Summary


PRSUBD20192377
Public Infrastructure
Final Acceptance
CITY OF LEES SUMMIT
DEVELOPMENT COMPLETE
STREETS OF WEST PRYOR PUBLIC STREET AND STORM (LOWENSTEIN AND BLACK TWIG)
08/26/2019
09/04/2019
03/01/2024
Locations
Contacts
EMERY SAPP AND SONS INC, Address:2301 I-70 DR NW, Phone:(573) 445-8331  
CITY OF LEES SUMMIT, Address:PO BOX 1600  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 08/26/2019 09/03/2019
Joe Starlin
Fees
Paid Fees Amount Paid Owing Date Paid
9110068-Storm Fee $6,500.05 $6,500.05 Paid Not payable online 08/26/2019
9110081-Paved Surface Inspection Fee $32,463.82 $32,463.82 Paid Not payable online 08/26/2019
9110071-Site Grading Fee $55,078.06 $55,078.06 Paid Not payable online 08/26/2019
Outstanding Fees Amount Paid Owing Date Paid
9110069-After Hours Inspections (Public Works)(Per Hour) $50.00 $0.00 $50.00 Not Paid
9110069-After Hours Inspections (Public Works)(Per Hour) $125.00 $0.00 $125.00 Not Paid
9110069-After Hours Inspections (Public Works)(Per Hour) $200.00 $0.00 $200.00 Not Paid


$375.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Storm - Material Verification Passed 10/15/2019
Pavement-Aggregate Base Partial 10/15/2019 10/15/2019
Misc
Informational
10/15/2019
10-15-19 10:19am They have placed geogrid and base rock at the east end of Lowenstein and the west side by the park. They will be placing base rock in the curve of Lowenstein when It dries out.
Pavement-Aggregate Base Partial 10/17/2019 at 3:00 PM 10/18/2019
Misc
Informational
10/15/2019
10-15-19 10:19am They have placed geogrid and base rock at the east end of Lowenstein and the west side by the park. They will be placing base rock in the curve of Lowenstein when It dries out.
Misc
Informational
10/18/2019
They have most of Lowenstein coverd with base rock except for a small section in the curve.
Pavement-Aggregate Base Partial 11/05/2019
Misc
Informational
10/18/2019
10-15-19 10:19am They have placed geogrid and base rock at the east end of Lowenstein and the west side by the park. They will be placing base rock in the curve of Lowenstein when It dries out.
Misc
Informational
10/18/2019
They have most of Lowenstein coverd with base rock except for a small section in the curve.
Misc
Informational
11/05/2019
All geogrid is installed and all base rock is laid. It needs to cure out for cutting and proof rolls.
Curb - Proof Roll Partial 11/05/2019
Misc
Informational
11/05/2019
11-5-19 We started the proof roll at 9:16am on Lowenstein. All of the curb line passed with corrections needed in a few spots and at all radiuses. The park curb line passed on the east side. We have not proof rolled the west side of the park.
Grading/Excavation/Fill Inspection Partial 11/05/2019
Misc
Informational
11/05/2019
11-5-19 They have cut out and are digging and placing base rock in for the turn lane at Pryor and Lowenstein. It should be ready for a proof roll on 11-7-19.
Pavement-Curb Construction Partial 11/6/2019 11/06/2019
Misc
Informational
11/06/2019
11-6-19 They have cut the grade for the curb pour on 11-7-19.
Pavement-Curb Construction Partial 11/7/2019 11/07/2019
Misc
Informational
11/06/2019
11-6-19 They have cut the grade for the curb pour on 11-7-19.
Misc
Informational
11/07/2019
11-7-19 8:14am The base rock temp is between 19 and 21 degrees at this time . I spoke with the Forman for Freeman Concrete and told him we need to reach 33 degrees and rising before they can pour curb. He said he understands. They are on hold for now.9:28am They have called off the pour.
Curb - Proof Roll Partial 11/08/2019
Misc
Informational
11/05/2019
11-5-19 We started the proof roll at 9:16am on Lowenstein. All of the curb line passed with corrections needed in a few spots and at all radiuses. The park curb line passed on the east side. We have not proof rolled the west side of the park.
Misc
Informational
11/08/2019
11-9-19 1:55pm The curb proof roll at the intersection of Pryor and Lowenstein has passed, pending more dry time. The curb line on the west side of the park failed.
Pavement-Curb Construction Partial 11/14/2019 11/14/2019
Misc
Informational
11/07/2019
11-6-19 They have cut the grade for the curb pour on 11-7-19.
Misc
Informational
11/07/2019
11-7-19 8:14am The base rock temp is between 19 and 21 degrees at this time . I spoke with the Forman for Freeman Concrete and told him we need to reach 33 degrees and rising before they can pour curb. He said he understands. They are on hold for now.9:28am They have called off the pour.
Misc
Informational
11/14/2019
11-14-19 8:26 am. They have started pouring curb. The inspector for Cook, Flatt, & Strobel is starting tests at approximately 9:14am. He said he was not informed that they were pouring. The temp for the mix is 64 degrees. The slump for the mix is 2 on the ticket. 4:46pm The major of the curb is poured they are working on the curb at the park.
Pavement-Curb Construction Partial 11/16/2019
Misc
Informational
11/14/2019
11-6-19 They have cut the grade for the curb pour on 11-7-19.
Misc
Informational
11/14/2019
11-7-19 8:14am The base rock temp is between 19 and 21 degrees at this time . I spoke with the Forman for Freeman Concrete and told him we need to reach 33 degrees and rising before they can pour curb. He said he understands. They are on hold for now.9:28am They have called off the pour.
Misc
Informational
11/14/2019
11-14-19 8:26 am. They have started pouring curb. The inspector for Cook, Flatt, & Strobel is starting tests at approximately 9:14am. He said he was not informed that they were pouring. The temp for the mix is 64 degrees. The slump for the mix is 2 on the ticket. 4:46pm The major of the curb is poured they are working on the curb at the park.
Misc
Informational
11/15/2019
11-15-19 11:16am ESS are setting up hand pours for the curb.
Misc
Informational
11/16/2019
11-16-19 9:52am Freeman concrete have poured the hand work at the park. They are smoothing out the back side of all the curb poured and will be curing. They do not need to cover with blankets. The temps are going to be above freezing. I spoke with ESS about pulling up blankets, they assume all risk before the 3500 break should the temp drop below freezing.
Pavement-Curb Construction Partial 11/18/2019 11/18/2019
Misc
Informational
11/16/2019
11-6-19 They have cut the grade for the curb pour on 11-7-19.
Misc
Informational
11/16/2019
11-7-19 8:14am The base rock temp is between 19 and 21 degrees at this time . I spoke with the Forman for Freeman Concrete and told him we need to reach 33 degrees and rising before they can pour curb. He said he understands. They are on hold for now.9:28am They have called off the pour.
Misc
Informational
11/16/2019
11-14-19 8:26 am. They have started pouring curb. The inspector for Cook, Flatt, & Strobel is starting tests at approximately 9:14am. He said he was not informed that they were pouring. The temp for the mix is 64 degrees. The slump for the mix is 2 on the ticket. 4:46pm The major of the curb is poured they are working on the curb at the park.
Misc
Informational
11/16/2019
11-15-19 11:16am ESS are setting up hand pours for the curb.
Misc
Informational
11/16/2019
11-16-19 9:52am Freeman concrete have poured the hand work at the park. They are smoothing out the back side of all the curb poured and will be curing. They do not need to cover with blankets. The temps are going to be above freezing. I spoke with ESS about pulling up blankets, they assume all risk before the 3500 break should the temp drop below freezing.
Misc
Informational
11/18/2019
11-18-19 They are pulling off blankets and are confident that the temp won’t go below 32 degrees before the 3500 break.
Pavement-Proof Roll Partial 11/19/2019 11/19/2019
Misc
Informational
11/19/2019
11-19-19 12 noon We proof rolled Lowenstein and it passed. We proof rolled the park and it had some areas that failed. The parking lot will need some corrections.
Pavement-Curb Construction Partial 11/20/2019 11/20/2019
Misc
Informational
11/18/2019
11-6-19 They have cut the grade for the curb pour on 11-7-19.
Misc
Informational
11/18/2019
11-7-19 8:14am The base rock temp is between 19 and 21 degrees at this time . I spoke with the Forman for Freeman Concrete and told him we need to reach 33 degrees and rising before they can pour curb. He said he understands. They are on hold for now.9:28am They have called off the pour.
Misc
Informational
11/18/2019
11-14-19 8:26 am. They have started pouring curb. The inspector for Cook, Flatt, & Strobel is starting tests at approximately 9:14am. He said he was not informed that they were pouring. The temp for the mix is 64 degrees. The slump for the mix is 2 on the ticket. 4:46pm The major of the curb is poured they are working on the curb at the park.
Misc
Informational
11/18/2019
11-15-19 11:16am ESS are setting up hand pours for the curb.
Misc
Informational
11/18/2019
11-16-19 9:52am Freeman concrete have poured the hand work at the park. They are smoothing out the back side of all the curb poured and will be curing. They do not need to cover with blankets. The temps are going to be above freezing. I spoke with ESS about pulling up blankets, they assume all risk before the 3500 break should the temp drop below freezing.
Misc
Informational
11/18/2019
11-18-19 They are pulling off blankets and are confident that the temp won’t go below 32 degrees before the 3500 break.
Misc
Informational
11/20/2019
11-20-19 2:41pm Bob Burns and I walked the intire curb line and marked all damaged curb.
Pavement-Surface Partial 11/20/2019 11/20/2019
Misc
Informational
11/20/2019
11-20-19 Metro Asphalt is doing the work. They have started laying asphalt the average temp out of the truck is 260. The average temp out of the machine is 290. 11:59am They have got the first lift of base on the north side of the road and are now working on laying the south side of the road. Temps are good. Cook,Flatt & Strobel are on site doing all testing requirements. They have been told to let the temp get to 140 degrees before a second lift Is applied and to use a tac coat. 4:12pm They have finished laying all the first layer of asphalt and are cleaning up. The third party inspector is still doing testing. Rain is starting to move in. They have the second layer of base placed on the north side down to the park. I have collected asphalt tickets for the day.
Street - Wedge Lift Partial 11/21/2019
Misc
Informational
11/21/2019
11-21-19 9:38am They have swept and dried the base from last nights rain and will start laying the second lift at 10am.
Misc
Informational
11/21/2019
11-21-19 9:38am They have swept and dried the base from last nights rain and will start laying the second lift at 10am. 12:40pm They have completed the second lift on the north side and they are now starting at Pryor a laying the south side. Temps out of the truck are averaging 260 degrees, 300 at the machine. Out side air temp is compliant as well as the surface temp. 3:00pm They have completed the second lift of asphalt and are now moving to the parking lot for the park.
Street - Surface Course Partial 11/25/2019 11/25/2019
Misc
Informational
11/25/2019
11-25-19 7:56am They are setting up concrete drive approach’s today and will be pouring. They are currently working on the approach for the private road across from Lowenstein park. They have stoped work due to hubs being wrong.
Pavement-Curb Construction Partial 12/03/2019
Misc
Informational
11/20/2019
11-6-19 They have cut the grade for the curb pour on 11-7-19.
Misc
Informational
11/20/2019
11-7-19 8:14am The base rock temp is between 19 and 21 degrees at this time . I spoke with the Forman for Freeman Concrete and told him we need to reach 33 degrees and rising before they can pour curb. He said he understands. They are on hold for now.9:28am They have called off the pour.
Misc
Informational
11/20/2019
11-14-19 8:26 am. They have started pouring curb. The inspector for Cook, Flatt, & Strobel is starting tests at approximately 9:14am. He said he was not informed that they were pouring. The temp for the mix is 64 degrees. The slump for the mix is 2 on the ticket. 4:46pm The major of the curb is poured they are working on the curb at the park.
Misc
Informational
11/20/2019
11-15-19 11:16am ESS are setting up hand pours for the curb.
Misc
Informational
11/20/2019
11-16-19 9:52am Freeman concrete have poured the hand work at the park. They are smoothing out the back side of all the curb poured and will be curing. They do not need to cover with blankets. The temps are going to be above freezing. I spoke with ESS about pulling up blankets, they assume all risk before the 3500 break should the temp drop below freezing.
Misc
Informational
11/20/2019
11-18-19 They are pulling off blankets and are confident that the temp won’t go below 32 degrees before the 3500 break.
Misc
Informational
11/20/2019
11-20-19 2:41pm Bob Burns and I walked the intire curb line and marked all damaged curb.
Misc
Informational
12/03/2019
12-3-19 Steve Robbins and I walked the curb line on Lowenstein and the park parking lot. We marked everything that must be removed and marked 37 panels that are in question.
Street - Surface Course Partial 12/3/2019 12/04/2019
Misc
Informational
12/04/2019
12-3-19 They have poured the whole drive at Lowenstein by the park and half of the drives at Lowenstein running north and south.
Street - Surface Course Partial 12/04/2019
Misc
Informational
12/04/2019
11-25-19 7:56am They are setting up concrete drive approach’s today and will be pouring. They are currently working on the approach for the private road across from Lowenstein park. They have stoped work due to hubs being wrong.
Misc
Informational
12/04/2019
12-4-19 They have poured the drive approach on Lowenstein by the park and are pouring the second half of the drive approaches that run north and south.
Pavement-Curb Construction Partial 12/04/2019
Misc
Informational
12/03/2019
11-6-19 They have cut the grade for the curb pour on 11-7-19.
Misc
Informational
12/03/2019
11-7-19 8:14am The base rock temp is between 19 and 21 degrees at this time . I spoke with the Forman for Freeman Concrete and told him we need to reach 33 degrees and rising before they can pour curb. He said he understands. They are on hold for now.9:28am They have called off the pour.
Misc
Informational
12/03/2019
11-14-19 8:26 am. They have started pouring curb. The inspector for Cook, Flatt, & Strobel is starting tests at approximately 9:14am. He said he was not informed that they were pouring. The temp for the mix is 64 degrees. The slump for the mix is 2 on the ticket. 4:46pm The major of the curb is poured they are working on the curb at the park.
