Summary


PRSUBD20220902
Public Infrastructure
Substantial Completion
WHD MANAGEMENT LLC
DEVELOPMENT COMPLETE
Mass grading, public sanitary and public water for Mega Storage and DBat
03/10/2022
05/09/2022
03/09/2026
Locations
Contacts
WHD MANAGEMENT LLC, Address:PO BOX 1059  
SITE RITE CONSTRUCTON CO, Address:1601 BELLEFONTAINE AVE, Phone:(816) 561-4890  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 04/22/2022 04/22/2022
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 04/12/2022
91100C8-Sanitary Sewer Insp Fees $1,735.35 $1,735.35 Paid 04/12/2022
91100C9-Water Insp Fee $876.00 $876.00 Paid 04/12/2022
9110072-Water Test Fee $400.00 $400.00 Paid 04/12/2022
9110071-Site Grading Fee $6,091.11 $6,091.11 Paid 04/12/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Record Drawing Review Pending
Sidewalk Inspection Pending
Driveway Inspection Pending
Site Visit Partial 06/28/2022
Misc
Informational
06/28/2022
6-28-22 AN we had a pre con with all the contractors and also got the approved plans. Work should be starting soon
Erosion Control Inspection Partial 06/30/2022
Misc
Informational
06/30/2022
6-30-22 AN. Gordan is installing the silt fence now so grading can begin
Grading/Excavation/Fill Inspection Partial 07/07/2022
Misc
Informational
07/07/2022
7-7-22 RH Grading has started.
Erosion Control Inspection Partial 07/07/2022
Misc
Informational
06/30/2022
6-30-22 AN. Gordan is installing the silt fence now so grading can begin 7-7-22 RH. Silt fence is up and in working order.
Grading/Excavation/Fill Inspection Partial 07/11/2022
Misc
Informational
07/07/2022
7-7-22 RH Grading has started. 7-11-22 RH. Grading and clearing of vegetation continues.
Grading/Excavation/Fill Inspection Partial 07/12/2022
Misc
Informational
07/11/2022
7-7-22 RH Grading has started. 7-11-22 RH. Grading and clearing of vegetation continues. 7-12-22 RH. Grading continues. Need to watch for silt pond to be put in before next rain event. Survey Stakes are in place.
Erosion Control Inspection Partial 07/12/2022
Misc
Informational
07/07/2022
6-30-22 AN. Gordan is installing the silt fence now so grading can begin 7-7-22 RH. Silt fence is up and in working order. 7-12-22 RH. Silt fence is up and in working order.
Grading/Excavation/Fill Inspection Partial 07/14/2022
Misc
Informational
07/12/2022
7-7-22 RH Grading has started. 7-11-22 RH. Grading and clearing of vegetation continues. 7-12-22 RH. Grading continues. Need to watch for silt pond to be put in before next rain event. Survey Stakes are in place. 7-13-22 AN crew is still grading
Grading/Excavation/Fill Inspection Partial 07/14/2022
Misc
Informational
07/14/2022
7-7-22 RH Grading has started. 7-11-22 RH. Grading and clearing of vegetation continues. 7-12-22 RH. Grading continues. Need to watch for silt pond to be put in before next rain event. Survey Stakes are in place. 7-13-22 AN crew is still grading 7-14-22 AN crew is still grading and is appears that they are also grading for the sediment basin
Grading/Excavation/Fill Inspection Partial 07/15/2022
Misc
Informational
07/14/2022
7-7-22 RH Grading has started. 7-11-22 RH. Grading and clearing of vegetation continues. 7-12-22 RH. Grading continues. Need to watch for silt pond to be put in before next rain event. Survey Stakes are in place. 7-13-22 AN crew is still grading 7-14-22 AN crew is still grading and is appears that they are also grading for the sediment basin 7-15-22 RH. Crew continues to grade site and detention basin.
Grading/Excavation/Fill Inspection Partial 07/18/2022
Misc
Informational
07/15/2022
7-7-22 RH Grading has started. 7-11-22 RH. Grading and clearing of vegetation continues. 7-12-22 RH. Grading continues. Need to watch for silt pond to be put in before next rain event. Survey Stakes are in place. 7-13-22 AN crew is still grading 7-14-22 AN crew is still grading and is appears that they are also grading for the sediment basin 7-15-22 RH. Crew continues to grade site and detention basin. 7-18-22 AN crew continues to grade the site
Erosion Control Inspection Partial 07/20/2022
Misc
Informational
07/12/2022
6-30-22 AN. Gordan is installing the silt fence now so grading can begin 7-7-22 RH. Silt fence is up and in working order. 7-12-22 RH. Silt fence is up and in working order. 7-20-22 AN silt fence is in good working order
Grading/Excavation/Fill Inspection Partial 07/20/2022
Misc
Informational
07/18/2022
7-7-22 RH Grading has started. 7-11-22 RH. Grading and clearing of vegetation continues. 7-12-22 RH. Grading continues. Need to watch for silt pond to be put in before next rain event. Survey Stakes are in place. 7-13-22 AN crew is still grading 7-14-22 AN crew is still grading and is appears that they are also grading for the sediment basin 7-15-22 RH. Crew continues to grade site and detention basin. 7-18-22 AN crew continues to grade the site 7-19-22 AN crew is still grading and working on the detention basin
Grading/Excavation/Fill Inspection Partial 07/20/2022
Misc
Informational
07/20/2022
7-7-22 RH Grading has started. 7-11-22 RH. Grading and clearing of vegetation continues. 7-12-22 RH. Grading continues. Need to watch for silt pond to be put in before next rain event. Survey Stakes are in place. 7-13-22 AN crew is still grading 7-14-22 AN crew is still grading and is appears that they are also grading for the sediment basin 7-15-22 RH. Crew continues to grade site and detention basin. 7-18-22 AN crew continues to grade the site 7-19-22 AN crew is still grading and working on the detention basin 7-20-22 AN crew is still grading and working on the detention basin
Grading/Excavation/Fill Inspection Partial 07/21/2022
Misc
Informational
07/20/2022
7-7-22 RH Grading has started. 7-11-22 RH. Grading and clearing of vegetation continues. 7-12-22 RH. Grading continues. Need to watch for silt pond to be put in before next rain event. Survey Stakes are in place. 7-13-22 AN crew is still grading 7-14-22 AN crew is still grading and is appears that they are also grading for the sediment basin 7-15-22 RH. Crew continues to grade site and detention basin. 7-18-22 AN crew continues to grade the site 7-19-22 AN crew is still grading and working on the detention basin 7-20-22 AN crew is still grading and working on the detention basin 7-21-22 AN continuing to grade the site
Erosion Control Inspection Failed 07/22/2022
Misc
Informational
07/20/2022
6-30-22 AN. Gordan is installing the silt fence now so grading can begin 7-7-22 RH. Silt fence is up and in working order. 7-12-22 RH. Silt fence is up and in working order. 7-20-22 AN silt fence is in good working order
Miscellaneous Correction
Corrective Action Required
07/22/2022
7-22-22 AN street needs to get cleaned up
Erosion Control Inspection Partial 07/26/2022
Misc
Informational
07/22/2022
6-30-22 AN. Gordan is installing the silt fence now so grading can begin 7-7-22 RH. Silt fence is up and in working order. 7-12-22 RH. Silt fence is up and in working order. 7-20-22 AN silt fence is in good working order
Miscellaneous Correction
Corrective Action Required
07/22/2022
7-22-22 AN street needs to get cleaned up 7-26-22 AN silt fence is in good working order
Grading/Excavation/Fill Inspection Partial 07/26/2022
Misc
Informational
07/21/2022
7-7-22 RH Grading has started. 7-11-22 RH. Grading and clearing of vegetation continues. 7-12-22 RH. Grading continues. Need to watch for silt pond to be put in before next rain event. Survey Stakes are in place. 7-13-22 AN crew is still grading 7-14-22 AN crew is still grading and is appears that they are also grading for the sediment basin 7-15-22 RH. Crew continues to grade site and detention basin. 7-18-22 AN crew continues to grade the site 7-19-22 AN crew is still grading and working on the detention basin 7-20-22 AN crew is still grading and working on the detention basin 7-21-22 AN continuing to grade the site 7-25-22 AN grading site 7-26-22 AN grading stie
Grading/Excavation/Fill Inspection Partial 07/28/2022
Misc
Informational
07/26/2022
7-7-22 RH Grading has started. 7-11-22 RH. Grading and clearing of vegetation continues. 7-12-22 RH. Grading continues. Need to watch for silt pond to be put in before next rain event. Survey Stakes are in place. 7-13-22 AN crew is still grading 7-14-22 AN crew is still grading and is appears that they are also grading for the sediment basin 7-15-22 RH. Crew continues to grade site and detention basin. 7-18-22 AN crew continues to grade the site 7-19-22 AN crew is still grading and working on the detention basin 7-20-22 AN crew is still grading and working on the detention basin 7-21-22 AN continuing to grade the site 7-25-22 AN grading site 7-26-22 AN grading stie 7-28-22 AN crew is grading a new entrance into the complex
Site Visit Partial 08/01/2022
Misc
Informational
06/28/2022
6-28-22 AN we had a pre con with all the contractors and also got the approved plans. Work should be starting soon 8-1-22AN no work
Grading/Excavation/Fill Inspection Partial 08/02/2022
Misc
Informational
07/28/2022
7-7-22 RH Grading has started. 7-11-22 RH. Grading and clearing of vegetation continues. 7-12-22 RH. Grading continues. Need to watch for silt pond to be put in before next rain event. Survey Stakes are in place. 7-13-22 AN crew is still grading 7-14-22 AN crew is still grading and is appears that they are also grading for the sediment basin 7-15-22 RH. Crew continues to grade site and detention basin. 7-18-22 AN crew continues to grade the site 7-19-22 AN crew is still grading and working on the detention basin 7-20-22 AN crew is still grading and working on the detention basin 7-21-22 AN continuing to grade the site 7-25-22 AN grading site 7-26-22 AN grading stie 7-28-22 AN crew is grading a new entrance into the complex 8-2-22 AN crew is continuing to grade the site
Grading/Excavation/Fill Inspection Partial 08/04/2022
Misc
Informational
08/02/2022
7-7-22 RH Grading has started. 7-11-22 RH. Grading and clearing of vegetation continues. 7-12-22 RH. Grading continues. Need to watch for silt pond to be put in before next rain event. Survey Stakes are in place. 7-13-22 AN crew is still grading 7-14-22 AN crew is still grading and is appears that they are also grading for the sediment basin 7-15-22 RH. Crew continues to grade site and detention basin. 7-18-22 AN crew continues to grade the site 7-19-22 AN crew is still grading and working on the detention basin 7-20-22 AN crew is still grading and working on the detention basin 7-21-22 AN continuing to grade the site 7-25-22 AN grading site 7-26-22 AN grading stie 7-28-22 AN crew is grading a new entrance into the complex 8-2-22 AN crew is continuing to grade the site 8-3-22 AN grading for roadway
Grading/Excavation/Fill Inspection Partial 08/04/2022
Misc
Informational
08/04/2022
7-7-22 RH Grading has started. 7-11-22 RH. Grading and clearing of vegetation continues. 7-12-22 RH. Grading continues. Need to watch for silt pond to be put in before next rain event. Survey Stakes are in place. 7-13-22 AN crew is still grading 7-14-22 AN crew is still grading and is appears that they are also grading for the sediment basin 7-15-22 RH. Crew continues to grade site and detention basin. 7-18-22 AN crew continues to grade the site 7-19-22 AN crew is still grading and working on the detention basin 7-20-22 AN crew is still grading and working on the detention basin 7-21-22 AN continuing to grade the site 7-25-22 AN grading site 7-26-22 AN grading stie 7-28-22 AN crew is grading a new entrance into the complex 8-2-22 AN crew is continuing to grade the site 8-3-22 AN grading for roadway 8-4-22 AN grading roadway
Erosion Control Inspection Failed 08/04/2022
Misc
Informational
07/26/2022
6-30-22 AN. Gordan is installing the silt fence now so grading can begin 7-7-22 RH. Silt fence is up and in working order. 7-12-22 RH. Silt fence is up and in working order. 7-20-22 AN silt fence is in good working order
Miscellaneous Correction
Corrective Action Required
07/26/2022
7-22-22 AN street needs to get cleaned up 7-26-22 AN silt fence is in good working order
Miscellaneous Correction
Corrective Action Required
08/04/2022
8-4-22 AN. Trucks are starting to track mud in to the roadway. Please keep it cleaned up
Grading/Excavation/Fill Inspection Partial 08/09/2022
Misc
Informational
08/04/2022
7-7-22 RH Grading has started. 7-11-22 RH. Grading and clearing of vegetation continues. 7-12-22 RH. Grading continues. Need to watch for silt pond to be put in before next rain event. Survey Stakes are in place. 7-13-22 AN crew is still grading 7-14-22 AN crew is still grading and is appears that they are also grading for the sediment basin 7-15-22 RH. Crew continues to grade site and detention basin. 7-18-22 AN crew continues to grade the site 7-19-22 AN crew is still grading and working on the detention basin 7-20-22 AN crew is still grading and working on the detention basin 7-21-22 AN continuing to grade the site 7-25-22 AN grading site 7-26-22 AN grading stie 7-28-22 AN crew is grading a new entrance into the complex 8-2-22 AN crew is continuing to grade the site 8-3-22 AN grading for roadway 8-4-22 AN grading roadway 8-9-22 RH. Crew continues to grade site and roadway.
