Summary


PRSITE20201463
Development - Site
Final Acceptance
DEVELOPMENT COMPLETE
WINTERSET VALLEY REPLAT LOTS 1450 AND 1451 STREET, STORM, MDP
06/03/2020
06/17/2020
11/25/2023
12/13/2022
Locations
Contacts
SCHLAGEL & ASSOCIATES, Address:14920 W 107TH ST, Phone:(913) 492-5158  
EMERY SAPP AND SONS INC, Address:2301 I-70 DR NW, Phone:(573) 445-8331  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 06/03/2020 06/17/2020
Dawn Bell
Fees
Paid Fees Amount Paid Owing Date Paid
9110068-Storm Fee $330.00 $330.00 Paid 06/05/2020
9110081-Paved Surface Inspection Fee $1,843.28 $1,843.28 Paid 06/05/2020
9110071-Site Grading Fee $210.00 $210.00 Paid 06/05/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Partial 9/16/2020 9/16/2020 09/18/2020
Misc
Informational
09/18/2020
They spread grass seed, mats and straw over the end section of storm line 400. RP 9-16-20
Site Visit Partial 9/17/2020 9/17/2020 09/18/2020
Misc
Informational
09/18/2020
Kevin’s crew ripped out curb’s and end section of asphalt on Audubon. RP 9-16-20
Site Visit Partial 9/17/2020 9/17/2020 09/18/2020
Misc
Informational
09/18/2020
Kevin’s crew ripped out curb’s and end section of asphalt on Audubon. RP 9-16-20
Misc
Informational
09/18/2020
Kevin’s crew spread out 1,100 tons of MODOT Type 5 base rock for the new end section of Audubon. RP 9-17-20
Pavement-Curb Construction Partial 9/24/2020 9/24/2020 09/24/2020
Misc
Informational
09/24/2020
Jose’s crew poured curbs for the knuckle at the end of Audubon, but this area was never proof rolled. I informed Jose that we still needed to remove 2 short sections of curbing form where they cut across Audubon. RP 9-24-20
Pavement-Curb Construction Partial 9/25/2020 9/25/2020 09/25/2020
Misc
Informational
09/24/2020
Jose’s crew poured curbs for the knuckle at the end of Audubon, but this area was never proof rolled. I informed Jose that we still needed to remove 2 short sections of curbing form where they cut across Audubon. RP 9-24-20
Misc
Informational
09/25/2020
Jose’s crew formed and poured the curb inlet and all the curb tie ins EXCEPT for a small section on the south side of Audubon. RP 9-25-20
Pavement-Curb Construction Passed 10/1/2020 10/1/2020 10/01/2020
Misc
Informational
09/25/2020
Jose’s crew poured curbs for the knuckle at the end of Audubon, but this area was never proof rolled. I informed Jose that we still needed to remove 2 short sections of curbing form where they cut across Audubon. RP 9-24-20
Misc
Informational
09/25/2020
Jose’s crew formed and poured the curb inlet and all the curb tie ins EXCEPT for a small section on the south side of Audubon. RP 9-25-20
Misc
Informational
10/01/2020
Richard’s crew from ESS poured the last section of curbing for the knuckle. RP 10-1-20
Site Visit Partial 9/21/2020 9/21/2020 03/05/2021
Misc
Informational
09/18/2020
Kevin’s crew ripped out curb’s and end section of asphalt on Audubon. RP 9-16-20
Misc
Informational
09/18/2020
Kevin’s crew spread out 1,100 tons of MODOT Type 5 base rock for the new end section of Audubon. RP 9-17-20
Misc
Informational
03/05/2021
ESS has started making modifications to the appearance of the storm structure. RP 3-5-21
Site Visit Partial 3/8/2021 3/8/2021 03/08/2021
Misc
Informational
03/05/2021
Kevin’s crew ripped out curb’s and end section of asphalt on Audubon. RP 9-16-20
Misc
Informational
03/05/2021
Kevin’s crew spread out 1,100 tons of MODOT Type 5 base rock for the new end section of Audubon. RP 9-17-20
Misc
Informational
03/05/2021
ESS has started making modifications to the appearance of the storm structure. RP 3-5-21
Misc
Informational
03/08/2021
ESS drilled and set new rebar through out the structure. RP 3-8-21
Site Visit Partial 3/9/2021 3/9/2021 03/10/2021
Misc
Informational
03/08/2021
Kevin’s crew ripped out curb’s and end section of asphalt on Audubon. RP 9-16-20
Misc
Informational
03/08/2021
Kevin’s crew spread out 1,100 tons of MODOT Type 5 base rock for the new end section of Audubon. RP 9-17-20
Misc
Informational
03/08/2021
ESS has started making modifications to the appearance of the storm structure. RP 3-5-21
Misc
Informational
03/08/2021
ESS drilled and set new rebar through out the structure. RP 3-8-21
Misc
Informational
03/10/2021
ESS framed and poured additional concrete to the structure. RP 3-10-21
ESC - (Vegetation/Ground Cover) Passed 02/24/2022
Misc
Informational
02/24/2022
The site is vegetated. RP 2-24-22
Erosion Control Inspection Passed 9/28/2020 02/24/2022
Misc
Informational
09/18/2020
They spread grass seed, mats and straw over the end section of storm line 400. RP 9-16-20
Site Visit Complete 3/16/2021 3/16/2021 02/24/2022
Misc
Informational
03/10/2021
Kevin’s crew ripped out curb’s and end section of asphalt on Audubon. RP 9-16-20
Misc
Informational
03/10/2021
Kevin’s crew spread out 1,100 tons of MODOT Type 5 base rock for the new end section of Audubon. RP 9-17-20
Misc
Informational
03/10/2021
ESS has started making modifications to the appearance of the storm structure. RP 3-5-21
Misc
Informational
03/10/2021
ESS drilled and set new rebar through out the structure. RP 3-8-21
Misc
Informational
03/10/2021
ESS framed and poured additional concrete to the structure. RP 3-10-21
Misc
Informational
02/24/2022
Job is completed. RP 2-24-22
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: