Summary


PRSUBD20202246
Public Infrastructure
Substantial Completion
JACKSON COUNTY MISSOURI
DEVELOPMENT COMPLETE
Public water main extension - Planning application PL2020263
08/11/2020
08/26/2020
Locations
Contacts
JACKSON COUNTY MISSOURI, Address:415 E 12TH ST  
HAPPY VALLEY PROPERTIES LLC, Address:801 NW COMMERCE DR  
HAPPY VALLEY PROPERTIES LLC, Address:801 NW COMMERCWE DR  
HAPPY VALLEY PROPERTIES LLC, Address:801 NW COMMERCE DR  
BROCKMAN DAWN R-TRUSTEE, Address:11900 NW CHIPMAN RD  
FOGEL-ANDERSON CONSTRUCTION CO, Address:1212 E 8TH ST, Phone:(816) 842-6914  
PARAGON STAR LLC, Address:4025 NE LAKEWOOD WAY STE 250  
HAPPY VALLEY PROPERTIES LLC, Address:4025 NE LAKEWOOD WAY STE 250  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 08/11/2020 08/26/2020
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
91100C9-Water Insp Fee $33,166.80 $33,166.80 Paid 08/18/2020
9110072-Water Test Fee $1,400.00 $1,400.00 Paid 08/18/2020
9110068-Storm Fee $279.00 $279.00 Paid 08/18/2020
9110081-Paved Surface Inspection Fee $525.00 $525.00 Paid 08/18/2020
9110071-Site Grading Fee $1,626.83 $1,626.83 Paid 08/18/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 08/18/2020
Outstanding Fees Amount Paid Owing Date Paid
9110079-After Hours Inspection (Building Codes)(Per Hour) $75.00 $0.00 $75.00 Not Paid
9110079-After Hours Inspection (Building Codes)(Per Hour) $75.00 $0.00 $75.00 Not Paid
9110079-After Hours Inspection (Building Codes)(Per Hour) $90.00 $0.00 $90.00 Not Paid
9110079-After Hours Inspection (Building Codes)(Per Hour) $80.00 $0.00 $80.00 Not Paid
9110079-After Hours Inspection (Building Codes)(Per Hour) $60.00 $0.00 $60.00 Not Paid
9110079-After Hours Inspection (Building Codes)(Per Hour) $50.00 $0.00 $50.00 Not Paid
9110079-After Hours Inspection (Building Codes)(Per Hour) $55.00 $0.00 $55.00 Not Paid
9110079-After Hours Inspection (Building Codes)(Per Hour) $70.00 $0.00 $70.00 Not Paid
9110079-After Hours Inspection (Building Codes)(Per Hour) $50.00 $0.00 $50.00 Not Paid
9110079-After Hours Inspection (Building Codes)(Per Hour) $30.00 $0.00 $30.00 Not Paid
9110079-After Hours Inspection (Building Codes)(Per Hour) $395.00 $0.00 $395.00 Not Paid
9110079-After Hours Inspection (Building Codes)(Per Hour) $95.00 $0.00 $95.00 Not Paid
9110079-After Hours Inspection (Building Codes)(Per Hour) $255.00 $0.00 $255.00 Not Paid
9110079-After Hours Inspection (Building Codes)(Per Hour) $325.00 $0.00 $325.00 Not Paid
9110079-After Hours Inspection (Building Codes)(Per Hour) $150.00 $0.00 $150.00 Not Paid
9110069-After Hours Inspections (Public Works)(Per Hour) $340.00 $0.00 $340.00 Not Paid


$2,195.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Punch List Inspection Pending
Misc
Informational
10/06/2023
4/29/21 Thursday Clarkson Gregg crew worked on the punch list that water provide for correct. Tracer wire and fixing valve box. Contractor will work to solve the issue of ( No Tracer Signal across I - 470 HWY on water main) Monday of next week.
Water Line - Construction Inspection Partial 09/25/2020
Misc
Informational
09/25/2020
9/25/20 Friday (Line “A “was started approximately at Sta 5+50). Contractor began excavation on 9/24/20 and put together 100’ 12” C900 Class 235 PVC Water Main. Contractor installed the 100’ water main 9/2520 that was connected outside excavation trench. Contractor continues to connect 12” Certa-Lok out excavation trench to install.
Misc
Informational
09/25/2020
9/25/20 1:40PM Contractor has is installed 200’ of 12” water line on Line A. Contractor continued to connect 12” Certa-Lok water line and 12”x6” Tee was put together for Sta 8+28.22 plans. Contractor will continue to connect 12” Certa-Lok water line for future install. Contractor has not received 12” Butterfly valves for job. The reschedule to show up on 10/15/20.
Misc
Informational
09/28/2020
9/28/20 Monday Contractor used a 11 1/4 12” bend instead of the 22.5 bend and also install hydrant before bend on Line A near Sta 8+18.18. Contractor will make changes on submitted as-built to reflect field change. Approximately 340’ of 12” of Certa-Lok waterline was installed & 22.5 Bend @ Sta. 10+55.63.
Water Line - Construction Inspection Partial 09/29/2020
Misc
Informational
09/25/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A. Contractor installed Approximately 420’ of 12” water main as-per project plans (see 3/15 to 4/15). Contractor should be pouring thrust blocks behind bends and fittings upcoming.
Water Line - Construction Inspection Partial 09/30/2020
Misc
Informational
09/29/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
09/30/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Water Line - Construction Inspection Partial 10/01/2020
Misc
Informational
09/30/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
09/30/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
10/01/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Water Line - Construction Inspection Partial 10/02/2020
Misc
Informational
10/01/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
10/01/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
10/01/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
10/02/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
10/03/2020
Misc
Informational
10/03/2020
10/3/20 Saturday Contractor install approximately 180’ of 12” Certa - Lok water main. Contractor backed filled excavation on piping except bends and fittings. All open excavation was fence in with orange safety fence.
Water Line - Construction Inspection Partial 10/06/2020
Misc
Informational
10/02/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
10/02/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
10/02/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
10/02/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
10/06/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Water Line - Construction Inspection Partial 10/07/2020
Misc
Informational
10/06/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
10/06/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
10/06/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
10/06/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
10/06/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
10/07/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Storm Sewer Construction Inspection Partial 10/08/2020
Misc
Informational
09/30/2020
Contractor began constructing forms for wing wall on both end of the Storm Line 4100 crossing View High Drive. Approved excavation is happening on the East side of the street.
Water Line - Construction Inspection Partial 10/08/2020
Misc
Informational
10/07/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
10/07/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
10/07/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
10/07/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
10/07/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
10/07/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
10/08/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Water Line - Construction Inspection Partial 10/09/2020
Misc
Informational
10/08/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
10/08/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
10/08/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
10/08/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
10/08/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
10/08/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
10/08/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
10/09/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Water Line - Construction Inspection Partial 10/12/2020
Misc
Informational
10/09/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
10/09/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
10/09/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
10/09/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
10/09/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
10/09/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
10/09/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
10/09/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
10/12/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Water Line - Construction Inspection Partial 10/13/2020
Misc
Informational
10/12/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
10/12/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
10/12/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
10/12/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
10/12/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
10/12/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
10/12/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
10/12/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
10/12/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
10/13/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Water Line - Construction Inspection Partial 10/14/2020
Misc
Informational
10/13/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
10/13/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
10/13/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
10/13/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
10/13/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
10/13/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
10/13/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
10/13/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
10/13/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
10/13/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
10/14/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.
Water Line - Construction Inspection Partial 10/14/2020
Misc
Informational
10/14/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
10/14/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
10/14/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
10/14/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
10/14/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
10/14/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
10/14/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
10/14/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
10/14/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
10/14/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
10/14/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
10/14/2020
Water Line - Construction Inspection Partial 10/15/2020
Misc
Informational
10/14/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
10/14/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
10/14/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
10/14/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
10/14/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
10/14/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
10/14/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
10/14/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
10/14/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
10/14/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
10/14/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
10/14/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Water Line - Construction Inspection Partial 10/16/2020
Misc
Informational
10/15/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
10/15/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
10/15/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
10/15/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
10/15/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
10/15/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
10/15/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
10/15/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
10/15/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
10/15/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
10/15/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
10/15/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
10/16/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
10/16/2020
10/17/20 Friday Contractor continued to install water main on the Northside to Sta 41+81 (45 deg bend). Southside did installed approximately 40’ of water main before they had to stop because of the boring crew 10/16/20 Thursday. Also the crew change the 11 1/4 to a 22 1/2 to achieve The 42” depth required for for water main coverage. Boring crew continued work and will begin encasement on 10/20/20 Monday.
Water Line - Construction Inspection Partial 10/17/2020
Misc
Informational
10/16/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
10/16/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
10/16/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
10/16/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
10/16/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
10/16/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
10/16/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
10/16/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
10/16/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
10/16/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
10/16/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
10/16/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
10/16/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
10/17/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00.
Water Line - Construction Inspection Partial 10/17/2020
Misc
Informational
10/17/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
10/17/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
10/17/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
10/17/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
10/17/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
10/17/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
10/17/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
10/17/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
10/17/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
10/17/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
10/17/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
10/17/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
10/17/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
10/17/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Water Line - Construction Inspection Partial 10/19/2020
Misc
Informational
10/17/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
10/17/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
10/17/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
10/17/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
10/17/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
10/17/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
10/17/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
10/17/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
10/17/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
10/17/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
10/17/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
10/17/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
10/17/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
10/17/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
10/19/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Water Line - Construction Inspection Partial 10/21/2020
Misc
Informational
10/19/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
10/19/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
10/19/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
10/19/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
10/19/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
10/19/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
10/19/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
10/19/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
10/19/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
10/19/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
10/19/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
10/19/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
10/19/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
10/19/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
10/19/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
10/21/2020
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Water Line - Construction Inspection Partial 10/22/2020
Misc
Informational
10/21/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
10/21/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
10/21/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
10/21/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
10/21/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
10/21/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
10/21/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
10/21/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
10/21/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
10/21/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
10/21/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
10/21/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
10/21/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
10/21/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
10/21/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
10/21/2020
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Misc
Informational
10/22/2020
10/22/20 Thursday the crew on the North end help to aid pulling the encasement and piping across I-470 also work was done on site for the Water Main approximately 400 was installed from the Tee. The South crew has installed 12” Water Certa-Lock pipe along relocation of water was done to not conflict with existing main. All changes shall be reflected on as-built.
Storm Sewer Construction Inspection Partial 10/22/2020
Misc
Informational
10/08/2020
Contractor began constructing forms for wing wall on both end of the Storm Line 4100 crossing View High Drive. Approved excavation is happening on the East side of the street.
Misc
Informational
10/22/2020
Contractor is preparing Storm Line 4100 to pour Wing Walls on the Eastside.
Erosion Control Inspection Partial 10/23/2020
Misc
Informational
10/23/2020
No corrective action needed at this time.
Water Line - Construction Inspection Partial 10/26/2020
Misc
Informational
10/22/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
10/22/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
10/22/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
10/22/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
10/22/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
10/22/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
10/22/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
10/22/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
10/22/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
10/22/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
10/22/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
10/22/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
10/22/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
10/22/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
10/22/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
10/22/2020
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Misc
Informational
10/22/2020
10/22/20 Thursday the crew on the North end help to aid pulling the encasement and piping across I-470 also work was done on site for the Water Main approximately 400 was installed from the Tee. The South crew has installed 12” Water Certa-Lock pipe along relocation of water was done to not conflict with existing main. All changes shall be reflected on as-built.
Misc
Informational
10/26/2020
10/26/20 Monday Contractor crew on the Southside did work on Saturday but they didn’t install pipe backfilled and graded. Today they installed 12” Certa - Lock water main pipe along Chipman Line A. The Northside Installed approx 200’ of 12” water main (This portion of the WATER MAIN falls under PRSITE 20203248) Sta. 03+97 Line D.
Water Line - Construction Inspection Partial 10/27/2020
Misc
Informational
10/26/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
10/26/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
10/26/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
10/26/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
10/26/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
10/26/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
10/26/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
10/26/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
10/26/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
10/26/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
10/26/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
10/26/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
10/26/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
10/26/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
10/26/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
10/26/2020
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Misc
Informational
10/26/2020
10/22/20 Thursday the crew on the North end help to aid pulling the encasement and piping across I-470 also work was done on site for the Water Main approximately 400 was installed from the Tee. The South crew has installed 12” Water Certa-Lock pipe along relocation of water was done to not conflict with existing main. All changes shall be reflected on as-built.
Misc
Informational
10/26/2020
10/26/20 Monday Contractor crew on the Southside did work on Saturday but they didn’t install pipe backfilled and graded. Today they installed 12” Certa - Lock water main pipe along Chipman Line A. The Northside Installed approx 200’ of 12” water main (This portion of the WATER MAIN falls under PRSITE 20203248) Sta. 03+97 Line D.
Misc
Informational
10/27/2020
10/27/20 Tuesday Contractor Crew continued to work installation of Water Main on Chipman Road. Crew to the North backfilled excavation of boring across I-470 Hwy.
Water Line - Construction Inspection Partial 10/28/2020
Misc
Informational
10/27/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
10/27/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
10/27/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
10/27/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
10/27/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
10/27/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
10/27/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
10/27/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
10/27/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
10/27/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
10/27/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
10/27/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
10/27/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
10/27/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
10/27/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
10/27/2020
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Misc
Informational
10/27/2020
10/22/20 Thursday the crew on the North end help to aid pulling the encasement and piping across I-470 also work was done on site for the Water Main approximately 400 was installed from the Tee. The South crew has installed 12” Water Certa-Lock pipe along relocation of water was done to not conflict with existing main. All changes shall be reflected on as-built.
Misc
Informational
10/27/2020
10/26/20 Monday Contractor crew on the Southside did work on Saturday but they didn’t install pipe backfilled and graded. Today they installed 12” Certa - Lock water main pipe along Chipman Line A. The Northside Installed approx 200’ of 12” water main (This portion of the WATER MAIN falls under PRSITE 20203248) Sta. 03+97 Line D.
Misc
Informational
10/27/2020
10/27/20 Tuesday Contractor Crew continued to work installation of Water Main on Chipman Road. Crew to the North backfilled excavation of boring across I-470 Hwy.