Misc
Informational
12/03/2019
11-15-19 11:16am ESS are setting up hand pours for the curb.
Misc
Informational
12/03/2019
11-16-19 9:52am Freeman concrete have poured the hand work at the park. They are smoothing out the back side of all the curb poured and will be curing. They do not need to cover with blankets. The temps are going to be above freezing. I spoke with ESS about pulling up blankets, they assume all risk before the 3500 break should the temp drop below freezing.
Misc
Informational
12/03/2019
11-18-19 They are pulling off blankets and are confident that the temp won’t go below 32 degrees before the 3500 break.
Misc
Informational
12/03/2019
11-20-19 2:41pm Bob Burns and I walked the intire curb line and marked all damaged curb.
Misc
Informational
12/03/2019
12-3-19 Steve Robbins and I walked the curb line on Lowenstein and the park parking lot. We marked everything that must be removed and marked 37 panels that are in question.
Misc
Informational
12/04/2019
12-4-19 12:48pm Bob Burns and Steve Robbins and I are walking the site to check curb again to determine what curb can be saved if any. 1:45pm After looking at it again we have determined that Mike Anderson needs to see the curb in person to evaluate.
Sidewalk Inspection Partial 12/6/2019 12/06/2019
Misc
Informational
12/06/2019
12-6-19 11:16am They have poured the sidewalk on the north east side of Lowenstein and now have started pouring the sidewalk on the south side of Lowenstein. They have been using plenty of cure up to this point.
Sidewalk Inspection Partial 12/11/2019 12/11/2019
Misc
Informational
12/06/2019
12-6-19 11:16am They have poured the sidewalk on the north east side of Lowenstein and now have started pouring the sidewalk on the south side of Lowenstein. They have been using plenty of cure up to this point.
Misc
Informational
12/11/2019
12-11-19 2:49pm They are pouring the sidewalk on Lowenstein in front of the park.
Sidewalk Inspection Partial 12/12/2019 12/12/2019
Misc
Informational
12/11/2019
12-6-19 11:16am They have poured the sidewalk on the north east side of Lowenstein and now have started pouring the sidewalk on the south side of Lowenstein. They have been using plenty of cure up to this point.
Misc
Informational
12/11/2019
12-11-19 2:49pm They are pouring the sidewalk on Lowenstein in front of the park.
Misc
Informational
12/12/2019
12-12-19 2:53pm They have set forms along the east side of Lowenstein. They are planning on pouring Friday the 13th.
Pavement-Curb Construction Partial 12/9/2019 12/30/2019
Misc
Informational
12/04/2019
11-6-19 They have cut the grade for the curb pour on 11-7-19.
Misc
Informational
12/04/2019
11-7-19 8:14am The base rock temp is between 19 and 21 degrees at this time . I spoke with the Forman for Freeman Concrete and told him we need to reach 33 degrees and rising before they can pour curb. He said he understands. They are on hold for now.9:28am They have called off the pour.
Misc
Informational
12/04/2019
11-14-19 8:26 am. They have started pouring curb. The inspector for Cook, Flatt, & Strobel is starting tests at approximately 9:14am. He said he was not informed that they were pouring. The temp for the mix is 64 degrees. The slump for the mix is 2 on the ticket. 4:46pm The major of the curb is poured they are working on the curb at the park.
Misc
Informational
12/04/2019
11-15-19 11:16am ESS are setting up hand pours for the curb.
Misc
Informational
12/04/2019
11-16-19 9:52am Freeman concrete have poured the hand work at the park. They are smoothing out the back side of all the curb poured and will be curing. They do not need to cover with blankets. The temps are going to be above freezing. I spoke with ESS about pulling up blankets, they assume all risk before the 3500 break should the temp drop below freezing.
Misc
Informational
12/04/2019
11-18-19 They are pulling off blankets and are confident that the temp won’t go below 32 degrees before the 3500 break.
Misc
Informational
12/04/2019
11-20-19 2:41pm Bob Burns and I walked the intire curb line and marked all damaged curb.
Misc
Informational
12/04/2019
12-3-19 Steve Robbins and I walked the curb line on Lowenstein and the park parking lot. We marked everything that must be removed and marked 37 panels that are in question.
Misc
Informational
12/04/2019
12-4-19 12:48pm Bob Burns and Steve Robbins and I are walking the site to check curb again to determine what curb can be saved if any. 1:45pm After looking at it again we have determined that Mike Anderson needs to see the curb in person to evaluate.
Misc
Informational
12/30/2019
12-30-19 10:56am Bob Burns, Dan Harper and I walked the complete curb line and marked what has to be replaced. Approximately 52 sections.
Sidewalk Inspection Partial 1/6/2020 01/06/2020
Misc
Informational
12/12/2019
12-6-19 11:16am They have poured the sidewalk on the north east side of Lowenstein and now have started pouring the sidewalk on the south side of Lowenstein. They have been using plenty of cure up to this point.
Misc
Informational
12/12/2019
12-11-19 2:49pm They are pouring the sidewalk on Lowenstein in front of the park.
Misc
Informational
12/12/2019
12-12-19 2:53pm They have set forms along the east side of Lowenstein. They are planning on pouring Friday the 13th.
Misc
Informational
01/06/2020
1-6-2020 3:44pm They are pouring the ADA tie-ins along Lowenstein. They have been informed to cover completely and evenly with cure before covering with blankets.
Pavement-Curb Construction Partial 1/6/2020 01/06/2020
Misc
Informational
12/30/2019
11-6-19 They have cut the grade for the curb pour on 11-7-19.
Misc
Informational
12/30/2019
11-7-19 8:14am The base rock temp is between 19 and 21 degrees at this time . I spoke with the Forman for Freeman Concrete and told him we need to reach 33 degrees and rising before they can pour curb. He said he understands. They are on hold for now.9:28am They have called off the pour.
Misc
Informational
12/30/2019
11-14-19 8:26 am. They have started pouring curb. The inspector for Cook, Flatt, & Strobel is starting tests at approximately 9:14am. He said he was not informed that they were pouring. The temp for the mix is 64 degrees. The slump for the mix is 2 on the ticket. 4:46pm The major of the curb is poured they are working on the curb at the park.
Misc
Informational
12/30/2019
11-15-19 11:16am ESS are setting up hand pours for the curb.
Misc
Informational
12/30/2019
11-16-19 9:52am Freeman concrete have poured the hand work at the park. They are smoothing out the back side of all the curb poured and will be curing. They do not need to cover with blankets. The temps are going to be above freezing. I spoke with ESS about pulling up blankets, they assume all risk before the 3500 break should the temp drop below freezing.
Misc
Informational
12/30/2019
11-18-19 They are pulling off blankets and are confident that the temp won’t go below 32 degrees before the 3500 break.
Misc
Informational
12/30/2019
11-20-19 2:41pm Bob Burns and I walked the intire curb line and marked all damaged curb.
Misc
Informational
12/30/2019
12-3-19 Steve Robbins and I walked the curb line on Lowenstein and the park parking lot. We marked everything that must be removed and marked 37 panels that are in question.
Misc
Informational
12/30/2019
12-4-19 12:48pm Bob Burns and Steve Robbins and I are walking the site to check curb again to determine what curb can be saved if any. 1:45pm After looking at it again we have determined that Mike Anderson needs to see the curb in person to evaluate.
Misc
Informational
12/30/2019
12-30-19 10:56am Bob Burns, Dan Harper and I walked the complete curb line and marked what has to be replaced. Approximately 52 sections.
Misc
Informational
01/06/2020
1-6-2020 3:55pm They are forming up for curb replacement along Lowenstein. They will be pouring on 1-7-2020.
Pavement-Curb Construction Partial 1/7/2020 01/07/2020
Misc
Informational
01/06/2020
11-6-19 They have cut the grade for the curb pour on 11-7-19.
Misc
Informational
01/06/2020
11-7-19 8:14am The base rock temp is between 19 and 21 degrees at this time . I spoke with the Forman for Freeman Concrete and told him we need to reach 33 degrees and rising before they can pour curb. He said he understands. They are on hold for now.9:28am They have called off the pour.
Misc
Informational
01/06/2020
11-14-19 8:26 am. They have started pouring curb. The inspector for Cook, Flatt, & Strobel is starting tests at approximately 9:14am. He said he was not informed that they were pouring. The temp for the mix is 64 degrees. The slump for the mix is 2 on the ticket. 4:46pm The major of the curb is poured they are working on the curb at the park.
Misc
Informational
01/06/2020
11-15-19 11:16am ESS are setting up hand pours for the curb.
Misc
Informational
01/06/2020
11-16-19 9:52am Freeman concrete have poured the hand work at the park. They are smoothing out the back side of all the curb poured and will be curing. They do not need to cover with blankets. The temps are going to be above freezing. I spoke with ESS about pulling up blankets, they assume all risk before the 3500 break should the temp drop below freezing.
Misc
Informational
01/06/2020
11-18-19 They are pulling off blankets and are confident that the temp won’t go below 32 degrees before the 3500 break.
Misc
Informational
01/06/2020
11-20-19 2:41pm Bob Burns and I walked the intire curb line and marked all damaged curb.
Misc
Informational
01/06/2020
12-3-19 Steve Robbins and I walked the curb line on Lowenstein and the park parking lot. We marked everything that must be removed and marked 37 panels that are in question.
Misc
Informational
01/06/2020
12-4-19 12:48pm Bob Burns and Steve Robbins and I are walking the site to check curb again to determine what curb can be saved if any. 1:45pm After looking at it again we have determined that Mike Anderson needs to see the curb in person to evaluate.
Misc
Informational
01/06/2020
12-30-19 10:56am Bob Burns, Dan Harper and I walked the complete curb line and marked what has to be replaced. Approximately 52 sections.
Misc
Informational
01/06/2020
1-6-2020 3:55pm They are forming up for curb replacement along Lowenstein. They will be pouring on 1-7-2020.
Misc
Informational
01/07/2020
1-7-2020 9:40am Sapp has started pouring curb on Lowenstein Dr. CFS is on site for testing. 2:52pm They will be covering with blankets due to temps.
Pavement-Curb Construction Partial 1/8/2020 01/08/2020
Misc
Informational
01/07/2020
11-6-19 They have cut the grade for the curb pour on 11-7-19.
Misc
Informational
01/07/2020
11-7-19 8:14am The base rock temp is between 19 and 21 degrees at this time . I spoke with the Forman for Freeman Concrete and told him we need to reach 33 degrees and rising before they can pour curb. He said he understands. They are on hold for now.9:28am They have called off the pour.
Misc
Informational
01/07/2020
11-14-19 8:26 am. They have started pouring curb. The inspector for Cook, Flatt, & Strobel is starting tests at approximately 9:14am. He said he was not informed that they were pouring. The temp for the mix is 64 degrees. The slump for the mix is 2 on the ticket. 4:46pm The major of the curb is poured they are working on the curb at the park.
Misc
Informational
01/07/2020
11-15-19 11:16am ESS are setting up hand pours for the curb.
Misc
Informational
01/07/2020
11-16-19 9:52am Freeman concrete have poured the hand work at the park. They are smoothing out the back side of all the curb poured and will be curing. They do not need to cover with blankets. The temps are going to be above freezing. I spoke with ESS about pulling up blankets, they assume all risk before the 3500 break should the temp drop below freezing.
Misc
Informational
01/07/2020
11-18-19 They are pulling off blankets and are confident that the temp won’t go below 32 degrees before the 3500 break.
Misc
Informational
01/07/2020
11-20-19 2:41pm Bob Burns and I walked the intire curb line and marked all damaged curb.
Misc
Informational
01/07/2020
12-3-19 Steve Robbins and I walked the curb line on Lowenstein and the park parking lot. We marked everything that must be removed and marked 37 panels that are in question.
Misc
Informational
01/07/2020
12-4-19 12:48pm Bob Burns and Steve Robbins and I are walking the site to check curb again to determine what curb can be saved if any. 1:45pm After looking at it again we have determined that Mike Anderson needs to see the curb in person to evaluate.
Misc
Informational
01/07/2020
12-30-19 10:56am Bob Burns, Dan Harper and I walked the complete curb line and marked what has to be replaced. Approximately 52 sections.
Misc
Informational
01/07/2020
1-6-2020 3:55pm They are forming up for curb replacement along Lowenstein. They will be pouring on 1-7-2020.
Misc
Informational
01/07/2020
1-7-2020 9:40am Sapp has started pouring curb on Lowenstein Dr. CFS is on site for testing. 2:52pm They will be covering with blankets due to temps.
Misc
Informational
01/08/2020
1-8-20 10:48am They are pouring the island curb and the curb on the south side of the road. 2:13pm They have pour approximately 11 yards of concrete today.
Pavement-Curb Construction Partial 01/09/2020
Misc
Informational
01/08/2020
11-6-19 They have cut the grade for the curb pour on 11-7-19.
Misc
Informational
01/08/2020
11-7-19 8:14am The base rock temp is between 19 and 21 degrees at this time . I spoke with the Forman for Freeman Concrete and told him we need to reach 33 degrees and rising before they can pour curb. He said he understands. They are on hold for now.9:28am They have called off the pour.
Misc
Informational
01/08/2020
11-14-19 8:26 am. They have started pouring curb. The inspector for Cook, Flatt, & Strobel is starting tests at approximately 9:14am. He said he was not informed that they were pouring. The temp for the mix is 64 degrees. The slump for the mix is 2 on the ticket. 4:46pm The major of the curb is poured they are working on the curb at the park.
Misc
Informational
01/08/2020
11-15-19 11:16am ESS are setting up hand pours for the curb.
Misc
Informational
01/08/2020
11-16-19 9:52am Freeman concrete have poured the hand work at the park. They are smoothing out the back side of all the curb poured and will be curing. They do not need to cover with blankets. The temps are going to be above freezing. I spoke with ESS about pulling up blankets, they assume all risk before the 3500 break should the temp drop below freezing.
Misc
Informational
01/08/2020
11-18-19 They are pulling off blankets and are confident that the temp won’t go below 32 degrees before the 3500 break.