Grading/Excavation/Fill Inspection Partial 08/11/2022
Misc
Informational
08/09/2022
7-7-22 RH Grading has started. 7-11-22 RH. Grading and clearing of vegetation continues. 7-12-22 RH. Grading continues. Need to watch for silt pond to be put in before next rain event. Survey Stakes are in place. 7-13-22 AN crew is still grading 7-14-22 AN crew is still grading and is appears that they are also grading for the sediment basin 7-15-22 RH. Crew continues to grade site and detention basin. 7-18-22 AN crew continues to grade the site 7-19-22 AN crew is still grading and working on the detention basin 7-20-22 AN crew is still grading and working on the detention basin 7-21-22 AN continuing to grade the site 7-25-22 AN grading site 7-26-22 AN grading stie 7-28-22 AN crew is grading a new entrance into the complex 8-2-22 AN crew is continuing to grade the site 8-3-22 AN grading for roadway 8-4-22 AN grading roadway 8-9-22 RH. Crew continues to grade site and roadway. 8-10-22 AN crew is still grading
Grading/Excavation/Fill Inspection Partial 08/11/2022
Misc
Informational
08/11/2022
7-7-22 RH Grading has started. 7-11-22 RH. Grading and clearing of vegetation continues. 7-12-22 RH. Grading continues. Need to watch for silt pond to be put in before next rain event. Survey Stakes are in place. 7-13-22 AN crew is still grading 7-14-22 AN crew is still grading and is appears that they are also grading for the sediment basin 7-15-22 RH. Crew continues to grade site and detention basin. 7-18-22 AN crew continues to grade the site 7-19-22 AN crew is still grading and working on the detention basin 7-20-22 AN crew is still grading and working on the detention basin 7-21-22 AN continuing to grade the site 7-25-22 AN grading site 7-26-22 AN grading stie 7-28-22 AN crew is grading a new entrance into the complex 8-2-22 AN crew is continuing to grade the site 8-3-22 AN grading for roadway 8-4-22 AN grading roadway 8-9-22 RH. Crew continues to grade site and roadway. 8-10-22 AN crew is still grading 8-11-22 AN crew is about done grading site
Erosion Control Inspection Partial 08/11/2022
Misc
Informational
08/04/2022
6-30-22 AN. Gordan is installing the silt fence now so grading can begin 7-7-22 RH. Silt fence is up and in working order. 7-12-22 RH. Silt fence is up and in working order. 7-20-22 AN silt fence is in good working order
Miscellaneous Correction
Corrective Action Required
08/04/2022
7-22-22 AN street needs to get cleaned up 7-26-22 AN silt fence is in good working order
Miscellaneous Correction
Corrective Action Required
08/04/2022
8-4-22 AN. Trucks are starting to track mud in to the roadway. Please keep it cleaned up 8-11-22 AN silt fence is in good working order and road is clean
Grading/Excavation/Fill Inspection Partial 08/17/2022
Misc
Informational
08/11/2022
7-7-22 RH Grading has started. 7-11-22 RH. Grading and clearing of vegetation continues. 7-12-22 RH. Grading continues. Need to watch for silt pond to be put in before next rain event. Survey Stakes are in place. 7-13-22 AN crew is still grading 7-14-22 AN crew is still grading and is appears that they are also grading for the sediment basin 7-15-22 RH. Crew continues to grade site and detention basin. 7-18-22 AN crew continues to grade the site 7-19-22 AN crew is still grading and working on the detention basin 7-20-22 AN crew is still grading and working on the detention basin 7-21-22 AN continuing to grade the site 7-25-22 AN grading site 7-26-22 AN grading stie 7-28-22 AN crew is grading a new entrance into the complex 8-2-22 AN crew is continuing to grade the site 8-3-22 AN grading for roadway 8-4-22 AN grading roadway 8-9-22 RH. Crew continues to grade site and roadway. 8-10-22 AN crew is still grading 8-11-22 AN crew is about done grading site 8-16-22 AN Raining and no work being done
Grading/Excavation/Fill Inspection Partial 08/17/2022
Misc
Informational
08/17/2022
7-7-22 RH Grading has started. 7-11-22 RH. Grading and clearing of vegetation continues. 7-12-22 RH. Grading continues. Need to watch for silt pond to be put in before next rain event. Survey Stakes are in place. 7-13-22 AN crew is still grading 7-14-22 AN crew is still grading and is appears that they are also grading for the sediment basin 7-15-22 RH. Crew continues to grade site and detention basin. 7-18-22 AN crew continues to grade the site 7-19-22 AN crew is still grading and working on the detention basin 7-20-22 AN crew is still grading and working on the detention basin 7-21-22 AN continuing to grade the site 7-25-22 AN grading site 7-26-22 AN grading stie 7-28-22 AN crew is grading a new entrance into the complex 8-2-22 AN crew is continuing to grade the site 8-3-22 AN grading for roadway 8-4-22 AN grading roadway 8-9-22 RH. Crew continues to grade site and roadway. 8-10-22 AN crew is still grading 8-11-22 AN crew is about done grading site 8-16-22 AN Raining and no work being done 8-17-22 AN to wet to do grading
Site Visit Partial 08/19/2022
Misc
Informational
08/01/2022
6-28-22 AN we had a pre con with all the contractors and also got the approved plans. Work should be starting soon 8-1-22AN no work 8-18-22 AN no work being done
Site Visit Partial 08/19/2022
Misc
Informational
08/19/2022
6-28-22 AN we had a pre con with all the contractors and also got the approved plans. Work should be starting soon 8-1-22AN no work 8-18-22 AN no work being done 8-19-22 AN no work being done
Site Visit Partial 08/22/2022
Misc
Informational
08/19/2022
6-28-22 AN we had a pre con with all the contractors and also got the approved plans. Work should be starting soon 8-1-22AN no work 8-18-22 AN no work being done 8-19-22 AN no work being done 8-22-22 AN no work for development
Erosion Control Inspection Partial 08/22/2022
Misc
Informational
08/11/2022
6-30-22 AN. Gordan is installing the silt fence now so grading can begin 7-7-22 RH. Silt fence is up and in working order. 7-12-22 RH. Silt fence is up and in working order. 7-20-22 AN silt fence is in good working order
Miscellaneous Correction
Corrective Action Required
08/11/2022
7-22-22 AN street needs to get cleaned up 7-26-22 AN silt fence is in good working order
Miscellaneous Correction
Corrective Action Required
08/11/2022
8-4-22 AN. Trucks are starting to track mud in to the roadway. Please keep it cleaned up 8-11-22 AN silt fence is in good working order and road is clean 8-22-22 AN no erosion control issues
Sanitary Sewer Construction Inspection Partial 08/26/2022
Misc
Informational
08/26/2022
8-25-22 AN. Randy began to dig up and expose the manhole tie in on the detail car property
Sanitary Sewer Construction Inspection Partial 08/26/2022
Misc
Informational
08/26/2022
8-25-22 AN. Randy began to dig up and expose the manhole tie in on the detail car property 8-26-22 AN. Man hole has been cored in to . Pic attached
Sanitary Sewer Construction Inspection Partial 08/29/2022
Misc
Informational
08/26/2022
8-25-22 AN. Randy began to dig up and expose the manhole tie in on the detail car property 8-26-22 AN. Man hole has been cored in to . Pic attached 8-29-22 AN. Crew installed about 5 sticks of pipe today .
Sanitary Sewer Construction Inspection Partial 08/31/2022
Misc
Informational
08/29/2022
8-25-22 AN. Randy began to dig up and expose the manhole tie in on the detail car property 8-26-22 AN. Man hole has been cored in to . Pic attached 8-29-22 AN. Crew installed about 5 sticks of pipe today . 8-31-22 AN. Crew is continuing to install sewer pipe
Sanitary Sewer Construction Inspection Partial 09/07/2022
Misc
Informational
08/31/2022
8-25-22 AN. Randy began to dig up and expose the manhole tie in on the detail car property 8-26-22 AN. Man hole has been cored in to . Pic attached 8-29-22 AN. Crew installed about 5 sticks of pipe today . 8-31-22 AN. Crew is continuing to install sewer pipe 9-7-22 AN. There is some concern about the straightness of the sewer main between the existing MH and S-1 , S-2. The pipe has some zig zags or bows in the main. ES and i shined a light in the main and could not see the light between MH’s also i had Randy with Tasco use their pipe laser and we also could not get it to shine through . I recommended that they get a third party to inspect and also do a mandrel test for the 10” main. We did do a mandrel test witch requires a 9.21 and they used a 9.24 mandrel. The mandrel went through with no problem.. we will have to wait until they are 100% done and the 30 day waiting period to have WU come out and inspect and determine if they will except the main .
