is up and working order. 5-16-24 BR Erosion control is up and working order. 5-23-24 BR There is several locations around the perimeter of property were silt fence needs to be repaired 5-29-24 BR Erosion control is up and working order. 6-3-24 BR Erosion control is up and working order. 6-18-24 BR Erosion control is up and working order. 6-26-24 BR Erosion control is up and working order.
Site Visit Partial 06/18/2024
Misc
Informational
11/20/2023
11-20-23 Dustin A, No work being done due to rain 11-21-23 Dustin A, No work Due to muddy conditions. 11-22-23 Dustin No work Being done for us today 12-8-23 BR No work being done for us. 1-19-24 Dustin A, No activity today due to frigid temperatures. 1-18-24 BR No work due to icy conditions 1-23-24 BR No work being done for us. 2-8-24 BR No work is being done for us. 2-15-24 BR No work is being done for us 3-4-24 BR Contractor is working framing on the building. 3-7-24 BR No work being done do to weather conditions. 3-11-24 BR Contractor is working on framing on the outside of building. 3-13-24 BR Contractor is working on framing on the building and adding roofing. 3-18-24 BR Contractor is working on building. 3-20-24 BR Contractor is starting to add brick to the outside f the building. 3-28-24 BR Contractor replace 4 panels of sidewalk on northside of SE Blue PKWY that was damage do to fire hydrant installed for this project. 4-1-24 BR Sidewalk is constructed to LS specifications on northside of SE Blue PKWY. 4-3-24 BR Contractor is working on outside of building installing brick t the building. 4-11-24 BR Contractor is working on outside of building. 4-15-24 BR Contractor is working on outside of building. 4-18-24 BR No work being done do to weather conditions. 4-22-24 BR Contractor is working on outside and inside of building. 4-29-24 BR Contractor is working on outside of building and gas line is being installed to the building. 5-1-24 BR Contractor is working on inside of building. Miller pipeline gas contractor is installing gas line to the building. 5-9-24 BR Contractor is working on inside of building. 5-13-24 BR Contractor working on inside of building. 5-17-24 BR Contractor is working on inside of building. 5-20-24 BR Contractor is working on inside of building. 5-30-24 BR Contractor is working on inside of building. 6-3-24 BR Contractor is working on inside of building. 6-18-24 BR Contractor is getting parking lot lights columns installed.
Sidewalk Inspection Partial 06/19/2024
Misc
Informational
06/19/2024
6-19-24 BR Contractor (JE Dunn) saw cut sidewalk on south entrance which are joint to joint and the north entrance sidewalk there are cut at joint to joint.
Pavement-Aggregate Base Partial 6/26/2024 6/26/2024 06/26/2024
Misc
Informational
06/17/2024
6-17-24 BR Contractor (JE Dunn) started grading parking lot and adding aggregate in place. 6-19-24 BR Contractor (JE Dunn) installing geo-grind on top of base on north side of parking lot. 6-26-24 BR Contractor (JE Dunn) installing geo-grand on top of base on south side of parking lot.
Site Visit Partial 6/27/2024 6/27/2024 06/27/2024
Misc
Informational
11/20/2023
11-20-23 Dustin A, No work being done due to rain 6-27-24 Dustin A, Nobody on site
Site Visit Partial 6/27/2024 6/27/2024 06/27/2024
Misc
Informational
06/27/2024
11-20-23 Dustin A, No work being done due to rain 6-27-24 Dustin A, Pouring curb and pavement prep
Site Visit Partial 7/8/2024 7/8/2024 07/08/2024
Misc
Informational
06/27/2024
11-20-23 Dustin A, No work being done due to rain 6-27-24 Dustin A, Pouring curb and pavement prep 7-8-24 PS No inspections for development today
Pavement-Curb Construction Partial 7/9/2024 7/9/2024 07/09/2024
Misc
Informational
06/19/2024
6-19-24 BR Contractor (JE Dunn) saw cut curb on south entrance which are joint to joint. But on the north entrance there not cut at joint to joint. There are several curb sections that needs to be taking out along with storm box wing was damage and needs to be replace. 6-25-24 BR Contractor preformed a poof roll on the curbs which was successful. Ready for concrete. 7-9-24 BR Contractor (JE Dunn) poured concrete curbs on south side and north side of parking lot.