Misc
Informational
01/08/2020
11-20-19 2:41pm Bob Burns and I walked the intire curb line and marked all damaged curb.
Misc
Informational
01/08/2020
12-3-19 Steve Robbins and I walked the curb line on Lowenstein and the park parking lot. We marked everything that must be removed and marked 37 panels that are in question.
Misc
Informational
01/08/2020
12-4-19 12:48pm Bob Burns and Steve Robbins and I are walking the site to check curb again to determine what curb can be saved if any. 1:45pm After looking at it again we have determined that Mike Anderson needs to see the curb in person to evaluate.
Misc
Informational
01/08/2020
12-30-19 10:56am Bob Burns, Dan Harper and I walked the complete curb line and marked what has to be replaced. Approximately 52 sections.
Misc
Informational
01/08/2020
1-6-2020 3:55pm They are forming up for curb replacement along Lowenstein. They will be pouring on 1-7-2020.
Misc
Informational
01/08/2020
1-7-2020 9:40am Sapp has started pouring curb on Lowenstein Dr. CFS is on site for testing. 2:52pm They will be covering with blankets due to temps.
Misc
Informational
01/08/2020
1-8-20 10:48am They are pouring the island curb and the curb on the south side of the road. 2:13pm They have pour approximately 11 yards of concrete today.
Misc
Informational
01/09/2020
1-9-20 They have all of the curb replacement done and are covering with blankets.
Pavement-Curb Construction Partial 02/17/2020
Misc
Informational
01/09/2020
11-6-19 They have cut the grade for the curb pour on 11-7-19.
Misc
Informational
01/09/2020
11-7-19 8:14am The base rock temp is between 19 and 21 degrees at this time . I spoke with the Forman for Freeman Concrete and told him we need to reach 33 degrees and rising before they can pour curb. He said he understands. They are on hold for now.9:28am They have called off the pour.
Misc
Informational
01/09/2020
11-14-19 8:26 am. They have started pouring curb. The inspector for Cook, Flatt, & Strobel is starting tests at approximately 9:14am. He said he was not informed that they were pouring. The temp for the mix is 64 degrees. The slump for the mix is 2 on the ticket. 4:46pm The major of the curb is poured they are working on the curb at the park.
Misc
Informational
01/09/2020
11-15-19 11:16am ESS are setting up hand pours for the curb.
Misc
Informational
01/09/2020
11-16-19 9:52am Freeman concrete have poured the hand work at the park. They are smoothing out the back side of all the curb poured and will be curing. They do not need to cover with blankets. The temps are going to be above freezing. I spoke with ESS about pulling up blankets, they assume all risk before the 3500 break should the temp drop below freezing.
Misc
Informational
01/09/2020
11-18-19 They are pulling off blankets and are confident that the temp won’t go below 32 degrees before the 3500 break.
Misc
Informational
01/09/2020
11-20-19 2:41pm Bob Burns and I walked the intire curb line and marked all damaged curb.
Misc
Informational
01/09/2020
12-3-19 Steve Robbins and I walked the curb line on Lowenstein and the park parking lot. We marked everything that must be removed and marked 37 panels that are in question.
Misc
Informational
01/09/2020
12-4-19 12:48pm Bob Burns and Steve Robbins and I are walking the site to check curb again to determine what curb can be saved if any. 1:45pm After looking at it again we have determined that Mike Anderson needs to see the curb in person to evaluate.
Misc
Informational
01/09/2020
12-30-19 10:56am Bob Burns, Dan Harper and I walked the complete curb line and marked what has to be replaced. Approximately 52 sections.
Misc
Informational
01/09/2020
1-6-2020 3:55pm They are forming up for curb replacement along Lowenstein. They will be pouring on 1-7-2020.
Misc
Informational
01/09/2020
1-7-2020 9:40am Sapp has started pouring curb on Lowenstein Dr. CFS is on site for testing. 2:52pm They will be covering with blankets due to temps.
Misc
Informational
01/09/2020
1-8-20 10:48am They are pouring the island curb and the curb on the south side of the road. 2:13pm They have pour approximately 11 yards of concrete today.
Misc
Informational
01/09/2020
1-9-20 They have all of the curb replacement done and are covering with blankets.
Misc
Informational
02/17/2020
2-17-20 11:02am They have placed rock in the island’s along Lowenstein and are compacting it.
Pavement-Curb Construction Partial 3/6/2020 03/06/2020
Misc
Informational
02/17/2020
11-6-19 They have cut the grade for the curb pour on 11-7-19.
Misc
Informational
02/17/2020
11-7-19 8:14am The base rock temp is between 19 and 21 degrees at this time . I spoke with the Forman for Freeman Concrete and told him we need to reach 33 degrees and rising before they can pour curb. He said he understands. They are on hold for now.9:28am They have called off the pour.
Misc
Informational
02/17/2020
11-14-19 8:26 am. They have started pouring curb. The inspector for Cook, Flatt, & Strobel is starting tests at approximately 9:14am. He said he was not informed that they were pouring. The temp for the mix is 64 degrees. The slump for the mix is 2 on the ticket. 4:46pm The major of the curb is poured they are working on the curb at the park.
Misc
Informational
02/17/2020
11-15-19 11:16am ESS are setting up hand pours for the curb.
Misc
Informational
02/17/2020
11-16-19 9:52am Freeman concrete have poured the hand work at the park. They are smoothing out the back side of all the curb poured and will be curing. They do not need to cover with blankets. The temps are going to be above freezing. I spoke with ESS about pulling up blankets, they assume all risk before the 3500 break should the temp drop below freezing.
Misc
Informational
02/17/2020
11-18-19 They are pulling off blankets and are confident that the temp won’t go below 32 degrees before the 3500 break.
Misc
Informational
02/17/2020
11-20-19 2:41pm Bob Burns and I walked the intire curb line and marked all damaged curb.
Misc
Informational
02/17/2020
12-3-19 Steve Robbins and I walked the curb line on Lowenstein and the park parking lot. We marked everything that must be removed and marked 37 panels that are in question.
Misc
Informational
02/17/2020
12-4-19 12:48pm Bob Burns and Steve Robbins and I are walking the site to check curb again to determine what curb can be saved if any. 1:45pm After looking at it again we have determined that Mike Anderson needs to see the curb in person to evaluate.
Misc
Informational
02/17/2020
12-30-19 10:56am Bob Burns, Dan Harper and I walked the complete curb line and marked what has to be replaced. Approximately 52 sections.
Misc
Informational
02/17/2020
1-6-2020 3:55pm They are forming up for curb replacement along Lowenstein. They will be pouring on 1-7-2020.
Misc
Informational
02/17/2020
1-7-2020 9:40am Sapp has started pouring curb on Lowenstein Dr. CFS is on site for testing. 2:52pm They will be covering with blankets due to temps.
Misc
Informational
02/17/2020
1-8-20 10:48am They are pouring the island curb and the curb on the south side of the road. 2:13pm They have pour approximately 11 yards of concrete today.
Misc
Informational
02/17/2020
1-9-20 They have all of the curb replacement done and are covering with blankets.
Misc
Informational
02/17/2020
2-17-20 11:02am They have placed rock in the island’s along Lowenstein and are compacting it.
Misc
Informational
03/06/2020
3-6-20 All of the curb is poured on the south side of B road coming of Lowenstein. Steve Robbins was the inspector.
Street - Surface Course Partial 12/9/2019 03/12/2020
Misc
Informational
12/04/2019
11-25-19 7:56am They are setting up concrete drive approach’s today and will be pouring. They are currently working on the approach for the private road across from Lowenstein park. They have stoped work due to hubs being wrong.
Misc
Informational
12/04/2019
12-4-19 They have poured the drive approach on Lowenstein by the park and are pouring the second half of the drive approaches that run north and south.
Misc
Informational
12/09/2019
12-9-19 10:17am They are laying type5 recycled asphalt in the turning lane on Pryor. This will be milled out for the correct surface at a later date.
Site Visit Partial 3/18/2020 03/18/2020
Misc
Informational
03/18/2020
There is no activity on site at this time.
Site Visit Partial 3/19/2020 03/19/2020
Misc
Informational
03/18/2020
There is no activity on site at this time.
Misc
Informational
03/19/2020
3-19-20 There is no work on site today due to weather. Heavy rain has set in. I have spoke with Codi and we are meeting Friday 3-20-20 to go over adding more erosion controls.
Erosion Control Inspection Partial 3/20/2020 03/20/2020
Misc
Informational
03/20/2020
I walked the site with the superintendent Codi and we went over all erosion controls that are in place and that need to be in place. He is going to work on getting everything in place.
Street - Surface Course Partial 3/26/2020 03/26/2020
Misc
Informational
03/12/2020
11-25-19 7:56am They are setting up concrete drive approach’s today and will be pouring. They are currently working on the approach for the private road across from Lowenstein park. They have stoped work due to hubs being wrong.
Misc
Informational
03/12/2020
12-4-19 They have poured the drive approach on Lowenstein by the park and are pouring the second half of the drive approaches that run north and south.
Misc
Informational
03/12/2020
12-9-19 10:17am They are laying type5 recycled asphalt in the turning lane on Pryor. This will be milled out for the correct surface at a later date.
Misc
Informational
03/26/2020
3-26-20 11:50am They are tacking the turn lane on Pryor and Lowenstein. No asphalt trucks have arrived yet. CFI is on site for testing along with Idecker. The first truck showed just after 12pm The temps are averaging around 250 out of the trucks. 3:47pm They are working on the Pryor turn lane. 4:03pm 432 ton has been layed at this time.6:34pm They have just completed the surface for Lowenstein and Pryor turn lane. They are now laying base for the Lowenstein Park parking lot.
Street - Surface Course Partial 03/27/2020
Misc
Informational
03/26/2020
11-25-19 7:56am They are setting up concrete drive approach’s today and will be pouring. They are currently working on the approach for the private road across from Lowenstein park. They have stoped work due to hubs being wrong.
Misc
Informational
03/26/2020
12-4-19 They have poured the drive approach on Lowenstein by the park and are pouring the second half of the drive approaches that run north and south.
Misc
Informational
03/26/2020
12-9-19 10:17am They are laying type5 recycled asphalt in the turning lane on Pryor. This will be milled out for the correct surface at a later date.
Misc
Informational
03/26/2020
3-26-20 11:50am They are tacking the turn lane on Pryor and Lowenstein. No asphalt trucks have arrived yet. CFI is on site for testing along with Idecker. The first truck showed just after 12pm The temps are averaging around 250 out of the trucks. 3:47pm They are working on the Pryor turn lane. 4:03pm 432 ton has been layed at this time.6:34pm They have just completed the surface for Lowenstein and Pryor turn lane. They are now laying base for the Lowenstein Park parking lot.
Misc
Informational
03/27/2020
3-27-20 10:36am K&G Striping are on site laying everything out. They will be back on Monday to Stripe.
Street - Surface Course Partial 03/30/2020
Misc
Informational
03/27/2020
11-25-19 7:56am They are setting up concrete drive approach’s today and will be pouring. They are currently working on the approach for the private road across from Lowenstein park. They have stoped work due to hubs being wrong.
Misc
Informational
03/27/2020
12-4-19 They have poured the drive approach on Lowenstein by the park and are pouring the second half of the drive approaches that run north and south.
Misc
Informational
03/27/2020
12-9-19 10:17am They are laying type5 recycled asphalt in the turning lane on Pryor. This will be milled out for the correct surface at a later date.
Misc
Informational
03/27/2020
3-26-20 11:50am They are tacking the turn lane on Pryor and Lowenstein. No asphalt trucks have arrived yet. CFI is on site for testing along with Idecker. The first truck showed just after 12pm The temps are averaging around 250 out of the trucks. 3:47pm They are working on the Pryor turn lane. 4:03pm 432 ton has been layed at this time.6:34pm They have just completed the surface for Lowenstein and Pryor turn lane. They are now laying base for the Lowenstein Park parking lot.
Misc
Informational
03/27/2020
3-27-20 10:36am K&G Striping are on site laying everything out. They will be back on Monday to Stripe.
Misc
Informational
03/30/2020
3-30-20 10:49am K&G Striping,INC. are on site painting all the stripes for Lowenstein.
Storm - Pipe Partial 10/18/2019 04/01/2020
Misc
Informational
03/31/2020
3-31-20 12:44PM Rudy is working on storm pipe at Black Twig and Lowenstein. They have installed 24’ of storm pipe at this time.
Water Line - Construction Inspection Partial 4/1/2020 04/01/2020
Misc
Informational
04/01/2020
4-1-20 10:12am They are removing the road and debris so they can install waterline. They are still working on digging everything out. No waterline has been installed. They will be pouring straddle blocks to support the existing waterline for valves.
Storm - Pipe Partial 4/2/2020 04/02/2020
Misc
Informational
04/01/2020
3-31-20 12:44PM Rudy is working on storm pipe at Black Twig and Lowenstein. They have installed 24’ of storm pipe at this time.
Misc
Informational
04/02/2020
4-2-20 10:04am They installed two sticks on 4-1-20. They are digging out to install storm box H-2. 12:53pm They have H2 box set and 3 sticks installed.
Storm - Pipe Partial 4/7/2020 04/07/2020
Misc
Informational
04/02/2020
3-31-20 12:44PM Rudy is working on storm pipe at Black Twig and Lowenstein. They have installed 24’ of storm pipe at this time.
Misc
Informational
04/02/2020
4-2-20 10:04am They installed two sticks on 4-1-20. They are digging out to install storm box H-2. 12:53pm They have H2 box set and 3 sticks installed.
Misc
Informational
04/03/2020
4-3-20 8:07am
Misc
Informational
04/03/2020
4-3-20 8:07am They have just set storm box H2 and are starting to tie it in.
Misc
Informational
04/07/2020
4-7-20 7:44am They are digging out on the south side of Black Twig and laying out storm pipe.
Misc
Informational
04/07/2020
4-7-20 2:19pm They have installed 35’ across the road to G2. They are coming out from G2 and will have approximately 60’ to G 3 box. They will pour collars at 3:30pm today.