Misc
Informational
10/28/2020
10/28/20 Wednesday Contractor installed approximately 40’ of 12” water main along Chipman Road. Contractor had to cut through existing drive way to install pipe and also clear existing 6” water main.
Water Line - Construction Inspection Partial 10/30/2020
Misc
Informational
10/28/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
10/28/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
10/28/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
10/28/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
10/28/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
10/28/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
10/28/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
10/28/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
10/28/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
10/28/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
10/28/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
10/28/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
10/28/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
10/28/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
10/28/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
10/28/2020
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Misc
Informational
10/28/2020
10/22/20 Thursday the crew on the North end help to aid pulling the encasement and piping across I-470 also work was done on site for the Water Main approximately 400 was installed from the Tee. The South crew has installed 12” Water Certa-Lock pipe along relocation of water was done to not conflict with existing main. All changes shall be reflected on as-built.
Misc
Informational
10/28/2020
10/26/20 Monday Contractor crew on the Southside did work on Saturday but they didn’t install pipe backfilled and graded. Today they installed 12” Certa - Lock water main pipe along Chipman Line A. The Northside Installed approx 200’ of 12” water main (This portion of the WATER MAIN falls under PRSITE 20203248) Sta. 03+97 Line D.
Misc
Informational
10/28/2020
10/27/20 Tuesday Contractor Crew continued to work installation of Water Main on Chipman Road. Crew to the North backfilled excavation of boring across I-470 Hwy.
Misc
Informational
10/28/2020
10/28/20 Wednesday Contractor installed approximately 40’ of 12” water main along Chipman Road. Contractor had to cut through existing drive way to install pipe and also clear existing 6” water main.
Misc
Informational
10/30/2020
10/30/20 Friday Tie-in was complete for the existing 8” to the newly installed 12” water main. 12” valve head East was moved to the newly installed Northbound an existing 8” valve East was less than a hundred feet away from the tie-in. A 8” sleeve was add during the tie-in. Contractor will reflected any changes on as-built.
Misc
Informational
10/30/2020
10/30/20 Friday Approximately 30’ of 12” Cert-Lock water main was installed coming out of the newly installed 12” valve. Contractor poured flowable fill in street crossing excavation.
Water Line - Construction Inspection Partial 10/31/2020
Misc
Informational
10/30/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
10/30/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
10/30/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
10/30/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
10/30/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
10/30/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
10/30/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
10/30/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
10/30/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
10/30/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
10/30/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
10/30/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
10/30/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
10/30/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
10/30/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
10/30/2020
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Misc
Informational
10/30/2020
10/22/20 Thursday the crew on the North end help to aid pulling the encasement and piping across I-470 also work was done on site for the Water Main approximately 400 was installed from the Tee. The South crew has installed 12” Water Certa-Lock pipe along relocation of water was done to not conflict with existing main. All changes shall be reflected on as-built.
Misc
Informational
10/30/2020
10/26/20 Monday Contractor crew on the Southside did work on Saturday but they didn’t install pipe backfilled and graded. Today they installed 12” Certa - Lock water main pipe along Chipman Line A. The Northside Installed approx 200’ of 12” water main (This portion of the WATER MAIN falls under PRSITE 20203248) Sta. 03+97 Line D.
Misc
Informational
10/30/2020
10/27/20 Tuesday Contractor Crew continued to work installation of Water Main on Chipman Road. Crew to the North backfilled excavation of boring across I-470 Hwy.
Misc
Informational
10/30/2020
10/28/20 Wednesday Contractor installed approximately 40’ of 12” water main along Chipman Road. Contractor had to cut through existing drive way to install pipe and also clear existing 6” water main.
Misc
Informational
10/30/2020
Tie-in was complete for the existing 8” to the newly installed 12” water main. 12” valve head East was moved to the newly installed Northbound an existing 8” valve East was less than a hundred feet away from the tie-in. A 8” sleeve was add during the tie-in. Contractor will reflected any changes on as-built.
Misc
Informational
10/31/2020
10/31/20 Saturday Two crews were working on the off-site 12” water main installation yesterday and today. 10/30/20 The second crew installed 160’ of 12” water main used a 11 1/4 bend instead of 22 1/2 bend because the grade was achieved before to line up with the Bore tie-in on the Southside of I-470 Hwy. A 12” sleeve was need just 4’ from the end of bore encasement, as-built will reflect all field changes. 10/31/20 This crew poured thrust & straddle blocks as shown on plan and backfilled excavation. 10/31 The crew on Chipman Road progress was slow due to the existing water main and the rock that was jackhammered and excavated.
Water Line - Construction Inspection Partial 11/02/2020
Misc
Informational
10/31/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
10/31/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
10/31/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
10/31/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
10/31/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
10/31/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
10/31/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
10/31/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
10/31/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
10/31/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
10/31/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
10/31/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
10/31/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
10/31/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
10/31/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
10/31/2020
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Misc
Informational
10/31/2020
10/22/20 Thursday the crew on the North end help to aid pulling the encasement and piping across I-470 also work was done on site for the Water Main approximately 400 was installed from the Tee. The South crew has installed 12” Water Certa-Lock pipe along relocation of water was done to not conflict with existing main. All changes shall be reflected on as-built.
Misc
Informational
10/31/2020
10/26/20 Monday Contractor crew on the Southside did work on Saturday but they didn’t install pipe backfilled and graded. Today they installed 12” Certa - Lock water main pipe along Chipman Line A. The Northside Installed approx 200’ of 12” water main (This portion of the WATER MAIN falls under PRSITE 20203248) Sta. 03+97 Line D.
Misc
Informational
10/31/2020
10/27/20 Tuesday Contractor Crew continued to work installation of Water Main on Chipman Road. Crew to the North backfilled excavation of boring across I-470 Hwy.
Misc
Informational
10/31/2020
10/28/20 Wednesday Contractor installed approximately 40’ of 12” water main along Chipman Road. Contractor had to cut through existing drive way to install pipe and also clear existing 6” water main.
Misc
Informational
10/31/2020
Tie-in was complete for the existing 8” to the newly installed 12” water main. 12” valve head East was moved to the newly installed Northbound an existing 8” valve East was less than a hundred feet away from the tie-in. A 8” sleeve was add during the tie-in. Contractor will reflected any changes on as-built.
Misc
Informational
10/31/2020
10/31/20 Saturday Two crews were working on the off-site 12” water main installation yesterday and today. 10/30/20 The second crew installed 160’ of 12” water main used a 11 1/4 bend instead of 22 1/2 bend because the grade was achieved before to line up with the Bore tie-in on the Southside of I-470 Hwy. A 12” sleeve was need just 4’ from the end of bore encasement, as-built will reflect all field changes. 10/31/20 This crew poured thrust & straddle blocks as shown on plan and backfilled excavation. 10/31 The crew on Chipman Road progress was slow due to the existing water main and the rock that was jackhammered and excavated.
Misc
Informational
11/02/2020
11/2/20 Monday Contractor installed Hydrant and approximately 80’ of 12” line on Chipman Road.
Water Line - Construction Inspection Partial 11/10/2020
Misc
Informational
11/02/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
11/02/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
11/02/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
11/02/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
11/02/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
11/02/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
11/02/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
11/02/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
11/02/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
11/02/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
11/02/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
11/02/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
11/02/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
11/02/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
11/02/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
11/02/2020
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Misc
Informational
11/02/2020
10/22/20 Thursday the crew on the North end help to aid pulling the encasement and piping across I-470 also work was done on site for the Water Main approximately 400 was installed from the Tee. The South crew has installed 12” Water Certa-Lock pipe along relocation of water was done to not conflict with existing main. All changes shall be reflected on as-built.
Misc
Informational
11/02/2020
10/26/20 Monday Contractor crew on the Southside did work on Saturday but they didn’t install pipe backfilled and graded. Today they installed 12” Certa - Lock water main pipe along Chipman Line A. The Northside Installed approx 200’ of 12” water main (This portion of the WATER MAIN falls under PRSITE 20203248) Sta. 03+97 Line D.
Misc
Informational
11/02/2020
10/27/20 Tuesday Contractor Crew continued to work installation of Water Main on Chipman Road. Crew to the North backfilled excavation of boring across I-470 Hwy.
Misc
Informational
11/02/2020
10/28/20 Wednesday Contractor installed approximately 40’ of 12” water main along Chipman Road. Contractor had to cut through existing drive way to install pipe and also clear existing 6” water main.
Misc
Informational
11/02/2020
Tie-in was complete for the existing 8” to the newly installed 12” water main. 12” valve head East was moved to the newly installed Northbound an existing 8” valve East was less than a hundred feet away from the tie-in. A 8” sleeve was add during the tie-in. Contractor will reflected any changes on as-built.
Misc
Informational
11/02/2020
10/31/20 Saturday Two crews were working on the off-site 12” water main installation yesterday and today. 10/30/20 The second crew installed 160’ of 12” water main used a 11 1/4 bend instead of 22 1/2 bend because the grade was achieved before to line up with the Bore tie-in on the Southside of I-470 Hwy. A 12” sleeve was need just 4’ from the end of bore encasement, as-built will reflect all field changes. 10/31/20 This crew poured thrust & straddle blocks as shown on plan and backfilled excavation. 10/31 The crew on Chipman Road progress was slow due to the existing water main and the rock that was jackhammered and excavated.
Misc
Informational
11/02/2020
11/2/20 Monday Contractor installed Hydrant and approximately 80’ of 12” line on Chipman Road.
Misc
Informational
11/10/2020
11/10/20 Tuesday Contractor has been locating leaks on the Northside of I-470 Hwy.
Water Line - Construction Inspection Partial 11/11/2020
Misc
Informational
11/10/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
11/10/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
11/10/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
11/10/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
11/10/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
11/10/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
11/10/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
11/10/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
11/10/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
11/10/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
11/10/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
11/10/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
11/10/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
11/10/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
11/10/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
11/10/2020
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Misc
Informational
11/10/2020
10/22/20 Thursday the crew on the North end help to aid pulling the encasement and piping across I-470 also work was done on site for the Water Main approximately 400 was installed from the Tee. The South crew has installed 12” Water Certa-Lock pipe along relocation of water was done to not conflict with existing main. All changes shall be reflected on as-built.
Misc
Informational
11/10/2020
10/26/20 Monday Contractor crew on the Southside did work on Saturday but they didn’t install pipe backfilled and graded. Today they installed 12” Certa - Lock water main pipe along Chipman Line A. The Northside Installed approx 200’ of 12” water main (This portion of the WATER MAIN falls under PRSITE 20203248) Sta. 03+97 Line D.
Misc
Informational
11/10/2020
10/27/20 Tuesday Contractor Crew continued to work installation of Water Main on Chipman Road. Crew to the North backfilled excavation of boring across I-470 Hwy.
Misc
Informational
11/10/2020
10/28/20 Wednesday Contractor installed approximately 40’ of 12” water main along Chipman Road. Contractor had to cut through existing drive way to install pipe and also clear existing 6” water main.
Misc
Informational
11/10/2020
Tie-in was complete for the existing 8” to the newly installed 12” water main. 12” valve head East was moved to the newly installed Northbound an existing 8” valve East was less than a hundred feet away from the tie-in. A 8” sleeve was add during the tie-in. Contractor will reflected any changes on as-built.
Misc
Informational
11/10/2020
10/31/20 Saturday Two crews were working on the off-site 12” water main installation yesterday and today. 10/30/20 The second crew installed 160’ of 12” water main used a 11 1/4 bend instead of 22 1/2 bend because the grade was achieved before to line up with the Bore tie-in on the Southside of I-470 Hwy. A 12” sleeve was need just 4’ from the end of bore encasement, as-built will reflect all field changes. 10/31/20 This crew poured thrust & straddle blocks as shown on plan and backfilled excavation. 10/31 The crew on Chipman Road progress was slow due to the existing water main and the rock that was jackhammered and excavated.
Misc
Informational
11/10/2020
11/2/20 Monday Contractor installed Hydrant and approximately 80’ of 12” line on Chipman Road.
Misc
Informational
11/10/2020
11/10/20 Tuesday Contractor has been locating leaks on the Northside of I-470 Hwy.
Misc
Informational
11/11/2020
11/11/20 Wednesday Contractor working to ensure all leaks were eliminated leaks were caused from the Northside crew not tightening bolts at the MJ fittings (new crew members). Contractor will began pre-test pressure test.
Water Line - Construction Inspection Partial 11/12/2020
Misc
Informational
11/11/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
11/11/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
11/11/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
11/11/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
11/11/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
11/11/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
11/11/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
11/11/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
11/11/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
11/11/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
11/11/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
11/11/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
11/11/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
11/11/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
11/11/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
11/11/2020
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Misc
Informational
11/11/2020
10/22/20 Thursday the crew on the North end help to aid pulling the encasement and piping across I-470 also work was done on site for the Water Main approximately 400 was installed from the Tee. The South crew has installed 12” Water Certa-Lock pipe along relocation of water was done to not conflict with existing main. All changes shall be reflected on as-built.
Misc
Informational
11/11/2020
10/26/20 Monday Contractor crew on the Southside did work on Saturday but they didn’t install pipe backfilled and graded. Today they installed 12” Certa - Lock water main pipe along Chipman Line A. The Northside Installed approx 200’ of 12” water main (This portion of the WATER MAIN falls under PRSITE 20203248) Sta. 03+97 Line D.
Misc
Informational
11/11/2020
10/27/20 Tuesday Contractor Crew continued to work installation of Water Main on Chipman Road. Crew to the North backfilled excavation of boring across I-470 Hwy.
Misc
Informational
11/11/2020
10/28/20 Wednesday Contractor installed approximately 40’ of 12” water main along Chipman Road. Contractor had to cut through existing drive way to install pipe and also clear existing 6” water main.
Misc
Informational
11/11/2020
Tie-in was complete for the existing 8” to the newly installed 12” water main. 12” valve head East was moved to the newly installed Northbound an existing 8” valve East was less than a hundred feet away from the tie-in. A 8” sleeve was add during the tie-in. Contractor will reflected any changes on as-built.
