Summary


PRSITE20191131
Development - Site
Final Acceptance
OAK VIEW LEES SUMMIT LLC
DEVELOPMENT COMPLETE
FULL COMMERCIAL SITE DEVELOPMENT
05/02/2019
01/22/2020
10/22/2021
Locations
Contacts
OAK VIEW LEES SUMMIT LLC, Address:201 HAWKS RIDGE TRL  
PROSSER WILBERT CONSTRUCTION INC, Address:13730 W 108TH ST, Phone:(913) 906-0104  
  
PS MID-WEST ONE LLC, Address:701 WESTERN AVE  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 11/27/2019 11/26/2019
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $22,738.00 $22,738.00 Paid 12/05/2019
8350015-Water Meter Fee $2,307.98 $2,307.98 Paid 12/05/2019
91100C8-Sanitary Sewer Insp Fees $48.75 $48.75 Paid 12/05/2019
91100C9-Water Insp Fee $703.95 $703.95 Paid 12/05/2019
9110072-Water Test Fee $200.00 $200.00 Paid 12/05/2019
9110068-Storm Sewer Inspection Fee $315.00 $315.00 Paid 12/05/2019
9110081-Paved Surface Inspection Fee $3,903.90 $3,903.90 Paid 12/05/2019
9110071-Site Grading Fee $600.00 $600.00 Paid 12/05/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Storm - Pipe Partial 1/29/2020 01/29/2020
Misc
Informational
01/29/2020
1-29-20 9:06am 28 degrees outside. They are getting ready to start digging out for roof drains. They will call when the first stick of pipe is installed.
Storm - Pipe Partial 1/30/2020 01/30/2020
Misc
Informational
01/29/2020
1-29-20 9:06am 28 degrees outside. They are getting ready to start digging out for roof drains. They will call when the first stick of pipe is installed.
Misc
Informational
01/30/2020
1-30-20 11:31am They have one stick of roof drain pipe installed with plenty of rock.1:46pm They have a total of 60’ installed at this time.
Storm - Pipe Partial 1/31/2020 01/31/2020
Misc
Informational
01/30/2020
1-29-20 9:06am 28 degrees outside. They are getting ready to start digging out for roof drains. They will call when the first stick of pipe is installed.
Misc
Informational
01/30/2020
1-30-20 11:31am They have one stick of roof drain pipe installed with plenty of rock.1:46pm They have a total of 60’ installed at this time.
Misc
Informational
01/31/2020
1-31-20 10:03pm They have installed approximately 80’ of storm pipe. 2:15pm They have installed approximately 140’ today.
Storm - Pipe Partial 2/3/2020 02/04/2020
Misc
Informational
01/31/2020
1-31-20 10:03pm They have installed approximately 80’ of storm pipe. 2:15pm They have installed approximately 140’ today.
Misc
Informational
01/31/2020
1-30-20 11:31am They have one stick of roof drain pipe installed with plenty of rock.1:46pm They have a total of 60’ installed at this time.
Misc
Informational
01/31/2020
1-29-20 9:06am 28 degrees outside. They are getting ready to start digging out for roof drains. They will call when the first stick of pipe is installed.
Misc
Informational
02/03/2020
2-3-20 9:02am They have trenched out for approximately 100’ and are installing rock for the pipe. They installed the storm pipe and backfilled.
Site Visit Partial 2/6/2020 02/06/2020
Misc
Informational
02/06/2020
2-6-20 There is no activity at this time.
Site Visit Partial 2/10/2020 02/10/2020
Misc
Informational
02/06/2020
2-6-20 There is no activity at this time.
Misc
Informational
02/10/2020
2-10-20 8:42amn Clayco Electric are the only crew on site at this time.
Erosion Control Inspection Partial 2/21/2020 02/21/2020
Misc
Informational
02/21/2020
2-21-20 8:30am I spoke with the Superintendent. There is silt fence down on the east side of the job site that needs addressed. All other erosion controls appear at this time to be good. The Superintendent said he would make the corrections right away.
Site Visit Partial 3/2/2020 03/02/2020
Misc
Informational
02/10/2020
2-6-20 There is no activity at this time.
