Summary


PRSITE20182837
Development - Site
Final Acceptance
M-III LONGVIEW LLC
DEVELOPMENT COMPLETE
FULL SITE DEVELOPMENT FOR COMMERCIAL BUILDING
08/24/2018
09/19/2018
06/04/2019
Locations
Contacts
ROSE CONSTRUCTION CO., INC., Address:15311 W 109TH STREET, Phone:(913) 782-0777  
M-III LONGVIEW LLC, Address:4601 COLLEGE BLVD STE 300, Phone:(816) 561-3796  
MIKE MASSEY, Phone:(913) 850-2444  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 08/24/2018 09/10/2018
Steve Robbins
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $22.50 $22.50 Paid 09/06/2018
91100C9-Water Insp Fee $67.50 $67.50 Paid 09/06/2018
9110072-Water Test Fee $0.00 $0.00 $0.00 N/A
9110068-Storm Fee $558.00 $558.00 Paid 09/06/2018
9110081-Paved Surface Inspection Fee $1,452.81 $1,452.81 Paid 09/06/2018
9110071-Site Grading Fee $1,401.00 $1,401.00 Paid 09/06/2018
8331401-Water Tap Fee $8,915.00 $8,915.00 Paid 09/06/2018
$9,102.00
8350015-Water Meter Fee $657.68 $657.68 Paid 09/06/2018
$656.17
9110079-After Hours Inspection (Building Codes)(Per Hour) $275.00 $275.00 Paid 06/04/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Partial 9/14/2018 at 3:00 PM 09/19/2018
Informational
09/19/2018
Ronald Paynter 09/19/2018 4:58 PM Inspected erosion control, silt fences are in place
Storm - Material Verification Passed 10/29/2018 10/30/2018
Misc
Corrective Action Required
10/30/2018
Verified storm sewer pipe, 4 ft diameter manhole, 6 ft by 4 ft non-setback curb inlet, two 30 inch nyloplast drain inlets
Storm - Outlet Structure Passed 10/26/2018 10/30/2018
Misc
Corrective Action Required
10/30/2018
Cut into existing curb inlet, installed 1 stick of storm pipe, poured concrete collar and storm invert. Attached photos
Misc
Corrective Action Required
10/30/2018
Cut into existing curb inlet, installed 1 stick of storm pipe, poured concrete collar and storm invert. Attached photos
Storm - Pipe Partial 10/29/2018 10/30/2018
Misc
Corrective Action Required
10/30/2018
Installed 2 sticks of storm pipe, compacted back fill with remote compactor. Attached photos
Storm - Pipe Partial 10/30/2018 10/30/2018
Misc
Corrective Action Required
10/30/2018
Ran into rock where the manhole goes, trying to remove it now. Installed one stick of storm pipe. Rock was removed, manhole was set. Photos attached.
Misc
Corrective Action Required
10/30/2018
Ran into rock where the manhole goes, trying to remove it now.
Storm - Pipe Partial 10/31/2018 10/31/2018
Misc
Corrective Action Required
10/30/2018
Ran into rock where the manhole goes, trying to remove it now. Rock was removed, manhole was set. Photos attached.
Misc
Corrective Action Required
10/30/2018
Ran into rock where the manhole goes, trying to remove it now.
Misc
Corrective Action Required
10/31/2018
Set first nyloplast drain inlet, ran into more rock. Had equipment problems. Going to pour collars and invert for manhole later today.
Misc
Corrective Action Required
10/31/2018
Set first nyloplast drain inlet, ran into more rock. Had mechanical problems with equipment. Going to pour collars and invert for manhole later today. Attached photos
Misc
Corrective Action Required
10/31/2018
Set first nyloplast drain inlet, ran into more rock. Had mechanical problems with equipment. Going to pour collars and invert for manhole later today. Attached photos
Storm - Pipe Partial 11/1/2018 11/01/2018
Misc
Corrective Action Required
11/01/2018
Ran into rock where the manhole goes, trying to remove it now. Rock was removed, manhole was set. Photos attached.
Misc
Corrective Action Required
11/01/2018
Ran into rock where the manhole goes, trying to remove it now.
Misc
Corrective Action Required
11/01/2018
Set first nyloplast drain inlet, ran into more rock. Had equipment problems. Going to pour collars and invert for manhole later today.
Misc
Corrective Action Required
11/01/2018
Set first nyloplast drain inlet, ran into more rock. Had mechanical problems with equipment. Going to pour collars and invert for manhole later today. Attached photos
Misc
Corrective Action Required
11/01/2018
Set first nyloplast drain inlet, ran into more rock. Had mechanical problems with equipment. Going to pour collars and invert for manhole later today. Attached photos
Misc
Corrective Action Required
11/01/2018
Set 2nd nyloplast drain inlet, installed 3 sticks of storm pipe, set curb inlet. Will pour collar and invert tomorrow. Photos attached.
Storm - Pipe Partial 11/2/2018 11/02/2018
Misc
Corrective Action Required
11/01/2018
Ran into rock where the manhole goes, trying to remove it now. Rock was removed, manhole was set. Photos attached.
Misc
Corrective Action Required
11/01/2018
Ran into rock where the manhole goes, trying to remove it now.
Misc
Corrective Action Required
11/01/2018
Set first nyloplast drain inlet, ran into more rock. Had equipment problems. Going to pour collars and invert for manhole later today.
Misc
Corrective Action Required
11/01/2018
Set first nyloplast drain inlet, ran into more rock. Had mechanical problems with equipment. Going to pour collars and invert for manhole later today. Attached photos
Misc
Corrective Action Required
11/01/2018
Set first nyloplast drain inlet, ran into more rock. Had mechanical problems with equipment. Going to pour collars and invert for manhole later today. Attached photos
Misc
Corrective Action Required
11/01/2018
Set 2nd nyloplast drain inlet, installed 3 sticks of storm pipe, set curb inlet. Will pour collar and invert tomorrow. Photos attached.
Misc
Corrective Action Required
11/02/2018
Installed last 2 sticks of storm pipe and capped off end section. Collars and invert poured.
Sewer Service Inspection Passed 11/19/2018
Misc
Informational
11/19/2018
The crew made the connection from the building stub to the existing 4” line stub. I verified that the correct materials were used.
Sanitary Sewer Construction Inspection Passed 11/19/2018
Sanitary Sewer Construction Inspection Passed 11/19/2018
Water Line - Construction Inspection Passed 11/21/2018 11/21/2018
Misc
Informational
11/21/2018
Tapped water main, ran copper from main to meter to building, installed meter yoke, tested water line, no leaks, set and back filled meter well
Curb - Proof Roll Passed 12/18/2018 12/24/2018
Misc
Informational
12/24/2018
Larry Bair had a tandem dump truck with a full load of aggregate. Sub base was solid, no pumping or rutting was detected.
Proof roll parking lot Passed 12/24/2018 12/24/2018
Misc
Informational
12/24/2018
Proof roll was entered under Curb proof roll
Pavement-Surface Passed 12/24/2018 12/24/2018
Misc
Informational
12/24/2018
J&J Asphalt laid 4 inches of APWA-5 asphalt down for base on the parking lot 1 foot short of curbs.
Commercial Curb Inspection Partial 1/4/2019 at 3:00 PM 01/04/2019
Informational
01/04/2019
Poured 7 yards of KCMMB concrete, formed 70 ft of curbing, vibrated mixture into curb, used white cureing compound on finished curb.
Misc
Informational
01/07/2019
Poured 7 yards of KCMMB concrete, vibrated curb, used white cure.
Commercial Curb Inspection Partial 1/9/2019 01/09/2019
Misc
Informational
01/09/2019
Talked with John from the contracting company on site. AB-3 base around the curb radius had adequately placed thickness and compaction for curb placement. I informed contractor that cure and cover was required for concrete due to the nighttime temperatures.
Sidewalk Inspection Passed 4/1/2019 04/01/2019
Misc
Informational
04/01/2019
All sidewalks meet spec.
Sidewalk Inspection Not Ready 4/11/2019 04/12/2019
Misc
Informational
04/12/2019
Received a call from Mike Massey about looking at their newest attempt to adding a step to the south entrance. When I arrived, the walk and ramp was in the midsts of being removed. I talked with the flatwork guy Mike from Leo Concrete. He informed me that they wanted to pour later today. I told him that I couldn’t approve anything without seeing the new plans. Mike from Rose Design Build called me back and said they submitted new plans and that Josh said to get with me to pour it. I told Mike that he couldn’t pour today. I went back to the office and talked with Kent and Josh about this. Josh said that he did approve the changes and that they needed to get with the building inspector to make sure they meet ADA requirements concerning the entrance.
Misc
Informational
04/12/2019
Received a call from Mike Massey about looking at their newest attempt to adding a step to the south entrance. When I arrived, the walk and ramp was in the midsts of being removed. I talked with the flatwork guy Mike from Leo Concrete. He informed me that they wanted to pour later today. I told him that I couldn’t approve anything without seeing the new plans. Mike from Rose Design Build called me back and said they submitted new plans and that Josh said to get with me to pour it. I told Mike that he couldn’t pour today. I went back to the office and talked with Kent and Josh about this. Josh said that he did approve the changes and that they needed to get with the building inspector to make sure they meet ADA requirements concerning the entrance.
Pavement-Surface Passed 4/17/2019 04/18/2019
Misc
Informational
04/17/2019
J & J Asphalt laid 4 inches of APWA-5 asphalt down for the parking lot base
Street - Surface Course Passed 4/17/2019 04/18/2019
Misc
Informational
04/17/2019
J&J Asphalt laid 1 1/2 inches of APWA-5 asphalt for the surface of the parking lot. The area between the ADA ramps is less than 2 percent cross slope.
