Permit Application Status

PRSITE20241951


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSITE20241951
Development - Site
Issued
PARAGON STAR LLC
DEVELOPMENT COMPLETE
PARAGON STAR - PRIVATE SITE DEVELOPMENT ASSOCIATE WITH COMMERCIAL DEVELOPMENT
04/19/2024
04/22/2024
Locations
Contacts
PARAGON STAR LLC, Address:4025 NE LAKEWOOD WAY, Unit 250, Phone:(816) 207-4500  
PARAGON STAR LLC, Address:4025 NE LAKEWOOD WAY, Unit 250, Phone:(816) 207-4500  
EPIC CONCRETE CONSTRUCTION, Address:12600 E 98TH ST, Phone:(816) 861-3300  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
None $0.00 $0.00 $0.00
Outstanding Fees Amount Paid Owing Date Paid
9110079-After Hours Inspection (Building Codes)(Per Hour) $50.00 $0.00 $50.00 Not Paid


$50.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Pavement-Proof Roll Pending
Pavement-Surface Pending
Install Street and Stop Signs Pending
Pavement-Aggregate Base Pending
Pavement-Curb Construction Pending
Pavement-Stabilized Subgrade Pending
Sidewalk Inspection Pending
Install Street and Stop Signs Pending
Pavement-Aggregate Base Pending
Pavement-Curb Construction Pending
Pavement-Stabilized Subgrade Pending
Sidewalk Inspection Pending
Sewer Service Inspection Pending
Misc
Partial Correction
06/17/2024
06/03/24 Monday JMJ (Pro Design- Kurt) Last week contractor installed grease trap and connected lateral approximately 96 feet of inch pipe and 56 feet of 4 inch. Contractor has two crews working today. 06/04/24 Tuesday JMJ (Pro Design-Kurt) Kurt crew - installed 119' of 6" SDR-26 , and 40' of 4" SDR-26 plus the install of 2nd grease trap. Blake crew installed 3rd grease trap for future building built as-per project plans 36' of 6", 17' of 4" SDR-26 and black ABS pipe 25' of 4" and 8' of 2". 06/07/24 Friday JMJ (Pro Design-Kurt) Blake crew- installed the 4th grease trap 06/06/04 Thursday but second for the future building. 06/11/24 Tuesday JMJ (Pro Design-Blake's Crew) Contractor installed grease trap on the Northeast 06/10/24 Monday. 60' of 6" SDR-26 Sanitary pipe was installed along with 2/45 deg bends and 4"x6"wye@ grease pit 06/11/24 Tuesday. 06/12/24 Wednesday JMJ (Pro Design- Blake's Crew) Contractor installed concrete collars on grease trap that was installed yesterday and backfilled excavation. Contractor is preparing for pressure testing of vaults. 06/13/24 Thursday JMJ (Pro Design-Blake Crew) Contractor tested 4 of the 5 grease trap passed. 2 the South of the building passed and 2 to the North passed the third one will be tested on 06/16/24 Monday. 06/17/24 Monday JMJ (Pro Design-Blake's Crew) Contractor tested finally completed the vacuum test of the last grease trap 5.
Storm Sewer Construction Inspection Pending
Misc
Informational
08/16/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801. 07/02/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 30' of 18" RCP and storm box 3402. Contractor installed lids on storm boxes that were set last week. 07/09/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 4802 and 40' of RCP 07/08/24 Monday. Contractor installed HDPE and inlet storm box 4803. Contractor continued installation of HDPE storm pipe. 07/10/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 60' of 24" HDPE yesterday 07/09/24. Contractor installed approximately 40' of 24" HDPE today. Contractor began to excavate from inlet storm box 4804 with 24" RCP. 07/11/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 24" RCP to junction box 4805. Contractor installed approximately 146' of 24" HDPE inlet storm box 4806. 07/15/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 70' of 24" HDPE storm inlet 5603. 07/17/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 108' of 24" HDPE storm inlets 5604, & 420. 20' of 15" HDPE and poured collars. 07/22/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 56' of 24" RCP, storm inlet 5605, and 4 inverts on 07/19/24 Friday. Contractor installed 110' of 24" RCP and storm inlet 4901. 07/23/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed the 4", 6", & 8" roof drains as per project plans. Contractor installed drains on the Southside of building. 07/24/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor also installed 4 nyloplast drains yesterday as-per project plans. Today contractor installed 2 nyloplast drains, 1 roof drain, 7 poured inverts. 07/25/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install roof drains. 1 roof drain and excavation was backfilled. 07/29/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the installation of storm lines. 07/30/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed storm box (5201 with 32' of 36" RCP ) & (5202 32' of 30"RCP) yesterday and today. 07/31/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the install of storm lines, collars and inverts were poured. 08/01/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the installation of the storm line as-per project plans Southwest side. 08/05/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's) Storm line was installed 5301 storm box 24" of HDPE 96' & 5302 storm box 18" HDPE 177'. 08/07/24 Wednesday JMJ (Pro-Design) 18" RCP was installed from 5202 to 5203 on 08/06/24 Tuesday a-per project plan.(Sub-Contractor Pro-Design Kurt's) Today contractor installed approximately 64' of 18" RCP from 5203 storm structure. 08/09/24 Friday JMJ (Sub-Contractor Pro-Design Kurt's) Contractor installed 19' of 24" RCP and structure 5504, and 24' of 24" HDPE storm pipe out of 5504. 08/14/24 Wednesday JMJ (Pro-Design) Contractor poured inverts and collars for storm pipes previously set. Contractor returned to the East side of project and install approximate 108' of 18" RCP going Southbound. Contractor began the install of one storm structure. 08/15/24 Thursday JMJ (Pro-Design) Monday 08/12/24 contractor laid 260' of 24" from 5204 to 5205. Collars and inverts on 5204, 5205, & 5206. 20' of 24" HDPE out of 5205 and 98' of 18" RCP from 5205 to 5206 as per project plans. Contractor spent most of today stacking storm structure and pouring collars and invert for structures. 08/16/24 Friday JMJ (Pro-Design) Yesterday Storm Junction box 5203 two curb inlet. 4601 laid 73' of 18" RCP from junction box 5203 to curb inlet 4601 set 4601. Poured collars on 4601 and 5203 inverts in 4601 and 5204. Stacked out curb at 5205. 5206, 5203 set lids on 4601, 5205,5206,5302. Today Storm box 4501 was set 60' of 30" HDPE storm pipe going East and 90' of 30" HDPE going South. Contractor plans to set storm box 4502.
Grading/Excavation/Fill Inspection Pending
Misc
Informational
08/20/2024
08/20/24 Tuesday JMJ (Design Pro) Contractor graded site.
Water Line - Construction Inspection Pending
Misc
Informational
08/23/2024
07/09/24 Tuesday JMJ (Rodriguez Construction) Contractor began to install 12" Serta Lock water pipe. The vendor delivered the wrong bolts to site so, the contractor set up for today. 07/10/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 260' of 12" serta lock water pipe as per project plans. 07/11/24 Thursday JMJ (Rodriguez Construction) Contractor installed approximately 140' of 12" serta lock water pipe and tee for the hydrant. 07/15/24 Monday JMJ (Rodriguez Construction) Contractor installed Fire hydrant and bends approximately 60' on Friday 07/12/24. Contractor installed approximately 100' today 12" serta lock water pipe. 07/17/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 200' of 12" serta lock water main, 12"X6" Tee, and 38' of 6" water pipe, and hydrant assembly. Contactor poured the backing blocks for bends, & tees. 07/23/24 Tuesday JMJ (Rodriguez Construction) Contractor has been working at the South of project on water main staring yesterday. Tie-in to exist 12" that was installed during the first phase of project. 12" Valves and bends. 07/24/24 Wednesday JMJ (Rodriguez Construction Wendell's crew) On Monday 07/22/24 contractor was able to installed approximately 100' of 12" serta lock water pipe. Today contractor installed 100' running along the Eastside of building and pass heading South toward the pipe that was instated Monday. Two hydrants, 22.5 & 11.25 bend were installed. Contractor began the installation of the backflow vault. Form and material will be done so vault floor can be poured. 07/25/24 Thursday JMJ (Rodriguez Construction Wendell's crew) Contractor poured backing block behind bends and hydrant tees. The floor of the backflow vault was poured. Contractor continues to install 12" serta lock water main as-per project plans. 07/26/24 Friday JMJ (Rodriguez Construction Wendell's crew) Contractor installed approximately 160' of 12" serta lock water main. 07/30/24 Tuesday JMJ (Rodriguez Construction Wendell's crew) Contractor continued to water main 12" serta lock. 07/31/24 Wednesday JMJ (Rodriguez Construction Wendell's crew) Contractor installed valves for backflow vault yesterday and poured collars for vault today. Contractor started the install of hydrant as-per project plans. Contractor also poured some backing blocks on for bends and tees on 12" serta lock water main. 08/01/24 Thursday JMJ (Rodriguez Construction Wendell's crew) Contractor continued the pour the backing block for the newly installed hydrant. 08/07/24 Wednesday JMJ (Rodriguez Construction Wendell's crew) Contractor has set backflow vault installed, backflow assembly, and poured the vault floor. 08/09/24 Friday JMJ (Rodriguez Construction Wendell's crew) Water line 12" serta lock water main was completed project.
Misc
Informational
08/23/2024
08/23/24 Friday JMJ (Pro-Design Corey's Crew) Contractor installed approximately 45' of 8" water to the building coming from a shut 8" valve. Contractor installed approximately 30' of 4" coming of a 6" shut valve, 6"X4" reducer down to 4". The 4" water main has straddle block and 4"X2" reducer for approximately 15' of 2" copper line.
Fire Line - Hydrostatic Test Pending
Misc
Informational
08/29/2024
08/29/31 Thursday JMJ (Rodriguez Const.) Fire / Domestic waterline pass hydrostatic Test @200psi for 2hours.
Site Visit Pending
Misc
Informational
02/07/2025
7-1-24 Dustin A, No work being done 10-22-24 Dustin A , no activity outside of building 02/07/25 Friday JMJ No related work throughout the week.
Erosion Control Inspection Pending
Misc
Informational
02/10/2025
08/16/24 Friday JMJ Erosion Sediment Control (ESC) Inspection appear to be functioning properly.
Misc
Informational
02/10/2025
12/03/24 Tuesday JMJ (Epic) Kara Starlin met with contractor and review erosion sediment control onsite. Key areas of possible soil erosion infiltration into storm system. Contractor has list of items from wrapping storm inlets with fencing relocating equipment that may pose a contamination threat.
Misc
Informational
02/10/2025
1/31/25 Friday JMJ Erosion control throughout the project needs to be adjusted to ensure it is properly functioning. 02/07/25 Friday JMJ Erosion control throughout the project needs to be adjusted to ensure it is properly functioning.
Sewer Service Inspection Partial 6/3/2024 6/3/2024 06/03/2024
Misc
Partial Correction
06/03/2024
06/03/24 Monday JMJ (Pro Design- Kurt) Last week contractor installed grease trap and connected lateral approximately 96 feet of inch pipe and 56 feet of 4 inch. Contractor has two crews working today. First crew installed130' feet of 6 inch SDR-26 and the second crew 50' feet of 6 inch SDR-26. Contractor began to install the second grease trap on the East end of the building.