Public Curb Inspection Partial 7/10/2024 7/10/2024 07/10/2024
Misc
Informational
07/10/2024
7-9-24 BR Contractor (JB Bishop)remove damage curb and formed up and compacted aggregate on north side entrance only with north wing on ex. storm box ready for concrete. 7-10-24 BR Contractor (JB Bishop) poured curb on north side entrance along with north wing on storm box to LS specifications.
Driveway Inspection Partial 7/10/2024 7/10/2024 07/10/2024
Misc
Informational
07/10/2024
7-10-24 BR Contractor (JB Bishop) formed up and compacted aggregate on north side entrance ready for concrete.
Driveway Inspection Partial 7/24/2024 7/24/2024 07/25/2024
Misc
Informational
07/10/2024
7-10-24 BR Contractor (JB Bishop) formed up and compacted aggregate on north side entrance ready for concrete. 7-25-24 Dustin A, South Approach was formed and compacted. Approved to pour
Sidewalk Inspection Partial 7/24/2024 7/24/2024 07/25/2024
Misc
Informational
06/19/2024
6-19-24 BR Contractor (JE Dunn) saw cut sidewalk on south entrance which are joint to joint and the north entrance sidewalk there are cut at joint to joint. 7-25-24 Dustin A, public SW on south entrance is formed and compacted. Slopes are in compliance. Informed contractor of white cure needed on public SW and to not apply picture frame on new SW . The existing Sw does have picture frame but will prob be replaced down the road . Approved to pour.
Documents & Images
Date Uploaded File Type Document Name
02/01/2023 Engineers Estimate Utility Relocation Estimate of Probable Cost
02/24/2023 Activity Document Fees PL2023002 Lee's Summit Medical Center ASC San and Water
02/24/2023 Approved Plans HCA LSMC ASC Sanitary and Water Main Improvement Plans Approved 02 24 23
08/03/2023 Receipt Receipt for transaction: 2023-006020
08/03/2023 Letter DE-Permit
09/21/2023 Letter INSPECTION SUMMARY
09/21/2023 Letter INSPECTION SUMMARY
09/25/2023 Photograph Sewer manhole invert (A-1)
09/25/2023 Photograph MH A-1
09/25/2023 Photograph 8x6 service line wye
09/25/2023 Letter INSPECTION SUMMARY
09/26/2023 Letter INSPECTION SUMMARY
09/29/2023 Letter INSPECTION SUMMARY
10/04/2023 Letter INSPECTION SUMMARY
10/04/2023 Letter INSPECTION SUMMARY
10/05/2023 Letter INSPECTION SUMMARY
10/05/2023 Letter INSPECTION SUMMARY
10/05/2023 Letter INSPECTION SUMMARY
10/12/2023 Letter INSPECTION SUMMARY
10/16/2023 Letter INSPECTION SUMMARY
10/18/2023 Letter INSPECTION SUMMARY
10/24/2023 Letter INSPECTION SUMMARY
10/31/2023 Letter INSPECTION SUMMARY
10/31/2023 Letter INSPECTION SUMMARY
11/07/2023 Letter INSPECTION SUMMARY
11/20/2023 Letter INSPECTION SUMMARY
11/21/2023 Letter INSPECTION SUMMARY
12/01/2023 Letter INSPECTION SUMMARY
12/05/2023 Letter INSPECTION SUMMARY
12/08/2023 Letter INSPECTION SUMMARY
12/28/2023 Letter INSPECTION SUMMARY
01/11/2024 Letter INSPECTION SUMMARY
01/30/2024 Letter INSPECTION SUMMARY
02/07/2024 Letter INSPECTION SUMMARY