Storm - Pipe Partial 4/8/2020 04/08/2020
Misc
Informational
04/07/2020
3-31-20 12:44PM Rudy is working on storm pipe at Black Twig and Lowenstein. They have installed 24’ of storm pipe at this time.
Misc
Informational
04/07/2020
4-2-20 10:04am They installed two sticks on 4-1-20. They are digging out to install storm box H-2. 12:53pm They have H2 box set and 3 sticks installed.
Misc
Informational
04/07/2020
4-3-20 8:07am
Misc
Informational
04/07/2020
4-3-20 8:07am They have just set storm box H2 and are starting to tie it in.
Misc
Informational
04/07/2020
4-7-20 7:44am They are digging out on the south side of Black Twig and laying out storm pipe.
Misc
Informational
04/07/2020
4-7-20 2:19pm They have installed 35’ across the road to G2. They are coming out from G2 and will have approximately 60’ to G 3 box. They will pour collars at 3:30pm today.
Misc
Informational
04/08/2020
4-8-20 11:06am They are working at the corner of Black Twig and Chipman. All of the storm pipe is installed approximately 53’ 15” 60’ of 18”. All concrete is poured.
Storm - Pipe Partial 4/9/2020 04/09/2020
Misc
Informational
04/08/2020
3-31-20 12:44PM Rudy is working on storm pipe at Black Twig and Lowenstein. They have installed 24’ of storm pipe at this time.
Misc
Informational
04/08/2020
4-2-20 10:04am They installed two sticks on 4-1-20. They are digging out to install storm box H-2. 12:53pm They have H2 box set and 3 sticks installed.
Misc
Informational
04/08/2020
4-3-20 8:07am
Misc
Informational
04/08/2020
4-3-20 8:07am They have just set storm box H2 and are starting to tie it in.
Misc
Informational
04/08/2020
4-7-20 7:44am They are digging out on the south side of Black Twig and laying out storm pipe.
Misc
Informational
04/08/2020
4-7-20 2:19pm They have installed 35’ across the road to G2. They are coming out from G2 and will have approximately 60’ to G 3 box. They will pour collars at 3:30pm today.
Misc
Informational
04/08/2020
4-8-20 11:06am They are working at the corner of Black Twig and Chipman. All of the storm pipe is installed approximately 53’ 15” 60’ of 18”. All concrete is poured.
Misc
Informational
04/09/2020
4-9-20 8:28am They are getting ready to run storm pipe across Lowenstein on the north side of black Twig.
Misc
Informational
04/09/2020
4-9-20 8:28am They are getting ready to run storm pipe across Lowenstein on the north side of black Twig.
Misc
Informational
04/09/2020
4-9-20 8:28am They are getting ready to run storm pipe across Lowenstein on the north side of black Twig.
Misc
Informational
04/09/2020
4-9-20 8:28am They are getting ready to run storm pipe across Lowenstein on the north side of black Twig. 1:54pm Rudy’s crew have installed the storm across Lowenstein and will be pouring collars later.
Grading/Excavation/Fill Inspection Partial 4/9/2020 04/09/2020
Misc
Informational
11/05/2019
11-5-19 They have cut out and are digging and placing base rock in for the turn lane at Pryor and Lowenstein. It should be ready for a proof roll on 11-7-19.
Misc
Informational
04/09/2020
4-9-20 3:23pm They are hauling out dirt cutting to grade at Lowenstein and Black Twig.
Grading/Excavation/Fill Inspection Partial 4/16/2020 04/16/2020
Misc
Informational
04/09/2020
11-5-19 They have cut out and are digging and placing base rock in for the turn lane at Pryor and Lowenstein. It should be ready for a proof roll on 11-7-19.
Misc
Informational
04/09/2020
4-9-20 3:23pm They are hauling out dirt cutting to grade at Lowenstein and Black Twig.
Misc
Informational
04/16/2020
4-16-20 ESS has cut out the south side of Black Twig to set up for curb and walk.
Grading/Excavation/Fill Inspection Partial 4/16/2020 04/16/2020
Misc
Informational
04/16/2020
11-5-19 They have cut out and are digging and placing base rock in for the turn lane at Pryor and Lowenstein. It should be ready for a proof roll on 11-7-19.
Misc
Informational
04/16/2020
4-9-20 3:23pm They are hauling out dirt cutting to grade at Lowenstein and Black Twig.
Misc
Informational
04/16/2020
4-16-20 ESS has cut out the south side of Black Twig to set up for curb and walk. 1:30pm ESS are installing Geo Grid and laying base rock.
Pavement-Curb Construction Partial 5/6/2020 05/06/2020
Misc
Informational
03/06/2020
11-6-19 They have cut the grade for the curb pour on 11-7-19.
Misc
Informational
03/06/2020
11-7-19 8:14am The base rock temp is between 19 and 21 degrees at this time . I spoke with the Forman for Freeman Concrete and told him we need to reach 33 degrees and rising before they can pour curb. He said he understands. They are on hold for now.9:28am They have called off the pour.
Misc
Informational
03/06/2020
11-14-19 8:26 am. They have started pouring curb. The inspector for Cook, Flatt, & Strobel is starting tests at approximately 9:14am. He said he was not informed that they were pouring. The temp for the mix is 64 degrees. The slump for the mix is 2 on the ticket. 4:46pm The major of the curb is poured they are working on the curb at the park.
Misc
Informational
03/06/2020
11-15-19 11:16am ESS are setting up hand pours for the curb.
Misc
Informational
03/06/2020
11-16-19 9:52am Freeman concrete have poured the hand work at the park. They are smoothing out the back side of all the curb poured and will be curing. They do not need to cover with blankets. The temps are going to be above freezing. I spoke with ESS about pulling up blankets, they assume all risk before the 3500 break should the temp drop below freezing.
Misc
Informational
03/06/2020
11-18-19 They are pulling off blankets and are confident that the temp won’t go below 32 degrees before the 3500 break.
Misc
Informational
03/06/2020
11-20-19 2:41pm Bob Burns and I walked the intire curb line and marked all damaged curb.
Misc
Informational
03/06/2020
12-3-19 Steve Robbins and I walked the curb line on Lowenstein and the park parking lot. We marked everything that must be removed and marked 37 panels that are in question.
Misc
Informational
03/06/2020
12-4-19 12:48pm Bob Burns and Steve Robbins and I are walking the site to check curb again to determine what curb can be saved if any. 1:45pm After looking at it again we have determined that Mike Anderson needs to see the curb in person to evaluate.
Misc
Informational
03/06/2020
12-30-19 10:56am Bob Burns, Dan Harper and I walked the complete curb line and marked what has to be replaced. Approximately 52 sections.
Misc
Informational
03/06/2020
1-6-2020 3:55pm They are forming up for curb replacement along Lowenstein. They will be pouring on 1-7-2020.
Misc
Informational
03/06/2020
1-7-2020 9:40am Sapp has started pouring curb on Lowenstein Dr. CFS is on site for testing. 2:52pm They will be covering with blankets due to temps.
Misc
Informational
03/06/2020
1-8-20 10:48am They are pouring the island curb and the curb on the south side of the road. 2:13pm They have pour approximately 11 yards of concrete today.
Misc
Informational
03/06/2020
1-9-20 They have all of the curb replacement done and are covering with blankets.
Misc
Informational
03/06/2020
2-17-20 11:02am They have placed rock in the island’s along Lowenstein and are compacting it.
Misc
Informational
03/06/2020
3-6-20 All of the curb is poured on the south side of B road coming of Lowenstein. Steve Robbins was the inspector. 5-6-20 8:48am ESS are getting ready to pour the curb on the south side of Black Twig. They will be setting up driveways for the residents. CFS will be doing the testing. Concrete is set for 9am. They have poured out the curb on Black Twig and are setting up throats for storm inlets. One citizen is not happy with there drive opening at 713 Black Twig. ESS MP will be talking with the developer. There was a complaint that a concrete truck was washing out close to a storm inlet. I spoke with the paving superintendent and he assured me that he would make sure that all trucks would have a proper wash out area.
Pavement-Curb Construction Partial 5/7/2020 05/07/2020
Misc
Informational
05/06/2020
11-6-19 They have cut the grade for the curb pour on 11-7-19.
Misc
Informational
05/06/2020
11-7-19 8:14am The base rock temp is between 19 and 21 degrees at this time . I spoke with the Forman for Freeman Concrete and told him we need to reach 33 degrees and rising before they can pour curb. He said he understands. They are on hold for now.9:28am They have called off the pour.
Misc
Informational
05/06/2020
11-14-19 8:26 am. They have started pouring curb. The inspector for Cook, Flatt, & Strobel is starting tests at approximately 9:14am. He said he was not informed that they were pouring. The temp for the mix is 64 degrees. The slump for the mix is 2 on the ticket. 4:46pm The major of the curb is poured they are working on the curb at the park.
Misc
Informational
05/06/2020
11-15-19 11:16am ESS are setting up hand pours for the curb.
Misc
Informational
05/06/2020
11-16-19 9:52am Freeman concrete have poured the hand work at the park. They are smoothing out the back side of all the curb poured and will be curing. They do not need to cover with blankets. The temps are going to be above freezing. I spoke with ESS about pulling up blankets, they assume all risk before the 3500 break should the temp drop below freezing.
Misc
Informational
05/06/2020
11-18-19 They are pulling off blankets and are confident that the temp won’t go below 32 degrees before the 3500 break.
Misc
Informational
05/06/2020
11-20-19 2:41pm Bob Burns and I walked the intire curb line and marked all damaged curb.
Misc
Informational
05/06/2020
12-3-19 Steve Robbins and I walked the curb line on Lowenstein and the park parking lot. We marked everything that must be removed and marked 37 panels that are in question.
Misc
Informational
05/06/2020
12-4-19 12:48pm Bob Burns and Steve Robbins and I are walking the site to check curb again to determine what curb can be saved if any. 1:45pm After looking at it again we have determined that Mike Anderson needs to see the curb in person to evaluate.
Misc
Informational
05/06/2020
12-30-19 10:56am Bob Burns, Dan Harper and I walked the complete curb line and marked what has to be replaced. Approximately 52 sections.
Misc
Informational
05/06/2020
1-6-2020 3:55pm They are forming up for curb replacement along Lowenstein. They will be pouring on 1-7-2020.
Misc
Informational
05/06/2020
1-7-2020 9:40am Sapp has started pouring curb on Lowenstein Dr. CFS is on site for testing. 2:52pm They will be covering with blankets due to temps.
Misc
Informational
05/06/2020
1-8-20 10:48am They are pouring the island curb and the curb on the south side of the road. 2:13pm They have pour approximately 11 yards of concrete today.
Misc
Informational
05/06/2020
1-9-20 They have all of the curb replacement done and are covering with blankets.
Misc
Informational
05/06/2020
2-17-20 11:02am They have placed rock in the island’s along Lowenstein and are compacting it.
Misc
Informational
05/06/2020
3-6-20 All of the curb is poured on the south side of B road coming of Lowenstein. Steve Robbins was the inspector. 5-6-20 8:48am ESS are getting ready to pour the curb on the south side of Black Twig. They will be setting up driveways for the residents. CFS will be doing the testing. Concrete is set for 9am. They have poured out the curb on Black Twig and are setting up throats for storm inlets. One citizen is not happy with there drive opening at 713 Black Twig. ESS MP will be talking with the developer. There was a complaint that a concrete truck was washing out close to a storm inlet. I spoke with the paving superintendent and he assured me that he would make sure that all trucks would have a proper wash out area. 5-7-20 They are pouring the wedge next to the curb along with throats. Pennys concrete is who ESS is using. Rain has moved in so they are done for the day.
Pavement-Curb Construction Partial 5/8/2020 05/08/2020
Misc
Informational
05/07/2020
11-6-19 They have cut the grade for the curb pour on 11-7-19.
Misc
Informational
05/07/2020
11-7-19 8:14am The base rock temp is between 19 and 21 degrees at this time . I spoke with the Forman for Freeman Concrete and told him we need to reach 33 degrees and rising before they can pour curb. He said he understands. They are on hold for now.9:28am They have called off the pour.
Misc
Informational
05/07/2020
11-14-19 8:26 am. They have started pouring curb. The inspector for Cook, Flatt, & Strobel is starting tests at approximately 9:14am. He said he was not informed that they were pouring. The temp for the mix is 64 degrees. The slump for the mix is 2 on the ticket. 4:46pm The major of the curb is poured they are working on the curb at the park.
Misc
Informational
05/07/2020
11-15-19 11:16am ESS are setting up hand pours for the curb.
Misc
Informational
05/07/2020
11-16-19 9:52am Freeman concrete have poured the hand work at the park. They are smoothing out the back side of all the curb poured and will be curing. They do not need to cover with blankets. The temps are going to be above freezing. I spoke with ESS about pulling up blankets, they assume all risk before the 3500 break should the temp drop below freezing.
Misc
Informational
05/07/2020
11-18-19 They are pulling off blankets and are confident that the temp won’t go below 32 degrees before the 3500 break.
Misc
Informational
05/07/2020
11-20-19 2:41pm Bob Burns and I walked the intire curb line and marked all damaged curb.
Misc
Informational
05/07/2020
12-3-19 Steve Robbins and I walked the curb line on Lowenstein and the park parking lot. We marked everything that must be removed and marked 37 panels that are in question.
Misc
Informational
05/07/2020
12-4-19 12:48pm Bob Burns and Steve Robbins and I are walking the site to check curb again to determine what curb can be saved if any. 1:45pm After looking at it again we have determined that Mike Anderson needs to see the curb in person to evaluate.
Misc
Informational
05/07/2020
12-30-19 10:56am Bob Burns, Dan Harper and I walked the complete curb line and marked what has to be replaced. Approximately 52 sections.
Misc
Informational
05/07/2020
1-6-2020 3:55pm They are forming up for curb replacement along Lowenstein. They will be pouring on 1-7-2020.
Misc
Informational
05/07/2020
1-7-2020 9:40am Sapp has started pouring curb on Lowenstein Dr. CFS is on site for testing. 2:52pm They will be covering with blankets due to temps.
Misc
Informational
05/07/2020
1-8-20 10:48am They are pouring the island curb and the curb on the south side of the road. 2:13pm They have pour approximately 11 yards of concrete today.