Sewer Service Inspection Partial 6/3/2024 6/3/2024 06/04/2024
Misc
Partial Correction
06/03/2024
06/03/24 Monday JMJ (Pro Design- Kurt) Last week contractor installed grease trap and connected lateral approximately 96 feet of inch pipe and 56 feet of 4 inch. Contractor has two crews working today. 06/04/24 Tuesday JMJ (Pro Design-Kurt) Kurt crew - installed 119' of 6" SDR-26 , and 40' of 4" SDR-26 plus the install of 2nd grease trap. Blake crew installed 3rd grease trap for future building built as-per project plans 36' of 6", 17' of 4" SDR-26 and black ABS pipe 25' of 4" and 8' of 2".
Sewer Service Inspection Partial 06/04/2024
Misc
Partial Correction
06/04/2024
06/03/24 Monday JMJ (Pro Design- Kurt) Last week contractor installed grease trap and connected lateral approximately 96 feet of inch pipe and 56 feet of 4 inch. Contractor has two crews working today. 06/04/24 Tuesday JMJ (Pro Design-Kurt) Kurt crew - installed 119' of 6" SDR-26 , and 40' of 4" SDR-26 plus the install of 2nd grease trap. Blake crew installed 3rd grease trap for future building built as-per project plans 36' of 6", 17' of 4" SDR-26 and black ABS pipe 25' of 4" and 8' of 2".
Sewer Service Inspection Partial 6/7/2024 6/7/2024 06/07/2024
Misc
Partial Correction
06/04/2024
06/03/24 Monday JMJ (Pro Design- Kurt) Last week contractor installed grease trap and connected lateral approximately 96 feet of inch pipe and 56 feet of 4 inch. Contractor has two crews working today. 06/04/24 Tuesday JMJ (Pro Design-Kurt) Kurt crew - installed 119' of 6" SDR-26 , and 40' of 4" SDR-26 plus the install of 2nd grease trap. Blake crew installed 3rd grease trap for future building built as-per project plans 36' of 6", 17' of 4" SDR-26 and black ABS pipe 25' of 4" and 8' of 2". 06/07/24 Friday JMJ (Pro Design-Kurt) Blake crew- installed the 4th grease trap 06/06/04 Thursday but second for the future building.
Storm Sewer Construction Inspection Partial 6/7/2024 6/7/2024 06/07/2024
Misc
Informational
06/07/2024
06/07/24 Friday JMJ Sub-Contractor Pro-Design Keith crew Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall.
Sewer Service Inspection Partial 6/10/2024 06/11/2024
Misc
Partial Correction
06/07/2024
06/03/24 Monday JMJ (Pro Design- Kurt) Last week contractor installed grease trap and connected lateral approximately 96 feet of inch pipe and 56 feet of 4 inch. Contractor has two crews working today. 06/04/24 Tuesday JMJ (Pro Design-Kurt) Kurt crew - installed 119' of 6" SDR-26 , and 40' of 4" SDR-26 plus the install of 2nd grease trap. Blake crew installed 3rd grease trap for future building built as-per project plans 36' of 6", 17' of 4" SDR-26 and black ABS pipe 25' of 4" and 8' of 2". 06/07/24 Friday JMJ (Pro Design-Kurt) Blake crew- installed the 4th grease trap 06/06/04 Thursday but second for the future building. 06/11/24 Tuesday JMJ (Pro Design-Blake Crew ) Contractor installed grease trap on the Northeast 06/10/24 Monday. 60' of 6" SDR-26 Sanitary pipe was installed along with 2/45 deg bends and 4"x6"wye@ grease pit 06/11/24 Tuesday.
Storm Sewer Construction Inspection Partial 6/11/2024 6/11/2024 06/11/2024
Misc
Informational
06/11/2024
06/11/24 Tuesday JMJ (Pro-Design Kurt Crew) Contractor installed approximately 60' of 36" RCP on 06/10/24 Monday. Contractor is pushing to set the base of curb inlet 5601. Depth of installation has slowed progress.
Sewer Service Inspection Partial 6/12/2024 6/12/2024 06/12/2024
Misc
Partial Correction
06/11/2024
06/03/24 Monday JMJ (Pro Design- Kurt) Last week contractor installed grease trap and connected lateral approximately 96 feet of inch pipe and 56 feet of 4 inch. Contractor has two crews working today. 06/04/24 Tuesday JMJ (Pro Design-Kurt) Kurt crew - installed 119' of 6" SDR-26 , and 40' of 4" SDR-26 plus the install of 2nd grease trap. Blake crew installed 3rd grease trap for future building built as-per project plans 36' of 6", 17' of 4" SDR-26 and black ABS pipe 25' of 4" and 8' of 2". 06/07/24 Friday JMJ (Pro Design-Kurt) Blake crew- installed the 4th grease trap 06/06/04 Thursday but second for the future building. 06/11/24 Tuesday JMJ (Pro Design-Blake Crew) Contractor installed grease trap on the Northeast 06/10/24 Monday. 60' of 6" SDR-26 Sanitary pipe was installed along with 2/45 deg bends and 4"x6"wye@ grease pit 06/11/24 Tuesday. 06/12/24 Wednesday JMJ (Pro Design- Blake Crew) Contractor installed concrete collars on grease trap that was installed yesterday and backfilled excavation. Contractor is preparing for pressure testing of vaults.
Storm Sewer Construction Inspection Partial 6/12/2024 6/12/2024 06/12/2024
Misc
Informational
06/11/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe.
Sewer Service Inspection Partial 6/13/2024 6/13/2024 06/13/2024
Misc
Partial Correction
06/12/2024
06/03/24 Monday JMJ (Pro Design- Kurt) Last week contractor installed grease trap and connected lateral approximately 96 feet of inch pipe and 56 feet of 4 inch. Contractor has two crews working today. 06/04/24 Tuesday JMJ (Pro Design-Kurt) Kurt crew - installed 119' of 6" SDR-26 , and 40' of 4" SDR-26 plus the install of 2nd grease trap. Blake crew installed 3rd grease trap for future building built as-per project plans 36' of 6", 17' of 4" SDR-26 and black ABS pipe 25' of 4" and 8' of 2". 06/07/24 Friday JMJ (Pro Design-Kurt) Blake crew- installed the 4th grease trap 06/06/04 Thursday but second for the future building. 06/11/24 Tuesday JMJ (Pro Design-Blake Crew) Contractor installed grease trap on the Northeast 06/10/24 Monday. 60' of 6" SDR-26 Sanitary pipe was installed along with 2/45 deg bends and 4"x6"wye@ grease pit 06/11/24 Tuesday. 06/12/24 Wednesday JMJ (Pro Design- Blake Crew) Contractor installed concrete collars on grease trap that was installed yesterday and backfilled excavation. Contractor is preparing for pressure testing of vaults. 06/13/24 Thursday JMJ (Pro Design-Blake Crew) Contractor tested 4 of the 5 grease trap passed. 2 the South of the building passed and 2 to the North passed the third one will be tested on 06/16/24 Monday.
Storm Sewer Construction Inspection Partial 6/13/2024 6/13/2024 06/13/2024
Misc
Informational
06/12/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). Contractor installed approximately 140' of 18" RCP storm pipe.
Sewer Service Inspection Partial 6/17/2024 6/17/2024 06/17/2024
Misc
Partial Correction
06/13/2024
06/03/24 Monday JMJ (Pro Design- Kurt) Last week contractor installed grease trap and connected lateral approximately 96 feet of inch pipe and 56 feet of 4 inch. Contractor has two crews working today. 06/04/24 Tuesday JMJ (Pro Design-Kurt) Kurt crew - installed 119' of 6" SDR-26 , and 40' of 4" SDR-26 plus the install of 2nd grease trap. Blake crew installed 3rd grease trap for future building built as-per project plans 36' of 6", 17' of 4" SDR-26 and black ABS pipe 25' of 4" and 8' of 2". 06/07/24 Friday JMJ (Pro Design-Kurt) Blake crew- installed the 4th grease trap 06/06/04 Thursday but second for the future building. 06/11/24 Tuesday JMJ (Pro Design-Blake's Crew) Contractor installed grease trap on the Northeast 06/10/24 Monday. 60' of 6" SDR-26 Sanitary pipe was installed along with 2/45 deg bends and 4"x6"wye@ grease pit 06/11/24 Tuesday. 06/12/24 Wednesday JMJ (Pro Design- Blake's Crew) Contractor installed concrete collars on grease trap that was installed yesterday and backfilled excavation. Contractor is preparing for pressure testing of vaults. 06/13/24 Thursday JMJ (Pro Design-Blake Crew) Contractor tested 4 of the 5 grease trap passed. 2 the South of the building passed and 2 to the North passed the third one will be tested on 06/16/24 Monday. 06/17/24 Monday JMJ (Pro Design-Blake's Crew) Contractor tested finally completed the vacuum test of the last grease trap 5.
Storm Sewer Construction Inspection Partial 6/17/2024 6/17/2024 06/17/2024
Misc
Informational
06/13/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303.
Storm Sewer Construction Inspection Partial 6/18/2024 6/18/2024 06/18/2024
Misc
Informational
06/17/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302.
Storm Sewer Construction Inspection Partial 6/19/2024 6/19/2024 06/19/2024
Misc
Informational
06/18/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ(Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501.
Storm Sewer Construction Inspection Partial 6/25/2024 6/25/2024 06/25/2024
Misc
Informational
06/19/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP.
Storm Sewer Construction Inspection Partial 6/26/2024 6/26/2024 06/26/2024
Misc
Informational
06/25/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP.
Storm Sewer Construction Inspection Partial 6/27/2024 6/27/2024 06/27/2024
Misc
Informational
06/26/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801.
Site Visit Partial 7/1/2024 7/1/2024 07/01/2024
Misc
Informational
07/01/2024
7-1-24 Dustin A, No work being done
Storm Sewer Construction Inspection Partial 7/2/2024 7/2/2024 07/02/2024
Misc
Informational
06/27/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801. 07/02/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 30' of 18" RCP and storm box 3402. Contractor installed lids on storm boxes that were set last week.
Storm Sewer Construction Inspection Partial 7/9/2024 7/9/2024 07/09/2024
Misc
Informational
07/02/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801. 07/02/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 30' of 18" RCP and storm box 3402. Contractor installed lids on storm boxes that were set last week. 07/09/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 4802 and 40' of RCP 07/08/24 Monday. Contractor installed HDPE and inlet storm box 4803. Contractor continued installation of HDPE storm pipe.
Water Line - Construction Inspection Partial 7/9/2024 7/9/2024 07/09/2024
Misc
Informational
07/09/2024
07/09/24 Tuesday JMJ (Rodriguez Construction) Contractor began to install 12" Serta Lock water pipe. The vendor delivered the wrong bolts to site so, the contractor set up for today.
Storm Sewer Construction Inspection Partial 7/10/2024 7/10/2024 07/10/2024
Misc
Informational
07/09/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801. 07/02/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 30' of 18" RCP and storm box 3402. Contractor installed lids on storm boxes that were set last week. 07/09/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 4802 and 40' of RCP 07/08/24 Monday. Contractor installed HDPE and inlet storm box 4803. Contractor continued installation of HDPE storm pipe. 07/10/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 60' of 24" HDPE yesterday 07/09/24.