Sanitary Sewer Construction Inspection Partial 09/08/2022
Misc
Informational
09/07/2022
8-25-22 AN. Randy began to dig up and expose the manhole tie in on the detail car property 8-26-22 AN. Man hole has been cored in to . Pic attached 8-29-22 AN. Crew installed about 5 sticks of pipe today . 8-31-22 AN. Crew is continuing to install sewer pipe 9-7-22 AN. There is some concern about the straightness of the sewer main between the existing MH and S-1 , S-2. The pipe has some zig zags or bows in the main. ES and i shined a light in the main and could not see the light between MH’s also i had Randy with Tasco use their pipe laser and we also could not get it to shine through . I recommended that they get a third party to inspect and also do a mandrel test for the 10” main. We did do a mandrel test witch requires a 9.21 and they used a 9.24 mandrel. The mandrel went through with no problem.. we will have to wait until they are 100% done and the 30 day waiting period to have WU come out and inspect and determine if they will except the main . 9-8-22 AN crew is installing the sewer main from MH S-2 to S-3 they also are installing MH S-3 9-8-22 AN. Spoke with rusty about the invert on the existing MH and let them know they needed to tear out the majority of the invert and re pour the invert
Sanitary Sewer - Invert Partial 09/09/2022
Misc
Informational
09/09/2022
9-9-22 AN Tasco poured the inverts on MH S-1 and S-2
Site Visit Partial 09/12/2022
Misc
Informational
08/22/2022
6-28-22 AN we had a pre con with all the contractors and also got the approved plans. Work should be starting soon 8-1-22AN no work 8-18-22 AN no work being done 8-19-22 AN no work being done 8-22-22 AN no work for development 9-12-22 AN no one on site today
Site Visit Partial 09/13/2022
Misc
Informational
09/12/2022
6-28-22 AN we had a pre con with all the contractors and also got the approved plans. Work should be starting soon 8-1-22AN no work 8-18-22 AN no work being done 8-19-22 AN no work being done 8-22-22 AN no work for development 9-12-22 AN no one on site today 9-13-22 AN no one on site
Site Visit Partial 09/14/2022
Misc
Informational
09/13/2022
6-28-22 AN we had a pre con with all the contractors and also got the approved plans. Work should be starting soon 8-1-22AN no work 8-18-22 AN no work being done 8-19-22 AN no work being done 8-22-22 AN no work for development 9-12-22 AN no one on site today 9-13-22 AN no one on site 9-14-22 AN no one on site
Site Visit Partial 9/16/2022 09/16/2022
Misc
Informational
09/14/2022
6-28-22 AN we had a pre con with all the contractors and also got the approved plans. Work should be starting soon 8-1-22AN no work 8-18-22 AN no work being done 8-19-22 AN no work being done 8-22-22 AN no work for development 9-12-22 AN no one on site today 9-13-22 AN no one on site 9/16/22 SR no on site , did not here anything about the test shut yet. 9-14-22 AN no one on site
Water Line - Construction Inspection Passed 09/21/2022
Misc
Informational
09/21/2022
09/21/22 Wednesday JMJ ( Genesis Plumbing ) Contractor performed tie-in on existing 12” water main with 12”X12” tee and 2/12” sleeve. Tie-in was perform from 6:20AM to 10:20AM.
Water Line - Construction Inspection Partial 09/26/2022
Misc
Informational
09/26/2022
9-26-22 AN. Water tie in was done last week
Water Line - Construction Inspection Partial 09/26/2022
Misc
Informational
09/26/2022
9-26-22 AN. Water tie in was done last week 9-26-22 AN. Crew has finished the water main with a dead end fire hydrant. Waiting on plans to be approved to extend the water main.
Sanitary Sewer Construction Inspection Partial 09/26/2022
Misc
Informational
09/08/2022
8-25-22 AN. Randy began to dig up and expose the manhole tie in on the detail car property 8-26-22 AN. Man hole has been cored in to . Pic attached 8-29-22 AN. Crew installed about 5 sticks of pipe today . 8-31-22 AN. Crew is continuing to install sewer pipe 9-7-22 AN. There is some concern about the straightness of the sewer main between the existing MH and S-1 , S-2. The pipe has some zig zags or bows in the main. ES and i shined a light in the main and could not see the light between MH’s also i had Randy with Tasco use their pipe laser and we also could not get it to shine through . I recommended that they get a third party to inspect and also do a mandrel test for the 10” main. We did do a mandrel test witch requires a 9.21 and they used a 9.24 mandrel. The mandrel went through with no problem.. we will have to wait until they are 100% done and the 30 day waiting period to have WU come out and inspect and determine if they will except the main . 9-8-22 AN crew is installing the sewer main from MH S-2 to S-3 they also are installing MH S-3 9-8-22 AN. Spoke with rusty about the invert on the existing MH and let them know they needed to tear out the majority of the invert and re pour the invert 9-26-22 AN. Wait for plans to be approved for the sewer extension and possibly redo part of the sewer main to get more flow
Water Line - Construction Inspection Partial 10/06/2022
Misc
Informational
09/26/2022