02/07/2024 Letter INSPECTION SUMMARY
02/08/2024 Letter INSPECTION SUMMARY
02/08/2024 Letter INSPECTION SUMMARY
02/09/2024 Letter DE-Certificate of Substantial Completion Single Lot
02/09/2024 Letter DE-Punch List
02/15/2024 Letter INSPECTION SUMMARY
02/29/2024 Letter INSPECTION SUMMARY
03/06/2024 Letter INSPECTION SUMMARY
03/07/2024 Letter INSPECTION SUMMARY
03/08/2024 Letter INSPECTION SUMMARY
03/11/2024 Letter INSPECTION SUMMARY
03/13/2024 Letter INSPECTION SUMMARY
03/15/2024 Letter INSPECTION SUMMARY
03/18/2024 Letter INSPECTION SUMMARY
03/20/2024 Letter INSPECTION SUMMARY
03/20/2024 Letter INSPECTION SUMMARY
03/27/2024 Letter INSPECTION SUMMARY
03/29/2024 Letter INSPECTION SUMMARY
04/01/2024 Letter INSPECTION SUMMARY
04/03/2024 Letter INSPECTION SUMMARY
04/03/2024 Letter INSPECTION SUMMARY
04/03/2024 Letter INSPECTION SUMMARY
04/11/2024 Letter INSPECTION SUMMARY
04/11/2024 Letter INSPECTION SUMMARY
04/15/2024 Letter INSPECTION SUMMARY
04/15/2024 Letter INSPECTION SUMMARY
04/18/2024 Letter INSPECTION SUMMARY
04/22/2024 Letter INSPECTION SUMMARY
04/23/2024 Letter INSPECTION SUMMARY
04/29/2024 Letter INSPECTION SUMMARY
05/01/2024 Letter INSPECTION SUMMARY
05/06/2024 Letter INSPECTION SUMMARY
05/09/2024 Letter INSPECTION SUMMARY
05/13/2024 Letter INSPECTION SUMMARY
05/16/2024 Letter INSPECTION SUMMARY
05/17/2024 Letter INSPECTION SUMMARY
05/17/2024 Letter INSPECTION SUMMARY
05/20/2024 Letter INSPECTION SUMMARY
05/23/2024 Letter INSPECTION SUMMARY
05/29/2024 Letter INSPECTION SUMMARY
05/30/2024 Letter INSPECTION SUMMARY
06/03/2024 Letter INSPECTION SUMMARY
06/03/2024 Letter INSPECTION SUMMARY
06/17/2024 Letter INSPECTION SUMMARY
06/18/2024 Letter INSPECTION SUMMARY
06/18/2024 Letter INSPECTION SUMMARY
06/19/2024 Letter INSPECTION SUMMARY
06/19/2024 Letter INSPECTION SUMMARY
06/19/2024 Letter INSPECTION SUMMARY
06/25/2024 Letter INSPECTION SUMMARY
06/26/2024 Letter INSPECTION SUMMARY
06/26/2024 Letter INSPECTION SUMMARY
06/27/2024 Letter INSPECTION SUMMARY
06/27/2024 Letter INSPECTION SUMMARY
07/08/2024 Letter INSPECTION SUMMARY
07/09/2024 Letter INSPECTION SUMMARY
07/10/2024 Letter INSPECTION SUMMARY
07/10/2024 Letter INSPECTION SUMMARY
07/25/2024 Letter INSPECTION SUMMARY
07/25/2024 Letter INSPECTION SUMMARY
07/25/2024 Letter INSPECTION SUMMARY
07/29/2024 Receipt Receipt for transaction:2024-006320
08/20/2024 Plans PRSUBD20230660 - Public Infrastructure - As Built
08/20/2024 Security Document PRSUBD20230660 - Public Infrastructure - Final Affidavit and Agreement
08/20/2024 Security Document PRSUBD20230660 - Public Infrastructure - Maintenance Bond
08/20/2024 Letter PRSUBD20230660 - Public Infrastructure - Punch List
08/20/2024 Letter PRSUBD20230660 - Public Infrastructure - Substantial Completion 02_09_24
09/16/2024 Letter DE-Certificate of Final Acceptance (Commercial)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home