Water Line - Construction Inspection Partial 7/10/2024 7/10/2024 07/10/2024
Misc
Informational
07/10/2024
07/10/24 Wednesday JMJ (Rodriguez Construction) Contractor began to install 12" (serta lock) water main.
Water Line - Construction Inspection Partial 7/10/2024 7/10/2024 07/10/2024
Misc
Informational
07/10/2024
07/09/24 Tuesday JMJ (Rodriguez Construction) Contractor began to install 12" Serta Lock water pipe. The vendor delivered the wrong bolts to site so, the contractor set up for today. 07/10/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 260' of 12" serta lock water pipe as per project plans.
Storm Sewer Construction Inspection Partial 7/10/2024 7/10/2024 07/10/2024
Misc
Informational
07/10/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801. 07/02/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 30' of 18" RCP and storm box 3402. Contractor installed lids on storm boxes that were set last week. 07/09/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 4802 and 40' of RCP 07/08/24 Monday. Contractor installed HDPE and inlet storm box 4803. Contractor continued installation of HDPE storm pipe. 07/10/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 60' of 24" HDPE yesterday 07/09/24. Contractor installed approximately 40' of 24"HDPE today. Contractor began to excavate from inlet storm box 4804 with 24" RCP.
Storm Sewer Construction Inspection Partial 7/11/2024 7/11/2024 07/11/2024
Misc
Informational
07/10/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801. 07/02/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 30' of 18" RCP and storm box 3402. Contractor installed lids on storm boxes that were set last week. 07/09/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 4802 and 40' of RCP 07/08/24 Monday. Contractor installed HDPE and inlet storm box 4803. Contractor continued installation of HDPE storm pipe. 07/10/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 60' of 24" HDPE yesterday 07/09/24. Contractor installed approximately 40' of 24" HDPE today. Contractor began to excavate from inlet storm box 4804 with 24" RCP. 07/11/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 24" RCP to junction box 4805. Contractor installed approximately 146' of 24" HDPE inlet storm box 4806.
Water Line - Construction Inspection Partial 7/11/2024 7/11/2024 07/11/2024
Misc
Informational
07/10/2024
07/09/24 Tuesday JMJ (Rodriguez Construction) Contractor began to install 12" Serta Lock water pipe. The vendor delivered the wrong bolts to site so, the contractor set up for today. 07/10/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 260' of 12" serta lock water pipe as per project plans. 07/11/24 Thursday JMJ (Rodriguez Construction) Contractor installed approximately 140' of 12" serta lock water pipe and tee for the hydrant.
Storm Sewer Construction Inspection Partial 7/15/2024 7/15/2024 07/15/2024
Misc
Informational
07/11/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801. 07/02/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 30' of 18" RCP and storm box 3402. Contractor installed lids on storm boxes that were set last week. 07/09/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 4802 and 40' of RCP 07/08/24 Monday. Contractor installed HDPE and inlet storm box 4803. Contractor continued installation of HDPE storm pipe. 07/10/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 60' of 24" HDPE yesterday 07/09/24. Contractor installed approximately 40' of 24" HDPE today. Contractor began to excavate from inlet storm box 4804 with 24" RCP. 07/11/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 24" RCP to junction box 4805. Contractor installed approximately 146' of 24" HDPE inlet storm box 4806. 07/15/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 70 of 24" HDPE storm inlet 5603.
Water Line - Construction Inspection Partial 7/15/2024 7/15/2024 07/15/2024
Misc
Informational
07/11/2024
07/09/24 Tuesday JMJ (Rodriguez Construction) Contractor began to install 12" Serta Lock water pipe. The vendor delivered the wrong bolts to site so, the contractor set up for today. 07/10/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 260' of 12" serta lock water pipe as per project plans. 07/11/24 Thursday JMJ (Rodriguez Construction) Contractor installed approximately 140' of 12" serta lock water pipe and tee for the hydrant. 07/15/24 Monday JMJ (Rodriguez Construction) Contractor installed Fire hydrant and bends approximately 60' on Friday 07/12/24. Contractor installed approximately 100' today 12" serta lock water pipe.
Storm Sewer Construction Inspection Partial 7/17/2024 7/17/2024 07/17/2024
Misc
Informational
07/15/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801. 07/02/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 30' of 18" RCP and storm box 3402. Contractor installed lids on storm boxes that were set last week. 07/09/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 4802 and 40' of RCP 07/08/24 Monday. Contractor installed HDPE and inlet storm box 4803. Contractor continued installation of HDPE storm pipe. 07/10/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 60' of 24" HDPE yesterday 07/09/24. Contractor installed approximately 40' of 24" HDPE today. Contractor began to excavate from inlet storm box 4804 with 24" RCP. 07/11/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 24" RCP to junction box 4805. Contractor installed approximately 146' of 24" HDPE inlet storm box 4806. 07/15/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 70' of 24" HDPE storm inlet 5603. 07/17/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 108' of 24" HDPE storm inlets 5604, & 420. 20' of 15" HDPE and poured collars.
Water Line - Construction Inspection Partial 7/17/2024 7/17/2024 07/17/2024
Misc
Informational
07/15/2024
07/09/24 Tuesday JMJ (Rodriguez Construction) Contractor began to install 12" Serta Lock water pipe. The vendor delivered the wrong bolts to site so, the contractor set up for today. 07/10/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 260' of 12" serta lock water pipe as per project plans. 07/11/24 Thursday JMJ (Rodriguez Construction) Contractor installed approximately 140' of 12" serta lock water pipe and tee for the hydrant. 07/15/24 Monday JMJ (Rodriguez Construction) Contractor installed Fire hydrant and bends approximately 60' on Friday 07/12/24. Contractor installed approximately 100' today 12" serta lock water pipe. 07/17/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 200' of 12" serta lock water main, 12"X6" Tee, and 38' of 6" water pipe, and hydrant assembly. Contactor poured the backing blocks for bends, & tees.
Storm Sewer Construction Inspection Partial 7/22/2024 7/22/2024 07/22/2024
Misc
Informational
07/17/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801. 07/02/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 30' of 18" RCP and storm box 3402. Contractor installed lids on storm boxes that were set last week. 07/09/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 4802 and 40' of RCP 07/08/24 Monday. Contractor installed HDPE and inlet storm box 4803. Contractor continued installation of HDPE storm pipe. 07/10/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 60' of 24" HDPE yesterday 07/09/24. Contractor installed approximately 40' of 24" HDPE today. Contractor began to excavate from inlet storm box 4804 with 24" RCP. 07/11/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 24" RCP to junction box 4805. Contractor installed approximately 146' of 24" HDPE inlet storm box 4806. 07/15/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 70' of 24" HDPE storm inlet 5603. 07/17/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 108' of 24" HDPE storm inlets 5604, & 420. 20' of 15" HDPE and poured collars. 07/22/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 56' of 24" RCP, storm inlet 5605, and 4 inverts on 07/19/24 Friday. Contractor installed 110' of 24" RCP and storm inlet 4901.
Water Line - Construction Inspection Partial 7/23/2024 7/23/2024 07/23/2024
Misc
Informational
07/17/2024
07/09/24 Tuesday JMJ (Rodriguez Construction) Contractor began to install 12" Serta Lock water pipe. The vendor delivered the wrong bolts to site so, the contractor set up for today. 07/10/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 260' of 12" serta lock water pipe as per project plans. 07/11/24 Thursday JMJ (Rodriguez Construction) Contractor installed approximately 140' of 12" serta lock water pipe and tee for the hydrant. 07/15/24 Monday JMJ (Rodriguez Construction) Contractor installed Fire hydrant and bends approximately 60' on Friday 07/12/24. Contractor installed approximately 100' today 12" serta lock water pipe. 07/17/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 200' of 12" serta lock water main, 12"X6" Tee, and 38' of 6" water pipe, and hydrant assembly. Contactor poured the backing blocks for bends, & tees. 07/23/24 Tuesday JMJ (Rodriguez Construction) Contractor has been working at the South of project on water main staring yesterday. Tie-in to exist 12" that was installed during the first phase of project. 12" Valves and bends.
Storm Sewer Construction Inspection Partial 7/23/2024 7/23/2024 07/23/2024
Misc
Informational
07/22/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801. 07/02/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 30' of 18" RCP and storm box 3402. Contractor installed lids on storm boxes that were set last week. 07/09/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 4802 and 40' of RCP 07/08/24 Monday. Contractor installed HDPE and inlet storm box 4803. Contractor continued installation of HDPE storm pipe. 07/10/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 60' of 24" HDPE yesterday 07/09/24. Contractor installed approximately 40' of 24" HDPE today. Contractor began to excavate from inlet storm box 4804 with 24" RCP. 07/11/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 24" RCP to junction box 4805. Contractor installed approximately 146' of 24" HDPE inlet storm box 4806. 07/15/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 70' of 24" HDPE storm inlet 5603. 07/17/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 108' of 24" HDPE storm inlets 5604, & 420. 20' of 15" HDPE and poured collars. 07/22/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 56' of 24" RCP, storm inlet 5605, and 4 inverts on 07/19/24 Friday. Contractor installed 110' of 24" RCP and storm inlet 4901. 07/23/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed the 4", 6", & 8" roof drains as per project plans. Contractor installed drains on the Southside of building.
Storm Sewer Construction Inspection Partial 7/24/2024 7/24/2024 07/24/2024
Misc
Informational
07/23/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801. 07/02/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 30' of 18" RCP and storm box 3402. Contractor installed lids on storm boxes that were set last week. 07/09/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 4802 and 40' of RCP 07/08/24 Monday. Contractor installed HDPE and inlet storm box 4803. Contractor continued installation of HDPE storm pipe. 07/10/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 60' of 24" HDPE yesterday 07/09/24. Contractor installed approximately 40' of 24" HDPE today. Contractor began to excavate from inlet storm box 4804 with 24" RCP. 07/11/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 24" RCP to junction box 4805. Contractor installed approximately 146' of 24" HDPE inlet storm box 4806. 07/15/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 70' of 24" HDPE storm inlet 5603. 07/17/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 108' of 24" HDPE storm inlets 5604, & 420. 20' of 15" HDPE and poured collars. 07/22/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 56' of 24" RCP, storm inlet 5605, and 4 inverts on 07/19/24 Friday. Contractor installed 110' of 24" RCP and storm inlet 4901. 07/23/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed the 4", 6", & 8" roof drains as per project plans. Contractor installed drains on the Southside of building. 07/24/24 Wednesday JMJ 9sUB-Contractor Pro-Design Kurt's crew) Contractor also installed 4 nyloplast drains yesterday as-per project plans. Today contractor installed 2 nyloplast drains, 1 roof drain, 7 poured inverts.