9-26-22 AN. Water tie in was done last week 9-26-22 AN. Crew has finished the water main with a dead end fire hydrant. Waiting on plans to be approved to extend the water main. (Only sewer is getting extended) 10-6-22 AN water main is ready for testing .
Sanitary Sewer - Mandrel Partial 10/10/2022
Misc
Informational
10/10/2022
10-10-22 AN. 10” sdr 26 mandrel test . 9.21 mandrel Existing MH to S1 passed S1 to S2 passed
Sanitary Sewer - Mandrel Partial 10/10/2022
Misc
Informational
10/10/2022
10-10-22 AN. 10” sdr 26 mandrel test . 9.21 mandrel Existing MH to S1 passed S1 to S2 passed S2 to S3 not tested
Sanitary Sewer - Air Test Partial 10/10/2022
Misc
Informational
10/10/2022
10-10-22 AN. Air test 3.5 psi , 9:26 min on 10in main Existing MH to S1 passed S1 to S2 passed S2 to S3 not tested
Water Line - Hydrostatic Test Passed 10/18/2022
Misc
Informational
10/18/2022
Did hydrostatic test at 150psi for 2hrs .. passed
Water Line - Coliform Test 1 Passed 10/18/2022
Misc
Informational
10/18/2022
10-18-22 AN. Water line was chlorinated and first sample passed
Water Line - Coliform Test 2 Passed 10/18/2022
Misc
Informational
10/18/2022
10-18-22 AN 2nd water sample passed
Water Line - Construction Inspection Passed 10/18/2022
Misc
Informational
10/06/2022
9-26-22 AN. Water tie in was done last week 9-26-22 AN. Crew has finished the water main with a dead end fire hydrant. Waiting on plans to be approved to extend the water main. (Only sewer is getting extended) 10-6-22 AN water main is ready for testing . 10-18-22 AN. Water line and dead end fire hydrant is completed and passed all testing
Sanitary Sewer - Camera Test Partial 11/18/2022 10/19/2022
Misc
Informational
10/19/2022
10-19-22 AN. Camera test for existing MH, s1, s2 passed
Sanitary Sewer Construction Inspection Partial 11/10/2022
Misc
Informational
09/26/2022
8-25-22 AN. Randy began to dig up and expose the manhole tie in on the detail car property 8-26-22 AN. Man hole has been cored in to . Pic attached 8-29-22 AN. Crew installed about 5 sticks of pipe today . 8-31-22 AN. Crew is continuing to install sewer pipe 9-7-22 AN. There is some concern about the straightness of the sewer main between the existing MH and S-1 , S-2. The pipe has some zig zags or bows in the main. ES and i shined a light in the main and could not see the light between MH’s also i had Randy with Tasco use their pipe laser and we also could not get it to shine through . I recommended that they get a third party to inspect and also do a mandrel test for the 10” main. We did do a mandrel test witch requires a 9.21 and they used a 9.24 mandrel. The mandrel went through with no problem.. we will have to wait until they are 100% done and the 30 day waiting period to have WU come out and inspect and determine if they will except the main . 9-8-22 AN crew is installing the sewer main from MH S-2 to S-3 they also are installing MH S-3 9-8-22 AN. Spoke with rusty about the invert on the existing MH and let them know they needed to tear out the majority of the invert and re pour the invert 9-26-22 AN. Wait for plans to be approved for the sewer extension and possibly redo part of the sewer main to get more flow 11-9-22 AN. Crew has Ben working on redoing the sewer line changes and extension 11-20-22 AN crew is continuing to work on the sewer extension . sewer main needs to be encased in concrete. i also dont have approved plans
Sanitary Sewer Construction Inspection Partial 11/14/2022
Misc
Informational
11/10/2022
8-25-22 AN. Randy began to dig up and expose the manhole tie in on the detail car property 8-26-22 AN. Man hole has been cored in to . Pic attached 8-29-22 AN. Crew installed about 5 sticks of pipe today . 8-31-22 AN. Crew is continuing to install sewer pipe 9-7-22 AN. There is some concern about the straightness of the sewer main between the existing MH and S-1 , S-2. The pipe has some zig zags or bows in the main. ES and i shined a light in the main and could not see the light between MH’s also i had Randy with Tasco use their pipe laser and we also could not get it to shine through . I recommended that they get a third party to inspect and also do a mandrel test for the 10” main. We did do a mandrel test witch requires a 9.21 and they used a 9.24 mandrel. The mandrel went through with no problem.. we will have to wait until they are 100% done and the 30 day waiting period to have WU come out and inspect and determine if they will except the main . 9-8-22 AN crew is installing the sewer main from MH S-2 to S-3 they also are installing MH S-3 9-8-22 AN. Spoke with rusty about the invert on the existing MH and let them know they needed to tear out the majority of the invert and re pour the invert 9-26-22 AN. Wait for plans to be approved for the sewer extension and possibly redo part of the sewer main to get more flow 11-9-22 AN. Crew has Ben working on redoing the sewer line changes and extension 11-14-22 AN. Crew is not working
Sanitary Sewer Construction Inspection Partial 11/21/2022
Misc
Informational
11/14/2022