Misc
Informational
05/07/2020
1-9-20 They have all of the curb replacement done and are covering with blankets.
Misc
Informational
05/07/2020
2-17-20 11:02am They have placed rock in the island’s along Lowenstein and are compacting it.
Misc
Informational
05/07/2020
3-6-20 All of the curb is poured on the south side of B road coming of Lowenstein. Steve Robbins was the inspector. 5-6-20 8:48am ESS are getting ready to pour the curb on the south side of Black Twig. They will be setting up driveways for the residents. CFS will be doing the testing. Concrete is set for 9am. They have poured out the curb on Black Twig and are setting up throats for storm inlets. One citizen is not happy with there drive opening at 713 Black Twig. ESS MP will be talking with the developer. There was a complaint that a concrete truck was washing out close to a storm inlet. I spoke with the paving superintendent and he assured me that he would make sure that all trucks would have a proper wash out area. 5-7-20 They are pouring the wedge next to the curb along with throats. Pennys concrete is who ESS is using. Rain has moved in so they are done for the day. 5-8-20 They poured driveway approaches today along Black Twig. All concrete trucks had a wash out pit at the west end of Black Twig.
Water Line - Construction Inspection Partial 5/14/2020 05/14/2020
Misc
Informational
04/01/2020
4-1-20 10:12am They are removing the road and debris so they can install waterline. They are still working on digging everything out. No waterline has been installed. They will be pouring straddle blocks to support the existing waterline for valves.
Misc
Informational
04/14/2020
4-14-20 9:17 am They have installed 40 foot of water line on the west side of Lowenstein. They have plenty of rock and tracer wire. 5-13-20 ESS is preparing to to tie-in the water line on Black Twig. The water line has been tied in and water is back in service.
Sidewalk Inspection Partial 06/03/2020
Misc
Informational
01/06/2020
12-6-19 11:16am They have poured the sidewalk on the north east side of Lowenstein and now have started pouring the sidewalk on the south side of Lowenstein. They have been using plenty of cure up to this point.
Misc
Informational
01/06/2020
12-11-19 2:49pm They are pouring the sidewalk on Lowenstein in front of the park.
Misc
Informational
01/06/2020
12-12-19 2:53pm They have set forms along the east side of Lowenstein. They are planning on pouring Friday the 13th.
Misc
Informational
01/06/2020
1-6-2020 3:44pm They are pouring the ADA tie-ins along Lowenstein. They have been informed to cover completely and evenly with cure before covering with blankets. 6-3-20 1:24pm ESS are pouring the sidewalk on the south side of Black Twig. They are working there way down from Lowenstein to Chipman.
Sidewalk Inspection Partial 6/4/2020 6/4/2020 06/04/2020
Misc
Informational
06/03/2020
12-6-19 11:16am They have poured the sidewalk on the north east side of Lowenstein and now have started pouring the sidewalk on the south side of Lowenstein. They have been using plenty of cure up to this point.
Misc
Informational
06/03/2020
12-11-19 2:49pm They are pouring the sidewalk on Lowenstein in front of the park.
Misc
Informational
06/03/2020
12-12-19 2:53pm They have set forms along the east side of Lowenstein. They are planning on pouring Friday the 13th.
Misc
Informational
06/03/2020
1-6-2020 3:44pm They are pouring the ADA tie-ins along Lowenstein. They have been informed to cover completely and evenly with cure before covering with blankets. 6-3-20 1:24pm ESS are pouring the sidewalk on the south side of Black Twig. They are working there way down from Lowenstein to Chipman. 6-4-20 8:59AM They are setting up more sidewalk and will be pouring at 10am. They have poured all of the walk down to Chipma Rd.
Grading/Excavation/Fill Inspection Partial 06/17/2020
Misc
Informational
04/16/2020
11-5-19 They have cut out and are digging and placing base rock in for the turn lane at Pryor and Lowenstein. It should be ready for a proof roll on 11-7-19.
Misc
Informational
04/16/2020
4-9-20 3:23pm They are hauling out dirt cutting to grade at Lowenstein and Black Twig.
Misc
Informational
04/16/2020
4-16-20 ESS has cut out the south side of Black Twig to set up for curb and walk. 1:30pm ESS are installing Geo Grid and laying base rock. 6-17-20 ESS has the graid cut and geo-grid down and are placing base rock. They will be l;poking for a proof roll on 6-18-20.
Curb - Proof Roll Partial 6/18/2020 6/18/2020 06/18/2020
Misc
Informational
11/08/2019
11-5-19 We started the proof roll at 9:16am on Lowenstein. All of the curb line passed with corrections needed in a few spots and at all radiuses. The park curb line passed on the east side. We have not proof rolled the west side of the park.
Misc
Informational
11/08/2019
11-9-19 1:55pm The curb proof roll at the intersection of Pryor and Lowenstein has passed, pending more dry time. The curb line on the west side of the park failed. 6-18-20 9:03am The proof roll for Lowenstein and Black Twig has passed. There is a chance of rain for the over night. I explained to the superintendent that it will be subject to a second proof roll if it does infact rain.
Pavement-Curb Construction Partial 6/19/2020 6/19/2020 06/19/2020
Misc
Informational
05/08/2020
11-6-19 They have cut the grade for the curb pour on 11-7-19.
Misc
Informational
05/08/2020
11-7-19 8:14am The base rock temp is between 19 and 21 degrees at this time . I spoke with the Forman for Freeman Concrete and told him we need to reach 33 degrees and rising before they can pour curb. He said he understands. They are on hold for now.9:28am They have called off the pour.
Misc
Informational
05/08/2020
11-14-19 8:26 am. They have started pouring curb. The inspector for Cook, Flatt, & Strobel is starting tests at approximately 9:14am. He said he was not informed that they were pouring. The temp for the mix is 64 degrees. The slump for the mix is 2 on the ticket. 4:46pm The major of the curb is poured they are working on the curb at the park.
Misc
Informational
05/08/2020
11-15-19 11:16am ESS are setting up hand pours for the curb.
Misc
Informational
05/08/2020
11-16-19 9:52am Freeman concrete have poured the hand work at the park. They are smoothing out the back side of all the curb poured and will be curing. They do not need to cover with blankets. The temps are going to be above freezing. I spoke with ESS about pulling up blankets, they assume all risk before the 3500 break should the temp drop below freezing.
Misc
Informational
05/08/2020
11-18-19 They are pulling off blankets and are confident that the temp won’t go below 32 degrees before the 3500 break.
Misc
Informational
05/08/2020
11-20-19 2:41pm Bob Burns and I walked the intire curb line and marked all damaged curb.
Misc
Informational
05/08/2020
12-3-19 Steve Robbins and I walked the curb line on Lowenstein and the park parking lot. We marked everything that must be removed and marked 37 panels that are in question.
Misc
Informational
05/08/2020
12-4-19 12:48pm Bob Burns and Steve Robbins and I are walking the site to check curb again to determine what curb can be saved if any. 1:45pm After looking at it again we have determined that Mike Anderson needs to see the curb in person to evaluate.
Misc
Informational
05/08/2020
12-30-19 10:56am Bob Burns, Dan Harper and I walked the complete curb line and marked what has to be replaced. Approximately 52 sections.
Misc
Informational
05/08/2020
1-6-2020 3:55pm They are forming up for curb replacement along Lowenstein. They will be pouring on 1-7-2020.
Misc
Informational
05/08/2020
1-7-2020 9:40am Sapp has started pouring curb on Lowenstein Dr. CFS is on site for testing. 2:52pm They will be covering with blankets due to temps.
Misc
Informational
05/08/2020
1-8-20 10:48am They are pouring the island curb and the curb on the south side of the road. 2:13pm They have pour approximately 11 yards of concrete today.
Misc
Informational
05/08/2020
1-9-20 They have all of the curb replacement done and are covering with blankets.
Misc
Informational
05/08/2020
2-17-20 11:02am They have placed rock in the island’s along Lowenstein and are compacting it.
Misc
Informational
05/08/2020
3-6-20 All of the curb is poured on the south side of B road coming of Lowenstein. Steve Robbins was the inspector. 5-6-20 8:48am ESS are getting ready to pour the curb on the south side of Black Twig. They will be setting up driveways for the residents. CFS will be doing the testing. Concrete is set for 9am. They have poured out the curb on Black Twig and are setting up throats for storm inlets. One citizen is not happy with there drive opening at 713 Black Twig. ESS MP will be talking with the developer. There was a complaint that a concrete truck was washing out close to a storm inlet. I spoke with the paving superintendent and he assured me that he would make sure that all trucks would have a proper wash out area. 5-7-20 They are pouring the wedge next to the curb along with throats. Pennys concrete is who ESS is using. Rain has moved in so they are done for the day. 5-8-20 They poured driveway approaches today along Black Twig. All concrete trucks had a wash out pit at the west end of Black Twig. 6-19-20 9:24am ESS put the pour for curb on hold due to weather. They are digging around inlets and prepping for the pour. ESS will start pouring curb at 11am.
Pavement-Curb Construction Partial 6/22/2020 6/22/2020 06/22/2020
Misc
Informational
06/19/2020
11-6-19 They have cut the grade for the curb pour on 11-7-19.
Misc
Informational
06/19/2020
11-7-19 8:14am The base rock temp is between 19 and 21 degrees at this time . I spoke with the Forman for Freeman Concrete and told him we need to reach 33 degrees and rising before they can pour curb. He said he understands. They are on hold for now.9:28am They have called off the pour.
Misc
Informational
06/19/2020
11-14-19 8:26 am. They have started pouring curb. The inspector for Cook, Flatt, & Strobel is starting tests at approximately 9:14am. He said he was not informed that they were pouring. The temp for the mix is 64 degrees. The slump for the mix is 2 on the ticket. 4:46pm The major of the curb is poured they are working on the curb at the park.
Misc
Informational
06/19/2020
11-15-19 11:16am ESS are setting up hand pours for the curb.
Misc
Informational
06/19/2020
11-16-19 9:52am Freeman concrete have poured the hand work at the park. They are smoothing out the back side of all the curb poured and will be curing. They do not need to cover with blankets. The temps are going to be above freezing. I spoke with ESS about pulling up blankets, they assume all risk before the 3500 break should the temp drop below freezing.
Misc
Informational
06/19/2020
11-18-19 They are pulling off blankets and are confident that the temp won’t go below 32 degrees before the 3500 break.
Misc
Informational
06/19/2020
11-20-19 2:41pm Bob Burns and I walked the intire curb line and marked all damaged curb.
Misc
Informational
06/19/2020
12-3-19 Steve Robbins and I walked the curb line on Lowenstein and the park parking lot. We marked everything that must be removed and marked 37 panels that are in question.
Misc
Informational
06/19/2020
12-4-19 12:48pm Bob Burns and Steve Robbins and I are walking the site to check curb again to determine what curb can be saved if any. 1:45pm After looking at it again we have determined that Mike Anderson needs to see the curb in person to evaluate.
Misc
Informational
06/19/2020
12-30-19 10:56am Bob Burns, Dan Harper and I walked the complete curb line and marked what has to be replaced. Approximately 52 sections.
Misc
Informational
06/19/2020
1-6-2020 3:55pm They are forming up for curb replacement along Lowenstein. They will be pouring on 1-7-2020.
Misc
Informational
06/19/2020
1-7-2020 9:40am Sapp has started pouring curb on Lowenstein Dr. CFS is on site for testing. 2:52pm They will be covering with blankets due to temps.
Misc
Informational
06/19/2020
1-8-20 10:48am They are pouring the island curb and the curb on the south side of the road. 2:13pm They have pour approximately 11 yards of concrete today.
Misc
Informational
06/19/2020
1-9-20 They have all of the curb replacement done and are covering with blankets.
Misc
Informational
06/19/2020
2-17-20 11:02am They have placed rock in the island’s along Lowenstein and are compacting it.
Misc
Informational
06/19/2020
3-6-20 All of the curb is poured on the south side of B road coming of Lowenstein. Steve Robbins was the inspector. 5-6-20 8:48am ESS are getting ready to pour the curb on the south side of Black Twig. They will be setting up driveways for the residents. CFS will be doing the testing. Concrete is set for 9am. They have poured out the curb on Black Twig and are setting up throats for storm inlets. One citizen is not happy with there drive opening at 713 Black Twig. ESS MP will be talking with the developer. There was a complaint that a concrete truck was washing out close to a storm inlet. I spoke with the paving superintendent and he assured me that he would make sure that all trucks would have a proper wash out area. 5-7-20 They are pouring the wedge next to the curb along with throats. Pennys concrete is who ESS is using. Rain has moved in so they are done for the day. 5-8-20 They poured driveway approaches today along Black Twig. All concrete trucks had a wash out pit at the west end of Black Twig. 6-19-20 9:24am ESS put the pour for curb on hold due to weather. They are digging around inlets and prepping for the pour. ESS will start pouring curb at 11am. 6-22-20 8:14am ESS is waiting to see what the weather is going to do before they pour curb. John M. Jackson 6-22-20 2:00pm ESS installed and cured curbs. Contractor began forming for curbs for entrance to parking lot area.
Proof roll parking lot Passed 06/22/2020
Misc
Informational
06/22/2020
Pavement-Curb Construction Partial 06/23/2020
Misc
Informational
06/22/2020
11-6-19 They have cut the grade for the curb pour on 11-7-19.
Misc
Informational
06/22/2020
11-7-19 8:14am The base rock temp is between 19 and 21 degrees at this time . I spoke with the Forman for Freeman Concrete and told him we need to reach 33 degrees and rising before they can pour curb. He said he understands. They are on hold for now.9:28am They have called off the pour.
Misc
Informational
06/22/2020
11-14-19 8:26 am. They have started pouring curb. The inspector for Cook, Flatt, & Strobel is starting tests at approximately 9:14am. He said he was not informed that they were pouring. The temp for the mix is 64 degrees. The slump for the mix is 2 on the ticket. 4:46pm The major of the curb is poured they are working on the curb at the park.
Misc
Informational
06/22/2020
11-15-19 11:16am ESS are setting up hand pours for the curb.