Misc
Informational
11/11/2020
10/31/20 Saturday Two crews were working on the off-site 12” water main installation yesterday and today. 10/30/20 The second crew installed 160’ of 12” water main used a 11 1/4 bend instead of 22 1/2 bend because the grade was achieved before to line up with the Bore tie-in on the Southside of I-470 Hwy. A 12” sleeve was need just 4’ from the end of bore encasement, as-built will reflect all field changes. 10/31/20 This crew poured thrust & straddle blocks as shown on plan and backfilled excavation. 10/31 The crew on Chipman Road progress was slow due to the existing water main and the rock that was jackhammered and excavated.
Misc
Informational
11/11/2020
11/2/20 Monday Contractor installed Hydrant and approximately 80’ of 12” line on Chipman Road.
Misc
Informational
11/11/2020
11/10/20 Tuesday Contractor has been locating leaks on the Northside of I-470 Hwy.
Misc
Informational
11/11/2020
11/11/20 Wednesday Contractor working to ensure all leaks were eliminated leaks were caused from the Northside crew not tightening bolts at the MJ fittings (new crew members). Contractor will began pre-test pressure test.
Misc
Informational
11/12/2020
11/12/20 Thursday Contractor continue to work on water line.
Water Line - Hydrostatic Test Passed 11/18/2020
Misc
Informational
11/18/2020
11/18/20 Wednesday Hydrostatic Test passed 150 PSI from offsite to onsite 12” Certa-Lock water main. (10:30 AM to 12:30PM).
Water Line - Construction Inspection Partial 11/18/2020
Misc
Informational
11/12/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
11/12/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
11/12/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
11/12/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
11/12/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
11/12/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
11/12/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
11/12/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
11/12/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
11/12/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
11/12/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
11/12/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
11/12/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
11/12/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
11/12/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
11/12/2020
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Misc
Informational
11/12/2020
10/22/20 Thursday the crew on the North end help to aid pulling the encasement and piping across I-470 also work was done on site for the Water Main approximately 400 was installed from the Tee. The South crew has installed 12” Water Certa-Lock pipe along relocation of water was done to not conflict with existing main. All changes shall be reflected on as-built.
Misc
Informational
11/12/2020
10/26/20 Monday Contractor crew on the Southside did work on Saturday but they didn’t install pipe backfilled and graded. Today they installed 12” Certa - Lock water main pipe along Chipman Line A. The Northside Installed approx 200’ of 12” water main (This portion of the WATER MAIN falls under PRSITE 20203248) Sta. 03+97 Line D.
Misc
Informational
11/12/2020
10/27/20 Tuesday Contractor Crew continued to work installation of Water Main on Chipman Road. Crew to the North backfilled excavation of boring across I-470 Hwy.
Misc
Informational
11/12/2020
10/28/20 Wednesday Contractor installed approximately 40’ of 12” water main along Chipman Road. Contractor had to cut through existing drive way to install pipe and also clear existing 6” water main.
Misc
Informational
11/12/2020
Tie-in was complete for the existing 8” to the newly installed 12” water main. 12” valve head East was moved to the newly installed Northbound an existing 8” valve East was less than a hundred feet away from the tie-in. A 8” sleeve was add during the tie-in. Contractor will reflected any changes on as-built.
Misc
Informational
11/12/2020
10/31/20 Saturday Two crews were working on the off-site 12” water main installation yesterday and today. 10/30/20 The second crew installed 160’ of 12” water main used a 11 1/4 bend instead of 22 1/2 bend because the grade was achieved before to line up with the Bore tie-in on the Southside of I-470 Hwy. A 12” sleeve was need just 4’ from the end of bore encasement, as-built will reflect all field changes. 10/31/20 This crew poured thrust & straddle blocks as shown on plan and backfilled excavation. 10/31 The crew on Chipman Road progress was slow due to the existing water main and the rock that was jackhammered and excavated.
Misc
Informational
11/12/2020
11/2/20 Monday Contractor installed Hydrant and approximately 80’ of 12” line on Chipman Road.
Misc
Informational
11/12/2020
11/10/20 Tuesday Contractor has been locating leaks on the Northside of I-470 Hwy.
Misc
Informational
11/12/2020
11/11/20 Wednesday Contractor working to ensure all leaks were eliminated leaks were caused from the Northside crew not tightening bolts at the MJ fittings (new crew members). Contractor will began pre-test pressure test.
Misc
Informational
11/12/2020
11/12/20 Thursday Contractor continue to work on water line.
Misc
Informational
11/17/2020
11/18/20 Wednesday Contractor has concrete schedule to complete encasement of water main & reinforcing steel Line A 36+80 to 37+40 (see water main detail page 10/15).
Water Line - Construction Inspection Partial 11/19/2020
Misc
Informational
11/18/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
11/18/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
11/18/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
11/18/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
11/18/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
11/18/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
11/18/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
11/18/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
11/18/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
11/18/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
11/18/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
11/18/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
11/18/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
11/18/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
11/18/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
11/18/2020
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Misc
Informational
11/18/2020
10/22/20 Thursday the crew on the North end help to aid pulling the encasement and piping across I-470 also work was done on site for the Water Main approximately 400 was installed from the Tee. The South crew has installed 12” Water Certa-Lock pipe along relocation of water was done to not conflict with existing main. All changes shall be reflected on as-built.
Misc
Informational
11/18/2020
10/26/20 Monday Contractor crew on the Southside did work on Saturday but they didn’t install pipe backfilled and graded. Today they installed 12” Certa - Lock water main pipe along Chipman Line A. The Northside Installed approx 200’ of 12” water main (This portion of the WATER MAIN falls under PRSITE 20203248) Sta. 03+97 Line D.
Misc
Informational
11/18/2020
10/27/20 Tuesday Contractor Crew continued to work installation of Water Main on Chipman Road. Crew to the North backfilled excavation of boring across I-470 Hwy.
Misc
Informational
11/18/2020
10/28/20 Wednesday Contractor installed approximately 40’ of 12” water main along Chipman Road. Contractor had to cut through existing drive way to install pipe and also clear existing 6” water main.
Misc
Informational
11/18/2020
Tie-in was complete for the existing 8” to the newly installed 12” water main. 12” valve head East was moved to the newly installed Northbound an existing 8” valve East was less than a hundred feet away from the tie-in. A 8” sleeve was add during the tie-in. Contractor will reflected any changes on as-built.
Misc
Informational
11/18/2020
10/31/20 Saturday Two crews were working on the off-site 12” water main installation yesterday and today. 10/30/20 The second crew installed 160’ of 12” water main used a 11 1/4 bend instead of 22 1/2 bend because the grade was achieved before to line up with the Bore tie-in on the Southside of I-470 Hwy. A 12” sleeve was need just 4’ from the end of bore encasement, as-built will reflect all field changes. 10/31/20 This crew poured thrust & straddle blocks as shown on plan and backfilled excavation. 10/31 The crew on Chipman Road progress was slow due to the existing water main and the rock that was jackhammered and excavated.
Misc
Informational
11/18/2020
11/2/20 Monday Contractor installed Hydrant and approximately 80’ of 12” line on Chipman Road.
Misc
Informational
11/18/2020
11/10/20 Tuesday Contractor has been locating leaks on the Northside of I-470 Hwy.
Misc
Informational
11/18/2020
11/11/20 Wednesday Contractor working to ensure all leaks were eliminated leaks were caused from the Northside crew not tightening bolts at the MJ fittings (new crew members). Contractor will began pre-test pressure test.
Misc
Informational
11/18/2020
11/12/20 Thursday Contractor continue to work on water line.
Misc
Informational
11/18/2020
11/18/20 Wednesday Contractor has concrete schedule to complete encasement of water main & reinforcing steel Line A 36+80 to 37+40 (see water main detail page 10/15).
Misc
Informational
11/19/2020
11/19/20 Thursday Contractor ( Clarkson Const. ) chlorinated the water 12” Certa-Lock water main from the offsite to onsite approximately 4000’. Contractor will continue to backfill encasement of water main & reinforced steel section, also rough grade area to reconstruct exist creek.
Water Line - Construction Inspection Partial 11/20/2020
Misc
Informational
11/19/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
11/19/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
11/19/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
11/19/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
11/19/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
11/19/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
11/19/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
11/19/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
11/19/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
11/19/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
11/19/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
11/19/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
11/19/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
11/19/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
11/19/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
11/19/2020
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Misc
Informational
11/19/2020
10/22/20 Thursday the crew on the North end help to aid pulling the encasement and piping across I-470 also work was done on site for the Water Main approximately 400 was installed from the Tee. The South crew has installed 12” Water Certa-Lock pipe along relocation of water was done to not conflict with existing main. All changes shall be reflected on as-built.
Misc
Informational
11/19/2020
10/26/20 Monday Contractor crew on the Southside did work on Saturday but they didn’t install pipe backfilled and graded. Today they installed 12” Certa - Lock water main pipe along Chipman Line A. The Northside Installed approx 200’ of 12” water main (This portion of the WATER MAIN falls under PRSITE 20203248) Sta. 03+97 Line D.
Misc
Informational
11/19/2020
10/27/20 Tuesday Contractor Crew continued to work installation of Water Main on Chipman Road. Crew to the North backfilled excavation of boring across I-470 Hwy.
Misc
Informational
11/19/2020
10/28/20 Wednesday Contractor installed approximately 40’ of 12” water main along Chipman Road. Contractor had to cut through existing drive way to install pipe and also clear existing 6” water main.
Misc
Informational
11/19/2020
Tie-in was complete for the existing 8” to the newly installed 12” water main. 12” valve head East was moved to the newly installed Northbound an existing 8” valve East was less than a hundred feet away from the tie-in. A 8” sleeve was add during the tie-in. Contractor will reflected any changes on as-built.
Misc
Informational
11/19/2020
10/31/20 Saturday Two crews were working on the off-site 12” water main installation yesterday and today. 10/30/20 The second crew installed 160’ of 12” water main used a 11 1/4 bend instead of 22 1/2 bend because the grade was achieved before to line up with the Bore tie-in on the Southside of I-470 Hwy. A 12” sleeve was need just 4’ from the end of bore encasement, as-built will reflect all field changes. 10/31/20 This crew poured thrust & straddle blocks as shown on plan and backfilled excavation. 10/31 The crew on Chipman Road progress was slow due to the existing water main and the rock that was jackhammered and excavated.
Misc
Informational
11/19/2020
11/2/20 Monday Contractor installed Hydrant and approximately 80’ of 12” line on Chipman Road.
Misc
Informational
11/19/2020
11/10/20 Tuesday Contractor has been locating leaks on the Northside of I-470 Hwy.
Misc
Informational
11/19/2020
11/11/20 Wednesday Contractor working to ensure all leaks were eliminated leaks were caused from the Northside crew not tightening bolts at the MJ fittings (new crew members). Contractor will began pre-test pressure test.
Misc
Informational
11/19/2020
11/12/20 Thursday Contractor continue to work on water line.
Misc
Informational
11/19/2020
11/18/20 Wednesday Contractor has concrete schedule to complete encasement of water main & reinforcing steel Line A 36+80 to 37+40 (see water main detail page 10/15).
Misc
Informational
11/19/2020
11/19/20 Thursday Contractor ( Clarkson Const. ) chlorinated the water 12” Certa-Lock water main from the offsite to onsite approximately 4000’. Contractor will continue to backfill encasement of water main & reinforced steel section, also rough grade area to reconstruct exist creek.
Misc
Informational
11/20/2020
11/20/20 Friday Contractor de chlorinating line 12” Certa-Lock water main from the offsite to onsite.
Water Line - Coliform Test 1 Partial 11/23/2020
Misc
Informational
11/23/2020
11/23/20 Monday 4 Bacteria samples plus a duplicate of the last location taken today.
Water Line - Construction Inspection Partial 12/01/2020
Misc
Informational
11/20/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
11/20/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
11/20/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
11/20/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
11/20/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
11/20/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
11/20/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
11/20/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
11/20/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
11/20/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
11/20/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
11/20/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
11/20/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
11/20/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
11/20/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
11/20/2020
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Misc
Informational
11/20/2020
10/22/20 Thursday the crew on the North end help to aid pulling the encasement and piping across I-470 also work was done on site for the Water Main approximately 400 was installed from the Tee. The South crew has installed 12” Water Certa-Lock pipe along relocation of water was done to not conflict with existing main. All changes shall be reflected on as-built.
Misc
Informational
11/20/2020
10/26/20 Monday Contractor crew on the Southside did work on Saturday but they didn’t install pipe backfilled and graded. Today they installed 12” Certa - Lock water main pipe along Chipman Line A. The Northside Installed approx 200’ of 12” water main (This portion of the WATER MAIN falls under PRSITE 20203248) Sta. 03+97 Line D.
Misc
Informational
11/20/2020
10/27/20 Tuesday Contractor Crew continued to work installation of Water Main on Chipman Road. Crew to the North backfilled excavation of boring across I-470 Hwy.
Misc
Informational
11/20/2020
10/28/20 Wednesday Contractor installed approximately 40’ of 12” water main along Chipman Road. Contractor had to cut through existing drive way to install pipe and also clear existing 6” water main.
Misc
Informational
11/20/2020
Tie-in was complete for the existing 8” to the newly installed 12” water main. 12” valve head East was moved to the newly installed Northbound an existing 8” valve East was less than a hundred feet away from the tie-in. A 8” sleeve was add during the tie-in. Contractor will reflected any changes on as-built.
Misc
Informational
11/20/2020
10/31/20 Saturday Two crews were working on the off-site 12” water main installation yesterday and today. 10/30/20 The second crew installed 160’ of 12” water main used a 11 1/4 bend instead of 22 1/2 bend because the grade was achieved before to line up with the Bore tie-in on the Southside of I-470 Hwy. A 12” sleeve was need just 4’ from the end of bore encasement, as-built will reflect all field changes. 10/31/20 This crew poured thrust & straddle blocks as shown on plan and backfilled excavation. 10/31 The crew on Chipman Road progress was slow due to the existing water main and the rock that was jackhammered and excavated.
Misc
Informational
11/20/2020
11/2/20 Monday Contractor installed Hydrant and approximately 80’ of 12” line on Chipman Road.
Misc
Informational
11/20/2020
11/10/20 Tuesday Contractor has been locating leaks on the Northside of I-470 Hwy.
Misc
Informational
11/20/2020
11/11/20 Wednesday Contractor working to ensure all leaks were eliminated leaks were caused from the Northside crew not tightening bolts at the MJ fittings (new crew members). Contractor will began pre-test pressure test.
Misc
Informational
11/20/2020
11/12/20 Thursday Contractor continue to work on water line.
Misc
Informational
11/20/2020
11/18/20 Wednesday Contractor has concrete schedule to complete encasement of water main & reinforcing steel Line A 36+80 to 37+40 (see water main detail page 10/15).
Misc
Informational
11/20/2020
11/19/20 Thursday Contractor ( Clarkson Const. ) chlorinated the water 12” Certa-Lock water main from the offsite to onsite approximately 4000’. Contractor will continue to backfill encasement of water main & reinforced steel section, also rough grade area to reconstruct exist creek.
Misc
Informational
11/20/2020
11/20/20 Friday Contractor de chlorinating line 12” Certa-Lock water main from the offsite to onsite.
Misc
Informational
12/01/2020
12/1/20 Tuesday began 12” Certa-Lock water main View High Drive.
Water Line - Construction Inspection Partial 12/02/2020
Misc
Informational
12/01/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
12/01/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
12/01/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
12/01/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
12/01/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
12/01/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
12/01/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
12/01/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
12/01/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
12/01/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
12/01/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
12/01/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
12/01/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
12/01/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
12/01/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
12/01/2020
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Misc
Informational
12/01/2020
10/22/20 Thursday the crew on the North end help to aid pulling the encasement and piping across I-470 also work was done on site for the Water Main approximately 400 was installed from the Tee. The South crew has installed 12” Water Certa-Lock pipe along relocation of water was done to not conflict with existing main. All changes shall be reflected on as-built.
Misc
Informational
12/01/2020
10/26/20 Monday Contractor crew on the Southside did work on Saturday but they didn’t install pipe backfilled and graded. Today they installed 12” Certa - Lock water main pipe along Chipman Line A. The Northside Installed approx 200’ of 12” water main (This portion of the WATER MAIN falls under PRSITE 20203248) Sta. 03+97 Line D.
Misc
Informational
12/01/2020
10/27/20 Tuesday Contractor Crew continued to work installation of Water Main on Chipman Road. Crew to the North backfilled excavation of boring across I-470 Hwy.
Misc
Informational
12/01/2020
10/28/20 Wednesday Contractor installed approximately 40’ of 12” water main along Chipman Road. Contractor had to cut through existing drive way to install pipe and also clear existing 6” water main.
Misc
Informational
12/01/2020
Tie-in was complete for the existing 8” to the newly installed 12” water main. 12” valve head East was moved to the newly installed Northbound an existing 8” valve East was less than a hundred feet away from the tie-in. A 8” sleeve was add during the tie-in. Contractor will reflected any changes on as-built.
Misc
Informational
12/01/2020
10/31/20 Saturday Two crews were working on the off-site 12” water main installation yesterday and today. 10/30/20 The second crew installed 160’ of 12” water main used a 11 1/4 bend instead of 22 1/2 bend because the grade was achieved before to line up with the Bore tie-in on the Southside of I-470 Hwy. A 12” sleeve was need just 4’ from the end of bore encasement, as-built will reflect all field changes. 10/31/20 This crew poured thrust & straddle blocks as shown on plan and backfilled excavation. 10/31 The crew on Chipman Road progress was slow due to the existing water main and the rock that was jackhammered and excavated.
Misc
Informational
12/01/2020
11/2/20 Monday Contractor installed Hydrant and approximately 80’ of 12” line on Chipman Road.
Misc
Informational
12/01/2020
11/10/20 Tuesday Contractor has been locating leaks on the Northside of I-470 Hwy.
Misc
Informational
12/01/2020
11/11/20 Wednesday Contractor working to ensure all leaks were eliminated leaks were caused from the Northside crew not tightening bolts at the MJ fittings (new crew members). Contractor will began pre-test pressure test.
Misc
Informational
12/01/2020
11/12/20 Thursday Contractor continue to work on water line.
Misc
Informational
12/01/2020
11/18/20 Wednesday Contractor has concrete schedule to complete encasement of water main & reinforcing steel Line A 36+80 to 37+40 (see water main detail page 10/15).
Misc
Informational
12/01/2020
11/19/20 Thursday Contractor ( Clarkson Const. ) chlorinated the water 12” Certa-Lock water main from the offsite to onsite approximately 4000’. Contractor will continue to backfill encasement of water main & reinforced steel section, also rough grade area to reconstruct exist creek.
Misc
Informational
12/01/2020
11/20/20 Friday Contractor de chlorinating line 12” Certa-Lock water main from the offsite to onsite.
Misc
Informational
12/01/2020
12/1/20 Tuesday began 12” Certa-Lock water main View High Drive.
Misc
Informational
12/02/2020
12/2/20 Wednesday contractor installed 22.5 bend @ Sta. 45.94.98 instead 45 deg bend to enable the hydrant @ Sta. 46+08.09 to be installed the correct distance from back of curb. Approximately 260’ was installed on Line A ( along View High Drive. Changes in elevation occurred do to survey error all field changes shall be reflected on as built.
Water Line - Construction Inspection Partial 12/03/2020
Misc
Informational
12/02/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
12/02/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
12/02/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
12/02/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
12/02/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
12/02/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
12/02/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
12/02/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
12/02/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
12/02/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
12/02/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
12/02/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
12/02/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
12/02/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
12/02/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
12/02/2020
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Misc
Informational
12/02/2020
10/22/20 Thursday the crew on the North end help to aid pulling the encasement and piping across I-470 also work was done on site for the Water Main approximately 400 was installed from the Tee. The South crew has installed 12” Water Certa-Lock pipe along relocation of water was done to not conflict with existing main. All changes shall be reflected on as-built.
Misc
Informational
12/02/2020
10/26/20 Monday Contractor crew on the Southside did work on Saturday but they didn’t install pipe backfilled and graded. Today they installed 12” Certa - Lock water main pipe along Chipman Line A. The Northside Installed approx 200’ of 12” water main (This portion of the WATER MAIN falls under PRSITE 20203248) Sta. 03+97 Line D.
Misc
Informational
12/02/2020
10/27/20 Tuesday Contractor Crew continued to work installation of Water Main on Chipman Road. Crew to the North backfilled excavation of boring across I-470 Hwy.
Misc
Informational
12/02/2020
10/28/20 Wednesday Contractor installed approximately 40’ of 12” water main along Chipman Road. Contractor had to cut through existing drive way to install pipe and also clear existing 6” water main.
Misc
Informational
12/02/2020
Tie-in was complete for the existing 8” to the newly installed 12” water main. 12” valve head East was moved to the newly installed Northbound an existing 8” valve East was less than a hundred feet away from the tie-in. A 8” sleeve was add during the tie-in. Contractor will reflected any changes on as-built.
Misc
Informational
12/02/2020
10/31/20 Saturday Two crews were working on the off-site 12” water main installation yesterday and today. 10/30/20 The second crew installed 160’ of 12” water main used a 11 1/4 bend instead of 22 1/2 bend because the grade was achieved before to line up with the Bore tie-in on the Southside of I-470 Hwy. A 12” sleeve was need just 4’ from the end of bore encasement, as-built will reflect all field changes. 10/31/20 This crew poured thrust & straddle blocks as shown on plan and backfilled excavation. 10/31 The crew on Chipman Road progress was slow due to the existing water main and the rock that was jackhammered and excavated.
Misc
Informational
12/02/2020
11/2/20 Monday Contractor installed Hydrant and approximately 80’ of 12” line on Chipman Road.
Misc
Informational
12/02/2020
11/10/20 Tuesday Contractor has been locating leaks on the Northside of I-470 Hwy.
Misc
Informational
12/02/2020
11/11/20 Wednesday Contractor working to ensure all leaks were eliminated leaks were caused from the Northside crew not tightening bolts at the MJ fittings (new crew members). Contractor will began pre-test pressure test.
Misc
Informational
12/02/2020
11/12/20 Thursday Contractor continue to work on water line.
Misc
Informational
12/02/2020
11/18/20 Wednesday Contractor has concrete schedule to complete encasement of water main & reinforcing steel Line A 36+80 to 37+40 (see water main detail page 10/15).
Misc
Informational
12/02/2020
11/19/20 Thursday Contractor ( Clarkson Const. ) chlorinated the water 12” Certa-Lock water main from the offsite to onsite approximately 4000’. Contractor will continue to backfill encasement of water main & reinforced steel section, also rough grade area to reconstruct exist creek.
Misc
Informational
12/02/2020
11/20/20 Friday Contractor de chlorinating line 12” Certa-Lock water main from the offsite to onsite.
Misc
Informational
12/02/2020
12/1/20 Tuesday began 12” Certa-Lock water main View High Drive.
Misc
Informational
12/02/2020
12/2/20 Wednesday contractor installed 22.5 bend @ Sta. 45.94.98 instead 45 deg bend to enable the hydrant @ Sta. 46+08.09 to be installed the correct distance from back of curb. Approximately 260’ was installed on Line A ( along View High Drive. Changes in elevation occurred do to survey error all field changes shall be reflected on as built.
Misc
Informational
12/03/2020
12/3/20 Thursday Contractor continued to install 12” Certa-Lock water line approximately 180’.
Water Line - Coliform Test 1 Passed 12/03/2020
Misc
Informational
12/03/2020
Misc
Informational
12/03/2020
Bacteria tests pass.
Water Line - Coliform Test 2 Passed 12/03/2020
Misc
Informational
12/03/2020
12/3/20 Thursday Bacteria - test passed except for testing point (C Line A ) until today addition showed that the line was clear of bacteria.
Water Line - Construction Inspection Partial 12/04/2020
Misc
Informational
12/03/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
12/03/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
12/03/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
12/03/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
12/03/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
12/03/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
12/03/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
12/03/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
12/03/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
12/03/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
12/03/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
12/03/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
12/03/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
12/03/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
12/03/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
12/03/2020
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Misc
Informational
12/03/2020
10/22/20 Thursday the crew on the North end help to aid pulling the encasement and piping across I-470 also work was done on site for the Water Main approximately 400 was installed from the Tee. The South crew has installed 12” Water Certa-Lock pipe along relocation of water was done to not conflict with existing main. All changes shall be reflected on as-built.
Misc
Informational
12/03/2020
10/26/20 Monday Contractor crew on the Southside did work on Saturday but they didn’t install pipe backfilled and graded. Today they installed 12” Certa - Lock water main pipe along Chipman Line A. The Northside Installed approx 200’ of 12” water main (This portion of the WATER MAIN falls under PRSITE 20203248) Sta. 03+97 Line D.
Misc
Informational
12/03/2020
10/27/20 Tuesday Contractor Crew continued to work installation of Water Main on Chipman Road. Crew to the North backfilled excavation of boring across I-470 Hwy.
Misc
Informational
12/03/2020
10/28/20 Wednesday Contractor installed approximately 40’ of 12” water main along Chipman Road. Contractor had to cut through existing drive way to install pipe and also clear existing 6” water main.
Misc
Informational
12/03/2020
Tie-in was complete for the existing 8” to the newly installed 12” water main. 12” valve head East was moved to the newly installed Northbound an existing 8” valve East was less than a hundred feet away from the tie-in. A 8” sleeve was add during the tie-in. Contractor will reflected any changes on as-built.
Misc
Informational
12/03/2020
10/31/20 Saturday Two crews were working on the off-site 12” water main installation yesterday and today. 10/30/20 The second crew installed 160’ of 12” water main used a 11 1/4 bend instead of 22 1/2 bend because the grade was achieved before to line up with the Bore tie-in on the Southside of I-470 Hwy. A 12” sleeve was need just 4’ from the end of bore encasement, as-built will reflect all field changes. 10/31/20 This crew poured thrust & straddle blocks as shown on plan and backfilled excavation. 10/31 The crew on Chipman Road progress was slow due to the existing water main and the rock that was jackhammered and excavated.
Misc
Informational
12/03/2020
11/2/20 Monday Contractor installed Hydrant and approximately 80’ of 12” line on Chipman Road.
Misc
Informational
12/03/2020
11/10/20 Tuesday Contractor has been locating leaks on the Northside of I-470 Hwy.
Misc
Informational
12/03/2020
11/11/20 Wednesday Contractor working to ensure all leaks were eliminated leaks were caused from the Northside crew not tightening bolts at the MJ fittings (new crew members). Contractor will began pre-test pressure test.
Misc
Informational
12/03/2020
11/12/20 Thursday Contractor continue to work on water line.
Misc
Informational
12/03/2020
11/18/20 Wednesday Contractor has concrete schedule to complete encasement of water main & reinforcing steel Line A 36+80 to 37+40 (see water main detail page 10/15).
Misc
Informational
12/03/2020
11/19/20 Thursday Contractor ( Clarkson Const. ) chlorinated the water 12” Certa-Lock water main from the offsite to onsite approximately 4000’. Contractor will continue to backfill encasement of water main & reinforced steel section, also rough grade area to reconstruct exist creek.
Misc
Informational
12/03/2020
11/20/20 Friday Contractor de chlorinating line 12” Certa-Lock water main from the offsite to onsite.
Misc
Informational
12/03/2020
12/1/20 Tuesday began 12” Certa-Lock water main View High Drive.
Misc
Informational
12/03/2020
12/2/20 Wednesday contractor installed 22.5 bend @ Sta. 45.94.98 instead 45 deg bend to enable the hydrant @ Sta. 46+08.09 to be installed the correct distance from back of curb. Approximately 260’ was installed on Line A ( along View High Drive. Changes in elevation occurred do to survey error all field changes shall be reflected on as built.
Misc
Informational
12/03/2020
12/3/20 Thursday Contractor continued to install 12” Certa-Lock water line approximately 180’.
Misc
Informational
12/04/2020
12/4/20 Friday Contractor continued installation of 12” Certa-Lock water line across View High Drive. Approximately 70’ of pipe was installed.
Grading/Excavation/Fill Inspection Partial 12/04/2020
Misc
Informational
12/04/2020
12/4/20 Friday Contractor cut across View High Drive as per plan between 49+44 and 50+48 Line A. Olsson did the compaction testing for the backfilling under the road.