8-25-22 AN. Randy began to dig up and expose the manhole tie in on the detail car property 8-26-22 AN. Man hole has been cored in to . Pic attached 8-29-22 AN. Crew installed about 5 sticks of pipe today . 8-31-22 AN. Crew is continuing to install sewer pipe 9-7-22 AN. There is some concern about the straightness of the sewer main between the existing MH and S-1 , S-2. The pipe has some zig zags or bows in the main. ES and i shined a light in the main and could not see the light between MH’s also i had Randy with Tasco use their pipe laser and we also could not get it to shine through . I recommended that they get a third party to inspect and also do a mandrel test for the 10” main. We did do a mandrel test witch requires a 9.21 and they used a 9.24 mandrel. The mandrel went through with no problem.. we will have to wait until they are 100% done and the 30 day waiting period to have WU come out and inspect and determine if they will except the main . 9-8-22 AN crew is installing the sewer main from MH S-2 to S-3 they also are installing MH S-3 9-8-22 AN. Spoke with rusty about the invert on the existing MH and let them know they needed to tear out the majority of the invert and re pour the invert 9-26-22 AN. Wait for plans to be approved for the sewer extension and possibly redo part of the sewer main to get more flow 11-9-22 AN. Crew has Ben working on redoing the sewer line changes and extension 11-14-22 AN. Crew is not working 11-21-22 AN. Crew is starting to install the rebar for the sewer encasement in the roadway
Sanitary Sewer Construction Inspection Partial 11/22/2022
Misc
Informational
11/21/2022
8-25-22 AN. Randy began to dig up and expose the manhole tie in on the detail car property 8-26-22 AN. Man hole has been cored in to . Pic attached 8-29-22 AN. Crew installed about 5 sticks of pipe today . 8-31-22 AN. Crew is continuing to install sewer pipe 9-7-22 AN. There is some concern about the straightness of the sewer main between the existing MH and S-1 , S-2. The pipe has some zig zags or bows in the main. ES and i shined a light in the main and could not see the light between MH’s also i had Randy with Tasco use their pipe laser and we also could not get it to shine through . I recommended that they get a third party to inspect and also do a mandrel test for the 10” main. We did do a mandrel test witch requires a 9.21 and they used a 9.24 mandrel. The mandrel went through with no problem.. we will have to wait until they are 100% done and the 30 day waiting period to have WU come out and inspect and determine if they will except the main . 9-8-22 AN crew is installing the sewer main from MH S-2 to S-3 they also are installing MH S-3 9-8-22 AN. Spoke with rusty about the invert on the existing MH and let them know they needed to tear out the majority of the invert and re pour the invert 9-26-22 AN. Wait for plans to be approved for the sewer extension and possibly redo part of the sewer main to get more flow 11-9-22 AN. Crew has Ben working on redoing the sewer line changes and extension 11-14-22 AN. Crew is not working 11-21-22 AN. Crew is starting to install the rebar for the sewer encasement in the roadway 11-22-22 AN. Crew still installing rebar for encasement of sewer main in road
Sanitary Sewer Construction Inspection Partial 12/12/2022
Misc
Informational
11/22/2022
8-25-22 AN. Randy began to dig up and expose the manhole tie in on the detail car property 8-26-22 AN. Man hole has been cored in to . Pic attached 8-29-22 AN. Crew installed about 5 sticks of pipe today . 8-31-22 AN. Crew is continuing to install sewer pipe 9-7-22 AN. There is some concern about the straightness of the sewer main between the existing MH and S-1 , S-2. The pipe has some zig zags or bows in the main. ES and i shined a light in the main and could not see the light between MH’s also i had Randy with Tasco use their pipe laser and we also could not get it to shine through . I recommended that they get a third party to inspect and also do a mandrel test for the 10” main. We did do a mandrel test witch requires a 9.21 and they used a 9.24 mandrel. The mandrel went through with no problem.. we will have to wait until they are 100% done and the 30 day waiting period to have WU come out and inspect and determine if they will except the main . 9-8-22 AN crew is installing the sewer main from MH S-2 to S-3 they also are installing MH S-3 9-8-22 AN. Spoke with rusty about the invert on the existing MH and let them know they needed to tear out the majority of the invert and re pour the invert 9-26-22 AN. Wait for plans to be approved for the sewer extension and possibly redo part of the sewer main to get more flow 11-9-22 AN. Crew has Ben working on redoing the sewer line changes and extension 11-14-22 AN. Crew is not working 11-21-22 AN. Crew is starting to install the rebar for the sewer encasement in the roadway 11-22-22 AN. Crew still installing rebar for encasement of sewer main in road
Miscellaneous Correction
Corrective Action Required
12/12/2022
12-12-22 AN. The sanitary that goes over the storm needs to be encased. No TCO will be issued until it is encased and all the testing is completed after the 30 day waiting period of completion .
