Permit Application Status

PRSUBD20192651


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSUBD20192651
Public Infrastructure
Final Acceptance
FSD WOODS CHAPEL LLC
DEVELOPMENT COMPLETE
Public water main relocation
09/17/2019
10/10/2019
07/02/2020
Locations
Contacts
FSD WOODS CHAPEL LLC, Address:456 1ST ST W FL 2  
BEAR CONSTRUCTION SERVICES, Address:9218 METCALF #311, Phone:(913) 674-8004  
LELAND HICKS, Address:8017 HIGH DRIVE, Phone:(913) 238-0081  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 09/17/2019 10/10/2019
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
Water Insp Fee $896.55 $896.55 Paid 09/24/2019
Water Test Fee $400.00 $400.00 Paid 09/24/2019
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Water - Material Verification Passed 01/10/2020
Miscellaneous PWORKS Inspection Passed 1/10/2020 01/10/2020
Misc
Informational
01/10/2020
I spoke with John Jackson and there was a mix-up over the permits, he thought there was only one permit, so the inspections for this water extension was done on the on-site infrastructure permit.
Water Line - Hydrostatic Test Passed 1/10/2020 02/03/2020
Misc
Informational
02/03/2020
Hydro Static passed on project.
Water Line - Coliform Test 1 Passed 07/02/2020
Water Line - Coliform Test 2 Passed 07/02/2020
Water Line - Valve Passed 07/02/2020
Water Line - Fire Hydrant Not Ready 07/02/2020
Water Line - Thrust Restraint Partial 07/02/2020
Water Line - Construction Taps Removed Passed 07/02/2020
Grading/Excavation/Fill Inspection Passed 07/02/2020
Water Line - Construction Inspection Passed 07/02/2020
Water - Material Verification Passed 07/02/2020
Water Line - Construction Inspection Passed 07/02/2020
Erosion Control Inspection Passed 07/02/2020
Documents & Images
Date Uploaded File Type Document Name
09/24/2019 Receipt Receipt for transaction: 2019-006409
10/10/2019 Letter DE-Permit
10/10/2019 Activity Document Signed TB Woods Chapel Water permit
01/10/2020 Letter DE-Daily Inspection Summary
01/10/2020 Taco Bell and Scooters Water Line
02/03/2020 Letter INSPECTION SUMMARY
04/01/2020 Letter DE-Punch List
06/05/2020 Activity Document Affidavit - Lees Summit Taco Bell Woods Chapel
06/05/2020 Plans UTILITY AS BUILT 2020-04-10
07/02/2020 Activity Document Maintenance Bond
07/02/2020 Taco Bell and Scooters Coffee Woods Chapel Water Main Final Acceptance
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home