Water Line - Construction Inspection Partial 12/07/2020
Misc
Informational
12/04/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
12/04/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
12/04/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
12/04/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
12/04/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
12/04/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
12/04/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
12/04/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
12/04/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
12/04/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
12/04/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
12/04/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
12/04/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
12/04/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
12/04/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
12/04/2020
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Misc
Informational
12/04/2020
10/22/20 Thursday the crew on the North end help to aid pulling the encasement and piping across I-470 also work was done on site for the Water Main approximately 400 was installed from the Tee. The South crew has installed 12” Water Certa-Lock pipe along relocation of water was done to not conflict with existing main. All changes shall be reflected on as-built.
Misc
Informational
12/04/2020
10/26/20 Monday Contractor crew on the Southside did work on Saturday but they didn’t install pipe backfilled and graded. Today they installed 12” Certa - Lock water main pipe along Chipman Line A. The Northside Installed approx 200’ of 12” water main (This portion of the WATER MAIN falls under PRSITE 20203248) Sta. 03+97 Line D.
Misc
Informational
12/04/2020
10/27/20 Tuesday Contractor Crew continued to work installation of Water Main on Chipman Road. Crew to the North backfilled excavation of boring across I-470 Hwy.
Misc
Informational
12/04/2020
10/28/20 Wednesday Contractor installed approximately 40’ of 12” water main along Chipman Road. Contractor had to cut through existing drive way to install pipe and also clear existing 6” water main.
Misc
Informational
12/04/2020
Tie-in was complete for the existing 8” to the newly installed 12” water main. 12” valve head East was moved to the newly installed Northbound an existing 8” valve East was less than a hundred feet away from the tie-in. A 8” sleeve was add during the tie-in. Contractor will reflected any changes on as-built.
Misc
Informational
12/04/2020
10/31/20 Saturday Two crews were working on the off-site 12” water main installation yesterday and today. 10/30/20 The second crew installed 160’ of 12” water main used a 11 1/4 bend instead of 22 1/2 bend because the grade was achieved before to line up with the Bore tie-in on the Southside of I-470 Hwy. A 12” sleeve was need just 4’ from the end of bore encasement, as-built will reflect all field changes. 10/31/20 This crew poured thrust & straddle blocks as shown on plan and backfilled excavation. 10/31 The crew on Chipman Road progress was slow due to the existing water main and the rock that was jackhammered and excavated.
Misc
Informational
12/04/2020
11/2/20 Monday Contractor installed Hydrant and approximately 80’ of 12” line on Chipman Road.
Misc
Informational
12/04/2020
11/10/20 Tuesday Contractor has been locating leaks on the Northside of I-470 Hwy.
Misc
Informational
12/04/2020
11/11/20 Wednesday Contractor working to ensure all leaks were eliminated leaks were caused from the Northside crew not tightening bolts at the MJ fittings (new crew members). Contractor will began pre-test pressure test.
Misc
Informational
12/04/2020
11/12/20 Thursday Contractor continue to work on water line.
Misc
Informational
12/04/2020
11/18/20 Wednesday Contractor has concrete schedule to complete encasement of water main & reinforcing steel Line A 36+80 to 37+40 (see water main detail page 10/15).
Misc
Informational
12/04/2020
11/19/20 Thursday Contractor ( Clarkson Const. ) chlorinated the water 12” Certa-Lock water main from the offsite to onsite approximately 4000’. Contractor will continue to backfill encasement of water main & reinforced steel section, also rough grade area to reconstruct exist creek.
Misc
Informational
12/04/2020
11/20/20 Friday Contractor de chlorinating line 12” Certa-Lock water main from the offsite to onsite.
Misc
Informational
12/04/2020
12/1/20 Tuesday began 12” Certa-Lock water main View High Drive.
Misc
Informational
12/04/2020
12/2/20 Wednesday contractor installed 22.5 bend @ Sta. 45.94.98 instead 45 deg bend to enable the hydrant @ Sta. 46+08.09 to be installed the correct distance from back of curb. Approximately 260’ was installed on Line A ( along View High Drive. Changes in elevation occurred do to survey error all field changes shall be reflected on as built.
Misc
Informational
12/04/2020
12/3/20 Thursday Contractor continued to install 12” Certa-Lock water line approximately 180’.
Misc
Informational
12/04/2020
12/4/20 Friday Contractor continued installation of 12” Certa-Lock water line across View High Drive. Approximately 70’ of pipe was installed.
Misc
Informational
12/07/2020
12/7/20 Monday Contractor continued installing 12” Certa-Lock water main to the end of Line A. Water line will connect to the 8” DIP for the Kansas City portion of water main to be installed.
Grading/Excavation/Fill Inspection Partial 12/07/2020
Misc
Informational
12/04/2020
12/4/20 Friday Contractor cut across View High Drive as per plan between 49+44 and 50+48 Line A. Olsson did the compaction testing for the backfilling under the road.
Misc
Informational
12/07/2020
12/7/20 Monday Contractor continues to grade/excavate/backfill project site for construction of project as per plan. Excavation has been perform as long as weather permits (weekdays and weekends).
Water Line - Construction Inspection Partial 12/09/2020
Misc
Informational
12/07/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
12/07/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
12/07/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
12/07/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
12/07/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
12/07/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
12/07/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
12/07/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
12/07/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
12/07/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
12/07/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
12/07/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
12/07/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
12/07/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
12/07/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
12/07/2020
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Misc
Informational
12/07/2020
10/22/20 Thursday the crew on the North end help to aid pulling the encasement and piping across I-470 also work was done on site for the Water Main approximately 400 was installed from the Tee. The South crew has installed 12” Water Certa-Lock pipe along relocation of water was done to not conflict with existing main. All changes shall be reflected on as-built.
Misc
Informational
12/07/2020
10/26/20 Monday Contractor crew on the Southside did work on Saturday but they didn’t install pipe backfilled and graded. Today they installed 12” Certa - Lock water main pipe along Chipman Line A. The Northside Installed approx 200’ of 12” water main (This portion of the WATER MAIN falls under PRSITE 20203248) Sta. 03+97 Line D.
Misc
Informational
12/07/2020
10/27/20 Tuesday Contractor Crew continued to work installation of Water Main on Chipman Road. Crew to the North backfilled excavation of boring across I-470 Hwy.
Misc
Informational
12/07/2020
10/28/20 Wednesday Contractor installed approximately 40’ of 12” water main along Chipman Road. Contractor had to cut through existing drive way to install pipe and also clear existing 6” water main.
Misc
Informational
12/07/2020
Tie-in was complete for the existing 8” to the newly installed 12” water main. 12” valve head East was moved to the newly installed Northbound an existing 8” valve East was less than a hundred feet away from the tie-in. A 8” sleeve was add during the tie-in. Contractor will reflected any changes on as-built.
Misc
Informational
12/07/2020
10/31/20 Saturday Two crews were working on the off-site 12” water main installation yesterday and today. 10/30/20 The second crew installed 160’ of 12” water main used a 11 1/4 bend instead of 22 1/2 bend because the grade was achieved before to line up with the Bore tie-in on the Southside of I-470 Hwy. A 12” sleeve was need just 4’ from the end of bore encasement, as-built will reflect all field changes. 10/31/20 This crew poured thrust & straddle blocks as shown on plan and backfilled excavation. 10/31 The crew on Chipman Road progress was slow due to the existing water main and the rock that was jackhammered and excavated.
Misc
Informational
12/07/2020
11/2/20 Monday Contractor installed Hydrant and approximately 80’ of 12” line on Chipman Road.
Misc
Informational
12/07/2020
11/10/20 Tuesday Contractor has been locating leaks on the Northside of I-470 Hwy.
Misc
Informational
12/07/2020
11/11/20 Wednesday Contractor working to ensure all leaks were eliminated leaks were caused from the Northside crew not tightening bolts at the MJ fittings (new crew members). Contractor will began pre-test pressure test.
Misc
Informational
12/07/2020
11/12/20 Thursday Contractor continue to work on water line.
Misc
Informational
12/07/2020
11/18/20 Wednesday Contractor has concrete schedule to complete encasement of water main & reinforcing steel Line A 36+80 to 37+40 (see water main detail page 10/15).
Misc
Informational
12/07/2020
11/19/20 Thursday Contractor ( Clarkson Const. ) chlorinated the water 12” Certa-Lock water main from the offsite to onsite approximately 4000’. Contractor will continue to backfill encasement of water main & reinforced steel section, also rough grade area to reconstruct exist creek.
Misc
Informational
12/07/2020
11/20/20 Friday Contractor de chlorinating line 12” Certa-Lock water main from the offsite to onsite.
Misc
Informational
12/07/2020
12/1/20 Tuesday began 12” Certa-Lock water main View High Drive.
Misc
Informational
12/07/2020
12/2/20 Wednesday contractor installed 22.5 bend @ Sta. 45.94.98 instead 45 deg bend to enable the hydrant @ Sta. 46+08.09 to be installed the correct distance from back of curb. Approximately 260’ was installed on Line A ( along View High Drive. Changes in elevation occurred do to survey error all field changes shall be reflected on as built.
Misc
Informational
12/07/2020
12/3/20 Thursday Contractor continued to install 12” Certa-Lock water line approximately 180’.
Misc
Informational
12/07/2020
12/4/20 Friday Contractor continued installation of 12” Certa-Lock water line across View High Drive. Approximately 70’ of pipe was installed.
Misc
Informational
12/07/2020
12/7/20 Monday Contractor continued installing 12” Certa-Lock water main to the end of Line A. Water line will connect to the 8” DIP for the Kansas City portion of water main to be installed.
Misc
Informational
12/09/2020
121/8/20 Tuesday 2:15PM Contractor ( Clarkston ) has installed approximately 100’ of 12” Certa-Lock water main on Line A. Working resolving elevation of Hydrant & Backflow Preventer.
Water Line - Construction Inspection Partial 12/10/2020
Misc
Informational
12/09/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
12/09/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
12/09/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
12/09/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
12/09/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
12/09/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
12/09/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
12/09/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
12/09/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
12/09/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
12/09/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
12/09/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
12/09/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
12/09/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
12/09/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
12/09/2020
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Misc
Informational
12/09/2020
10/22/20 Thursday the crew on the North end help to aid pulling the encasement and piping across I-470 also work was done on site for the Water Main approximately 400 was installed from the Tee. The South crew has installed 12” Water Certa-Lock pipe along relocation of water was done to not conflict with existing main. All changes shall be reflected on as-built.
Misc
Informational
12/09/2020
10/26/20 Monday Contractor crew on the Southside did work on Saturday but they didn’t install pipe backfilled and graded. Today they installed 12” Certa - Lock water main pipe along Chipman Line A. The Northside Installed approx 200’ of 12” water main (This portion of the WATER MAIN falls under PRSITE 20203248) Sta. 03+97 Line D.
Misc
Informational
12/09/2020
10/27/20 Tuesday Contractor Crew continued to work installation of Water Main on Chipman Road. Crew to the North backfilled excavation of boring across I-470 Hwy.
Misc
Informational
12/09/2020
10/28/20 Wednesday Contractor installed approximately 40’ of 12” water main along Chipman Road. Contractor had to cut through existing drive way to install pipe and also clear existing 6” water main.
Misc
Informational
12/09/2020
Tie-in was complete for the existing 8” to the newly installed 12” water main. 12” valve head East was moved to the newly installed Northbound an existing 8” valve East was less than a hundred feet away from the tie-in. A 8” sleeve was add during the tie-in. Contractor will reflected any changes on as-built.
Misc
Informational
12/09/2020
10/31/20 Saturday Two crews were working on the off-site 12” water main installation yesterday and today. 10/30/20 The second crew installed 160’ of 12” water main used a 11 1/4 bend instead of 22 1/2 bend because the grade was achieved before to line up with the Bore tie-in on the Southside of I-470 Hwy. A 12” sleeve was need just 4’ from the end of bore encasement, as-built will reflect all field changes. 10/31/20 This crew poured thrust & straddle blocks as shown on plan and backfilled excavation. 10/31 The crew on Chipman Road progress was slow due to the existing water main and the rock that was jackhammered and excavated.
Misc
Informational
12/09/2020
11/2/20 Monday Contractor installed Hydrant and approximately 80’ of 12” line on Chipman Road.
Misc
Informational
12/09/2020
11/10/20 Tuesday Contractor has been locating leaks on the Northside of I-470 Hwy.
Misc
Informational
12/09/2020
11/11/20 Wednesday Contractor working to ensure all leaks were eliminated leaks were caused from the Northside crew not tightening bolts at the MJ fittings (new crew members). Contractor will began pre-test pressure test.
Misc
Informational
12/09/2020
11/12/20 Thursday Contractor continue to work on water line.
Misc
Informational
12/09/2020
11/18/20 Wednesday Contractor has concrete schedule to complete encasement of water main & reinforcing steel Line A 36+80 to 37+40 (see water main detail page 10/15).
Misc
Informational
12/09/2020
11/19/20 Thursday Contractor ( Clarkson Const. ) chlorinated the water 12” Certa-Lock water main from the offsite to onsite approximately 4000’. Contractor will continue to backfill encasement of water main & reinforced steel section, also rough grade area to reconstruct exist creek.
Misc
Informational
12/09/2020
11/20/20 Friday Contractor de chlorinating line 12” Certa-Lock water main from the offsite to onsite.
Misc
Informational
12/09/2020
12/1/20 Tuesday began 12” Certa-Lock water main View High Drive.
Misc
Informational
12/09/2020
12/2/20 Wednesday contractor installed 22.5 bend @ Sta. 45.94.98 instead 45 deg bend to enable the hydrant @ Sta. 46+08.09 to be installed the correct distance from back of curb. Approximately 260’ was installed on Line A ( along View High Drive. Changes in elevation occurred do to survey error all field changes shall be reflected on as built.
Misc
Informational
12/09/2020
12/3/20 Thursday Contractor continued to install 12” Certa-Lock water line approximately 180’.
Misc
Informational
12/09/2020
12/4/20 Friday Contractor continued installation of 12” Certa-Lock water line across View High Drive. Approximately 70’ of pipe was installed.
Misc
Informational
12/09/2020
12/7/20 Monday Contractor continued installing 12” Certa-Lock water main to the end of Line A. Water line will connect to the 8” DIP for the Kansas City portion of water main to be installed.
Misc
Informational
12/09/2020
12/8/20 Tuesday 2:15PM Contractor ( Clarkston ) has installed approximately 100’ of 12” Certa-Lock water main on Line A. Working resolving elevation of Hydrant & Backflow Preventer.