Water Line - Construction Inspection Partial 12/29/2022
Miscellaneous Correction
Corrective Action Required
12/29/2022
12-29-22 DP Valve on water line was closed, need to redo water sample
Water Line - Coliform Test 1 Partial 01/09/2023
Misc
Informational
01/09/2023
1-9-23 DP. Crew never opened up valve after samples passed so they need to flush again and take 1 more sample
Water Line - Coliform Test 1 Passed 01/23/2023
Misc
Informational
01/09/2023
1-9-23 DP. Crew never opened up valve after samples passed so they need to flush again and take 1 more sample 1-23-23 DP Took water sample and passed. Valve is opened.
Water Line - Construction Inspection Partial 02/08/2023
Miscellaneous Correction
Informational
02/08/2023
12-29-22 DP Valve on water line was closed, need to redo water sample 2-8-23 DP Water bond inspection for DBATS passed
Water Line - Coliform Test 2 Partial 03/09/2023
Water Line - Construction Inspection Passed 03/09/2023
Miscellaneous Correction
Corrective Action Required
02/08/2023
12-29-22 DP Valve on water line was closed, need to redo water sample 2-8-23 DP Water bond inspection for DBATS passed
Erosion Control Inspection Failed 03/28/2023
Misc
Informational
08/22/2022
6-30-22 AN. Gordan is installing the silt fence now so grading can begin 7-7-22 RH. Silt fence is up and in working order. 7-12-22 RH. Silt fence is up and in working order. 7-20-22 AN silt fence is in good working order
Miscellaneous Correction
Corrective Action Required
08/22/2022
7-22-22 AN street needs to get cleaned up 7-26-22 AN silt fence is in good working order
Miscellaneous Correction
Corrective Action Required
08/22/2022
8-4-22 AN. Trucks are starting to track mud in to the roadway. Please keep it cleaned up 8-11-22 AN silt fence is in good working order and road is clean 8-22-22 AN no erosion control issues
Misc
Corrective Action Required
03/28/2023
Site visited and it appears that erosion control is still failed I talked to Troy and he is going to get in contact with the owner and get the street cleaned up and the gutter buddies replaced. I will send picture to him that needs to fixed and I will also put pictures attracted to inspection.
ESC - (Vegetation/Ground Cover) Partial 05/19/2023
Misc
Informational
05/19/2023
5-19-23 NS. ESC is currently in good working order.
Site Visit Partial 12/18/2023 12/18/2023
Misc
Informational
09/16/2022
6-28-22 AN we had a pre con with all the contractors and also got the approved plans. Work should be starting soon 8-1-22AN no work 8-18-22 AN no work being done 8-19-22 AN no work being done 8-22-22 AN no work for development 9-12-22 AN no one on site today 9-13-22 AN no one on site 9/16/22 SR no on site , did not here anything about the test shut yet. 9-14-22 AN no one on site 12-18-23 NS Site Visited all work is complete
Sanitary Sewer - Vacuum Passed 02/29/2024
Misc
Informational
02/29/2024
2-29-24 NS Site Visited it appears that inspection passed
Sanitary Sewer Construction Inspection Passed 02/29/2024
Misc
Informational
12/12/2022
8-25-22 AN. Randy began to dig up and expose the manhole tie in on the detail car property 8-26-22 AN. Man hole has been cored in to . Pic attached 8-29-22 AN. Crew installed about 5 sticks of pipe today . 8-31-22 AN. Crew is continuing to install sewer pipe 9-7-22 AN. There is some concern about the straightness of the sewer main between the existing MH and S-1 , S-2. The pipe has some zig zags or bows in the main. ES and i shined a light in the main and could not see the light between MH’s also i had Randy with Tasco use their pipe laser and we also could not get it to shine through . I recommended that they get a third party to inspect and also do a mandrel test for the 10” main. We did do a mandrel test witch requires a 9.21 and they used a 9.24 mandrel. The mandrel went through with no problem.. we will have to wait until they are 100% done and the 30 day waiting period to have WU come out and inspect and determine if they will except the main . 9-8-22 AN crew is installing the sewer main from MH S-2 to S-3 they also are installing MH S-3 9-8-22 AN. Spoke with rusty about the invert on the existing MH and let them know they needed to tear out the majority of the invert and re pour the invert 9-26-22 AN. Wait for plans to be approved for the sewer extension and possibly redo part of the sewer main to get more flow 11-9-22 AN. Crew has Ben working on redoing the sewer line changes and extension 11-14-22 AN. Crew is not working 11-21-22 AN. Crew is starting to install the rebar for the sewer encasement in the roadway 11-22-22 AN. Crew still installing rebar for encasement of sewer main in road 2-29-24 NS Site Visited it appears that inspection passed
Miscellaneous Correction
Corrective Action Required
12/12/2022
12-12-22 AN. The sanitary that goes over the storm needs to be encased. No TCO will be issued until it is encased and all the testing is completed after the 30 day waiting period of completion .