Water Line - Construction Inspection Partial 7/24/2024 7/24/2024 07/24/2024
Misc
Informational
07/23/2024
07/09/24 Tuesday JMJ (Rodriguez Construction) Contractor began to install 12" Serta Lock water pipe. The vendor delivered the wrong bolts to site so, the contractor set up for today. 07/10/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 260' of 12" serta lock water pipe as per project plans. 07/11/24 Thursday JMJ (Rodriguez Construction) Contractor installed approximately 140' of 12" serta lock water pipe and tee for the hydrant. 07/15/24 Monday JMJ (Rodriguez Construction) Contractor installed Fire hydrant and bends approximately 60' on Friday 07/12/24. Contractor installed approximately 100' today 12" serta lock water pipe. 07/17/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 200' of 12" serta lock water main, 12"X6" Tee, and 38' of 6" water pipe, and hydrant assembly. Contactor poured the backing blocks for bends, & tees. 07/23/24 Tuesday JMJ (Rodriguez Construction) Contractor has been working at the South of project on water main staring yesterday. Tie-in to exist 12" that was installed during the first phase of project. 12" Valves and bends. 07/24/24 Wednesday JMJ (Rodriguez Construction Wendell's crew) On Monday 07/22/24 contractor was able to installed approximately 100' of 12" serta lock water pipe. Today contractor installed 100' running along the Eastside of building and pass heading South toward the pipe that was instated Monday. Two hydrants, 22.5 & 11.25 bend were installed. Contractor began the installation of the backflow vault. Form and material will be done so vault floor can be poured.
Storm Sewer Construction Inspection Partial 7/25/2024 7/25/2024 07/25/2024
Misc
Informational
07/24/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801. 07/02/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 30' of 18" RCP and storm box 3402. Contractor installed lids on storm boxes that were set last week. 07/09/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 4802 and 40' of RCP 07/08/24 Monday. Contractor installed HDPE and inlet storm box 4803. Contractor continued installation of HDPE storm pipe. 07/10/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 60' of 24" HDPE yesterday 07/09/24. Contractor installed approximately 40' of 24" HDPE today. Contractor began to excavate from inlet storm box 4804 with 24" RCP. 07/11/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 24" RCP to junction box 4805. Contractor installed approximately 146' of 24" HDPE inlet storm box 4806. 07/15/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 70' of 24" HDPE storm inlet 5603. 07/17/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 108' of 24" HDPE storm inlets 5604, & 420. 20' of 15" HDPE and poured collars. 07/22/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 56' of 24" RCP, storm inlet 5605, and 4 inverts on 07/19/24 Friday. Contractor installed 110' of 24" RCP and storm inlet 4901. 07/23/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed the 4", 6", & 8" roof drains as per project plans. Contractor installed drains on the Southside of building. 07/24/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor also installed 4 nyloplast drains yesterday as-per project plans. Today contractor installed 2 nyloplast drains, 1 roof drain, 7 poured inverts. 07/25/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install roof drains. 1 roof drain and excavation was backfilled.
Water Line - Construction Inspection Partial 7/25/2024 7/25/2024 07/25/2024
Misc
Informational
07/24/2024
07/09/24 Tuesday JMJ (Rodriguez Construction) Contractor began to install 12" Serta Lock water pipe. The vendor delivered the wrong bolts to site so, the contractor set up for today. 07/10/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 260' of 12" serta lock water pipe as per project plans. 07/11/24 Thursday JMJ (Rodriguez Construction) Contractor installed approximately 140' of 12" serta lock water pipe and tee for the hydrant. 07/15/24 Monday JMJ (Rodriguez Construction) Contractor installed Fire hydrant and bends approximately 60' on Friday 07/12/24. Contractor installed approximately 100' today 12" serta lock water pipe. 07/17/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 200' of 12" serta lock water main, 12"X6" Tee, and 38' of 6" water pipe, and hydrant assembly. Contactor poured the backing blocks for bends, & tees. 07/23/24 Tuesday JMJ (Rodriguez Construction) Contractor has been working at the South of project on water main staring yesterday. Tie-in to exist 12" that was installed during the first phase of project. 12" Valves and bends. 07/24/24 Wednesday JMJ (Rodriguez Construction Wendell's crew) On Monday 07/22/24 contractor was able to installed approximately 100' of 12" serta lock water pipe. Today contractor installed 100' running along the Eastside of building and pass heading South toward the pipe that was instated Monday. Two hydrants, 22.5 & 11.25 bend were installed. Contractor began the installation of the backflow vault. Form and material will be done so vault floor can be poured. 07/25/24 Thursday JMJ (Rodriguez Construction Wendell's crew) Contractor poured backing block behind bends and hydrant tees. The floor of the backflow vualt was poured. Contractor continues to install 12" serta lock water main as-per project plans.
Water Line - Construction Inspection Partial 7/26/2024 7/26/2024 07/26/2024
Misc
Informational
07/25/2024
07/09/24 Tuesday JMJ (Rodriguez Construction) Contractor began to install 12" Serta Lock water pipe. The vendor delivered the wrong bolts to site so, the contractor set up for today. 07/10/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 260' of 12" serta lock water pipe as per project plans. 07/11/24 Thursday JMJ (Rodriguez Construction) Contractor installed approximately 140' of 12" serta lock water pipe and tee for the hydrant. 07/15/24 Monday JMJ (Rodriguez Construction) Contractor installed Fire hydrant and bends approximately 60' on Friday 07/12/24. Contractor installed approximately 100' today 12" serta lock water pipe. 07/17/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 200' of 12" serta lock water main, 12"X6" Tee, and 38' of 6" water pipe, and hydrant assembly. Contactor poured the backing blocks for bends, & tees. 07/23/24 Tuesday JMJ (Rodriguez Construction) Contractor has been working at the South of project on water main staring yesterday. Tie-in to exist 12" that was installed during the first phase of project. 12" Valves and bends. 07/24/24 Wednesday JMJ (Rodriguez Construction Wendell's crew) On Monday 07/22/24 contractor was able to installed approximately 100' of 12" serta lock water pipe. Today contractor installed 100' running along the Eastside of building and pass heading South toward the pipe that was instated Monday. Two hydrants, 22.5 & 11.25 bend were installed. Contractor began the installation of the backflow vault. Form and material will be done so vault floor can be poured. 07/25/24 Thursday JMJ (Rodriguez Construction Wendell's crew) Contractor poured backing block behind bends and hydrant tees. The floor of the backflow vualt was poured. Contractor continues to install 12" serta lock water main as-per project plans. 07/26/24 Friday JMJ (Rodriguez Construction Wendell's crew) Contractor installed approximately 160' of 12" serta lock water main.
Storm Sewer Construction Inspection Partial 7/29/2024 7/29/2024 07/29/2024
Misc
Informational
07/25/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801. 07/02/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 30' of 18" RCP and storm box 3402. Contractor installed lids on storm boxes that were set last week. 07/09/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 4802 and 40' of RCP 07/08/24 Monday. Contractor installed HDPE and inlet storm box 4803. Contractor continued installation of HDPE storm pipe. 07/10/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 60' of 24" HDPE yesterday 07/09/24. Contractor installed approximately 40' of 24" HDPE today. Contractor began to excavate from inlet storm box 4804 with 24" RCP. 07/11/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 24" RCP to junction box 4805. Contractor installed approximately 146' of 24" HDPE inlet storm box 4806. 07/15/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 70' of 24" HDPE storm inlet 5603. 07/17/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 108' of 24" HDPE storm inlets 5604, & 420. 20' of 15" HDPE and poured collars. 07/22/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 56' of 24" RCP, storm inlet 5605, and 4 inverts on 07/19/24 Friday. Contractor installed 110' of 24" RCP and storm inlet 4901. 07/23/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed the 4", 6", & 8" roof drains as per project plans. Contractor installed drains on the Southside of building. 07/24/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor also installed 4 nyloplast drains yesterday as-per project plans. Today contractor installed 2 nyloplast drains, 1 roof drain, 7 poured inverts. 07/25/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install roof drains. 1 roof drain and excavation was backfilled. 07/29/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the installation of storm lines.
Storm Sewer Construction Inspection Partial 7/30/2024 7/30/2024 07/30/2024
Misc
Informational
07/29/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801. 07/02/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 30' of 18" RCP and storm box 3402. Contractor installed lids on storm boxes that were set last week. 07/09/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 4802 and 40' of RCP 07/08/24 Monday. Contractor installed HDPE and inlet storm box 4803. Contractor continued installation of HDPE storm pipe. 07/10/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 60' of 24" HDPE yesterday 07/09/24. Contractor installed approximately 40' of 24" HDPE today. Contractor began to excavate from inlet storm box 4804 with 24" RCP. 07/11/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 24" RCP to junction box 4805. Contractor installed approximately 146' of 24" HDPE inlet storm box 4806. 07/15/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 70' of 24" HDPE storm inlet 5603. 07/17/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 108' of 24" HDPE storm inlets 5604, & 420. 20' of 15" HDPE and poured collars. 07/22/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 56' of 24" RCP, storm inlet 5605, and 4 inverts on 07/19/24 Friday. Contractor installed 110' of 24" RCP and storm inlet 4901. 07/23/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed the 4", 6", & 8" roof drains as per project plans. Contractor installed drains on the Southside of building. 07/24/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor also installed 4 nyloplast drains yesterday as-per project plans. Today contractor installed 2 nyloplast drains, 1 roof drain, 7 poured inverts. 07/25/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install roof drains. 1 roof drain and excavation was backfilled. 07/29/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the installation of storm lines. 07/30/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed storm box (5201 with 32' of 36" RCP ) & (5202 32' of 30"RCP) yesterday and today.
Water Line - Construction Inspection Partial 7/30/2024 7/30/2024 07/30/2024
Misc
Informational
07/26/2024
07/09/24 Tuesday JMJ (Rodriguez Construction) Contractor began to install 12" Serta Lock water pipe. The vendor delivered the wrong bolts to site so, the contractor set up for today. 07/10/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 260' of 12" serta lock water pipe as per project plans. 07/11/24 Thursday JMJ (Rodriguez Construction) Contractor installed approximately 140' of 12" serta lock water pipe and tee for the hydrant. 07/15/24 Monday JMJ (Rodriguez Construction) Contractor installed Fire hydrant and bends approximately 60' on Friday 07/12/24. Contractor installed approximately 100' today 12" serta lock water pipe. 07/17/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 200' of 12" serta lock water main, 12"X6" Tee, and 38' of 6" water pipe, and hydrant assembly. Contactor poured the backing blocks for bends, & tees. 07/23/24 Tuesday JMJ (Rodriguez Construction) Contractor has been working at the South of project on water main staring yesterday. Tie-in to exist 12" that was installed during the first phase of project. 12" Valves and bends. 07/24/24 Wednesday JMJ (Rodriguez Construction Wendell's crew) On Monday 07/22/24 contractor was able to installed approximately 100' of 12" serta lock water pipe. Today contractor installed 100' running along the Eastside of building and pass heading South toward the pipe that was instated Monday. Two hydrants, 22.5 & 11.25 bend were installed. Contractor began the installation of the backflow vault. Form and material will be done so vault floor can be poured. 07/25/24 Thursday JMJ (Rodriguez Construction Wendell's crew) Contractor poured backing block behind bends and hydrant tees. The floor of the backflow vault was poured. Contractor continues to install 12" serta lock water main as-per project plans. 07/26/24 Friday JMJ (Rodriguez Construction Wendell's crew) Contractor installed approximately 160' of 12" serta lock water main. 07/30/24 Tuesday JMJ (Rodriguez Construction Wendell's crew) Contractor continued to water main 12" serta lock.
Storm Sewer Construction Inspection Partial 7/31/2024 7/31/2024 07/31/2024
Misc
Informational
07/30/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801. 07/02/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 30' of 18" RCP and storm box 3402. Contractor installed lids on storm boxes that were set last week. 07/09/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 4802 and 40' of RCP 07/08/24 Monday. Contractor installed HDPE and inlet storm box 4803. Contractor continued installation of HDPE storm pipe. 07/10/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 60' of 24" HDPE yesterday 07/09/24. Contractor installed approximately 40' of 24" HDPE today. Contractor began to excavate from inlet storm box 4804 with 24" RCP. 07/11/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 24" RCP to junction box 4805. Contractor installed approximately 146' of 24" HDPE inlet storm box 4806. 07/15/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 70' of 24" HDPE storm inlet 5603. 07/17/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 108' of 24" HDPE storm inlets 5604, & 420. 20' of 15" HDPE and poured collars. 07/22/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 56' of 24" RCP, storm inlet 5605, and 4 inverts on 07/19/24 Friday. Contractor installed 110' of 24" RCP and storm inlet 4901. 07/23/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed the 4", 6", & 8" roof drains as per project plans. Contractor installed drains on the Southside of building. 07/24/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor also installed 4 nyloplast drains yesterday as-per project plans. Today contractor installed 2 nyloplast drains, 1 roof drain, 7 poured inverts. 07/25/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install roof drains. 1 roof drain and excavation was backfilled. 07/29/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the installation of storm lines. 07/30/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed storm box (5201 with 32' of 36" RCP ) & (5202 32' of 30"RCP) yesterday and today. 07/31/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the install of storm lines, collars and inverts were poured.
Water Line - Construction Inspection Partial 7/31/2024 7/31/2024 07/31/2024
Misc
Informational
07/30/2024
07/09/24 Tuesday JMJ (Rodriguez Construction) Contractor began to install 12" Serta Lock water pipe. The vendor delivered the wrong bolts to site so, the contractor set up for today. 07/10/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 260' of 12" serta lock water pipe as per project plans. 07/11/24 Thursday JMJ (Rodriguez Construction) Contractor installed approximately 140' of 12" serta lock water pipe and tee for the hydrant. 07/15/24 Monday JMJ (Rodriguez Construction) Contractor installed Fire hydrant and bends approximately 60' on Friday 07/12/24. Contractor installed approximately 100' today 12" serta lock water pipe. 07/17/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 200' of 12" serta lock water main, 12"X6" Tee, and 38' of 6" water pipe, and hydrant assembly. Contactor poured the backing blocks for bends, & tees. 07/23/24 Tuesday JMJ (Rodriguez Construction) Contractor has been working at the South of project on water main staring yesterday. Tie-in to exist 12" that was installed during the first phase of project. 12" Valves and bends. 07/24/24 Wednesday JMJ (Rodriguez Construction Wendell's crew) On Monday 07/22/24 contractor was able to installed approximately 100' of 12" serta lock water pipe. Today contractor installed 100' running along the Eastside of building and pass heading South toward the pipe that was instated Monday. Two hydrants, 22.5 & 11.25 bend were installed. Contractor began the installation of the backflow vault. Form and material will be done so vault floor can be poured. 07/25/24 Thursday JMJ (Rodriguez Construction Wendell's crew) Contractor poured backing block behind bends and hydrant tees. The floor of the backflow vault was poured. Contractor continues to install 12" serta lock water main as-per project plans. 07/26/24 Friday JMJ (Rodriguez Construction Wendell's crew) Contractor installed approximately 160' of 12" serta lock water main. 07/30/24 Tuesday JMJ (Rodriguez Construction Wendell's crew) Contractor continued to water main 12" serta lock. 07/31/24 Wednesday JMJ (Rodriguez Construction Wendell's crew) Contractor installed valves for backflow vault yesterday and poured collars for vault today. Contractor started the install of hydrant as-per project plans. Contractor also poured some backing blocks on for bends and tees on 12" serta lock water main.
Storm Sewer Construction Inspection Partial 8/1/2024 8/1/2024 08/01/2024
Misc
Informational
07/31/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801. 07/02/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 30' of 18" RCP and storm box 3402. Contractor installed lids on storm boxes that were set last week. 07/09/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 4802 and 40' of RCP 07/08/24 Monday. Contractor installed HDPE and inlet storm box 4803. Contractor continued installation of HDPE storm pipe. 07/10/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 60' of 24" HDPE yesterday 07/09/24. Contractor installed approximately 40' of 24" HDPE today. Contractor began to excavate from inlet storm box 4804 with 24" RCP. 07/11/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 24" RCP to junction box 4805. Contractor installed approximately 146' of 24" HDPE inlet storm box 4806. 07/15/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 70' of 24" HDPE storm inlet 5603. 07/17/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 108' of 24" HDPE storm inlets 5604, & 420. 20' of 15" HDPE and poured collars. 07/22/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 56' of 24" RCP, storm inlet 5605, and 4 inverts on 07/19/24 Friday. Contractor installed 110' of 24" RCP and storm inlet 4901. 07/23/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed the 4", 6", & 8" roof drains as per project plans. Contractor installed drains on the Southside of building. 07/24/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor also installed 4 nyloplast drains yesterday as-per project plans. Today contractor installed 2 nyloplast drains, 1 roof drain, 7 poured inverts. 07/25/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install roof drains. 1 roof drain and excavation was backfilled. 07/29/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the installation of storm lines. 07/30/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed storm box (5201 with 32' of 36" RCP ) & (5202 32' of 30"RCP) yesterday and today. 07/31/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the install of storm lines, collars and inverts were poured. 08/01/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the installation of the storm line as-per project plans Southwest side.
Water Line - Construction Inspection Partial 8/1/2024 8/1/2024 08/01/2024
Misc
Informational
07/31/2024
07/09/24 Tuesday JMJ (Rodriguez Construction) Contractor began to install 12" Serta Lock water pipe. The vendor delivered the wrong bolts to site so, the contractor set up for today. 07/10/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 260' of 12" serta lock water pipe as per project plans. 07/11/24 Thursday JMJ (Rodriguez Construction) Contractor installed approximately 140' of 12" serta lock water pipe and tee for the hydrant. 07/15/24 Monday JMJ (Rodriguez Construction) Contractor installed Fire hydrant and bends approximately 60' on Friday 07/12/24. Contractor installed approximately 100' today 12" serta lock water pipe. 07/17/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 200' of 12" serta lock water main, 12"X6" Tee, and 38' of 6" water pipe, and hydrant assembly. Contactor poured the backing blocks for bends, & tees. 07/23/24 Tuesday JMJ (Rodriguez Construction) Contractor has been working at the South of project on water main staring yesterday. Tie-in to exist 12" that was installed during the first phase of project. 12" Valves and bends. 07/24/24 Wednesday JMJ (Rodriguez Construction Wendell's crew) On Monday 07/22/24 contractor was able to installed approximately 100' of 12" serta lock water pipe. Today contractor installed 100' running along the Eastside of building and pass heading South toward the pipe that was instated Monday. Two hydrants, 22.5 & 11.25 bend were installed. Contractor began the installation of the backflow vault. Form and material will be done so vault floor can be poured. 07/25/24 Thursday JMJ (Rodriguez Construction Wendell's crew) Contractor poured backing block behind bends and hydrant tees. The floor of the backflow vault was poured. Contractor continues to install 12" serta lock water main as-per project plans. 07/26/24 Friday JMJ (Rodriguez Construction Wendell's crew) Contractor installed approximately 160' of 12" serta lock water main. 07/30/24 Tuesday JMJ (Rodriguez Construction Wendell's crew) Contractor continued to water main 12" serta lock. 07/31/24 Wednesday JMJ (Rodriguez Construction Wendell's crew) Contractor installed valves for backflow vault yesterday and poured collars for vault today. Contractor started the install of hydrant as-per project plans. Contractor also poured some backing blocks on for bends and tees on 12" serta lock water main. 08/01/24 Thursday JMJ (Rodriguez Construction Wendell's crew) Contractor continued the pour the backing block for the newly installed hydrant.
Storm Sewer Construction Inspection Partial 8/5/2024 8/5/2024 08/05/2024
Misc
Informational
08/01/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801. 07/02/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 30' of 18" RCP and storm box 3402. Contractor installed lids on storm boxes that were set last week. 07/09/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 4802 and 40' of RCP 07/08/24 Monday. Contractor installed HDPE and inlet storm box 4803. Contractor continued installation of HDPE storm pipe. 07/10/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 60' of 24" HDPE yesterday 07/09/24. Contractor installed approximately 40' of 24" HDPE today. Contractor began to excavate from inlet storm box 4804 with 24" RCP. 07/11/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 24" RCP to junction box 4805. Contractor installed approximately 146' of 24" HDPE inlet storm box 4806. 07/15/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 70' of 24" HDPE storm inlet 5603. 07/17/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 108' of 24" HDPE storm inlets 5604, & 420. 20' of 15" HDPE and poured collars. 07/22/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 56' of 24" RCP, storm inlet 5605, and 4 inverts on 07/19/24 Friday. Contractor installed 110' of 24" RCP and storm inlet 4901. 07/23/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed the 4", 6", & 8" roof drains as per project plans. Contractor installed drains on the Southside of building. 07/24/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor also installed 4 nyloplast drains yesterday as-per project plans. Today contractor installed 2 nyloplast drains, 1 roof drain, 7 poured inverts. 07/25/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install roof drains. 1 roof drain and excavation was backfilled. 07/29/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the installation of storm lines. 07/30/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed storm box (5201 with 32' of 36" RCP ) & (5202 32' of 30"RCP) yesterday and today. 07/31/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the install of storm lines, collars and inverts were poured. 08/01/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the installation of the storm line as-per project plans Southwest side. 08/05/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's) Storm line was installed 5301 storm box 24" of HDPE 96' & 5302 storm box 18" HDPE 177'.
Storm Sewer Construction Inspection Partial 8/7/2024 8/7/2024 08/07/2024
Misc
Informational
08/05/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801. 07/02/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 30' of 18" RCP and storm box 3402. Contractor installed lids on storm boxes that were set last week. 07/09/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 4802 and 40' of RCP 07/08/24 Monday. Contractor installed HDPE and inlet storm box 4803. Contractor continued installation of HDPE storm pipe. 07/10/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 60' of 24" HDPE yesterday 07/09/24. Contractor installed approximately 40' of 24" HDPE today. Contractor began to excavate from inlet storm box 4804 with 24" RCP. 07/11/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 24" RCP to junction box 4805. Contractor installed approximately 146' of 24" HDPE inlet storm box 4806. 07/15/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 70' of 24" HDPE storm inlet 5603. 07/17/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 108' of 24" HDPE storm inlets 5604, & 420. 20' of 15" HDPE and poured collars. 07/22/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 56' of 24" RCP, storm inlet 5605, and 4 inverts on 07/19/24 Friday. Contractor installed 110' of 24" RCP and storm inlet 4901. 07/23/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed the 4", 6", & 8" roof drains as per project plans. Contractor installed drains on the Southside of building. 07/24/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor also installed 4 nyloplast drains yesterday as-per project plans. Today contractor installed 2 nyloplast drains, 1 roof drain, 7 poured inverts. 07/25/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install roof drains. 1 roof drain and excavation was backfilled. 07/29/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the installation of storm lines. 07/30/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed storm box (5201 with 32' of 36" RCP ) & (5202 32' of 30"RCP) yesterday and today. 07/31/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the install of storm lines, collars and inverts were poured. 08/01/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the installation of the storm line as-per project plans Southwest side. 08/05/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's) Storm line was installed 5301 storm box 24" of HDPE 96' & 5302 storm box 18" HDPE 177'. 08/07/24 Wednesday JMJ (Pro-Design) 18" RCP was installed from 5202 to 5203 on 08/06/24 Tuesday a-per project plan. Today contractor installed approximately 64' of 18" RCP from 5203 storm structure.
Water Line - Construction Inspection Partial 8/7/2024 8/7/2024 08/07/2024
Misc
Informational
08/01/2024
07/09/24 Tuesday JMJ (Rodriguez Construction) Contractor began to install 12" Serta Lock water pipe. The vendor delivered the wrong bolts to site so, the contractor set up for today. 07/10/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 260' of 12" serta lock water pipe as per project plans. 07/11/24 Thursday JMJ (Rodriguez Construction) Contractor installed approximately 140' of 12" serta lock water pipe and tee for the hydrant. 07/15/24 Monday JMJ (Rodriguez Construction) Contractor installed Fire hydrant and bends approximately 60' on Friday 07/12/24. Contractor installed approximately 100' today 12" serta lock water pipe. 07/17/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 200' of 12" serta lock water main, 12"X6" Tee, and 38' of 6" water pipe, and hydrant assembly. Contactor poured the backing blocks for bends, & tees. 07/23/24 Tuesday JMJ (Rodriguez Construction) Contractor has been working at the South of project on water main staring yesterday. Tie-in to exist 12" that was installed during the first phase of project. 12" Valves and bends. 07/24/24 Wednesday JMJ (Rodriguez Construction Wendell's crew) On Monday 07/22/24 contractor was able to installed approximately 100' of 12" serta lock water pipe. Today contractor installed 100' running along the Eastside of building and pass heading South toward the pipe that was instated Monday. Two hydrants, 22.5 & 11.25 bend were installed. Contractor began the installation of the backflow vault. Form and material will be done so vault floor can be poured. 07/25/24 Thursday JMJ (Rodriguez Construction Wendell's crew) Contractor poured backing block behind bends and hydrant tees. The floor of the backflow vault was poured. Contractor continues to install 12" serta lock water main as-per project plans. 07/26/24 Friday JMJ (Rodriguez Construction Wendell's crew) Contractor installed approximately 160' of 12" serta lock water main. 07/30/24 Tuesday JMJ (Rodriguez Construction Wendell's crew) Contractor continued to water main 12" serta lock. 07/31/24 Wednesday JMJ (Rodriguez Construction Wendell's crew) Contractor installed valves for backflow vault yesterday and poured collars for vault today. Contractor started the install of hydrant as-per project plans. Contractor also poured some backing blocks on for bends and tees on 12" serta lock water main. 08/01/24 Thursday JMJ (Rodriguez Construction Wendell's crew) Contractor continued the pour the backing block for the newly installed hydrant. 08/07/24 Wednesday JMJ (Rodriguez Construction Wendell's crew) Contractor has set backflow vault installed, backflow assembly, and poured the vault floor.
Storm Sewer Construction Inspection Partial 8/9/2024 8/9/2024 08/09/2024
Misc
Informational
08/07/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801. 07/02/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 30' of 18" RCP and storm box 3402. Contractor installed lids on storm boxes that were set last week. 07/09/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 4802 and 40' of RCP 07/08/24 Monday. Contractor installed HDPE and inlet storm box 4803. Contractor continued installation of HDPE storm pipe. 07/10/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 60' of 24" HDPE yesterday 07/09/24. Contractor installed approximately 40' of 24" HDPE today. Contractor began to excavate from inlet storm box 4804 with 24" RCP. 07/11/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 24" RCP to junction box 4805. Contractor installed approximately 146' of 24" HDPE inlet storm box 4806. 07/15/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 70' of 24" HDPE storm inlet 5603. 07/17/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 108' of 24" HDPE storm inlets 5604, & 420. 20' of 15" HDPE and poured collars. 07/22/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 56' of 24" RCP, storm inlet 5605, and 4 inverts on 07/19/24 Friday. Contractor installed 110' of 24" RCP and storm inlet 4901. 07/23/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed the 4", 6", & 8" roof drains as per project plans. Contractor installed drains on the Southside of building. 07/24/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor also installed 4 nyloplast drains yesterday as-per project plans. Today contractor installed 2 nyloplast drains, 1 roof drain, 7 poured inverts. 07/25/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install roof drains. 1 roof drain and excavation was backfilled. 07/29/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the installation of storm lines. 07/30/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed storm box (5201 with 32' of 36" RCP ) & (5202 32' of 30"RCP) yesterday and today. 07/31/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the install of storm lines, collars and inverts were poured. 08/01/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the installation of the storm line as-per project plans Southwest side. 08/05/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's) Storm line was installed 5301 storm box 24" of HDPE 96' & 5302 storm box 18" HDPE 177'. 08/07/24 Wednesday JMJ (Pro-Design) 18" RCP was installed from 5202 to 5203 on 08/06/24 Tuesday a-per project plan.(Sub-Contractor Pro-Design Kurt's) Today contractor installed approximately 64' of 18" RCP from 5203 storm structure. 08/09/24 Friday JMJ (Sub-Contractor Pro-Design Kurt's) Contractor installed 19' of 24" RCP and structure 5504, and 24' of 24" HDPE storm pipe out of 5504.
Water Line - Construction Inspection Partial 8/9/2024 8/9/2024 08/09/2024
Misc
Informational
08/07/2024
07/09/24 Tuesday JMJ (Rodriguez Construction) Contractor began to install 12" Serta Lock water pipe. The vendor delivered the wrong bolts to site so, the contractor set up for today. 07/10/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 260' of 12" serta lock water pipe as per project plans. 07/11/24 Thursday JMJ (Rodriguez Construction) Contractor installed approximately 140' of 12" serta lock water pipe and tee for the hydrant. 07/15/24 Monday JMJ (Rodriguez Construction) Contractor installed Fire hydrant and bends approximately 60' on Friday 07/12/24. Contractor installed approximately 100' today 12" serta lock water pipe. 07/17/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 200' of 12" serta lock water main, 12"X6" Tee, and 38' of 6" water pipe, and hydrant assembly. Contactor poured the backing blocks for bends, & tees. 07/23/24 Tuesday JMJ (Rodriguez Construction) Contractor has been working at the South of project on water main staring yesterday. Tie-in to exist 12" that was installed during the first phase of project. 12" Valves and bends. 07/24/24 Wednesday JMJ (Rodriguez Construction Wendell's crew) On Monday 07/22/24 contractor was able to installed approximately 100' of 12" serta lock water pipe. Today contractor installed 100' running along the Eastside of building and pass heading South toward the pipe that was instated Monday. Two hydrants, 22.5 & 11.25 bend were installed. Contractor began the installation of the backflow vault. Form and material will be done so vault floor can be poured. 07/25/24 Thursday JMJ (Rodriguez Construction Wendell's crew) Contractor poured backing block behind bends and hydrant tees. The floor of the backflow vault was poured. Contractor continues to install 12" serta lock water main as-per project plans. 07/26/24 Friday JMJ (Rodriguez Construction Wendell's crew) Contractor installed approximately 160' of 12" serta lock water main. 07/30/24 Tuesday JMJ (Rodriguez Construction Wendell's crew) Contractor continued to water main 12" serta lock. 07/31/24 Wednesday JMJ (Rodriguez Construction Wendell's crew) Contractor installed valves for backflow vault yesterday and poured collars for vault today. Contractor started the install of hydrant as-per project plans. Contractor also poured some backing blocks on for bends and tees on 12" serta lock water main. 08/01/24 Thursday JMJ (Rodriguez Construction Wendell's crew) Contractor continued the pour the backing block for the newly installed hydrant. 08/07/24 Wednesday JMJ (Rodriguez Construction Wendell's crew) Contractor has set backflow vault installed, backflow assembly, and poured the vault floor. 08/09/24 Friday JMJ (Rodriguez Construction Wendell's crew) Water line 12" serta lock water main was completed project.
Storm Sewer Construction Inspection Partial 8/14/2024 8/14/2024 08/14/2024
Misc
Informational
08/09/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801. 07/02/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 30' of 18" RCP and storm box 3402. Contractor installed lids on storm boxes that were set last week. 07/09/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 4802 and 40' of RCP 07/08/24 Monday. Contractor installed HDPE and inlet storm box 4803. Contractor continued installation of HDPE storm pipe. 07/10/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 60' of 24" HDPE yesterday 07/09/24. Contractor installed approximately 40' of 24" HDPE today. Contractor began to excavate from inlet storm box 4804 with 24" RCP. 07/11/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 24" RCP to junction box 4805. Contractor installed approximately 146' of 24" HDPE inlet storm box 4806. 07/15/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 70' of 24" HDPE storm inlet 5603. 07/17/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 108' of 24" HDPE storm inlets 5604, & 420. 20' of 15" HDPE and poured collars. 07/22/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 56' of 24" RCP, storm inlet 5605, and 4 inverts on 07/19/24 Friday. Contractor installed 110' of 24" RCP and storm inlet 4901. 07/23/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed the 4", 6", & 8" roof drains as per project plans. Contractor installed drains on the Southside of building. 07/24/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor also installed 4 nyloplast drains yesterday as-per project plans. Today contractor installed 2 nyloplast drains, 1 roof drain, 7 poured inverts. 07/25/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install roof drains. 1 roof drain and excavation was backfilled. 07/29/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the installation of storm lines. 07/30/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed storm box (5201 with 32' of 36" RCP ) & (5202 32' of 30"RCP) yesterday and today. 07/31/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the install of storm lines, collars and inverts were poured. 08/01/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the installation of the storm line as-per project plans Southwest side. 08/05/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's) Storm line was installed 5301 storm box 24" of HDPE 96' & 5302 storm box 18" HDPE 177'. 08/07/24 Wednesday JMJ (Pro-Design) 18" RCP was installed from 5202 to 5203 on 08/06/24 Tuesday a-per project plan.(Sub-Contractor Pro-Design Kurt's) Today contractor installed approximately 64' of 18" RCP from 5203 storm structure. 08/09/24 Friday JMJ (Sub-Contractor Pro-Design Kurt's) Contractor installed 19' of 24" RCP and structure 5504, and 24' of 24" HDPE storm pipe out of 5504. 08/14/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's) Contractor poured inverts and collars for storm pipes previously set. Contractor returned to the East side of project and install approximate 108' of 18" RCP going Southbound. Contractor began the install of one storm structure.
Storm Sewer Construction Inspection Partial 8/15/2024 8/15/2024 08/15/2024
Misc
Informational
08/14/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801. 07/02/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 30' of 18" RCP and storm box 3402. Contractor installed lids on storm boxes that were set last week. 07/09/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 4802 and 40' of RCP 07/08/24 Monday. Contractor installed HDPE and inlet storm box 4803. Contractor continued installation of HDPE storm pipe. 07/10/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 60' of 24" HDPE yesterday 07/09/24. Contractor installed approximately 40' of 24" HDPE today. Contractor began to excavate from inlet storm box 4804 with 24" RCP. 07/11/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 24" RCP to junction box 4805. Contractor installed approximately 146' of 24" HDPE inlet storm box 4806. 07/15/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 70' of 24" HDPE storm inlet 5603. 07/17/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 108' of 24" HDPE storm inlets 5604, & 420. 20' of 15" HDPE and poured collars. 07/22/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 56' of 24" RCP, storm inlet 5605, and 4 inverts on 07/19/24 Friday. Contractor installed 110' of 24" RCP and storm inlet 4901. 07/23/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed the 4", 6", & 8" roof drains as per project plans. Contractor installed drains on the Southside of building. 07/24/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor also installed 4 nyloplast drains yesterday as-per project plans. Today contractor installed 2 nyloplast drains, 1 roof drain, 7 poured inverts. 07/25/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install roof drains. 1 roof drain and excavation was backfilled. 07/29/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the installation of storm lines. 07/30/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed storm box (5201 with 32' of 36" RCP ) & (5202 32' of 30"RCP) yesterday and today. 07/31/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the install of storm lines, collars and inverts were poured. 08/01/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the installation of the storm line as-per project plans Southwest side. 08/05/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's) Storm line was installed 5301 storm box 24" of HDPE 96' & 5302 storm box 18" HDPE 177'. 08/07/24 Wednesday JMJ (Pro-Design) 18" RCP was installed from 5202 to 5203 on 08/06/24 Tuesday a-per project plan.(Sub-Contractor Pro-Design Kurt's) Today contractor installed approximately 64' of 18" RCP from 5203 storm structure. 08/09/24 Friday JMJ (Sub-Contractor Pro-Design Kurt's) Contractor installed 19' of 24" RCP and structure 5504, and 24' of 24" HDPE storm pipe out of 5504. 08/14/24 Wednesday JMJ (Pro-Design) Contractor poured inverts and collars for storm pipes previously set. Contractor returned to the East side of project and install approximate 108' of 18" RCP going Southbound. Contractor began the install of one storm structure. 08/15/24 Thursday JMJ (Pro-Design) Monday 08/12/24 contractor laid 260' of 24" from 5204 to 5205. Collars and inverts on 5204, 5205, & 5206. 20' of 24" HDPE out of 5205 and 98' of 18" RCP from 5205 to 5206 as per project plans. Contractor spent most of today stacking storm structure and pouring collars and invert for structures.
Erosion Control Inspection Partial 8/16/2024 8/16/2024 08/16/2024
Misc
Informational
08/16/2024
08/16/24 Friday JMJ Erosion Sediment Control (ESC) Inspection appear to be functioning properly.
Storm Sewer Construction Inspection Partial 8/16/2024 8/16/2024 08/16/2024
Misc
Informational
08/15/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801. 07/02/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 30' of 18" RCP and storm box 3402. Contractor installed lids on storm boxes that were set last week. 07/09/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 4802 and 40' of RCP 07/08/24 Monday. Contractor installed HDPE and inlet storm box 4803. Contractor continued installation of HDPE storm pipe. 07/10/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 60' of 24" HDPE yesterday 07/09/24. Contractor installed approximately 40' of 24" HDPE today. Contractor began to excavate from inlet storm box 4804 with 24" RCP. 07/11/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 24" RCP to junction box 4805. Contractor installed approximately 146' of 24" HDPE inlet storm box 4806. 07/15/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 70' of 24" HDPE storm inlet 5603. 07/17/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 108' of 24" HDPE storm inlets 5604, & 420. 20' of 15" HDPE and poured collars. 07/22/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 56' of 24" RCP, storm inlet 5605, and 4 inverts on 07/19/24 Friday. Contractor installed 110' of 24" RCP and storm inlet 4901. 07/23/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed the 4", 6", & 8" roof drains as per project plans. Contractor installed drains on the Southside of building. 07/24/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor also installed 4 nyloplast drains yesterday as-per project plans. Today contractor installed 2 nyloplast drains, 1 roof drain, 7 poured inverts. 07/25/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install roof drains. 1 roof drain and excavation was backfilled. 07/29/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the installation of storm lines. 07/30/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed storm box (5201 with 32' of 36" RCP ) & (5202 32' of 30"RCP) yesterday and today. 07/31/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the install of storm lines, collars and inverts were poured. 08/01/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the installation of the storm line as-per project plans Southwest side. 08/05/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's) Storm line was installed 5301 storm box 24" of HDPE 96' & 5302 storm box 18" HDPE 177'. 08/07/24 Wednesday JMJ (Pro-Design) 18" RCP was installed from 5202 to 5203 on 08/06/24 Tuesday a-per project plan.(Sub-Contractor Pro-Design Kurt's) Today contractor installed approximately 64' of 18" RCP from 5203 storm structure. 08/09/24 Friday JMJ (Sub-Contractor Pro-Design Kurt's) Contractor installed 19' of 24" RCP and structure 5504, and 24' of 24" HDPE storm pipe out of 5504. 08/14/24 Wednesday JMJ (Pro-Design) Contractor poured inverts and collars for storm pipes previously set. Contractor returned to the East side of project and install approximate 108' of 18" RCP going Southbound. Contractor began the install of one storm structure. 08/15/24 Thursday JMJ (Pro-Design) Monday 08/12/24 contractor laid 260' of 24" from 5204 to 5205. Collars and inverts on 5204, 5205, & 5206. 20' of 24" HDPE out of 5205 and 98' of 18" RCP from 5205 to 5206 as per project plans. Contractor spent most of today stacking storm structure and pouring collars and invert for structures. 08/16/24 Friday JMJ (Pro-Design) Storm Junction box 5203 two curb inlet. 4601 laid 73' of 18" RCP from junction box 5203 to curb inlet 4601 set 4601. Poured collars on 4601 and 5203 inverts in 4601 and 5204. Stacked out curb at 5205. 5206, 5203 set lids on 4601, 5205,5206,5302.
Storm Sewer Construction Inspection Partial 8/16/2024 8/16/2024 08/16/2024
Misc
Informational
08/16/2024
06/07/24 Friday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor started the excavate and install 36" RCP Storm pipe @ the Western end of future bridge. Approximately 16' was installed with prefab toe wall. 06/11/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed storm box 5601 and 16' of 36" RCP Storm pipe. 06/12/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor continue to stack out storm box 5601 and continue to install 18" RCP Storm pipe. 06/13/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt crew) Contractor installed 70' of 18" RCP storm pipe 06/12/24 Wednesday. Contractor continued installation of 18" RCP storm inlet 4301 (6'X4'). 06/17/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued to install RCP storm pipe approximately 200', curb inlet 4302 & 4303. 06/18/24 Tuesday JMJ ( Sub-Contractor Pro-Design Kurt's crew) Contractor only 70' of 18" RCP storm pipe, & 25' of 15" RCP and storm box 4303 06/17/24. Contractor laid the 18" RCP pipe up to inlet 4302. 06/19/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 18" RCP from storm inlet 4301 to newly installed inlet 5501. 06/25/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 43' of 24" RCP 5602 completed 06/21/24 Thursday. Contractor 16' of 36" RCP, & perform compaction test. Continued to installed 24" RCP. 06/26/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed 56' of 36" RCP and set box 4801 completed 06/25/24. Today contractor installed 124' of 18" RCP. 06/27/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install storm moving West from storm box 4801. 07/02/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 30' of 18" RCP and storm box 3402. Contractor installed lids on storm boxes that were set last week. 07/09/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor 4802 and 40' of RCP 07/08/24 Monday. Contractor installed HDPE and inlet storm box 4803. Contractor continued installation of HDPE storm pipe. 07/10/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 60' of 24" HDPE yesterday 07/09/24. Contractor installed approximately 40' of 24" HDPE today. Contractor began to excavate from inlet storm box 4804 with 24" RCP. 07/11/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 40' of 24" RCP to junction box 4805. Contractor installed approximately 146' of 24" HDPE inlet storm box 4806. 07/15/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 70' of 24" HDPE storm inlet 5603. 07/17/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 108' of 24" HDPE storm inlets 5604, & 420. 20' of 15" HDPE and poured collars. 07/22/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed approximately 56' of 24" RCP, storm inlet 5605, and 4 inverts on 07/19/24 Friday. Contractor installed 110' of 24" RCP and storm inlet 4901. 07/23/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed the 4", 6", & 8" roof drains as per project plans. Contractor installed drains on the Southside of building. 07/24/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor also installed 4 nyloplast drains yesterday as-per project plans. Today contractor installed 2 nyloplast drains, 1 roof drain, 7 poured inverts. 07/25/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continues to install roof drains. 1 roof drain and excavation was backfilled. 07/29/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the installation of storm lines. 07/30/24 Tuesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor installed storm box (5201 with 32' of 36" RCP ) & (5202 32' of 30"RCP) yesterday and today. 07/31/24 Wednesday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the install of storm lines, collars and inverts were poured. 08/01/24 Thursday JMJ (Sub-Contractor Pro-Design Kurt's crew) Contractor continued the installation of the storm line as-per project plans Southwest side. 08/05/24 Monday JMJ (Sub-Contractor Pro-Design Kurt's) Storm line was installed 5301 storm box 24" of HDPE 96' & 5302 storm box 18" HDPE 177'. 08/07/24 Wednesday JMJ (Pro-Design) 18" RCP was installed from 5202 to 5203 on 08/06/24 Tuesday a-per project plan.(Sub-Contractor Pro-Design Kurt's) Today contractor installed approximately 64' of 18" RCP from 5203 storm structure. 08/09/24 Friday JMJ (Sub-Contractor Pro-Design Kurt's) Contractor installed 19' of 24" RCP and structure 5504, and 24' of 24" HDPE storm pipe out of 5504. 08/14/24 Wednesday JMJ (Pro-Design) Contractor poured inverts and collars for storm pipes previously set. Contractor returned to the East side of project and install approximate 108' of 18" RCP going Southbound. Contractor began the install of one storm structure. 08/15/24 Thursday JMJ (Pro-Design) Monday 08/12/24 contractor laid 260' of 24" from 5204 to 5205. Collars and inverts on 5204, 5205, & 5206. 20' of 24" HDPE out of 5205 and 98' of 18" RCP from 5205 to 5206 as per project plans. Contractor spent most of today stacking storm structure and pouring collars and invert for structures. 08/16/24 Friday JMJ (Pro-Design) Yesterday Storm Junction box 5203 two curb inlet. 4601 laid 73' of 18" RCP from junction box 5203 to curb inlet 4601 set 4601. Poured collars on 4601 and 5203 inverts in 4601 and 5204. Stacked out curb at 5205. 5206, 5203 set lids on 4601, 5205,5206,5302. Today Storm box 4501 was set 60' of 30" HDPE storm pipe going East and 90' of 30" HDPE going South. Contractor plans to set storm box 4502.
Grading/Excavation/Fill Inspection Partial 8/20/2024 8/20/2024 08/20/2024
Misc
Informational
08/20/2024
08/20/24 Tuesday JMJ (Design Pro) Contractor graded site.