Misc
Informational
12/10/2020
12/10/20 Thursday 4:05PM Contractor ( Clarkston ) installed approximately 20’ plus of 12” water mains 2/45 degree bends & the Fire Hydrant into the newly installed Backflow Preventer Vault. Contractor pour the floor for the Backflow Preventer Vault. I will update changes that were made to adjust for leveling of the Fire Hydrant @ Sta 52+92.41 & Backflow Preventer and Vault.
Site Visit Partial 12/11/2020
Misc
Informational
12/11/2020
12/11/20 Friday Contractor staged piping and Backflow valves In Backflow Preventer Vault. ( Side note contractor has been working on the sanitary Line A approximately 160’ of 21 SDR was install and main hole. Once the correct project # is found I will re-enter information to the correct project. ) It appears the contractor have shut down for the day due to weather conditions (Rain).
Water Line - Construction Inspection Partial 12/14/2020
Misc
Informational
12/10/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
12/10/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
12/10/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
12/10/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
12/10/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
12/10/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
12/10/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
12/10/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
12/10/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
12/10/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
12/10/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
12/10/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
12/10/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
12/10/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
12/10/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
12/10/2020
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Misc
Informational
12/10/2020
10/22/20 Thursday the crew on the North end help to aid pulling the encasement and piping across I-470 also work was done on site for the Water Main approximately 400 was installed from the Tee. The South crew has installed 12” Water Certa-Lock pipe along relocation of water was done to not conflict with existing main. All changes shall be reflected on as-built.
Misc
Informational
12/10/2020
10/26/20 Monday Contractor crew on the Southside did work on Saturday but they didn’t install pipe backfilled and graded. Today they installed 12” Certa - Lock water main pipe along Chipman Line A. The Northside Installed approx 200’ of 12” water main (This portion of the WATER MAIN falls under PRSITE 20203248) Sta. 03+97 Line D.
Misc
Informational
12/10/2020
10/27/20 Tuesday Contractor Crew continued to work installation of Water Main on Chipman Road. Crew to the North backfilled excavation of boring across I-470 Hwy.
Misc
Informational
12/10/2020
10/28/20 Wednesday Contractor installed approximately 40’ of 12” water main along Chipman Road. Contractor had to cut through existing drive way to install pipe and also clear existing 6” water main.
Misc
Informational
12/10/2020
Tie-in was complete for the existing 8” to the newly installed 12” water main. 12” valve head East was moved to the newly installed Northbound an existing 8” valve East was less than a hundred feet away from the tie-in. A 8” sleeve was add during the tie-in. Contractor will reflected any changes on as-built.
Misc
Informational
12/10/2020
10/31/20 Saturday Two crews were working on the off-site 12” water main installation yesterday and today. 10/30/20 The second crew installed 160’ of 12” water main used a 11 1/4 bend instead of 22 1/2 bend because the grade was achieved before to line up with the Bore tie-in on the Southside of I-470 Hwy. A 12” sleeve was need just 4’ from the end of bore encasement, as-built will reflect all field changes. 10/31/20 This crew poured thrust & straddle blocks as shown on plan and backfilled excavation. 10/31 The crew on Chipman Road progress was slow due to the existing water main and the rock that was jackhammered and excavated.
Misc
Informational
12/10/2020
11/2/20 Monday Contractor installed Hydrant and approximately 80’ of 12” line on Chipman Road.
Misc
Informational
12/10/2020
11/10/20 Tuesday Contractor has been locating leaks on the Northside of I-470 Hwy.
Misc
Informational
12/10/2020
11/11/20 Wednesday Contractor working to ensure all leaks were eliminated leaks were caused from the Northside crew not tightening bolts at the MJ fittings (new crew members). Contractor will began pre-test pressure test.
Misc
Informational
12/10/2020
11/12/20 Thursday Contractor continue to work on water line.
Misc
Informational
12/10/2020
11/18/20 Wednesday Contractor has concrete schedule to complete encasement of water main & reinforcing steel Line A 36+80 to 37+40 (see water main detail page 10/15).
Misc
Informational
12/10/2020
11/19/20 Thursday Contractor ( Clarkson Const. ) chlorinated the water 12” Certa-Lock water main from the offsite to onsite approximately 4000’. Contractor will continue to backfill encasement of water main & reinforced steel section, also rough grade area to reconstruct exist creek.
Misc
Informational
12/10/2020
11/20/20 Friday Contractor de chlorinating line 12” Certa-Lock water main from the offsite to onsite.
Misc
Informational
12/10/2020
12/1/20 Tuesday began 12” Certa-Lock water main View High Drive.
Misc
Informational
12/10/2020
12/2/20 Wednesday contractor installed 22.5 bend @ Sta. 45.94.98 instead 45 deg bend to enable the hydrant @ Sta. 46+08.09 to be installed the correct distance from back of curb. Approximately 260’ was installed on Line A ( along View High Drive. Changes in elevation occurred do to survey error all field changes shall be reflected on as built.
Misc
Informational
12/10/2020
12/3/20 Thursday Contractor continued to install 12” Certa-Lock water line approximately 180’.
Misc
Informational
12/10/2020
12/4/20 Friday Contractor continued installation of 12” Certa-Lock water line across View High Drive. Approximately 70’ of pipe was installed.
Misc
Informational
12/10/2020
12/7/20 Monday Contractor continued installing 12” Certa-Lock water main to the end of Line A. Water line will connect to the 8” DIP for the Kansas City portion of water main to be installed.
Misc
Informational
12/10/2020
121/8/20 Tuesday 2:15PM Contractor ( Clarkston ) has installed approximately 100’ of 12” Certa-Lock water main on Line A. Working resolving elevation of Hydrant & Backflow Preventer.
Misc
Informational
12/14/2020
12/14/20 Monday Contractor ( Clarkston ) continued to install valves, fitting & pipping for Backflow Preventer. 22 1/4” then a 4’ 12” pipe 11.5’ then a 3.5’ 12” pipe and last before 12”X8” Reducer to the Kansas City water line.
Water Line - Construction Inspection Partial 03/03/2021
Misc
Informational
12/14/2020
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
12/14/2020
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
12/14/2020
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
12/14/2020
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
12/14/2020
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
12/14/2020
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
12/14/2020
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
12/14/2020
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
12/14/2020
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
12/14/2020
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
12/14/2020
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
12/14/2020
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
12/14/2020
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
12/14/2020
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
12/14/2020
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
12/14/2020
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Misc
Informational
12/14/2020
10/22/20 Thursday the crew on the North end help to aid pulling the encasement and piping across I-470 also work was done on site for the Water Main approximately 400 was installed from the Tee. The South crew has installed 12” Water Certa-Lock pipe along relocation of water was done to not conflict with existing main. All changes shall be reflected on as-built.
Misc
Informational
12/14/2020
10/26/20 Monday Contractor crew on the Southside did work on Saturday but they didn’t install pipe backfilled and graded. Today they installed 12” Certa - Lock water main pipe along Chipman Line A. The Northside Installed approx 200’ of 12” water main (This portion of the WATER MAIN falls under PRSITE 20203248) Sta. 03+97 Line D.
Misc
Informational
12/14/2020
10/27/20 Tuesday Contractor Crew continued to work installation of Water Main on Chipman Road. Crew to the North backfilled excavation of boring across I-470 Hwy.
Misc
Informational
12/14/2020
10/28/20 Wednesday Contractor installed approximately 40’ of 12” water main along Chipman Road. Contractor had to cut through existing drive way to install pipe and also clear existing 6” water main.
Misc
Informational
12/14/2020
Tie-in was complete for the existing 8” to the newly installed 12” water main. 12” valve head East was moved to the newly installed Northbound an existing 8” valve East was less than a hundred feet away from the tie-in. A 8” sleeve was add during the tie-in. Contractor will reflected any changes on as-built.
Misc
Informational
12/14/2020
10/31/20 Saturday Two crews were working on the off-site 12” water main installation yesterday and today. 10/30/20 The second crew installed 160’ of 12” water main used a 11 1/4 bend instead of 22 1/2 bend because the grade was achieved before to line up with the Bore tie-in on the Southside of I-470 Hwy. A 12” sleeve was need just 4’ from the end of bore encasement, as-built will reflect all field changes. 10/31/20 This crew poured thrust & straddle blocks as shown on plan and backfilled excavation. 10/31 The crew on Chipman Road progress was slow due to the existing water main and the rock that was jackhammered and excavated.
Misc
Informational
12/14/2020
11/2/20 Monday Contractor installed Hydrant and approximately 80’ of 12” line on Chipman Road.
Misc
Informational
12/14/2020
11/10/20 Tuesday Contractor has been locating leaks on the Northside of I-470 Hwy.
Misc
Informational
12/14/2020
11/11/20 Wednesday Contractor working to ensure all leaks were eliminated leaks were caused from the Northside crew not tightening bolts at the MJ fittings (new crew members). Contractor will began pre-test pressure test.
Misc
Informational
12/14/2020
11/12/20 Thursday Contractor continue to work on water line.
Misc
Informational
12/14/2020
11/18/20 Wednesday Contractor has concrete schedule to complete encasement of water main & reinforcing steel Line A 36+80 to 37+40 (see water main detail page 10/15).
Misc
Informational
12/14/2020
11/19/20 Thursday Contractor ( Clarkson Const. ) chlorinated the water 12” Certa-Lock water main from the offsite to onsite approximately 4000’. Contractor will continue to backfill encasement of water main & reinforced steel section, also rough grade area to reconstruct exist creek.
Misc
Informational
12/14/2020
11/20/20 Friday Contractor de chlorinating line 12” Certa-Lock water main from the offsite to onsite.
Misc
Informational
12/14/2020
12/1/20 Tuesday began 12” Certa-Lock water main View High Drive.
Misc
Informational
12/14/2020
12/2/20 Wednesday contractor installed 22.5 bend @ Sta. 45.94.98 instead 45 deg bend to enable the hydrant @ Sta. 46+08.09 to be installed the correct distance from back of curb. Approximately 260’ was installed on Line A ( along View High Drive. Changes in elevation occurred do to survey error all field changes shall be reflected on as built.
Misc
Informational
12/14/2020
12/3/20 Thursday Contractor continued to install 12” Certa-Lock water line approximately 180’.
Misc
Informational
12/14/2020
12/4/20 Friday Contractor continued installation of 12” Certa-Lock water line across View High Drive. Approximately 70’ of pipe was installed.
Misc
Informational
12/14/2020
12/7/20 Monday Contractor continued installing 12” Certa-Lock water main to the end of Line A. Water line will connect to the 8” DIP for the Kansas City portion of water main to be installed.
Misc
Informational
12/14/2020
121/8/20 Tuesday 2:15PM Contractor ( Clarkston ) has installed approximately 100’ of 12” Certa-Lock water main on Line A. Working resolving elevation of Hydrant & Backflow Preventer.
Misc
Informational
12/14/2020
12/14/20 Monday Contractor ( Clarkston ) continued to install valves, fitting & pipping for Backflow Preventer. 22 1/4” then a 4’ 12” pipe 11.5’ then a 3.5’ 12” pipe and last before 12”X8” Reducer to the Kansas City water line.
Misc
Informational
03/03/2021
3/3/21 Wednesday Contractor ( Clarkston Const. ) backfilled line A .
Water Line - Hydrostatic Test Passed 03/03/2021
Misc
Informational
03/03/2021
Contractor ( Clarkston Const. ) Performed Hydrostatic Tested on line A from Sta. 46+33 to 53+22 8”x8”x8” Tee.
Driveway Inspection Partial 03/10/2021
Misc
Informational
03/10/2021
Contractor ( Clarkson Greg crew ) began forming driveway that were removed for the installation of 12” Certa Lock water main. See documents for pics.
Misc
Informational
03/10/2021
3/10/21 Wednesday Contractor pour the portion of driveway that was removed during excavation. ( Resident complained about driveway approach not being completely replace. Chipman Road is schedule to be widen soon which will remove that section of the driveway. I have informed my chain of command via e-mail and telephone about the issue.The driveway approach was already crack before the start of the job, contractor has pictures prior to the beginning of project. )
Water Line - Construction Inspection Passed 03/10/2021
Misc
Informational
03/03/2021
9/28/20 Tuesday Contractor continued to installed 12” Certa - Lok Water main Line A.
Misc
Informational
03/03/2021
9/30/20 Wednesday Contractor installed 281’ of 12” Certa - Lok Water main Line A, (2)22 1/4 Deg. Bends were installed @ approximately 16+00 and 17+25. The contractor did not have to install (4) 45 Deg. Bends to get the grade depth for the water line. Contractor will submit all field changes on As-Built. Contractor believes 10 12” approved valves will be onsite on 10/02/20 Friday.
Misc
Informational
03/03/2021
10/1/20 Thursday Contractor was able to install 12” water main to Sta 18+86 approximately 160’ feet more 9/30/20. Today contractor installed approximately 63’ of 12” water main with a 22.25 Bend, 12” Butterfly Valve for Air Relief Assembly. Contractor poured thrust blocks for bends, tees and hydrants. Contract continues to put together 12” water main for installation on 10/2/20.
Misc
Informational
03/03/2021
10/2/20 Friday Contractor continued to install 12” water main, hydrant was set @ Sta. 20+54.86. Approximately 274’ of 12” Certa - Lok on Line A. Contractor working on boring pit for direction boring.
Misc
Informational
03/03/2021
10/6/20 Tuesday Contractor continued to bore across the I-470 Hwy since yesterday 10/5/20. Contractor put together 360’ on the North side of I-470 Hwy for installment in casement under Hwy. Today 320’ was install from the South side of Hwy on Line A.
Misc
Informational
03/03/2021
10/7/20 Wednesday Contractor continued to installed 12 Certa-Lok water main on Line A as-per plan. The contractor ran into heavy rock and was only able to install 20’ of pipe & a fire hydrant. Continued boring across I -470 Hwy.
Misc
Informational
03/03/2021
10/8/20 Thursday Contractor was only able to install 100’ of 12” Certa-Lok water main due to the heavy rock in excavated area. Boring continued.
Misc
Informational
03/03/2021
10/9/20 Friday Contractor installed 126’ of 12” Certa-Lok water main just beyond the 22.5 deg Bend @ Sta 29+49.08. The vertical 45 deg Bends were not needed to make the grade. Contractor began to break grade at the 45 deg Bend @ Sta 28+38.83. Changes to the project plans will be reflected on as-built.
Misc
Informational
03/03/2021
10/12/20 Monday Contractor worked 10/10/20 progress was slow due having to fill in low elevation areas as per plan. Contractor continued to work on water main, thrust blocks were poured behind fittings and bends.
Misc
Informational
03/03/2021
10/13/20 Tuesday Contractor add a crew to begin installation of 12” water main on line o the Northside of I-470 Hwy. Approximately 100’ of Certa - Lock 12” water was installed on site on the Northside. The Southside crew was only able to install 70’ of 12” water main because of the rock. Southside crew continued to move toward Sta. 30+69.58 were the North & West 12” Butterfly valves are to be installed.
Misc
Informational
03/03/2021
10/14/20 Wednesday Contractor of Clarkson Const. on the Northside installed 4/45 Degree Bends and framed the wire casing for concrete to encase vertical piping. Contractor on the Southside still jackhammering rock progress is slow.2/12” Butterfly Valves were installed with 12”x12”x12” Tee 6 thrust blocks was poured on Bends and Fittings.
Misc
Informational
03/03/2021
10/15/20 Thursday Boring operations of continued. The water line construction is at a temporarily on hold until casing are installed (and or ) until Traffic permits and sign is in place to resume further installation.
Misc
Informational
03/03/2021
10/16/20 Friday Contractor continued to install Certa-Lock water line Consturtion on the Northside of I-470 Hwy. From approximately Sta 38+00 to 40+84 @ 2:00PM today. Contractor continue to prep for more pipe installation. Contractor said they plan to work on 10/17/20 Saturday.
Misc
Informational
03/03/2021
10/17/20 Saturday Contractor is preparing water line to install up to Sta 46+00. Contractors will install Certa -Lock 12” piping to Sta 45.04.70 12X12X12 Tee they will stop there because a one of the 12” valve is inoperable. So instead of closing off the entrance since they will not be able to install 12” Butterfly valve he began to backfill. Onsite supervisor of Clarkson ( Nick Peeles ) has informed his supervisor of the valves needed to continue water main installation.
Misc
Informational
03/03/2021
10/19/20 Monday Contractor poured thrust blocks behind all fits and bends that were installed on Saturday. Boring began to wield encasement for water pipe that is to be installed across !-470 Hwy. South crew began to excavate to install water line that travels along NE Chipman Road.
Misc
Informational
03/03/2021
10/21/20 Wednesday Contractor has continued to work to get boring encasement across I-470 and continued to work to install water main.
Misc
Informational
03/03/2021
10/22/20 Thursday the crew on the North end help to aid pulling the encasement and piping across I-470 also work was done on site for the Water Main approximately 400 was installed from the Tee. The South crew has installed 12” Water Certa-Lock pipe along relocation of water was done to not conflict with existing main. All changes shall be reflected on as-built.
Misc
Informational
03/03/2021
10/26/20 Monday Contractor crew on the Southside did work on Saturday but they didn’t install pipe backfilled and graded. Today they installed 12” Certa - Lock water main pipe along Chipman Line A. The Northside Installed approx 200’ of 12” water main (This portion of the WATER MAIN falls under PRSITE 20203248) Sta. 03+97 Line D.
Misc
Informational
03/03/2021
10/27/20 Tuesday Contractor Crew continued to work installation of Water Main on Chipman Road. Crew to the North backfilled excavation of boring across I-470 Hwy.
Misc
Informational
03/03/2021
10/28/20 Wednesday Contractor installed approximately 40’ of 12” water main along Chipman Road. Contractor had to cut through existing drive way to install pipe and also clear existing 6” water main.
Misc
Informational
03/03/2021
Tie-in was complete for the existing 8” to the newly installed 12” water main. 12” valve head East was moved to the newly installed Northbound an existing 8” valve East was less than a hundred feet away from the tie-in. A 8” sleeve was add during the tie-in. Contractor will reflected any changes on as-built.
Misc
Informational
03/03/2021
10/31/20 Saturday Two crews were working on the off-site 12” water main installation yesterday and today. 10/30/20 The second crew installed 160’ of 12” water main used a 11 1/4 bend instead of 22 1/2 bend because the grade was achieved before to line up with the Bore tie-in on the Southside of I-470 Hwy. A 12” sleeve was need just 4’ from the end of bore encasement, as-built will reflect all field changes. 10/31/20 This crew poured thrust & straddle blocks as shown on plan and backfilled excavation. 10/31 The crew on Chipman Road progress was slow due to the existing water main and the rock that was jackhammered and excavated.
Misc
Informational
03/03/2021
11/2/20 Monday Contractor installed Hydrant and approximately 80’ of 12” line on Chipman Road.
Misc
Informational
03/03/2021
11/10/20 Tuesday Contractor has been locating leaks on the Northside of I-470 Hwy.
Misc
Informational
03/03/2021
11/11/20 Wednesday Contractor working to ensure all leaks were eliminated leaks were caused from the Northside crew not tightening bolts at the MJ fittings (new crew members). Contractor will began pre-test pressure test.
Misc
Informational
03/03/2021
11/12/20 Thursday Contractor continue to work on water line.
Misc
Informational
03/03/2021
11/18/20 Wednesday Contractor has concrete schedule to complete encasement of water main & reinforcing steel Line A 36+80 to 37+40 (see water main detail page 10/15).
Misc
Informational
03/03/2021
11/19/20 Thursday Contractor ( Clarkson Const. ) chlorinated the water 12” Certa-Lock water main from the offsite to onsite approximately 4000’. Contractor will continue to backfill encasement of water main & reinforced steel section, also rough grade area to reconstruct exist creek.
Misc
Informational
03/03/2021
11/20/20 Friday Contractor de chlorinating line 12” Certa-Lock water main from the offsite to onsite.
Misc
Informational
03/03/2021
12/1/20 Tuesday began 12” Certa-Lock water main View High Drive.
Misc
Informational
03/03/2021
12/2/20 Wednesday contractor installed 22.5 bend @ Sta. 45.94.98 instead 45 deg bend to enable the hydrant @ Sta. 46+08.09 to be installed the correct distance from back of curb. Approximately 260’ was installed on Line A ( along View High Drive. Changes in elevation occurred do to survey error all field changes shall be reflected on as built.
Misc
Informational
03/03/2021
12/3/20 Thursday Contractor continued to install 12” Certa-Lock water line approximately 180’.
Misc
Informational
03/03/2021
12/4/20 Friday Contractor continued installation of 12” Certa-Lock water line across View High Drive. Approximately 70’ of pipe was installed.
Misc
Informational
03/03/2021
12/7/20 Monday Contractor continued installing 12” Certa-Lock water main to the end of Line A. Water line will connect to the 8” DIP for the Kansas City portion of water main to be installed.
Misc
Informational
03/03/2021
121/8/20 Tuesday 2:15PM Contractor ( Clarkston ) has installed approximately 100’ of 12” Certa-Lock water main on Line A. Working resolving elevation of Hydrant & Backflow Preventer.
Misc
Informational
03/03/2021
12/14/20 Monday Contractor ( Clarkston ) continued to install valves, fitting & pipping for Backflow Preventer. 22 1/4” then a 4’ 12” pipe 11.5’ then a 3.5’ 12” pipe and last before 12”X8” Reducer to the Kansas City water line.
Misc
Informational
03/03/2021
3/3/21 Wednesday Contractor ( Clarkston Const. ) backfilled line A .
Misc
Informational
03/08/2021
3/8/21 Monday Contractor chlorination of Lines A was done to the end of Lee’s Summit water main to the Back Flow Preventer. Approximate time 9:45AM
Misc
Informational
03/10/2021
3/10/21 Wednesday Contractor ( Gregg crew - Clarkson ) dechlorinated Lines A & D. Contractor had to re-chlorinate Lines 3/9/10 due to insufficient amount of chlorine in lines.
Water Line - Coliform Test 1 Partial 03/11/2021
Misc
Informational
03/11/2021
3/11/21 Thursday Contractor to samples from Lines A & D. Line D is PRSITE 20203248.
ESC - (Vegetation/Ground Cover) Partial 03/11/2021
Misc
Informational
03/11/2021
3/11/21 Thursday Contractor ( Clarkson - Gregg crew ) Seed the excavated grounds on the Southside of the I-470 up to and along Chipman Road.
Water Line - Coliform Test 2 Partial 03/12/2021
Misc
Informational
03/12/2021
3/12/21 Friday Contractor collect samples for Line A & D.
Water Line - Construction Inspection Partial 04/01/2021
Misc
Informational
04/01/2021
4/1/21 Thursday Contractor ( Clarkson - Gregg crew ) as reported and observed by me KCMO water main run through Lee’s Summit property started at Sta. 7+07.00 and runs to Sta. 19+75.00 . Yesterday contractor installed 8” DIP from Sta. 7+07.00 to Sta. 11+50.00. 1 fire hydrant assembly and 4x45* bends.
Water Line - Construction Inspection Partial 04/05/2021
Misc
Informational
04/01/2021
4/1/21 Thursday Contractor ( Clarkson - Gregg crew ) as reported and observed by me KCMO water main run through Lee’s Summit property started at Sta. 7+07.00 and runs to Sta. 19+75.00 . Yesterday contractor installed 8” DIP from Sta. 7+07.00 to Sta. 11+50.00. 1 fire hydrant assembly and 4x45* bends.
Misc
Informational
04/01/2021
4/5/21 Monday Contractor ( Clarkson - Gregg crew ) 4/1/21 Thursday installed 250’ of 8” DIP from Sta 11+00 to Sta 13+50. Install 2 X 45 bends and 1 Lee’s Summit Hydrant Line B.
Water Line - Construction Inspection Partial 04/06/2021
Misc
Informational
04/05/2021
4/1/21 Thursday Contractor ( Clarkson - Gregg crew ) as reported and observed by me KCMO water main run through Lee’s Summit property started at Sta. 7+07.00 and runs to Sta. 19+75.00 . Yesterday contractor installed 8” DIP from Sta. 7+07.00 to Sta. 11+50.00. 1 fire hydrant assembly and 4x45* bends.
Misc
Informational
04/05/2021
4/5/21 Monday Contractor ( Clarkson - Gregg crew ) 4/1/21 Thursday installed 250’ of 8” DIP from Sta 11+00 to Sta 13+50. Install 2 X 45 bends and 1 Lee’s Summit Hydrant Line B.
Misc
Informational
04/06/2021
4/6/21 Tuesday Contractor ( Clarkson - Gregg crew ) 4/5/21 Monday installed approximately 250’ of DIP from Sta 13+50 to 16+00 on Line B. 8”X8”X8” Tee was installed @ Sta 13+96 & 3/8” valves around the Sta. Aalso installed Fire Hydrant @ Sta 15+47. Contractor poured 4/6/21backing blocks behind hydrant and bends and fittings. Contractor has continued installation of 8” DIP on line B.
Water Line - Construction Inspection Partial 04/07/2021
Misc
Informational
04/06/2021
4/1/21 Thursday Contractor ( Clarkson - Gregg crew ) as reported and observed by me KCMO water main run through Lee’s Summit property started at Sta. 7+07.00 and runs to Sta. 19+75.00 . Yesterday contractor installed 8” DIP from Sta. 7+07.00 to Sta. 11+50.00. 1 fire hydrant assembly and 4x45* bends.
Misc
Informational
04/06/2021
4/5/21 Monday Contractor ( Clarkson - Gregg crew ) 4/1/21 Thursday installed 250’ of 8” DIP from Sta 11+00 to Sta 13+50. Install 2 X 45 bends and 1 Lee’s Summit Hydrant Line B.
Misc
Informational
04/06/2021
4/6/21 Tuesday Contractor ( Clarkson - Gregg crew ) 4/5/21 Monday installed approximately 250’ of DIP from Sta 13+50 to 16+00 on Line B. 8”X8”X8” Tee was installed @ Sta 13+96 & 3/8” valves around the Sta. Aalso installed Fire Hydrant @ Sta 15+47. Contractor poured 4/6/21backing blocks behind hydrant and bends and fittings. Contractor has continued installation of 8” DIP on line B.
Misc
Informational
04/07/2021
4/7/21 Wednesday Contractor ( Clarkson - Gregg crew ) 4/6/21 as-per pre field stakes approximately 300 8” DIP was Installed. Contractor was at another location and inclement weather (rain) at site.
Water Line - Construction Inspection Partial 04/12/2021
Misc
Informational
04/07/2021
4/1/21 Thursday Contractor ( Clarkson - Gregg crew ) as reported and observed by me KCMO water main run through Lee’s Summit property started at Sta. 7+07.00 and runs to Sta. 19+75.00 . Yesterday contractor installed 8” DIP from Sta. 7+07.00 to Sta. 11+50.00. 1 fire hydrant assembly and 4x45* bends.
Misc
Informational
04/07/2021
4/5/21 Monday Contractor ( Clarkson - Gregg crew ) 4/1/21 Thursday installed 250’ of 8” DIP from Sta 11+00 to Sta 13+50. Install 2 X 45 bends and 1 Lee’s Summit Hydrant Line B.
Misc
Informational
04/07/2021
4/6/21 Tuesday Contractor ( Clarkson - Gregg crew ) 4/5/21 Monday installed approximately 250’ of DIP from Sta 13+50 to 16+00 on Line B. 8”X8”X8” Tee was installed @ Sta 13+96 & 3/8” valves around the Sta. Aalso installed Fire Hydrant @ Sta 15+47. Contractor poured 4/6/21backing blocks behind hydrant and bends and fittings. Contractor has continued installation of 8” DIP on line B.
Misc
Informational
04/07/2021
4/7/21 Wednesday Contractor ( Clarkson - Gregg crew ) 4/6/21 as-per pre field stakes approximately 300 8” DIP was Installed. Contractor was at another location and inclement weather (rain) at site.
Misc
Informational
04/12/2021
4/12/21 Monday Contractor (Clarkson - Gregg crew) continued to work on water along View High Pkwy.
Water Line - Hydrostatic Test Partial 04/14/2021
Misc
Informational
04/14/2021
Contractor passed hydrostatic tested.
Misc
Informational
04/14/2021
Contractor passed hydrostatic tested on 4/13/21.
Water Line - Construction Inspection Partial 04/14/2021
Misc
Informational
04/12/2021
4/1/21 Thursday Contractor ( Clarkson - Gregg crew ) as reported and observed by me KCMO water main run through Lee’s Summit property started at Sta. 7+07.00 and runs to Sta. 19+75.00 . Yesterday contractor installed 8” DIP from Sta. 7+07.00 to Sta. 11+50.00. 1 fire hydrant assembly and 4x45* bends.
Misc
Informational
04/12/2021
4/5/21 Monday Contractor ( Clarkson - Gregg crew ) 4/1/21 Thursday installed 250’ of 8” DIP from Sta 11+00 to Sta 13+50. Install 2 X 45 bends and 1 Lee’s Summit Hydrant Line B.
Misc
Informational
04/12/2021
4/6/21 Tuesday Contractor ( Clarkson - Gregg crew ) 4/5/21 Monday installed approximately 250’ of DIP from Sta 13+50 to 16+00 on Line B. 8”X8”X8” Tee was installed @ Sta 13+96 & 3/8” valves around the Sta. Aalso installed Fire Hydrant @ Sta 15+47. Contractor poured 4/6/21backing blocks behind hydrant and bends and fittings. Contractor has continued installation of 8” DIP on line B.
Misc
Informational
04/12/2021
4/7/21 Wednesday Contractor ( Clarkson - Gregg crew ) 4/6/21 as-per pre field stakes approximately 300 8” DIP was Installed. Contractor was at another location and inclement weather (rain) at site.
Misc
Informational
04/12/2021
4/12/21 Monday Contractor (Clarkson - Gregg crew) continued to work on water along View High Pkwy.
Misc
Informational
04/14/2021
4/13/21 Wednesday Contractor (Clarkson - Gregg crew) Pressure tested pass yesterday Kansas City inspector was on site to observe the pressure test of Line B along View High Pkwy ( I - John Jackson was rear end in my city vehicle on 4/13/21 Tuesday). Contractor chlorinated the Line B which changes from Kansas City to Lee’s Summit.
Storm Sewer Construction Inspection Partial 05/25/2021
Misc
Informational
10/22/2020
Contractor began constructing forms for wing wall on both end of the Storm Line 4100 crossing View High Drive. Approved excavation is happening on the East side of the street.
Misc
Informational
10/22/2020
Contractor is preparing Storm Line 4100 to pour Wing Walls on the Eastside.
Misc
Informational
05/25/2021
5/24/21 Monday Contractor (Clarkson - Gregg Crew) installed approximately 72’ of 24” RCP between 3301 and 3302. 5/25/21 (Gregg Crew) Tuesday Contractor doing general work on site. 6/15/21 Tuesday Contractor ( Clarkson - Gregg Crew) installed 15” HDPE storm pipe form junction box 603 to inlet 604. Olsson is the Third party inspection that is performing compaction test when utilities cross streets. 6/16/21 Wednesday Contractor ( Clarkson -Gregg Crew ) installed CI 3701& pipe after Retaining Wall was built to a level to allow proper placement. Contractor also poured collars and inverts on CI,CI 604 & Junction Box 603. 6/17/21 Thursday Contractor ( Clarkson - Gregg Crew ) was able to install pipe and structures on Line 900 & Line 600 to structure 605 6/16/21 Wednesday. Collars and inverts will be poured on newly installed structures. Contractor ( Clarkson - 2nd Crew ) installed 24” HDPE storm pipe and CI 902,903 & 904 also ran short stub for line 12” HDPE storm line 2000 6/16/21 to 6/17/21. 6/21/21 Monday Contractor ( Clarkson - Darron Crew ) will be work on toe wall for Storm Line 1200 .
Water Line - Construction Inspection Passed 06/28/2021
Misc
Informational
04/14/2021
4/1/21 Thursday Contractor ( Clarkson - Gregg crew ) as reported and observed by me KCMO water main run through Lee’s Summit property started at Sta. 7+07.00 and runs to Sta. 19+75.00 . Yesterday contractor installed 8” DIP from Sta. 7+07.00 to Sta. 11+50.00. 1 fire hydrant assembly and 4x45* bends.
Misc
Informational
04/14/2021
4/5/21 Monday Contractor ( Clarkson - Gregg crew ) 4/1/21 Thursday installed 250’ of 8” DIP from Sta 11+00 to Sta 13+50. Install 2 X 45 bends and 1 Lee’s Summit Hydrant Line B.
Misc
Informational
04/14/2021
4/6/21 Tuesday Contractor ( Clarkson - Gregg crew ) 4/5/21 Monday installed approximately 250’ of DIP from Sta 13+50 to 16+00 on Line B. 8”X8”X8” Tee was installed @ Sta 13+96 & 3/8” valves around the Sta. Aalso installed Fire Hydrant @ Sta 15+47. Contractor poured 4/6/21backing blocks behind hydrant and bends and fittings. Contractor has continued installation of 8” DIP on line B.
Misc
Informational
04/14/2021
4/7/21 Wednesday Contractor ( Clarkson - Gregg crew ) 4/6/21 as-per pre field stakes approximately 300 8” DIP was Installed. Contractor was at another location and inclement weather (rain) at site.
Misc
Informational
04/14/2021
4/12/21 Monday Contractor (Clarkson - Gregg crew) continued to work on water along View High Pkwy.
Misc
Informational
04/14/2021
4/13/21 Wednesday Contractor (Clarkson - Gregg crew) Pressure tested pass yesterday Kansas City inspector was on site to observe the pressure test of Line B along View High Pkwy ( I - John Jackson was rear end in my city vehicle on 4/13/21 Tuesday). Contractor chlorinated the Line B which changes from Kansas City to Lee’s Summit.
Misc
Informational
04/14/2021
4/14/21 Wednesday Contractor (Clarkson - Gregg crew) rotated hydrants along Chipman Road.
Misc
Informational
04/19/2021
Misc
Informational
06/28/2021
Contractor ( Clarkson Gregg-Crew ) was ask to turn Backflow Preventer in reverse To stop water loss to KCMO water line that connected to it (on View High Drive). Lee’s Summit & Fogel-Anderson have come upon with this plan to correct water design issue.
Site Visit Complete 10/26/2022
Misc
Informational
12/11/2020
12/11/20 Friday Contractor staged piping and Backflow valves In Backflow Preventer Vault. ( Side note contractor has been working on the sanitary Line A approximately 160’ of 21 SDR was install and main hole. Once the correct project # is found I will re-enter information to the correct project. ) It appears the contractor has shut down for the day due to weather conditions (Rain).
Documents & Images
Date Uploaded File Type Document Name
08/18/2020 Receipt Receipt for transaction:2020-005335
08/26/2020 Letter DE-Permit
08/26/2020 Approved Plans Paragon Star Offsite water main extension Approved 8.26.20
09/25/2020 Photograph image.jpg
09/25/2020 Photograph image.jpg0
09/25/2020 Photograph image.jpg1
09/25/2020 Letter INSPECTION SUMMARY
09/25/2020 Letter INSPECTION SUMMARY
09/25/2020 Photograph image.jpg2
09/25/2020 Letter INSPECTION SUMMARY
09/29/2020 Letter INSPECTION SUMMARY
09/29/2020 Photograph image.jpg3
09/29/2020 Photograph image.jpg4
09/29/2020 Photograph image.jpg5
09/29/2020 Photograph image.jpg6
09/29/2020 Photograph image.jpg7
09/29/2020 Letter INSPECTION SUMMARY
09/29/2020 Letter INSPECTION SUMMARY
09/30/2020 Letter INSPECTION SUMMARY
09/30/2020 Letter INSPECTION SUMMARY
10/01/2020 Photograph image.jpg8
10/01/2020 Photograph image.jpg9
10/01/2020 Photograph image.jpg10
10/01/2020 Letter INSPECTION SUMMARY
10/01/2020 Letter INSPECTION SUMMARY
10/02/2020 Approved Plans Approved Revision - 12720C1600-6 Water Main Plan & Profile - Line A
10/03/2020 Photograph image.jpg11
10/03/2020 Photograph image.jpg12
10/03/2020 Photograph image.jpg13
10/03/2020 Letter INSPECTION SUMMARY
10/03/2020 Letter INSPECTION SUMMARY
10/06/2020 Letter INSPECTION SUMMARY
10/07/2020 Letter INSPECTION SUMMARY
10/08/2020 Photograph image.jpg14
10/08/2020 Photograph image.jpg15
10/08/2020 Photograph image.jpg16
10/08/2020 Photograph image.jpg17
10/08/2020 Letter INSPECTION SUMMARY
10/08/2020 Letter INSPECTION SUMMARY
10/09/2020 Letter INSPECTION SUMMARY
10/12/2020 Letter INSPECTION SUMMARY
10/13/2020 Letter INSPECTION SUMMARY
10/14/2020 Photograph image.jpg18
10/14/2020 Photograph image.jpg19
10/14/2020 Letter INSPECTION SUMMARY
10/14/2020 Letter INSPECTION SUMMARY
10/14/2020 Letter INSPECTION SUMMARY
10/15/2020 Letter INSPECTION SUMMARY
10/16/2020 Photograph image.jpg20
10/16/2020 Photograph image.jpg21
10/16/2020 Photograph image.jpg22
10/16/2020 Photograph image.jpg23
10/16/2020 Letter INSPECTION SUMMARY
10/16/2020 Letter INSPECTION SUMMARY
10/17/2020 Letter INSPECTION SUMMARY
10/17/2020 Photograph image.jpg24
10/17/2020 Photograph image.jpg25
10/17/2020 Photograph image.jpg26
10/17/2020 Photograph image.jpg27
10/17/2020 Photograph image.jpg28
10/17/2020 Photograph image.jpg29
10/17/2020 Photograph image.jpg30
10/17/2020 Photograph image.jpg31
10/17/2020 Letter INSPECTION SUMMARY
10/17/2020 Letter INSPECTION SUMMARY
10/19/2020 Letter INSPECTION SUMMARY
10/21/2020 Letter INSPECTION SUMMARY
10/22/2020 Letter INSPECTION SUMMARY
10/22/2020 Letter INSPECTION SUMMARY
10/23/2020 Letter INSPECTION SUMMARY
10/26/2020 Letter INSPECTION SUMMARY
10/27/2020 Letter INSPECTION SUMMARY
10/28/2020 Letter INSPECTION SUMMARY
10/30/2020 Photograph image.jpg32
10/30/2020 Photograph image.jpg33
10/30/2020 Letter INSPECTION SUMMARY
10/30/2020 Letter INSPECTION SUMMARY
10/30/2020 Photograph image.jpg34
10/30/2020 Photograph image.jpg35
10/30/2020 Photograph image.jpg36
10/31/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter INSPECTION SUMMARY
11/12/2020 Letter INSPECTION SUMMARY
11/17/2020 Photograph image.jpg37
11/18/2020 Letter INSPECTION SUMMARY
11/18/2020 Letter INSPECTION SUMMARY
11/19/2020 Letter INSPECTION SUMMARY
11/20/2020 Letter INSPECTION SUMMARY
11/20/2020 Letter INSPECTION SUMMARY
11/20/2020 Letter INSPECTION SUMMARY
11/23/2020 Letter INSPECTION SUMMARY
11/23/2020 Letter INSPECTION SUMMARY
12/01/2020 Photograph image.jpg38
12/01/2020 Letter INSPECTION SUMMARY
12/02/2020 Letter INSPECTION SUMMARY
12/03/2020 Letter INSPECTION SUMMARY
12/03/2020 Letter INSPECTION SUMMARY
12/03/2020 Letter INSPECTION SUMMARY
12/04/2020 Letter INSPECTION SUMMARY
12/04/2020 Letter INSPECTION SUMMARY
12/07/2020 Photograph image.jpg39
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/09/2020 Letter INSPECTION SUMMARY
12/10/2020 Photograph image.jpg40
12/10/2020 Photograph image.jpg41
12/10/2020 Photograph image.jpg42
12/10/2020 Photograph image.jpg43
12/10/2020 Letter INSPECTION SUMMARY
12/10/2020 Photograph image.jpg44
12/10/2020 Letter INSPECTION SUMMARY
12/11/2020 Letter INSPECTION SUMMARY
12/14/2020 Photograph image.jpg45
12/14/2020 Photograph image.jpg46
12/14/2020 Letter INSPECTION SUMMARY
03/03/2021 Letter INSPECTION SUMMARY
03/03/2021 Letter INSPECTION SUMMARY
03/10/2021 Photograph image.jpg47
03/10/2021 Photograph image.jpg48
03/10/2021 Photograph image.jpg49
03/10/2021 Letter INSPECTION SUMMARY
03/10/2021 Letter INSPECTION SUMMARY
03/10/2021 Photograph image.jpg50
03/10/2021 Photograph image.jpg51
03/10/2021 Letter INSPECTION SUMMARY
03/11/2021 Letter INSPECTION SUMMARY
03/11/2021 Letter INSPECTION SUMMARY
03/11/2021 Letter INSPECTION SUMMARY
03/12/2021 Letter INSPECTION SUMMARY
03/12/2021 Letter INSPECTION SUMMARY
04/01/2021 Letter INSPECTION SUMMARY
04/05/2021 Letter INSPECTION SUMMARY
04/06/2021 Letter INSPECTION SUMMARY
04/07/2021 Letter INSPECTION SUMMARY
04/12/2021 Letter INSPECTION SUMMARY
04/12/2021 Letter INSPECTION SUMMARY
04/14/2021 Letter INSPECTION SUMMARY
04/14/2021 Letter INSPECTION SUMMARY
04/29/2021 Letter INSPECTION SUMMARY
06/15/2021 Letter INSPECTION SUMMARY
06/15/2021 Letter INSPECTION SUMMARY
06/15/2021 Photograph image.jpg52
06/16/2021 Photograph image.jpg53
06/28/2021 Letter INSPECTION SUMMARY
06/28/2021 Letter INSPECTION SUMMARY
05/24/2023 Letter DE-Certificate of Substantial Completion Multiple Lot
08/21/2023 Letter DE-Certificate of Substantial Completion Single Lot
08/21/2023 Letter DE-Punch List
08/21/2023 Letter Paragon Star Offsite Water Main Extension Full Substantial Completion
08/21/2023 Letter Paragon Star Offsite Water Main extension Punch List
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home