Misc
Informational
06/22/2020
11-16-19 9:52am Freeman concrete have poured the hand work at the park. They are smoothing out the back side of all the curb poured and will be curing. They do not need to cover with blankets. The temps are going to be above freezing. I spoke with ESS about pulling up blankets, they assume all risk before the 3500 break should the temp drop below freezing.
Misc
Informational
06/22/2020
11-18-19 They are pulling off blankets and are confident that the temp won’t go below 32 degrees before the 3500 break.
Misc
Informational
06/22/2020
11-20-19 2:41pm Bob Burns and I walked the intire curb line and marked all damaged curb.
Misc
Informational
06/22/2020
12-3-19 Steve Robbins and I walked the curb line on Lowenstein and the park parking lot. We marked everything that must be removed and marked 37 panels that are in question.
Misc
Informational
06/22/2020
12-4-19 12:48pm Bob Burns and Steve Robbins and I are walking the site to check curb again to determine what curb can be saved if any. 1:45pm After looking at it again we have determined that Mike Anderson needs to see the curb in person to evaluate.
Misc
Informational
06/22/2020
12-30-19 10:56am Bob Burns, Dan Harper and I walked the complete curb line and marked what has to be replaced. Approximately 52 sections.
Misc
Informational
06/22/2020
1-6-2020 3:55pm They are forming up for curb replacement along Lowenstein. They will be pouring on 1-7-2020.
Misc
Informational
06/22/2020
1-7-2020 9:40am Sapp has started pouring curb on Lowenstein Dr. CFS is on site for testing. 2:52pm They will be covering with blankets due to temps.
Misc
Informational
06/22/2020
1-8-20 10:48am They are pouring the island curb and the curb on the south side of the road. 2:13pm They have pour approximately 11 yards of concrete today.
Misc
Informational
06/22/2020
1-9-20 They have all of the curb replacement done and are covering with blankets.
Misc
Informational
06/22/2020
2-17-20 11:02am They have placed rock in the island’s along Lowenstein and are compacting it.
Misc
Informational
06/22/2020
3-6-20 All of the curb is poured on the south side of B road coming of Lowenstein. Steve Robbins was the inspector. 5-6-20 8:48am ESS are getting ready to pour the curb on the south side of Black Twig. They will be setting up driveways for the residents. CFS will be doing the testing. Concrete is set for 9am. They have poured out the curb on Black Twig and are setting up throats for storm inlets. One citizen is not happy with there drive opening at 713 Black Twig. ESS MP will be talking with the developer. There was a complaint that a concrete truck was washing out close to a storm inlet. I spoke with the paving superintendent and he assured me that he would make sure that all trucks would have a proper wash out area. 5-7-20 They are pouring the wedge next to the curb along with throats. Pennys concrete is who ESS is using. Rain has moved in so they are done for the day. 5-8-20 They poured driveway approaches today along Black Twig. All concrete trucks had a wash out pit at the west end of Black Twig. 6-19-20 9:24am ESS put the pour for curb on hold due to weather. They are digging around inlets and prepping for the pour. ESS will start pouring curb at 11am. 6-22-20 8:14am ESS is waiting to see what the weather is going to do before they pour curb.
Misc
Informational
06/23/2020
Concrete arrived at 8:15 am to pour curbs at the newly constructed entrance of the parkiing lot on NW Lowenstein RD . Contractor continued to pour curbs for entrance second truck arrived around 10:25am . Contractor cured installed curbs. Contractor work to form the radius corner curbs at NW Lowenstein RD & Black Twig LN also the storm inlets throats. The contractor completed the radius curbs with ADA sidewalk indention at the West & East side of Black Twig LN & NW Lowenstein RD. All concrete was cured. Contractor continued to form approach for parking lot to pour tomorrow 6-24-20.
Driveway Inspection Passed 06/24/2020
Misc
Informational
06/24/2020
DRIVEWAY- Approach for the parking lot was pour by 9:55 6-24-20 concrete by PCI. Contractor will cure concrete approach.
Pavement-Surface Partial 06/25/2020
Misc
Informational
11/20/2019
11-20-19 Metro Asphalt is doing the work. They have started laying asphalt the average temp out of the truck is 260. The average temp out of the machine is 290. 11:59am They have got the first lift of base on the north side of the road and are now working on laying the south side of the road. Temps are good. Cook,Flatt & Strobel are on site doing all testing requirements. They have been told to let the temp get to 140 degrees before a second lift Is applied and to use a tac coat. 4:12pm They have finished laying all the first layer of asphalt and are cleaning up. The third party inspector is still doing testing. Rain is starting to move in. They have the second layer of base placed on the north side down to the park. I have collected asphalt tickets for the day.
Misc
Informational
06/25/2020
6-25-20 Metro Asphalt started around 10:30am. The temperatures ranged in the upper 290 deg. Base Asphalt was layed on Black Twig Ln & NW Lowenstein Drive. I will collected tickets at the end of the day.
Sidewalk Inspection Partial 06/25/2020
Misc
Informational
06/04/2020
12-6-19 11:16am They have poured the sidewalk on the north east side of Lowenstein and now have started pouring the sidewalk on the south side of Lowenstein. They have been using plenty of cure up to this point.
Misc
Informational
06/04/2020
12-11-19 2:49pm They are pouring the sidewalk on Lowenstein in front of the park.
Misc
Informational
06/04/2020
12-12-19 2:53pm They have set forms along the east side of Lowenstein. They are planning on pouring Friday the 13th.
Misc
Informational
06/04/2020
1-6-2020 3:44pm They are pouring the ADA tie-ins along Lowenstein. They have been informed to cover completely and evenly with cure before covering with blankets. 6-3-20 1:24pm ESS are pouring the sidewalk on the south side of Black Twig. They are working there way down from Lowenstein to Chipman. 6-4-20 8:59AM They are setting up more sidewalk and will be pouring at 10am. They have poured all of the walk down to Chipma Rd.
Misc
Informational
06/25/2020
6-25-20 Contractor poured concrete commercial use sidewalk 10’ wide approximately 230’ in distance . Sidewalks location is along Pryor RD and Lowenstein RD. 6-24-20 Contractor poured concrete for sidewalks 5’ in width and approximately 310’ in distance, location on Pryor RD and just S of I-470 .
Pavement-Surface Passed 6/26/2020 6/26/2020 06/26/2020
Misc
Informational
06/25/2020
11-20-19 Metro Asphalt is doing the work. They have started laying asphalt the average temp out of the truck is 260. The average temp out of the machine is 290. 11:59am They have got the first lift of base on the north side of the road and are now working on laying the south side of the road. Temps are good. Cook,Flatt & Strobel are on site doing all testing requirements. They have been told to let the temp get to 140 degrees before a second lift Is applied and to use a tac coat. 4:12pm They have finished laying all the first layer of asphalt and are cleaning up. The third party inspector is still doing testing. Rain is starting to move in. They have the second layer of base placed on the north side down to the park. I have collected asphalt tickets for the day.
Misc
Informational
06/25/2020
6-25-20 Metro Asphalt started around 10:30am. The temperatures ranged in the upper 290 deg. Base Asphalt was layed on Black Twig Ln & NW Lowenstein Drive. I will collected tickets at the end of the day.
Misc
Informational
06/26/2020
6/26/2020 Metro Asphalt started laying the 2nd base lift around 8:30am. The temperatures Were in the upper 200’s to lower 300’s. Base Asphalt was layed on Black Twig Ln & NW Lowenstein Drive. Type 5R base was laid.
Street - Surface Course Partial 6/26/2020 6/26/2020 06/26/2020
Misc
Informational
03/30/2020
11-25-19 7:56am They are setting up concrete drive approach’s today and will be pouring. They are currently working on the approach for the private road across from Lowenstein park. They have stoped work due to hubs being wrong.
Misc
Informational
03/30/2020
12-4-19 They have poured the drive approach on Lowenstein by the park and are pouring the second half of the drive approaches that run north and south.
Misc
Informational
03/30/2020
12-9-19 10:17am They are laying type5 recycled asphalt in the turning lane on Pryor. This will be milled out for the correct surface at a later date.
Misc
Informational
03/30/2020
3-26-20 11:50am They are tacking the turn lane on Pryor and Lowenstein. No asphalt trucks have arrived yet. CFI is on site for testing along with Idecker. The first truck showed just after 12pm The temps are averaging around 250 out of the trucks. 3:47pm They are working on the Pryor turn lane. 4:03pm 432 ton has been layed at this time.6:34pm They have just completed the surface for Lowenstein and Pryor turn lane. They are now laying base for the Lowenstein Park parking lot.
Misc
Informational
03/30/2020
3-27-20 10:36am K&G Striping are on site laying everything out. They will be back on Monday to Stripe.
Misc
Informational
03/30/2020
3-30-20 10:49am K&G Striping,INC. are on site painting all the stripes for Lowenstein.
Misc
Informational
06/26/2020
John DiMauro 06/26/2020 7:00PM AFTER HOURS INSPECTION 4:30PM - 7:00PM Metro Asphalt installed the Type 5 surface lift for the Public road along Lowenstein and Black Twig. The temperatures, equipment and methods used were in compliance.
Street - Surface Course Partial 6/29/2020 6/29/2020 06/29/2020
Misc
Informational
06/26/2020
11-25-19 7:56am They are setting up concrete drive approach’s today and will be pouring. They are currently working on the approach for the private road across from Lowenstein park. They have stoped work due to hubs being wrong.
Misc
Informational
06/26/2020
12-4-19 They have poured the drive approach on Lowenstein by the park and are pouring the second half of the drive approaches that run north and south.
Misc
Informational
06/26/2020
12-9-19 10:17am They are laying type5 recycled asphalt in the turning lane on Pryor. This will be milled out for the correct surface at a later date.
Misc
Informational
06/26/2020
3-26-20 11:50am They are tacking the turn lane on Pryor and Lowenstein. No asphalt trucks have arrived yet. CFI is on site for testing along with Idecker. The first truck showed just after 12pm The temps are averaging around 250 out of the trucks. 3:47pm They are working on the Pryor turn lane. 4:03pm 432 ton has been layed at this time.6:34pm They have just completed the surface for Lowenstein and Pryor turn lane. They are now laying base for the Lowenstein Park parking lot.
Misc
Informational
06/26/2020
3-27-20 10:36am K&G Striping are on site laying everything out. They will be back on Monday to Stripe.
Misc
Informational
06/26/2020
3-30-20 10:49am K&G Striping,INC. are on site painting all the stripes for Lowenstein.
Misc
Informational
06/26/2020
John DiMauro 06/26/2020 7:00PM AFTER HOURS INSPECTION 4:30PM - 7:00PM Metro Asphalt installed the Type 5 surface lift for the Public road along Lowenstein and Black Twig. The temperatures, equipment and methods used were in compliance. 6-29-20 Metro is on site to lay asphalt on Back Twig. They have started laying the asphalt at Chipman working there way to Lowenstein. They are using Type 5-01. Temps are approximately 250 degrees. 3:25pm Metro has finished laying asphalt on Black Twig and are cleaning the street.
Street - Surface Course Partial 06/30/2020
Misc
Informational
06/29/2020
11-25-19 7:56am They are setting up concrete drive approach’s today and will be pouring. They are currently working on the approach for the private road across from Lowenstein park. They have stoped work due to hubs being wrong.
Misc
Informational
06/29/2020
12-4-19 They have poured the drive approach on Lowenstein by the park and are pouring the second half of the drive approaches that run north and south.
Misc
Informational
06/29/2020
12-9-19 10:17am They are laying type5 recycled asphalt in the turning lane on Pryor. This will be milled out for the correct surface at a later date.
Misc
Informational
06/29/2020
3-26-20 11:50am They are tacking the turn lane on Pryor and Lowenstein. No asphalt trucks have arrived yet. CFI is on site for testing along with Idecker. The first truck showed just after 12pm The temps are averaging around 250 out of the trucks. 3:47pm They are working on the Pryor turn lane. 4:03pm 432 ton has been layed at this time.6:34pm They have just completed the surface for Lowenstein and Pryor turn lane. They are now laying base for the Lowenstein Park parking lot.
Misc
Informational
06/29/2020
3-27-20 10:36am K&G Striping are on site laying everything out. They will be back on Monday to Stripe.
Misc
Informational
06/29/2020
3-30-20 10:49am K&G Striping,INC. are on site painting all the stripes for Lowenstein.
Misc
Informational
06/29/2020
John DiMauro 06/26/2020 7:00PM AFTER HOURS INSPECTION 4:30PM - 7:00PM Metro Asphalt installed the Type 5 surface lift for the Public road along Lowenstein and Black Twig. The temperatures, equipment and methods used were in compliance. 6-29-20 Metro is on site to lay asphalt on Back Twig. They have started laying the asphalt at Chipman working there way to Lowenstein. They are using Type 5-01. Temps are approximately 250 degrees. 3:25pm Metro has finished laying asphalt on Black Twig and are cleaning the street. 6-30-20 11:05am K&G Striping are on Lowenstein laying out the strips.
Sidewalk Inspection Partial 6/30/2020 6/30/2020 06/30/2020
Misc
Informational
06/25/2020
12-6-19 11:16am They have poured the sidewalk on the north east side of Lowenstein and now have started pouring the sidewalk on the south side of Lowenstein. They have been using plenty of cure up to this point.
Misc
Informational
06/25/2020
12-11-19 2:49pm They are pouring the sidewalk on Lowenstein in front of the park.
Misc
Informational
06/25/2020
12-12-19 2:53pm They have set forms along the east side of Lowenstein. They are planning on pouring Friday the 13th.
Misc
Informational
06/25/2020
1-6-2020 3:44pm They are pouring the ADA tie-ins along Lowenstein. They have been informed to cover completely and evenly with cure before covering with blankets. 6-3-20 1:24pm ESS are pouring the sidewalk on the south side of Black Twig. They are working there way down from Lowenstein to Chipman. 6-4-20 8:59AM They are setting up more sidewalk and will be pouring at 10am. They have poured all of the walk down to Chipma Rd.