Misc
Informational
02/10/2020
2-10-20 8:42amn Clayco Electric are the only crew on site at this time.
Misc
Informational
03/02/2020
3-2-20 There were crews on site working but know inspections needed. Erosion looked good at this time.
Erosion Control Inspection Partial 3/18/2020 03/27/2020
Misc
Informational
02/21/2020
2-21-20 8:30am I spoke with the Superintendent. There is silt fence down on the east side of the job site that needs addressed. All other erosion controls appear at this time to be good. The Superintendent said he would make the corrections right away.
Misc
Informational
03/27/2020
3-27-20 10am Most of the erosion appears to be in place and working. The superintendent said that they are coming out today to check and do any repairs.
Sewer Service Inspection Partial 4/10/2020 04/10/2020
Misc
Informational
04/10/2020
4-10-20 2:30pm They have hooked on to the sanitary service line and will be backfilling.
Storm - Pipe Partial 4/10/2020 04/10/2020
Misc
Informational
02/04/2020
1-31-20 10:03pm They have installed approximately 80’ of storm pipe. 2:15pm They have installed approximately 140’ today.
Misc
Informational
02/04/2020
1-30-20 11:31am They have one stick of roof drain pipe installed with plenty of rock.1:46pm They have a total of 60’ installed at this time.
Misc
Informational
02/04/2020
1-29-20 9:06am 28 degrees outside. They are getting ready to start digging out for roof drains. They will call when the first stick of pipe is installed.
Misc
Informational
02/04/2020
2-3-20 9:02am They have trenched out for approximately 100’ and are installing rock for the pipe. They installed the storm pipe and backfilled.
Misc
Informational
04/10/2020
4-10-20 On 4-9-20 Mark Harding inspected the roof drain tie-ins. He said they were good.
Site Visit Partial 04/29/2020
Misc
Informational
03/02/2020
2-6-20 There is no activity at this time.
Misc
Informational
03/02/2020
2-10-20 8:42amn Clayco Electric are the only crew on site at this time.
Misc
Informational
03/02/2020
3-2-20 There were crews on site working but know inspections needed. Erosion looked good at this time. 4-29-20 8:26am There are crews working. There are no inspections needed at this time.
Erosion Control Inspection Partial 04/29/2020
Misc
Informational
03/27/2020
2-21-20 8:30am I spoke with the Superintendent. There is silt fence down on the east side of the job site that needs addressed. All other erosion controls appear at this time to be good. The Superintendent said he would make the corrections right away.
Misc
Informational
03/27/2020
3-27-20 10am Most of the erosion appears to be in place and working. The superintendent said that they are coming out today to check and do any repairs. 4-29-20 8:38am All of the erosion controls are in place and appear to be working at this time.
Site Visit Partial 5/6/2020 05/06/2020
Misc
Informational
04/29/2020
2-6-20 There is no activity at this time.
Misc
Informational
04/29/2020
2-10-20 8:42amn Clayco Electric are the only crew on site at this time.
Misc
Informational
04/29/2020
3-2-20 There were crews on site working but know inspections needed. Erosion looked good at this time. 4-29-20 8:26am There are crews working. There are no inspections needed at this time.5-6-20 9:09am The crews are working on the building. There are no inspections needed at this time. They are calling in a water tap with the water department.
Water Line - Construction Inspection Partial 05/08/2020
Misc
Informational
02/04/2020
2-4-20 9:48am They are getting ready to install the domestic copper water line that runs into the building. They will be getting the meter and pit at a later date. 5-8-20 11:32am The meter has been set and they have 10’ of copper. We will be doing a pressure test nest week.
Fire Line - Flush Passed 05/19/2020
Misc
Informational
05/19/2020
5-19-20 2:32pm They flushed the fire line for 4 minutes. The line is approximately 35’ long.
Site Visit Partial 07/08/2020
Misc
Informational
05/06/2020
3-2-20 There were crews on site working but know inspections needed. Erosion looked good at this time. 4-29-20 8:26am There are crews working. There are no inspections needed at this time.5-6-20 9:09am The crews are working on the building. There are no inspections needed at this time. They are calling in a water tap with the water department.
Misc
Informational
05/06/2020
2-10-20 8:42amn Clayco Electric are the only crew on site at this time.
Misc
Informational
05/06/2020
2-6-20 There is no activity at this time. 7-8-20 There is no activity that requires a inspection at this time.
Site Visit Partial 07/09/2020
Misc
Informational
07/08/2020
3-2-20 There were crews on site working but know inspections needed. Erosion looked good at this time. 4-29-20 8:26am There are crews working. There are no inspections needed at this time.5-6-20 9:09am The crews are working on the building. There are no inspections needed at this time. They are calling in a water tap with the water department.
Misc
Informational
07/08/2020
2-10-20 8:42amn Clayco Electric are the only crew on site at this time.
Misc
Informational
07/08/2020
2-6-20 There is no activity at this time. 7-8-20 There is no activity that requires a inspection at this time. 7-9-20 They are setting up sidewalk;k on the south side and asked for direction.
Site Visit Partial 07/10/2020
Misc
Informational
07/09/2020
3-2-20 There were crews on site working but know inspections needed. Erosion looked good at this time. 4-29-20 8:26am There are crews working. There are no inspections needed at this time.5-6-20 9:09am The crews are working on the building. There are no inspections needed at this time. They are calling in a water tap with the water department.
Misc
Informational
07/09/2020
2-10-20 8:42amn Clayco Electric are the only crew on site at this time.
Misc
Informational
07/09/2020
2-6-20 There is no activity at this time. 7-8-20 There is no activity that requires a inspection at this time. 7-9-20 They are setting up sidewalk on the south side and asked for direction. 7-10-20 Steve Robbins and I met on site to look at the sidewalk and rap on the south side of the building. It looks like they will be able to stay ADA compliant.
Site Visit Partial 7/13/2020 7/13/2020 07/13/2020
Misc
Informational
07/10/2020
3-2-20 There were crews on site working but know inspections needed. Erosion looked good at this time. 4-29-20 8:26am There are crews working. There are no inspections needed at this time.5-6-20 9:09am The crews are working on the building. There are no inspections needed at this time. They are calling in a water tap with the water department.
Misc
Informational
07/10/2020
2-10-20 8:42amn Clayco Electric are the only crew on site at this time.
Misc
Informational
07/10/2020
2-6-20 There is no activity at this time. 7-8-20 There is no activity that requires a inspection at this time. 7-9-20 They are setting up sidewalk on the south side and asked for direction. 7-10-20 Steve Robbins and I met on site to look at the sidewalk and rap on the south side of the building. It looks like they will be able to stay ADA compliant. 7-13-20 8:32am Theyare working on replacing broken curb. They are setting up sidewalk too.
Site Visit Partial 07/14/2020
Misc
Informational
07/13/2020
3-2-20 There were crews on site working but know inspections needed. Erosion looked good at this time. 4-29-20 8:26am There are crews working. There are no inspections needed at this time.5-6-20 9:09am The crews are working on the building. There are no inspections needed at this time. They are calling in a water tap with the water department.
Misc
Informational
07/13/2020
2-10-20 8:42amn Clayco Electric are the only crew on site at this time.
Misc
Informational
07/13/2020
2-6-20 There is no activity at this time. 7-8-20 There is no activity that requires a inspection at this time. 7-9-20 They are setting up sidewalk on the south side and asked for direction. 7-10-20 Steve Robbins and I met on site to look at the sidewalk and rap on the south side of the building. It looks like they will be able to stay ADA compliant. 7-13-20 8:32am They are working on replacing broken curb. They are setting up sidewalk too. 7-14-20 7:52am They are still working on curb and sidewalk set up.
Pavement-Curb Construction Passed 07/16/2020
Misc
Informational
07/16/2020
7-16-20 10:23am They have poured the curb on the East side of the building taking care of damaged curb.
Sidewalk Inspection Passed 7/17/2020 7/17/2020 07/17/2020
Misc
Informational
07/17/2020
7-17-20 8:27AM They are setting up the sidewalk on the North side of the building. 2:05pm They have poured the sidewalk and it is ADA compliant.
Site Visit Partial 7/20/2020 7/20/2020 07/20/2020
Misc
Informational
07/14/2020
3-2-20 There were crews on site working but know inspections needed. Erosion looked good at this time. 4-29-20 8:26am There are crews working. There are no inspections needed at this time.5-6-20 9:09am The crews are working on the building. There are no inspections needed at this time. They are calling in a water tap with the water department.
Misc
Informational
07/14/2020
2-10-20 8:42amn Clayco Electric are the only crew on site at this time.
Misc
Informational
07/14/2020
2-6-20 There is no activity at this time. 7-8-20 There is no activity that requires a inspection at this time. 7-9-20 They are setting up sidewalk on the south side and asked for direction. 7-10-20 Steve Robbins and I met on site to look at the sidewalk and rap on the south side of the building. It looks like they will be able to stay ADA compliant. 7-13-20 8:32am They are working on replacing broken curb. They are setting up sidewalk too. 7-14-20 7:52am They are still working on curb and sidewalk set up. 7-20-20 8:27am There is no activity that requires inspections at this time.
Site Visit Partial 8/18/2020 8/18/2020 08/18/2020
Misc
Informational
07/20/2020
3-2-20 There were crews on site working but know inspections needed. Erosion looked good at this time. 4-29-20 8:26am There are crews working. There are no inspections needed at this time.5-6-20 9:09am The crews are working on the building. There are no inspections needed at this time. They are calling in a water tap with the water department.
Misc
Informational
07/20/2020
2-10-20 8:42amn Clayco Electric are the only crew on site at this time.
Misc
Informational
07/20/2020
2-6-20 There is no activity at this time. 7-8-20 There is no activity that requires a inspection at this time. 7-9-20 They are setting up sidewalk on the south side and asked for direction. 7-10-20 Steve Robbins and I met on site to look at the sidewalk and rap on the south side of the building. It looks like they will be able to stay ADA compliant. 7-13-20 8:32am They are working on replacing broken curb. They are setting up sidewalk too. 7-14-20 7:52am They are still working on curb and sidewalk set up. 7-20-20 8:27am There is no activity that requires inspections at this time. 7-19-20 Steve Robbins and I talked to Alan Gentry about getting them a final for the site.
Site Visit Partial 8/26/2020 8/26/2020 08/26/2020
Misc
Informational
08/18/2020
3-2-20 There were crews on site working but know inspections needed. Erosion looked good at this time. 4-29-20 8:26am There are crews working. There are no inspections needed at this time.5-6-20 9:09am The crews are working on the building. There are no inspections needed at this time. They are calling in a water tap with the water department.
Misc
Informational
08/18/2020
2-10-20 8:42amn Clayco Electric are the only crew on site at this time.
Misc
Informational
08/18/2020
2-6-20 There is no activity at this time. 7-8-20 There is no activity that requires a inspection at this time. 7-9-20 They are setting up sidewalk on the south side and asked for direction. 7-10-20 Steve Robbins and I met on site to look at the sidewalk and rap on the south side of the building. It looks like they will be able to stay ADA compliant. 7-13-20 8:32am They are working on replacing broken curb. They are setting up sidewalk too. 7-14-20 7:52am They are still working on curb and sidewalk set up. 7-20-20 8:27am There is no activity that requires inspections at this time. 7-19-20 Steve Robbins and I talked to Alan Gentry about getting them a final for the site. 8-26-20 3:25pm There is no activity on site today that requires inspections.
Site Visit Partial 9/9/2020 9/9/2020 09/09/2020
Misc
Informational
08/26/2020
3-2-20 There were crews on site working but know inspections needed. Erosion looked good at this time. 4-29-20 8:26am There are crews working. There are no inspections needed at this time.5-6-20 9:09am The crews are working on the building. There are no inspections needed at this time. They are calling in a water tap with the water department.
Misc
Informational
08/26/2020
2-10-20 8:42amn Clayco Electric are the only crew on site at this time.
Misc
Informational
08/26/2020
2-6-20 There is no activity at this time. 7-8-20 There is no activity that requires a inspection at this time. 7-9-20 They are setting up sidewalk on the south side and asked for direction. 7-10-20 Steve Robbins and I met on site to look at the sidewalk and rap on the south side of the building. It looks like they will be able to stay ADA compliant. 7-13-20 8:32am They are working on replacing broken curb. They are setting up sidewalk too. 7-14-20 7:52am They are still working on curb and sidewalk set up. 7-20-20 8:27am There is no activity that requires inspections at this time. 7-19-20 Steve Robbins and I talked to Alan Gentry about getting them a final for the site. 8-26-20 3:25pm There is no activity on site today that requires inspections. 9-9-20 10:54am There is no work on site that requires any inspections at this time.
Storm Sewer Construction Inspection Passed 12/08/2020
Site Visit Partial 12/08/2020
Misc
Informational
09/09/2020
3-2-20 There were crews on site working but know inspections needed. Erosion looked good at this time. 4-29-20 8:26am There are crews working. There are no inspections needed at this time.5-6-20 9:09am The crews are working on the building. There are no inspections needed at this time. They are calling in a water tap with the water department.
Misc
Informational
09/09/2020
2-10-20 8:42amn Clayco Electric are the only crew on site at this time.
Misc
Informational
09/09/2020
2-6-20 There is no activity at this time. 7-8-20 There is no activity that requires a inspection at this time. 7-9-20 They are setting up sidewalk on the south side and asked for direction. 7-10-20 Steve Robbins and I met on site to look at the sidewalk and rap on the south side of the building. It looks like they will be able to stay ADA compliant. 7-13-20 8:32am They are working on replacing broken curb. They are setting up sidewalk too. 7-14-20 7:52am They are still working on curb and sidewalk set up. 7-20-20 8:27am There is no activity that requires inspections at this time. 7-19-20 Steve Robbins and I talked to Alan Gentry about getting them a final for the site. 8-26-20 3:25pm There is no activity on site today that requires inspections. 9-9-20 10:54am There is no work on site that requires any inspections at this time. 12-8-20 3:14pm They are working on pulling up all of the silt fence. And picking up materials.
Erosion Control Inspection Partial 12/09/2020
Misc
Informational
04/29/2020
2-21-20 8:30am I spoke with the Superintendent. There is silt fence down on the east side of the job site that needs addressed. All other erosion controls appear at this time to be good. The Superintendent said he would make the corrections right away.
Misc
Informational
04/29/2020
3-27-20 10am Most of the erosion appears to be in place and working. The superintendent said that they are coming out today to check and do any repairs. 4-29-20 8:38am All of the erosion controls are in place and appear to be working at this time. 12-9-20 3:40pm They still have silt fence laying on site that needs picked up.
Site Visit Partial 12/11/2020
Misc
Informational
12/08/2020
3-2-20 There were crews on site working but know inspections needed. Erosion looked good at this time. 4-29-20 8:26am There are crews working. There are no inspections needed at this time.5-6-20 9:09am The crews are working on the building. There are no inspections needed at this time. They are calling in a water tap with the water department.
Misc
Informational
12/08/2020
2-10-20 8:42amn Clayco Electric are the only crew on site at this time.
Misc
Informational
12/08/2020
2-6-20 There is no activity at this time. 7-8-20 There is no activity that requires a inspection at this time. 7-9-20 They are setting up sidewalk on the south side and asked for direction. 7-10-20 Steve Robbins and I met on site to look at the sidewalk and rap on the south side of the building. It looks like they will be able to stay ADA compliant. 7-13-20 8:32am They are working on replacing broken curb. They are setting up sidewalk too. 7-14-20 7:52am They are still working on curb and sidewalk set up. 7-20-20 8:27am There is no activity that requires inspections at this time. 7-19-20 Steve Robbins and I talked to Alan Gentry about getting them a final for the site. 8-26-20 3:25pm There is no activity on site today that requires inspections. 9-9-20 10:54am There is no work on site that requires any inspections at this time. 12-8-20 3:14pm They are working on pulling up all of the silt fence. And picking up materials. 12-11-20 8:02am Light rain. There is no work taking place. Silt fence and materials are still on site that removed.
Site Visit Partial 12/17/2020
Misc
Informational
12/11/2020
3-2-20 There were crews on site working but know inspections needed. Erosion looked good at this time. 4-29-20 8:26am There are crews working. There are no inspections needed at this time.5-6-20 9:09am The crews are working on the building. There are no inspections needed at this time. They are calling in a water tap with the water department.
Misc
Informational
12/11/2020
2-10-20 8:42amn Clayco Electric are the only crew on site at this time.
Misc
Informational
12/11/2020
2-6-20 There is no activity at this time. 7-8-20 There is no activity that requires a inspection at this time. 7-9-20 They are setting up sidewalk on the south side and asked for direction. 7-10-20 Steve Robbins and I met on site to look at the sidewalk and rap on the south side of the building. It looks like they will be able to stay ADA compliant. 7-13-20 8:32am They are working on replacing broken curb. They are setting up sidewalk too. 7-14-20 7:52am They are still working on curb and sidewalk set up. 7-20-20 8:27am There is no activity that requires inspections at this time. 7-19-20 Steve Robbins and I talked to Alan Gentry about getting them a final for the site. 8-26-20 3:25pm There is no activity on site today that requires inspections. 9-9-20 10:54am There is no work on site that requires any inspections at this time. 12-8-20 3:14pm They are working on pulling up all of the silt fence. And picking up materials. 12-11-20 8:02am Light rain. There is no work taking place. Silt fence and materials are still on site that removed. 12-187-20 8:10am I checked the site to see what needs to be removed. They have silt fence and pipe on site that needs to go. The fuel tank and dumpster will need to be removed too.
Erosion Control Inspection Passed 12/29/2020
Misc
Informational
12/09/2020
2-21-20 8:30am I spoke with the Superintendent. There is silt fence down on the east side of the job site that needs addressed. All other erosion controls appear at this time to be good. The Superintendent said he would make the corrections right away.
Misc
Informational
12/09/2020
3-27-20 10am Most of the erosion appears to be in place and working. The superintendent said that they are coming out today to check and do any repairs. 4-29-20 8:38am All of the erosion controls are in place and appear to be working at this time. 12-9-20 3:40pm They still have silt fence laying on site that needs picked up.
Site Visit Complete 12/29/2020
Misc
Informational
12/17/2020
3-2-20 There were crews on site working but know inspections needed. Erosion looked good at this time. 4-29-20 8:26am There are crews working. There are no inspections needed at this time.5-6-20 9:09am The crews are working on the building. There are no inspections needed at this time. They are calling in a water tap with the water department.
Misc
Informational
12/17/2020
2-10-20 8:42amn Clayco Electric are the only crew on site at this time.
Misc
Informational
12/17/2020
2-6-20 There is no activity at this time. 7-8-20 There is no activity that requires a inspection at this time. 7-9-20 They are setting up sidewalk on the south side and asked for direction. 7-10-20 Steve Robbins and I met on site to look at the sidewalk and rap on the south side of the building. It looks like they will be able to stay ADA compliant. 7-13-20 8:32am They are working on replacing broken curb. They are setting up sidewalk too. 7-14-20 7:52am They are still working on curb and sidewalk set up. 7-20-20 8:27am There is no activity that requires inspections at this time. 7-19-20 Steve Robbins and I talked to Alan Gentry about getting them a final for the site. 8-26-20 3:25pm There is no activity on site today that requires inspections. 9-9-20 10:54am There is no work on site that requires any inspections at this time. 12-8-20 3:14pm They are working on pulling up all of the silt fence. And picking up materials. 12-11-20 8:02am Light rain. There is no work taking place. Silt fence and materials are still on site that removed. 12-187-20 8:10am I checked the site to see what needs to be removed. They have silt fence and pipe on site that needs to go. The fuel tank and dumpster will need to be removed too.
Storm - Pipe Passed 12/30/2020
Misc
Informational
04/10/2020
1-31-20 10:03pm They have installed approximately 80’ of storm pipe. 2:15pm They have installed approximately 140’ today.
Misc
Informational
04/10/2020
1-30-20 11:31am They have one stick of roof drain pipe installed with plenty of rock.1:46pm They have a total of 60’ installed at this time.
Misc
Informational
04/10/2020
1-29-20 9:06am 28 degrees outside. They are getting ready to start digging out for roof drains. They will call when the first stick of pipe is installed.
Misc
Informational
04/10/2020
2-3-20 9:02am They have trenched out for approximately 100’ and are installing rock for the pipe. They installed the storm pipe and backfilled.
Misc
Informational
04/10/2020
4-10-20 On 4-9-20 Mark Harding inspected the roof drain tie-ins. He said they were good.
Sanitary Sewer Construction Inspection Passed 12/30/2020
Water - Material Verification Passed 12/30/2020
Sewer Service Inspection Passed 12/30/2020
ESC - (Vegetation/Ground Cover) Passed 12/30/2020
Storm - Material Verification Passed 12/30/2020
Pavement-Surface Passed 12/30/2020
Pavement-Proof Roll Passed 12/30/2020
Documents & Images
Date Uploaded File Type Document Name
12/05/2019 Receipt Receipt for transaction: 2019-007608
12/06/2019 Letter DE-Permit
01/22/2020 signed permit Oak View
01/29/2020 Letter INSPECTION SUMMARY
01/30/2020 Roof drain pick north end
01/30/2020 Roof drain pip[e
01/30/2020 Letter INSPECTION SUMMARY
02/06/2020 Letter INSPECTION SUMMARY
02/06/2020 Binder1
02/10/2020 Letter INSPECTION SUMMARY
02/11/2020 656850982_20200204_133528_6479508_resized
02/11/2020 677168444_20200204_134703_5319413_resized
02/11/2020 679939007_20200204_133539_6231654_resized
02/11/2020 679015486_20200204_133546_6745073_resized
02/11/2020 678091965_20200204_134656_7483468_resized
02/21/2020 Letter INSPECTION SUMMARY
02/21/2020 Letter INSPECTION SUMMARY
02/21/2020 Letter INSPECTION SUMMARY
03/02/2020 Letter INSPECTION SUMMARY
03/27/2020 Letter INSPECTION SUMMARY
04/10/2020 Sanitary
04/10/2020 Letter INSPECTION SUMMARY
04/10/2020 Letter INSPECTION SUMMARY
04/10/2020 Letter DE-Daily Inspection Summary
04/29/2020 Letter INSPECTION SUMMARY
04/29/2020 Letter INSPECTION SUMMARY
05/06/2020 Letter INSPECTION SUMMARY
05/08/2020 Letter INSPECTION SUMMARY
05/19/2020 Letter INSPECTION SUMMARY
07/08/2020 Letter INSPECTION SUMMARY
07/09/2020 Letter INSPECTION SUMMARY
07/09/2020 Letter INSPECTION SUMMARY
07/10/2020 Letter INSPECTION SUMMARY
07/10/2020 Letter INSPECTION SUMMARY
07/13/2020 Letter INSPECTION SUMMARY
07/13/2020 Letter INSPECTION SUMMARY
07/14/2020 Letter INSPECTION SUMMARY
07/14/2020 Letter INSPECTION SUMMARY
07/16/2020 Letter INSPECTION SUMMARY
07/16/2020 Letter INSPECTION SUMMARY
07/17/2020 Letter INSPECTION SUMMARY
07/20/2020 Letter INSPECTION SUMMARY
08/18/2020 Letter INSPECTION SUMMARY
08/26/2020 Letter INSPECTION SUMMARY
08/26/2020 Letter INSPECTION SUMMARY
09/09/2020 Letter INSPECTION SUMMARY
12/08/2020 Letter INSPECTION SUMMARY
12/08/2020 Letter INSPECTION SUMMARY
12/09/2020 Letter INSPECTION SUMMARY
12/11/2020 Letter INSPECTION SUMMARY
12/17/2020 Letter INSPECTION SUMMARY
10/22/2021 Letter DE-Certificate of Final Acceptance (Commercial)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home