Summary


PRSITE20190091
Development - Site
Final Acceptance
HIBE HOLDINGS LLC
DEVELOPMENT COMPLETE
FIRE LINE INSTALLATION FROM THE MAIN TO THE BUILDING. INTERIOR BACKFLOW
01/16/2019
02/08/2019
10/08/2019
Locations
Contacts
HIBE HOLDINGS LLC, Address:2601 W 68TH ST  
ALL ABOUT PLUMBING LLC , Address:504 SE DOUGLAS ST , Phone:(816) 877-3949  
SCOTT BRISCOE, Address:504 SE DOUGLAS, Phone:(816) 877-3946  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 01/16/2019 01/30/2019
Development Center
Fees
Paid Fees Amount Paid Owing Date Paid
Water Insp Fee $949.50 $949.50 Paid 01/30/2019
Water Test Fee $200.00 $200.00 Paid 01/30/2019
Paved Surface Inspection Fee $826.95 $826.95 Paid 01/30/2019
Site Grading Fee $177.65 $177.65 Paid 01/30/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Water Line - Construction Inspection Partial 02/15/2019
Misc
Informational
02/15/2019
Inspection for the fire riser entering the building. The correct materials were used and the thrust block is poured.
Site Visit Partial 03/22/2019
Misc
Informational
03/22/2019
3-22-19 Talked with Scott he is getting ready to jackhammer the concrete to get to the water line.
Site Visit Partial 3/25/2019 at 8:30 AM 03/25/2019
Misc
Informational
03/25/2019
Joe Starlin 03/25/2019 3:37 PM Met with Scott on site to talk about the tie in with the water main. After talking with Dan Harper Scott is aloud to install at a 45 degree angle With the tee.
Water Line - Construction Inspection Partial 03/27/2019
Misc
Informational
03/27/2019
3-27-19 The crew have everything dug out and are placeing water line under the road. Also met with water department and tried to do a test shutdown. They could not get on the valve.
Site Visit Partial 3/28/2019 at 11:00 AM 03/28/2019
Misc
Informational
03/25/2019
3-22-19 Talked with Scott he is getting ready to jackhammer the concrete to get to the water line.
Misc
Informational
03/28/2019
Joe Starlin 03/28/2019 11:42 AM I met with water on site to discuss water valves to shut off for the tie in.
Site Visit Partial 04/01/2019
Misc
Informational
03/28/2019
3-22-19 Talked with Scott he is getting ready to jackhammer the concrete to get to the water line.
Misc
Informational
03/28/2019
Joe Starlin 03/28/2019 11:42 AM I met with water on site to discuss water valves to shut off for the tie in.
Misc
Informational
04/01/2019
4-1-19 Talked with Scott he used C900 pipe for under the road. Looks like we are good to go for water tie in on 4-3-19 at 12am.
Water Line - Construction Inspection Partial 04/04/2019
Misc
Informational
04/04/2019
4-4-19 We shut off the water main at 12am and open the hydrant. The crew cut into the main and installed the tee after disinfecting the assembly. They installed the valve and will connect the pipe to the valve during the day time. The water was turned back on at approximately 4:40am. We flushed according to the flushing velocity chart.
Site Visit Partial 04/05/2019
Misc
Informational
04/01/2019
3-22-19 Talked with Scott he is getting ready to jackhammer the concrete to get to the water line.
Misc
Informational
04/01/2019
Joe Starlin 03/28/2019 11:42 AM I met with water on site to discuss water valves to shut off for the tie in.
Misc
Informational
04/01/2019
4-1-19 Talked with Scott he used C900 pipe for under the road. Looks like we are good to go for water tie in on 4-3-19 at 12am.
Misc
Informational
04/05/2019
4-5-19 Talked with Scott, he has a leak at one of his connections. It appears we will have to do another water shut down to do the repair.
Water Line - Construction Inspection Partial 04/06/2019
Misc
Informational
04/04/2019
Inspection for the fire riser entering the building. The correct materials were used and the thrust block is poured.
Misc
Informational
04/06/2019
4-6-19 The crew pumped out the hole and tried to tighten the bolts at the leak. The gasket apears to be damaged. We will have to do another water shut down for the repair.
Site Visit Partial 4/9/2019 at 8:30 AM 04/09/2019
Misc
Informational
04/05/2019
3-22-19 Talked with Scott he is getting ready to jackhammer the concrete to get to the water line.
Misc
Informational
04/05/2019
Joe Starlin 03/28/2019 11:42 AM I met with water on site to discuss water valves to shut off for the tie in.
Misc
Informational
04/05/2019
4-1-19 Talked with Scott he used C900 pipe for under the road. Looks like we are good to go for water tie in on 4-3-19 at 12am.
Misc
Informational
04/05/2019
4-5-19 Talked with Scott, he has a leak at one of his connections. It appears we will have to do another water shut down to do the repair.
Misc
Informational
04/09/2019
Joe Starlin 04/09/2019 11:18 AM Talked with Scott Briscoe about putting out the door hangers for the water shut down taking place on 4-12-19 on Douglas. I gave him the door hangers and he said they would be put out today just after 11am.
Water Line - Construction Inspection Partial 4/9/2019 04/12/2019
Misc
Informational
04/06/2019
Inspection for the fire riser entering the building. The correct materials were used and the thrust block is poured.
Misc
Informational
04/06/2019
4-6-19 The crew pumped out the hole and tried to tighten the bolts at the leak. The gasket apears to be damaged. We will have to do another water shut down for the repair.
Misc
Informational
04/12/2019
4-12-19 We have shut the water off at 12:45am. They have pumped out the hole and removed the valve with the bad gasket. They have sterilized everything. The valve has been reinstalled and water turned back on. We can find no leaks. We are flushing for 55 minuets.
Water Line - Construction Inspection Partial 4/15/2019 04/15/2019
Misc
Informational
04/12/2019
Inspection for the fire riser entering the building. The correct materials were used and the thrust block is poured.
Misc
Informational
04/12/2019
4-6-19 The crew pumped out the hole and tried to tighten the bolts at the leak. The gasket apears to be damaged. We will have to do another water shut down for the repair.
Misc
Informational
04/12/2019
4-12-19 We have shut the water off at 12:45am. They have pumped out the hole and removed the valve with the bad gasket. They have sterilized everything. The valve has been reinstalled and water turned back on. We can find no leaks. We are flushing for 55 minuets.
Misc
Informational
04/15/2019
4-15-19 Scott put in valves and installed the back flow preventer.
Water Line - Thrust Restraint Partial 04/18/2019
Misc
Informational
04/18/2019
4-18-19 Scott poured thrust blocks, he needs to add two more one in front of the vault and one at the last fitting before the building.
Water Line - Thrust Restraint Passed 04/19/2019
Misc
Informational
04/18/2019
4-18-19 Scott poured thrust blocks, he needs to add two more one in front of the vault and one at the last fitting before the building.
Misc
Informational
04/19/2019
3-18-19 Scott poured the last two thrust blocks, I showed the pics of the thrust blocks to Bob Burns and talked with Steve Robbins about them. They both are good with them. Scott is now ready to flush the line.
Fire Line - Flush Passed 04/19/2019
Misc
Informational
04/19/2019
4-19-19 Water flushing is complete.
Water - Material Verification Passed 04/23/2019
Water Line - Hydrostatic Test Passed 04/23/2019
Misc
Informational
04/23/2019
4-23-19 The fire line held at 200psi for 2 hours.
Water Line - Construction Inspection Partial 04/26/2019
Misc
Informational
04/15/2019
Inspection for the fire riser entering the building. The correct materials were used and the thrust block is poured.
Misc
Informational
04/15/2019
4-6-19 The crew pumped out the hole and tried to tighten the bolts at the leak. The gasket apears to be damaged. We will have to do another water shut down for the repair.
Misc
Informational
04/15/2019
4-12-19 We have shut the water off at 12:45am. They have pumped out the hole and removed the valve with the bad gasket. They have sterilized everything. The valve has been reinstalled and water turned back on. We can find no leaks. We are flushing for 55 minuets.
Misc
Informational
04/15/2019
4-15-19 Scott put in valves and installed the back flow preventer.
Misc
Informational
04/26/2019
4-23-19 The water line was chlorinated. 4-26-19 The water line has been flushed of all chlorine. We will pull first sample on Monday 4-29-19 at 8AM.
Water Line - Coliform Test 2 Partial 05/01/2019
Misc
Informational
05/01/2019
5-1-19 We pulled the second set of samples at 8:22am and they have been delivered to the lab.
Water Line - Coliform Test 1 Partial 05/01/2019
Misc
Informational
05/01/2019
4-29-19 We pulled a water sample and it has been delivered to the lab.
Water Line - Coliform Test 1 Passed 5/1/2019 05/01/2019
Misc
Informational
05/01/2019
4-29-19 We pulled a water sample and it has been delivered to the lab.
Misc
Informational
05/01/2019
Joe Starlin 05/01/2019 10:05 AM The lab results for coliform test 1 have passed.
Water Line - Coliform Test 2 Passed 5/3/2019 05/03/2019
Misc
Informational
05/01/2019
5-1-19 We pulled the second set of samples at 8:22am and they have been delivered to the lab.
Misc
Informational
05/03/2019
Joe Starlin 05/03/2019 6:49 AM The second water sample has passed.
Water Line - Construction Taps Removed Passed 05/07/2019
Grading/Excavation/Fill Inspection Passed 3/27/2019 05/07/2019
Street - Surface Course Passed 05/09/2019
Misc
Informational
05/09/2019
Joe Starlin 05/09/2019 7:28 AM The street replacement is complete.
Corrective Action Required
05/09/2019
Water Line - Valve Passed 05/09/2019
Water Line - Construction Inspection Passed 05/09/2019
Misc
Informational
04/26/2019
Inspection for the fire riser entering the building. The correct materials were used and the thrust block is poured.
Misc
Informational
04/26/2019
4-6-19 The crew pumped out the hole and tried to tighten the bolts at the leak. The gasket apears to be damaged. We will have to do another water shut down for the repair.
Misc
Informational
04/26/2019
4-12-19 We have shut the water off at 12:45am. They have pumped out the hole and removed the valve with the bad gasket. They have sterilized everything. The valve has been reinstalled and water turned back on. We can find no leaks. We are flushing for 55 minuets.
Misc
Informational
04/26/2019
4-15-19 Scott put in valves and installed the back flow preventer.
Misc
Informational
04/26/2019
4-23-19 The water line was chlorinated. 4-26-19 The water line has been flushed of all chlorine. We will pull first sample on Monday 4-29-19 at 8AM.
Street - Repairs Passed 05/09/2019
Misc
Informational
04/23/2019
4-23-19 Scott has the hole ready for concrete on Douglas.
Misc
Informational
04/25/2019
4-25-19 Scott has been informed to use 4K mix and Berlap Finnish.
Site Visit Partial 4/10/2019 05/09/2019
Misc
Informational
04/09/2019
3-22-19 Talked with Scott he is getting ready to jackhammer the concrete to get to the water line.
Misc
Informational
04/09/2019
Joe Starlin 03/28/2019 11:42 AM I met with water on site to discuss water valves to shut off for the tie in.
Misc
Informational
04/09/2019
4-1-19 Talked with Scott he used C900 pipe for under the road. Looks like we are good to go for water tie in on 4-3-19 at 12am.
Misc
Informational
04/09/2019
4-5-19 Talked with Scott, he has a leak at one of his connections. It appears we will have to do another water shut down to do the repair.
Misc
Informational
04/09/2019
Joe Starlin 04/09/2019 11:18 AM Talked with Scott Briscoe about putting out the door hangers for the water shut down taking place on 4-12-19 on Douglas. I gave him the door hangers and he said they would be put out today just after 11am.
Misc
Informational
04/23/2019
4-23-19 Scott pressurized the fire line at 220psi for two hours and it passed. We then chlorinated the line and it will sit for 24 hours.
Misc
Informational
05/09/2019
5-9-19 At the commercial final I let the owner know that the only outstanding item I have is asphalt patch needs to be done.
Street - Repairs Passed 05/16/2019
Misc
Informational
05/13/2019
5-13-19 The parking lot asphalt patch has been completed. I did not like the finished product. The surface was not smooth.The patch was done without notifying me and I was told by the owner of the property Pat that the subgrade was soft so they stoped rolling the asphalt. I explained to him that the subgrade was obviously bad and that the patch will fail sooner that is should. He said he was fine with the work that was done.
Documents & Images
Date Uploaded File Type Document Name
01/30/2019 Receipt Receipt for transaction: 2019-000305
01/31/2019 Letter DE-Permit
02/04/2019 Letter DE-Permit
02/11/2019 Arcade Alley permit signed
02/15/2019 image
02/15/2019 Letter INSPECTION SUMMARY
03/22/2019 Letter INSPECTION SUMMARY
03/25/2019 Letter DE-Daily Inspection Summary
03/27/2019 Letter INSPECTION SUMMARY
03/27/2019 Letter INSPECTION SUMMARY
04/01/2019 Letter INSPECTION SUMMARY
04/01/2019 Letter INSPECTION SUMMARY
04/01/2019 Letter DE-Daily Inspection Summary
04/01/2019 Letter INSPECTION SUMMARY
04/04/2019 image0
04/04/2019 image1
04/04/2019 image2
04/04/2019 image3
04/04/2019 image4
04/04/2019 image5
04/04/2019 Letter INSPECTION SUMMARY
04/05/2019 Letter INSPECTION SUMMARY
04/05/2019 Letter INSPECTION SUMMARY
04/06/2019 image6
04/06/2019 Letter INSPECTION SUMMARY
04/12/2019 Letter INSPECTION SUMMARY
04/12/2019 Letter INSPECTION SUMMARY
04/15/2019 image7
04/15/2019 image8
04/15/2019 image9
04/15/2019 image10
04/15/2019 Letter INSPECTION SUMMARY
04/16/2019 image11
04/16/2019 image12
04/16/2019 image13
04/16/2019 image14
04/16/2019 image15
04/17/2019 image16
04/17/2019 image17
04/17/2019 image18
04/17/2019 image19
04/17/2019 image20
04/17/2019 image21
04/17/2019 image22
04/18/2019 Letter INSPECTION SUMMARY
04/18/2019 image23
04/18/2019 image24
04/19/2019 Letter INSPECTION SUMMARY
04/19/2019 Letter INSPECTION SUMMARY
04/23/2019 Letter INSPECTION SUMMARY
04/23/2019 Letter INSPECTION SUMMARY
04/23/2019 Letter INSPECTION SUMMARY
04/25/2019 image25
04/26/2019 Letter INSPECTION SUMMARY
05/01/2019 Letter INSPECTION SUMMARY
05/01/2019 Letter INSPECTION SUMMARY
05/01/2019 Letter DE-Daily Inspection Summary
05/03/2019 Letter DE-Daily Inspection Summary
05/03/2019 arcade alley water test 2
05/03/2019 arcade alley water sample 1
05/07/2019 Letter DE-Daily Inspection Summary
05/07/2019 Letter DE-Daily Inspection Summary
05/09/2019 Letter DE-Daily Inspection Summary
05/09/2019 Letter DE-Daily Inspection Summary
05/09/2019 Letter DE-Daily Inspection Summary
05/09/2019 Letter DE-Daily Inspection Summary
05/09/2019 Letter INSPECTION SUMMARY
05/09/2019 back flow test arcade alley
05/09/2019 back flow arcade alley
05/09/2019 arcade alley invoice
05/09/2019 Invoice
05/13/2019 image26
05/13/2019 image27
05/16/2019 Letter INSPECTION SUMMARY
05/20/2019 Letter DE-Certificate of Final Acceptance (Commercial)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home