Misc
Informational
06/25/2020
6-25-20 Contractor poured concrete commercial use sidewalk 10’ wide approximately 230’ in distance . Sidewalks location is along Pryor RD and Lowenstein RD. 6-24-20 Contractor poured concrete for sidewalks 5’ in width and approximately 310’ in distance, location on Pryor RD and just S of I-470 . 6-30-20 ESS are setting up the sidewalk on the southwest corner of Lowenstein and Black Twig. 1:41pm They have the string line set but no forms at this time.
Sidewalk Inspection Partial 07/01/2020
Misc
Informational
06/30/2020
12-6-19 11:16am They have poured the sidewalk on the north east side of Lowenstein and now have started pouring the sidewalk on the south side of Lowenstein. They have been using plenty of cure up to this point.
Misc
Informational
06/30/2020
12-11-19 2:49pm They are pouring the sidewalk on Lowenstein in front of the park.
Misc
Informational
06/30/2020
12-12-19 2:53pm They have set forms along the east side of Lowenstein. They are planning on pouring Friday the 13th.
Misc
Informational
06/30/2020
1-6-2020 3:44pm They are pouring the ADA tie-ins along Lowenstein. They have been informed to cover completely and evenly with cure before covering with blankets. 6-3-20 1:24pm ESS are pouring the sidewalk on the south side of Black Twig. They are working there way down from Lowenstein to Chipman. 6-4-20 8:59AM They are setting up more sidewalk and will be pouring at 10am. They have poured all of the walk down to Chipma Rd.
Misc
Informational
06/30/2020
6-25-20 Contractor poured concrete commercial use sidewalk 10’ wide approximately 230’ in distance . Sidewalks location is along Pryor RD and Lowenstein RD. 6-24-20 Contractor poured concrete for sidewalks 5’ in width and approximately 310’ in distance, location on Pryor RD and just S of I-470 . 6-30-20 ESS are setting up the sidewalk on the southwest corner of Lowenstein and Black Twig. 1:41pm They have the string line set but no forms at this time. 7-1-20 8:47am ESS have poured the walking path on 6-30-20. Due to rain they will not be working today.
Street - Surface Course Partial 07/01/2020
Misc
Informational
06/30/2020
11-25-19 7:56am They are setting up concrete drive approach’s today and will be pouring. They are currently working on the approach for the private road across from Lowenstein park. They have stoped work due to hubs being wrong.
Misc
Informational
06/30/2020
12-4-19 They have poured the drive approach on Lowenstein by the park and are pouring the second half of the drive approaches that run north and south.
Misc
Informational
06/30/2020
12-9-19 10:17am They are laying type5 recycled asphalt in the turning lane on Pryor. This will be milled out for the correct surface at a later date.
Misc
Informational
06/30/2020
3-26-20 11:50am They are tacking the turn lane on Pryor and Lowenstein. No asphalt trucks have arrived yet. CFI is on site for testing along with Idecker. The first truck showed just after 12pm The temps are averaging around 250 out of the trucks. 3:47pm They are working on the Pryor turn lane. 4:03pm 432 ton has been layed at this time.6:34pm They have just completed the surface for Lowenstein and Pryor turn lane. They are now laying base for the Lowenstein Park parking lot.
Misc
Informational
06/30/2020
3-27-20 10:36am K&G Striping are on site laying everything out. They will be back on Monday to Stripe.
Misc
Informational
06/30/2020
3-30-20 10:49am K&G Striping,INC. are on site painting all the stripes for Lowenstein.
Misc
Informational
06/30/2020
John DiMauro 06/26/2020 7:00PM AFTER HOURS INSPECTION 4:30PM - 7:00PM Metro Asphalt installed the Type 5 surface lift for the Public road along Lowenstein and Black Twig. The temperatures, equipment and methods used were in compliance. 6-29-20 Metro is on site to lay asphalt on Back Twig. They have started laying the asphalt at Chipman working there way to Lowenstein. They are using Type 5-01. Temps are approximately 250 degrees. 3:25pm Metro has finished laying asphalt on Black Twig and are cleaning the street. 6-30-20 11:05am K&G Striping are on Lowenstein laying out the strips. 7-1-20 10:57am K&G Striping have completed the stripping on Lowenstein.
Sidewalk Inspection Partial 7/2/2020 7/2/2020 07/02/2020
Misc
Informational
07/01/2020
12-6-19 11:16am They have poured the sidewalk on the north east side of Lowenstein and now have started pouring the sidewalk on the south side of Lowenstein. They have been using plenty of cure up to this point.
Misc
Informational
07/01/2020
12-11-19 2:49pm They are pouring the sidewalk on Lowenstein in front of the park.
Misc
Informational
07/01/2020
12-12-19 2:53pm They have set forms along the east side of Lowenstein. They are planning on pouring Friday the 13th.
Misc
Informational
07/01/2020
1-6-2020 3:44pm They are pouring the ADA tie-ins along Lowenstein. They have been informed to cover completely and evenly with cure before covering with blankets. 6-3-20 1:24pm ESS are pouring the sidewalk on the south side of Black Twig. They are working there way down from Lowenstein to Chipman. 6-4-20 8:59AM They are setting up more sidewalk and will be pouring at 10am. They have poured all of the walk down to Chipma Rd.
Misc
Informational
07/01/2020
6-25-20 Contractor poured concrete commercial use sidewalk 10’ wide approximately 230’ in distance . Sidewalks location is along Pryor RD and Lowenstein RD. 6-24-20 Contractor poured concrete for sidewalks 5’ in width and approximately 310’ in distance, location on Pryor RD and just S of I-470 . 6-30-20 ESS are setting up the sidewalk on the southwest corner of Lowenstein and Black Twig. 1:41pm They have the string line set but no forms at this time. 7-1-20 8:47am ESS have poured the walking path on 6-30-20. Due to rain they will not be working today. 7-2-20 ESS have the south side of Black Twig set up and are working on setting forms for the North side of Black Twig. They will be pouring later today.
Street - Surface Course Partial 07/07/2020
Misc
Informational
07/01/2020
11-25-19 7:56am They are setting up concrete drive approach’s today and will be pouring. They are currently working on the approach for the private road across from Lowenstein park. They have stoped work due to hubs being wrong.
Misc
Informational
07/01/2020
12-4-19 They have poured the drive approach on Lowenstein by the park and are pouring the second half of the drive approaches that run north and south.
Misc
Informational
07/01/2020
12-9-19 10:17am They are laying type5 recycled asphalt in the turning lane on Pryor. This will be milled out for the correct surface at a later date.
Misc
Informational
07/01/2020
3-26-20 11:50am They are tacking the turn lane on Pryor and Lowenstein. No asphalt trucks have arrived yet. CFI is on site for testing along with Idecker. The first truck showed just after 12pm The temps are averaging around 250 out of the trucks. 3:47pm They are working on the Pryor turn lane. 4:03pm 432 ton has been layed at this time.6:34pm They have just completed the surface for Lowenstein and Pryor turn lane. They are now laying base for the Lowenstein Park parking lot.
Misc
Informational
07/01/2020
3-27-20 10:36am K&G Striping are on site laying everything out. They will be back on Monday to Stripe.
Misc
Informational
07/01/2020
3-30-20 10:49am K&G Striping,INC. are on site painting all the stripes for Lowenstein.
Misc
Informational
07/01/2020
John DiMauro 06/26/2020 7:00PM AFTER HOURS INSPECTION 4:30PM - 7:00PM Metro Asphalt installed the Type 5 surface lift for the Public road along Lowenstein and Black Twig. The temperatures, equipment and methods used were in compliance. 6-29-20 Metro is on site to lay asphalt on Back Twig. They have started laying the asphalt at Chipman working there way to Lowenstein. They are using Type 5-01. Temps are approximately 250 degrees. 3:25pm Metro has finished laying asphalt on Black Twig and are cleaning the street. 6-30-20 11:05am K&G Striping are on Lowenstein laying out the strips. 7-1-20 10:57am K&G Striping have completed the stripping on Lowenstein. 7-7-20 8:05am ESS has cut out the road at Black Twig and Lowenstein to pour the trench drain that runs North and South. 10:13am ESS have poured the concrete trench drain going across Black Twig. CFS is on site for a cylinder.
Street - Surface Course Passed 07/09/2020
Misc
Informational
07/07/2020
11-25-19 7:56am They are setting up concrete drive approach’s today and will be pouring. They are currently working on the approach for the private road across from Lowenstein park. They have stoped work due to hubs being wrong.
Misc
Informational
07/07/2020
12-4-19 They have poured the drive approach on Lowenstein by the park and are pouring the second half of the drive approaches that run north and south.
Misc
Informational
07/07/2020
12-9-19 10:17am They are laying type5 recycled asphalt in the turning lane on Pryor. This will be milled out for the correct surface at a later date.
Misc
Informational
07/07/2020
3-26-20 11:50am They are tacking the turn lane on Pryor and Lowenstein. No asphalt trucks have arrived yet. CFI is on site for testing along with Idecker. The first truck showed just after 12pm The temps are averaging around 250 out of the trucks. 3:47pm They are working on the Pryor turn lane. 4:03pm 432 ton has been layed at this time.6:34pm They have just completed the surface for Lowenstein and Pryor turn lane. They are now laying base for the Lowenstein Park parking lot.
Misc
Informational
07/07/2020
3-27-20 10:36am K&G Striping are on site laying everything out. They will be back on Monday to Stripe.
Misc
Informational
07/07/2020
3-30-20 10:49am K&G Striping,INC. are on site painting all the stripes for Lowenstein.
Misc
Informational
07/07/2020
John DiMauro 06/26/2020 7:00PM AFTER HOURS INSPECTION 4:30PM - 7:00PM Metro Asphalt installed the Type 5 surface lift for the Public road along Lowenstein and Black Twig. The temperatures, equipment and methods used were in compliance. 6-29-20 Metro is on site to lay asphalt on Back Twig. They have started laying the asphalt at Chipman working there way to Lowenstein. They are using Type 5-01. Temps are approximately 250 degrees. 3:25pm Metro has finished laying asphalt on Black Twig and are cleaning the street. 6-30-20 11:05am K&G Striping are on Lowenstein laying out the strips. 7-1-20 10:57am K&G Striping have completed the stripping on Lowenstein. 7-7-20 8:05am ESS has cut out the road at Black Twig and Lowenstein to pour the trench drain that runs North and South. 10:13am ESS have poured the concrete trench drain going across Black Twig. CFS is on site for a cylinder.
Pavement-Curb Construction Passed 07/09/2020
Misc
Informational
06/23/2020
11-6-19 They have cut the grade for the curb pour on 11-7-19.
Misc
Informational
06/23/2020
11-7-19 8:14am The base rock temp is between 19 and 21 degrees at this time . I spoke with the Forman for Freeman Concrete and told him we need to reach 33 degrees and rising before they can pour curb. He said he understands. They are on hold for now.9:28am They have called off the pour.
Misc
Informational
06/23/2020
11-14-19 8:26 am. They have started pouring curb. The inspector for Cook, Flatt, & Strobel is starting tests at approximately 9:14am. He said he was not informed that they were pouring. The temp for the mix is 64 degrees. The slump for the mix is 2 on the ticket. 4:46pm The major of the curb is poured they are working on the curb at the park.
Misc
Informational
06/23/2020
11-15-19 11:16am ESS are setting up hand pours for the curb.
Misc
Informational
06/23/2020
11-16-19 9:52am Freeman concrete have poured the hand work at the park. They are smoothing out the back side of all the curb poured and will be curing. They do not need to cover with blankets. The temps are going to be above freezing. I spoke with ESS about pulling up blankets, they assume all risk before the 3500 break should the temp drop below freezing.
Misc
Informational
06/23/2020
11-18-19 They are pulling off blankets and are confident that the temp won’t go below 32 degrees before the 3500 break.
Misc
Informational
06/23/2020
11-20-19 2:41pm Bob Burns and I walked the intire curb line and marked all damaged curb.
Misc
Informational
06/23/2020
12-3-19 Steve Robbins and I walked the curb line on Lowenstein and the park parking lot. We marked everything that must be removed and marked 37 panels that are in question.
Misc
Informational
06/23/2020
12-4-19 12:48pm Bob Burns and Steve Robbins and I are walking the site to check curb again to determine what curb can be saved if any. 1:45pm After looking at it again we have determined that Mike Anderson needs to see the curb in person to evaluate.
Misc
Informational
06/23/2020
12-30-19 10:56am Bob Burns, Dan Harper and I walked the complete curb line and marked what has to be replaced. Approximately 52 sections.
Misc
Informational
06/23/2020
1-6-2020 3:55pm They are forming up for curb replacement along Lowenstein. They will be pouring on 1-7-2020.
Misc
Informational
06/23/2020
1-7-2020 9:40am Sapp has started pouring curb on Lowenstein Dr. CFS is on site for testing. 2:52pm They will be covering with blankets due to temps.
Misc
Informational
06/23/2020
1-8-20 10:48am They are pouring the island curb and the curb on the south side of the road. 2:13pm They have pour approximately 11 yards of concrete today.
Misc
Informational
06/23/2020
1-9-20 They have all of the curb replacement done and are covering with blankets.
Misc
Informational
06/23/2020
2-17-20 11:02am They have placed rock in the island’s along Lowenstein and are compacting it.
Misc
Informational
06/23/2020
3-6-20 All of the curb is poured on the south side of B road coming of Lowenstein. Steve Robbins was the inspector. 5-6-20 8:48am ESS are getting ready to pour the curb on the south side of Black Twig. They will be setting up driveways for the residents. CFS will be doing the testing. Concrete is set for 9am. They have poured out the curb on Black Twig and are setting up throats for storm inlets. One citizen is not happy with there drive opening at 713 Black Twig. ESS MP will be talking with the developer. There was a complaint that a concrete truck was washing out close to a storm inlet. I spoke with the paving superintendent and he assured me that he would make sure that all trucks would have a proper wash out area. 5-7-20 They are pouring the wedge next to the curb along with throats. Pennys concrete is who ESS is using. Rain has moved in so they are done for the day. 5-8-20 They poured driveway approaches today along Black Twig. All concrete trucks had a wash out pit at the west end of Black Twig. 6-19-20 9:24am ESS put the pour for curb on hold due to weather. They are digging around inlets and prepping for the pour. ESS will start pouring curb at 11am. 6-22-20 8:14am ESS is waiting to see what the weather is going to do before they pour curb.