Water Service Inspection Partial 8/21/2024 8/21/2024 08/21/2024
Misc
Informational
08/21/2024
08/21/24 Wednesday JMJ ( Pro-Design ) Contractor is attempting to pressure test water line.
Water Service Inspection Partial 8/21/2024 8/21/2024 08/21/2024
Misc
Informational
08/21/2024
08/21/24 Wednesday JMJ ( Pro-Design ) Contractor is attempting to pressure test water line.
Water Line - Construction Inspection Partial 8/23/2024 8/23/2024 08/23/2024
Misc
Informational
08/09/2024
07/09/24 Tuesday JMJ (Rodriguez Construction) Contractor began to install 12" Serta Lock water pipe. The vendor delivered the wrong bolts to site so, the contractor set up for today. 07/10/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 260' of 12" serta lock water pipe as per project plans. 07/11/24 Thursday JMJ (Rodriguez Construction) Contractor installed approximately 140' of 12" serta lock water pipe and tee for the hydrant. 07/15/24 Monday JMJ (Rodriguez Construction) Contractor installed Fire hydrant and bends approximately 60' on Friday 07/12/24. Contractor installed approximately 100' today 12" serta lock water pipe. 07/17/24 Wednesday JMJ (Rodriguez Construction) Contractor installed approximately 200' of 12" serta lock water main, 12"X6" Tee, and 38' of 6" water pipe, and hydrant assembly. Contactor poured the backing blocks for bends, & tees. 07/23/24 Tuesday JMJ (Rodriguez Construction) Contractor has been working at the South of project on water main staring yesterday. Tie-in to exist 12" that was installed during the first phase of project. 12" Valves and bends. 07/24/24 Wednesday JMJ (Rodriguez Construction Wendell's crew) On Monday 07/22/24 contractor was able to installed approximately 100' of 12" serta lock water pipe. Today contractor installed 100' running along the Eastside of building and pass heading South toward the pipe that was instated Monday. Two hydrants, 22.5 & 11.25 bend were installed. Contractor began the installation of the backflow vault. Form and material will be done so vault floor can be poured. 07/25/24 Thursday JMJ (Rodriguez Construction Wendell's crew) Contractor poured backing block behind bends and hydrant tees. The floor of the backflow vault was poured. Contractor continues to install 12" serta lock water main as-per project plans. 07/26/24 Friday JMJ (Rodriguez Construction Wendell's crew) Contractor installed approximately 160' of 12" serta lock water main. 07/30/24 Tuesday JMJ (Rodriguez Construction Wendell's crew) Contractor continued to water main 12" serta lock. 07/31/24 Wednesday JMJ (Rodriguez Construction Wendell's crew) Contractor installed valves for backflow vault yesterday and poured collars for vault today. Contractor started the install of hydrant as-per project plans. Contractor also poured some backing blocks on for bends and tees on 12" serta lock water main. 08/01/24 Thursday JMJ (Rodriguez Construction Wendell's crew) Contractor continued the pour the backing block for the newly installed hydrant. 08/07/24 Wednesday JMJ (Rodriguez Construction Wendell's crew) Contractor has set backflow vault installed, backflow assembly, and poured the vault floor. 08/09/24 Friday JMJ (Rodriguez Construction Wendell's crew) Water line 12" serta lock water main was completed project.
Misc
Informational
08/23/2024
08/23/24 Friday JMJ (Pro-Design Corey's Crew) Contractor installed approximately 45' of 8" water to the building coming from a shut 8" valve. Contractor installed approximately 30' of 4" coming of a 6" shut valve, 6"X4" reducer down to 4". The 4" water main has straddle block and 4"X2" reducer for approximately 15' of 2" copper line.
Fire Line - Hydrostatic Test Partial 8/29/2024 8/29/2024 08/29/2024
Misc
Informational
08/29/2024
08/29/31 Thursday JMJ (Rodriguez Const.) Fire / Domestic waterline pass hydrostatic Test @200psi for 2hours.
Water Service Inspection Passed 9/4/2024 9/4/2024 09/04/2024
Misc
Informational
08/21/2024
08/21/24 Wednesday JMJ ( Pro-Design ) Contractor is attempting to pressure test water line.
Misc
Informational
09/04/2024
09/04/24 Wednesday JMJ (Rodriguez Const.) Contractor chlorinated waterline on 09/03/24 & de-chlorinated waterline on 09/04/24
Water Service Inspection Partial 9/18/2024 9/18/2024 09/18/2024
Misc
Informational
09/18/2024
09/18/24 Wednesday JMJ (Rodriguez Construction) Waiting for the last sample to pass bacterial sample test to notify Water.
Water Service Inspection Passed 9/25/2024 9/25/2024 09/25/2024
Misc
Informational
09/18/2024
09/18/24 Wednesday JMJ (Rodriguez Construction) Waiting for the last sample to pass bacterial sample test to notify Water. 09/25/24 Wednesday JMJ ( Pro-Design Construction) Contractor installed approximately installed a 6"X4" tap for irrigation line 60' of 4" with a straddle block. Meter was installed on the Northeast side of building. Contractor also completed Fireline hydrostatic @200psi same corner of building.
Fire Line Construction Inspection Passed 9/25/2024 9/25/2024 09/25/2024
Misc
Informational
09/25/2024
09/25/24 Wednesday JMJ ( Pro-Design ) Contractor flushed fire line @ the Northeast section of building.
Site Visit Partial 10/22/2024 10/22/2024 10/22/2024
Misc
Informational
07/01/2024
7-1-24 Dustin A, No work being done 10-22-24 Dustin A , no activity outside of building
Erosion Control Inspection Partial 12/5/2024 12/5/2024 12/05/2024
Misc
Informational
08/16/2024
08/16/24 Friday JMJ Erosion Sediment Control (ESC) Inspection appear to be functioning properly.
Misc
Informational
12/05/2024
12/03/24 Tuesday JMJ (Epic) Kara Starlin met with contractor and review erosion sediment control onsite. Key areas of possible soil erosion infiltration into storm system. Contractor has list of items from wrapping storm inlets with fencing relocating equipment that may pose a contamination threat.
Site Visit Partial 2/7/2025 2/7/2025 02/07/2025
Misc
Informational
10/22/2024
7-1-24 Dustin A, No work being done 10-22-24 Dustin A , no activity outside of building 02/07/25 Friday JMJ No related work throughout the week.
Erosion Control Inspection Partial 1/31/2025 1/31/2025 02/10/2025
Misc
Informational
12/05/2024
08/16/24 Friday JMJ Erosion Sediment Control (ESC) Inspection appear to be functioning properly.
Misc
Informational
12/05/2024
12/03/24 Tuesday JMJ (Epic) Kara Starlin met with contractor and review erosion sediment control onsite. Key areas of possible soil erosion infiltration into storm system. Contractor has list of items from wrapping storm inlets with fencing relocating equipment that may pose a contamination threat.
Misc
Informational
01/31/2025
1/31/25 Friday JMJ Erosion control throughout the project needs to be adjusted to ensure it is properly functioning. 02/07/25 Friday JMJ Erosion control throughout the project needs to be adjusted to ensure it is properly functioning.
Documents & Images
Date Uploaded File Type Document Name
12/08/2022 Approved Plans Approved Village FDP 2020_11_04_PL2019306_Village
12/08/2022 Approved Plans Approved Village Private Street and Utilities
04/22/2024 Letter DE-Permit
06/03/2024 Letter INSPECTION SUMMARY
06/03/2024 Letter INSPECTION SUMMARY
06/04/2024 Letter INSPECTION SUMMARY
06/04/2024 Letter INSPECTION SUMMARY
06/07/2024 Letter INSPECTION SUMMARY
06/07/2024 Letter INSPECTION SUMMARY
06/07/2024 Letter INSPECTION SUMMARY
06/07/2024 Letter INSPECTION SUMMARY
06/11/2024 Letter INSPECTION SUMMARY
06/11/2024 Letter INSPECTION SUMMARY
06/12/2024 Letter INSPECTION SUMMARY
06/12/2024 Letter INSPECTION SUMMARY
06/13/2024 Letter INSPECTION SUMMARY
06/13/2024 Letter INSPECTION SUMMARY
06/13/2024 Letter INSPECTION SUMMARY
06/13/2024 Letter INSPECTION SUMMARY
06/17/2024 Letter INSPECTION SUMMARY
06/17/2024 Letter INSPECTION SUMMARY
06/18/2024 Letter INSPECTION SUMMARY
06/19/2024 Letter INSPECTION SUMMARY
06/19/2024 Letter INSPECTION SUMMARY
06/25/2024 Letter INSPECTION SUMMARY
06/26/2024 Letter INSPECTION SUMMARY
06/27/2024 Letter INSPECTION SUMMARY
07/01/2024 Letter INSPECTION SUMMARY
07/02/2024 Letter INSPECTION SUMMARY
07/09/2024 Letter INSPECTION SUMMARY
07/09/2024 Letter INSPECTION SUMMARY
07/10/2024 Letter INSPECTION SUMMARY
07/10/2024 Letter INSPECTION SUMMARY
07/10/2024 Letter INSPECTION SUMMARY
07/10/2024 Letter INSPECTION SUMMARY
07/11/2024 Letter INSPECTION SUMMARY
07/11/2024 Letter INSPECTION SUMMARY
07/15/2024 Letter INSPECTION SUMMARY
07/15/2024 Letter INSPECTION SUMMARY
07/17/2024 Letter INSPECTION SUMMARY
07/17/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
07/23/2024 Letter INSPECTION SUMMARY
07/23/2024 Letter INSPECTION SUMMARY
07/23/2024 Letter INSPECTION SUMMARY
07/24/2024 Letter INSPECTION SUMMARY
07/24/2024 Letter INSPECTION SUMMARY
07/25/2024 Letter INSPECTION SUMMARY
07/25/2024 Letter INSPECTION SUMMARY
07/26/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
07/30/2024 Letter INSPECTION SUMMARY
07/30/2024 Letter INSPECTION SUMMARY
07/30/2024 Letter INSPECTION SUMMARY
07/31/2024 Letter INSPECTION SUMMARY
07/31/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/05/2024 Letter INSPECTION SUMMARY
08/07/2024 Letter INSPECTION SUMMARY
08/07/2024 Letter INSPECTION SUMMARY
08/09/2024 Letter INSPECTION SUMMARY
08/09/2024 Letter INSPECTION SUMMARY
08/14/2024 Letter INSPECTION SUMMARY
08/15/2024 Letter INSPECTION SUMMARY
08/16/2024 Letter INSPECTION SUMMARY
08/16/2024 Letter INSPECTION SUMMARY
08/16/2024 Letter INSPECTION SUMMARY
08/20/2024 Letter INSPECTION SUMMARY
08/21/2024 Letter INSPECTION SUMMARY
08/21/2024 Letter INSPECTION SUMMARY
08/23/2024 Letter INSPECTION SUMMARY
08/29/2024 Letter INSPECTION SUMMARY
09/04/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/25/2024 Letter INSPECTION SUMMARY
10/02/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
02/07/2025 Letter INSPECTION SUMMARY
02/07/2025 Letter INSPECTION SUMMARY
02/10/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home