Documents & Images
Date Uploaded File Type Document Name
04/12/2022 Receipt Receipt for transaction: 2022-002001
04/12/2022 Receipt Receipt for transaction: 2022-002001
04/15/2022 Approved Plans Town Centre, Lot 1 - Mass Grading Approved 4.15.22
04/15/2022 Approved Plans Town Centre, Lot 1 - Sanitary Approved 4.15.22
04/15/2022 Approved Plans Town Centre, Lot 1 - Water Approved 4.15.22
05/03/2022 Letter DE-Permit
06/28/2022 Letter INSPECTION SUMMARY
06/30/2022 Letter INSPECTION SUMMARY
07/07/2022 Letter INSPECTION SUMMARY
07/07/2022 Letter INSPECTION SUMMARY
07/11/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/14/2022 Letter INSPECTION SUMMARY
07/14/2022 Letter INSPECTION SUMMARY
07/15/2022 Letter INSPECTION SUMMARY
07/18/2022 Letter INSPECTION SUMMARY
07/20/2022 Letter INSPECTION SUMMARY
07/20/2022 Letter INSPECTION SUMMARY
07/20/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/22/2022 Letter INSPECTION SUMMARY
07/26/2022 Letter INSPECTION SUMMARY
07/26/2022 Letter INSPECTION SUMMARY
07/28/2022 Letter INSPECTION SUMMARY
08/01/2022 Letter INSPECTION SUMMARY
08/02/2022 Letter INSPECTION SUMMARY
08/04/2022 Letter INSPECTION SUMMARY
08/04/2022 Letter INSPECTION SUMMARY
08/04/2022 Letter INSPECTION SUMMARY
08/09/2022 Letter INSPECTION SUMMARY
08/11/2022 Letter INSPECTION SUMMARY
08/11/2022 Letter INSPECTION SUMMARY
08/11/2022 Letter INSPECTION SUMMARY
08/17/2022 Letter INSPECTION SUMMARY
08/17/2022 Letter INSPECTION SUMMARY
08/19/2022 Letter INSPECTION SUMMARY
08/19/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter INSPECTION SUMMARY
08/26/2022 Letter INSPECTION SUMMARY
08/26/2022 Letter INSPECTION SUMMARY
08/26/2022 Manhole tie in cored
08/29/2022 Letter INSPECTION SUMMARY
08/31/2022 Letter INSPECTION SUMMARY
09/07/2022 Letter INSPECTION SUMMARY
09/08/2022 Letter INSPECTION SUMMARY
09/09/2022 Letter INSPECTION SUMMARY
09/12/2022 Letter INSPECTION SUMMARY
09/13/2022 Letter INSPECTION SUMMARY
09/14/2022 Letter INSPECTION SUMMARY
09/16/2022 Letter INSPECTION SUMMARY
09/21/2022 Letter INSPECTION SUMMARY
09/26/2022 Letter INSPECTION SUMMARY
09/26/2022 Letter INSPECTION SUMMARY
09/26/2022 Letter INSPECTION SUMMARY
09/26/2022 Letter INSPECTION SUMMARY
09/26/2022 Letter INSPECTION SUMMARY
10/06/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/18/2022 WO#1FJ1252 - DBAT and Mega 1
10/18/2022 WO#1FJ1409 - D Bat & Mega 2
10/18/2022 Letter INSPECTION SUMMARY
10/18/2022 Letter INSPECTION SUMMARY
10/18/2022 Letter INSPECTION SUMMARY
10/18/2022 Letter INSPECTION SUMMARY
10/19/2022 Letter INSPECTION SUMMARY
11/10/2022 Letter INSPECTION SUMMARY
11/10/2022 Letter INSPECTION SUMMARY
11/14/2022 Letter INSPECTION SUMMARY
11/21/2022 Letter INSPECTION SUMMARY
11/22/2022 Letter INSPECTION SUMMARY
12/12/2022 Letter INSPECTION SUMMARY
12/29/2022 Letter INSPECTION SUMMARY
01/09/2023 Letter INSPECTION SUMMARY
01/23/2023 Letter INSPECTION SUMMARY
01/23/2023 DBAT MEGA Public Water
02/08/2023 Letter INSPECTION SUMMARY
02/08/2023 Letter INSPECTION SUMMARY
03/09/2023 Letter Town Centre Lot 1 Partial Substantial Completion for Off-Site Public Water and Sewer
03/09/2023 Letter Town Centre Lot 1 Punch List
03/09/2023 Letter Town Centre Lot 1 Substantial Completion
03/09/2023 Letter Town Centre Lot 1 Updated Punch List
03/28/2023 Letter INSPECTION SUMMARY
05/02/2023 Security Document 3-YEAR MAINTENANCE BOND
11/09/2023 Plans Town Centre - Public Water As-builts - 11_09_2023
11/09/2023 Plans Town Centre - Public Sanitary As-builts - 11_09_2023
02/29/2024 Letter DE-Certificate of Substantial Completion Single Lot
02/29/2024 Letter DE-Punch List
02/29/2024 Letter INSPECTION SUMMARY
02/29/2024 Letter INSPECTION SUMMARY
02/29/2024 Letter DE-Certificate of Substantial Completion Single Lot
02/29/2024 Letter INSPECTION SUMMARY
02/29/2024 Letter INSPECTION SUMMARY
02/29/2024 Letter INSPECTION SUMMARY
02/29/2024 Letter INSPECTION SUMMARY
05/08/2024 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home