Misc
Informational
06/23/2020
Concrete arrived at 8:15 am to pour curbs at the newly constructed entrance of the parkiing lot on NW Lowenstein RD .
Sidewalk Inspection Passed 7/7/2020 07/09/2020
Misc
Informational
07/02/2020
12-6-19 11:16am They have poured the sidewalk on the north east side of Lowenstein and now have started pouring the sidewalk on the south side of Lowenstein. They have been using plenty of cure up to this point.
Misc
Informational
07/02/2020
12-11-19 2:49pm They are pouring the sidewalk on Lowenstein in front of the park.
Misc
Informational
07/02/2020
12-12-19 2:53pm They have set forms along the east side of Lowenstein. They are planning on pouring Friday the 13th.
Misc
Informational
07/02/2020
1-6-2020 3:44pm They are pouring the ADA tie-ins along Lowenstein. They have been informed to cover completely and evenly with cure before covering with blankets. 6-3-20 1:24pm ESS are pouring the sidewalk on the south side of Black Twig. They are working there way down from Lowenstein to Chipman. 6-4-20 8:59AM They are setting up more sidewalk and will be pouring at 10am. They have poured all of the walk down to Chipma Rd.
Misc
Informational
07/02/2020
6-25-20 Contractor poured concrete commercial use sidewalk 10’ wide approximately 230’ in distance . Sidewalks location is along Pryor RD and Lowenstein RD. 6-24-20 Contractor poured concrete for sidewalks 5’ in width and approximately 310’ in distance, location on Pryor RD and just S of I-470 . 6-30-20 ESS are setting up the sidewalk on the southwest corner of Lowenstein and Black Twig. 1:41pm They have the string line set but no forms at this time. 7-1-20 8:47am ESS have poured the walking path on 6-30-20. Due to rain they will not be working today. 7-2-20 ESS have the south side of Black Twig set up and are working on setting forms for the North side of Black Twig. They will be pouring later today. 7-6-20 7:49am The sidewalk on the NW and SW side of Black Twig are poured. Bob Burns is meeting me on site to check the sidewalk for ADA compliants.
Site Visit Partial 07/10/2020
Misc
Informational
03/19/2020
There is no activity on site at this time.
Misc
Informational
03/19/2020
3-19-20 There is no work on site today due to weather. Heavy rain has set in. I have spoke with Codi and we are meeting Friday 3-20-20 to go over adding more erosion controls. 7-10-20 They are cleaning the roads so they can open them later today.
Sidewalk Inspection Partial 8/11/2020 8/11/2020 08/11/2020
Misc
Informational
08/11/2020
8-11-20 8:10am ESS are on site setting up the sidewalk on the west side of Pryor between private road C and private road A.
Site Visit Partial 08/13/2020
Misc
Informational
07/10/2020
There is no activity on site at this time.
Misc
Informational
07/10/2020
3-19-20 There is no work on site today due to weather. Heavy rain has set in. I have spoke with Codi and we are meeting Friday 3-20-20 to go over adding more erosion controls. 7-10-20 They are cleaning the roads so they can open them later today. 8-13-20 10:19am I met Bob Burns on site to discuss Miller Pipe Line and when they will replace the sidewalk on the SW corner of Blacktwig.
Sidewalk Inspection Partial 08/20/2020
Misc
Informational
08/11/2020
8-11-20 8:10am ESS are on site setting up the sidewalk on the west side of Pryor between private road C and private road A.
Misc
Informational
08/20/2020
8-20-20 They have set up the ADA at the SW corner of Lowenstein and Black Twig.
Sidewalk Inspection Passed 09/04/2020
Misc
Informational
08/20/2020
8-11-20 8:10am ESS are on site setting up the sidewalk on the west side of Pryor between private road C and private road A.
Misc
Informational
08/20/2020
8-20-20 They have set up the ADA at the SW corner of Lowenstein and Black Twig.
Curb - Proof Roll Passed 09/04/2020
Misc
Informational
06/18/2020
11-5-19 We started the proof roll at 9:16am on Lowenstein. All of the curb line passed with corrections needed in a few spots and at all radiuses. The park curb line passed on the east side. We have not proof rolled the west side of the park.
Misc
Informational
06/18/2020
11-9-19 1:55pm The curb proof roll at the intersection of Pryor and Lowenstein has passed, pending more dry time. The curb line on the west side of the park failed. 6-18-20 9:03am The proof roll for Lowenstein and Black Twig has passed. There is a chance of rain for the over night. I explained to the superintendent that it will be subject to a second proof roll if it does infact rain.
Grading/Excavation/Fill Inspection Passed 09/04/2020
Misc
Informational
06/17/2020
11-5-19 They have cut out and are digging and placing base rock in for the turn lane at Pryor and Lowenstein. It should be ready for a proof roll on 11-7-19.
Misc
Informational
06/17/2020
4-9-20 3:23pm They are hauling out dirt cutting to grade at Lowenstein and Black Twig.
Misc
Informational
06/17/2020
4-16-20 ESS has cut out the south side of Black Twig to set up for curb and walk. 1:30pm ESS are installing Geo Grid and laying base rock. 6-17-20 ESS has the graid cut and geo-grid down and are placing base rock. They will be l;poking for a proof roll on 6-18-20.
Water Line - Construction Inspection Passed 09/04/2020
Misc
Informational
05/14/2020
4-14-20 9:17 am They have installed 40 foot of water line on the west side of Lowenstein. They have plenty of rock and tracer wire. 5-13-20 ESS is preparing to to tie-in the water line on Black Twig. The water line has been tied in and water is back in service.
Misc
Informational
05/14/2020
4-1-20 10:12am They are removing the road and debris so they can install waterline. They are still working on digging everything out. No waterline has been installed. They will be pouring straddle blocks to support the existing waterline for valves.
Storm - Pipe Passed 09/04/2020
Misc
Informational
04/09/2020
3-31-20 12:44PM Rudy is working on storm pipe at Black Twig and Lowenstein. They have installed 24’ of storm pipe at this time.
Misc
Informational
04/09/2020
4-2-20 10:04am They installed two sticks on 4-1-20. They are digging out to install storm box H-2. 12:53pm They have H2 box set and 3 sticks installed.
Misc
Informational
04/09/2020
4-3-20 8:07am
Misc
Informational
04/09/2020
4-3-20 8:07am They have just set storm box H2 and are starting to tie it in.
Misc
Informational
04/09/2020
4-7-20 7:44am They are digging out on the south side of Black Twig and laying out storm pipe.
Misc
Informational
04/09/2020
4-7-20 2:19pm They have installed 35’ across the road to G2. They are coming out from G2 and will have approximately 60’ to G 3 box. They will pour collars at 3:30pm today.
Misc
Informational
04/09/2020
4-8-20 11:06am They are working at the corner of Black Twig and Chipman. All of the storm pipe is installed approximately 53’ 15” 60’ of 18”. All concrete is poured.
Misc
Informational
04/09/2020
4-9-20 8:28am They are getting ready to run storm pipe across Lowenstein on the north side of black Twig.
Misc
Informational
04/09/2020
4-9-20 8:28am They are getting ready to run storm pipe across Lowenstein on the north side of black Twig.
Misc
Informational
04/09/2020
4-9-20 8:28am They are getting ready to run storm pipe across Lowenstein on the north side of black Twig.
Misc
Informational
04/09/2020
4-9-20 8:28am They are getting ready to run storm pipe across Lowenstein on the north side of black Twig. 1:54pm Rudy’s crew have installed the storm across Lowenstein and will be pouring collars later.
Erosion Control Inspection Partial 09/04/2020
Misc
Informational
03/20/2020
I walked the site with the superintendent Codi and we went over all erosion controls that are in place and that need to be in place. He is going to work on getting everything in place.
Pavement-Proof Roll Passed 09/04/2020
Misc
Informational
11/19/2019
11-19-19 12 noon We proof rolled Lowenstein and it passed. We proof rolled the park and it had some areas that failed. The parking lot will need some corrections.
Storm - Material Verification Passed 09/04/2020
Install Street and Stop Signs Passed 09/04/2020
Storm - Swales Passed 09/04/2020
Storm - Outlet Structure Passed 10/18/2019 09/04/2020
Storm - Inlets Clean Passed 09/04/2020
Curb - Compression Strength Passed 09/04/2020
Install Street and Stop Signs Passed 09/04/2020
Street - Wedge Lift Partial 09/08/2020
Misc
Informational
11/21/2019
11-21-19 9:38am They have swept and dried the base from last nights rain and will start laying the second lift at 10am.
Misc
Informational
11/21/2019
11-21-19 9:38am They have swept and dried the base from last nights rain and will start laying the second lift at 10am. 12:40pm They have completed the second lift on the north side and they are now starting at Pryor a laying the south side. Temps out of the truck are averaging 260 degrees, 300 at the machine. Out side air temp is compliant as well as the surface temp. 3:00pm They have completed the second lift of asphalt and are now moving to the parking lot for the park.
Documents & Images
Date Uploaded File Type Document Name
08/26/2019 Receipt Receipt for transaction: 2019-005814
09/03/2019 Letter DE-Permit
09/04/2019 streets of west pryor reports
09/04/2019 swp permit 20192377
10/15/2019 testing report
10/15/2019 testing report
10/15/2019 testing report
10/15/2019 testing report
10/15/2019 19-1066-dr-81
10/15/2019 B3 collar
10/15/2019 B4 box and collar
10/18/2019 Letter DE-Daily Inspection Summary
11/05/2019 Letter INSPECTION SUMMARY
11/05/2019 Letter INSPECTION SUMMARY
11/05/2019 Letter INSPECTION SUMMARY
11/05/2019 Letter INSPECTION SUMMARY
11/05/2019 Letter INSPECTION SUMMARY
11/07/2019 Letter INSPECTION SUMMARY
11/14/2019 Curb evaporation retardant
11/14/2019 Curb on Lowenstein
11/14/2019 Concrete ticket for curb on Lowenstein
11/19/2019 Proof roll ticket
12/11/2019 park sidewalk
01/15/2020 PW Traffic Permit184
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/06/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter DE-Daily Inspection Summary
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/19/2020 image
03/19/2020 Water run off
03/19/2020 Letter INSPECTION SUMMARY
03/20/2020 Letter INSPECTION SUMMARY
03/26/2020 Copy of he asphalt ticket
03/26/2020 Lowenstein surface going down
03/26/2020 Lowenstein asphalt
03/26/2020 Letter INSPECTION SUMMARY
03/27/2020 Letter INSPECTION SUMMARY
03/30/2020 Letter INSPECTION SUMMARY
04/01/2020 Letter INSPECTION SUMMARY
04/01/2020 Letter INSPECTION SUMMARY
04/02/2020 H2 storm box and pipe
04/02/2020 Letter INSPECTION SUMMARY
04/03/2020 H3
04/07/2020 Letter INSPECTION SUMMARY
04/08/2020 Letter INSPECTION SUMMARY
04/09/2020 Storm pipe going across Lowenstein
04/09/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/14/2020 Waterline west side of Lowenstein at the Park
04/16/2020 Letter INSPECTION SUMMARY
04/16/2020 Letter INSPECTION SUMMARY
05/06/2020 Curb on Black Twig
05/06/2020 BLack Twig curb
05/06/2020 Curb tickets
05/06/2020 Letter INSPECTION SUMMARY
05/07/2020 Letter INSPECTION SUMMARY
05/08/2020 Letter INSPECTION SUMMARY
05/14/2020 Letter INSPECTION SUMMARY
06/03/2020 Letter INSPECTION SUMMARY
06/04/2020 Letter INSPECTION SUMMARY
06/17/2020 Letter INSPECTION SUMMARY
06/18/2020 Letter INSPECTION SUMMARY
06/19/2020 Letter INSPECTION SUMMARY
06/22/2020 Letter INSPECTION SUMMARY
06/22/2020 Letter INSPECTION SUMMARY
06/22/2020 Letter INSPECTION SUMMARY
06/22/2020 Letter INSPECTION SUMMARY
06/22/2020 Letter INSPECTION SUMMARY
06/22/2020 Letter INSPECTION SUMMARY
06/23/2020 Letter INSPECTION SUMMARY
06/23/2020 Letter INSPECTION SUMMARY
06/24/2020 image final Ticket Driveway approach .jpg
06/24/2020 Letter INSPECTION SUMMARY
06/25/2020 Letter INSPECTION SUMMARY
06/25/2020 Letter INSPECTION SUMMARY
06/25/2020 Letter INSPECTION SUMMARY
06/26/2020 Letter INSPECTION SUMMARY
06/26/2020 Letter INSPECTION SUMMARY
06/29/2020 Black Twig ticket .jpg
06/29/2020 Asphalt On Black Twig.jpg
06/29/2020 Letter INSPECTION SUMMARY
06/30/2020 Letter INSPECTION SUMMARY
06/30/2020 Letter INSPECTION SUMMARY
07/01/2020 Letter INSPECTION SUMMARY
07/01/2020 Letter INSPECTION SUMMARY
07/02/2020 Letter INSPECTION SUMMARY
07/07/2020 Letter INSPECTION SUMMARY
07/09/2020 Letter INSPECTION SUMMARY
07/09/2020 Letter INSPECTION SUMMARY
07/09/2020 Letter INSPECTION SUMMARY
07/10/2020 Letter INSPECTION SUMMARY
08/11/2020 Letter INSPECTION SUMMARY
08/13/2020 as-builts on plans
08/13/2020 Letter INSPECTION SUMMARY
08/20/2020 Letter INSPECTION SUMMARY
09/08/2020 Letter DE-Certificate of Substantial Completion Multiple Lot
09/08/2020 Letter DE-Punch List
03/01/2024 Final Affidavit - SOWP Public Street and Storm (Lowenstein Black Twig 2.29.24
03/01/2024 Letter DE-Certificate of Final Acceptance (Commercial)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.