ESC - (Vegetation/Ground Cover) Passed 5/6/2019 05/06/2019
Misc
Informational
05/06/2019
Sod was laid Saturday. RP 5-6-19
Storm - Inlets Clean Passed 5/6/2019 05/06/2019
Misc
Informational
05/06/2019
Storm inlets were clear of debris. RP 5-6-19
Pavement-Surface Passed 5/14/2019 05/14/2019
Misc
Informational
04/17/2019
J & J Asphalt laid 4 inches of APWA-5 asphalt down for the parking lot base
Misc
Informational
05/14/2019
All American Reid-Mix pour 6 inches of 4K KCMMB mix for the base to repair the hole in the handicapped parking spot. Terry is doing the repair work for Spire Gas.
Commercial Curb Inspection Passed 05/17/2019
Misc
Informational
05/17/2019
Talked with John from the contracting company on site. AB-3 base around the curb radius had adequately placed thickness and compaction for curb placement. I informed contractor that cure and cover was required for concrete due to the nighttime temperatures.
Misc
Informational
05/17/2019
A section of the curb on the back (west) side of the building was replaced today. Photos Attached
Commercial Curb Inspection Passed 1/7/2019 05/23/2019
Misc
Informational
01/04/2019
Poured 7 yards of KCMMB concrete, formed 70 ft of curbing, vibrated mixture into curb, used white cureing compound on finished curb.
Misc
Informational
01/04/2019
Poured 7 yards of KCMMB concrete, vibrated curb, used white cure.
Misc
Informational
05/23/2019
Leo Concrete replaced broken curbing on 5-17-19.
Street - Surface Course Passed 5/15/2019 05/23/2019
Misc
Informational
04/17/2019
J&J Asphalt laid 1 1/2 inches of APWA-5 asphalt for the surface of the parking lot. The area between the ADA ramps is less than 2 percent cross slope.
Misc
Informational
05/15/2019
Moaz Construction patched the hole in the handicapped parking spot with virgin surface mix 1/2”. Was told they would be using 2-01 asphalt mix.
Erosion Control Inspection Passed 5/28/2019 05/28/2019
Misc
Informational
05/28/2019
The lot north of Good Vets has over 70% vegetation. RP 5-28-19
Sidewalk Inspection Passed 06/04/2019
Commercial Curb Inspection Passed 06/04/2019
Grading/Excavation/Fill Inspection Passed 06/05/2019
Documents & Images
Date Uploaded File Type Document Name
09/06/2018 Receipt Receipt for transaction: 2018-006236
09/12/2018 Letter DE-Permit
09/19/2018 DOC091918-09192018165212
09/19/2018 Letter DE-Daily Inspection Summary
10/30/2018 F193B1A4-4C37-44D3-B9BE-39F7B96AC7E1
10/30/2018 41E5B02B-5DAF-4C88-BB00-2C0E26F71DBC
10/30/2018 43B3268D-E301-4B8B-8486-567BC1BED379
10/30/2018 39F801BE-DC6E-4D4B-8B99-B9BC998E6F34
10/30/2018 01243394-032B-4B5B-923B-0E8B70E7D640
10/30/2018 6846135B-894A-4506-BB00-96713529A4D7
10/30/2018 56DB889F-926B-4A63-8CD0-360ED2404074
10/30/2018 CCC4BF7E-28C1-44C4-A2CB-007C43564D6E
10/30/2018 B7E5D019-C923-420B-ADF9-FB20988A1B30
10/30/2018 B9F8481B-52DC-48AC-BC66-85D7A0AEFDB9
10/30/2018 CF5426C2-1A9E-4D9A-B268-C3913AEE45B6
10/30/2018 C53151B7-5F8A-41BB-9290-2477AA667FF7
10/30/2018 6B4B1942-7EA7-4967-B611-8B2ECA55BFEB
10/30/2018 BBA8C050-A825-4C88-9880-E612DE696E67
10/30/2018 D29DCF65-3984-40D7-A8CE-66EE87D95D47
10/30/2018 FF13AE0D-F8F1-4CA5-BE05-B37ECC0B8B53
10/30/2018 FF2554B0-D758-47C3-9E30-4C9BF370085E
10/30/2018 7B674951-B135-4D84-A892-08A7782D8580
10/30/2018 8ADD5698-B8EE-48FA-AFD6-084065EFEB22
10/30/2018 Letter DE-Permit
10/30/2018 Letter Inspection Summary
10/30/2018 Letter Inspection Summary
10/30/2018 Letter Inspection Summary
10/30/2018 Letter Inspection Summary
10/30/2018 Letter Inspection Summary
10/31/2018 68638EC0-DBF3-4E3C-992C-8192A7C0303B
10/31/2018 1AB45C0F-474A-40F2-A4BF-7B1E0AEDAE5B
10/31/2018 Letter Inspection Summary
11/01/2018 Letter Inspection Summary
11/01/2018 76DE181A-DDB9-4734-B1D3-D084AB72A399
11/01/2018 BF23B4D8-C6AF-42E3-A5AB-BEEE5603DC77
11/01/2018 5AF86E28-952C-47BD-8C1A-F43691D18C1A
11/01/2018 998EC9B8-E42C-440B-83DB-16A1B83F990C
11/01/2018 00D459AC-11FD-45AF-9055-6EF73AE2A6AA
11/01/2018 79B01FC3-6693-425E-9AA0-B49BA0EE36E4
11/02/2018 A6039AE2-A680-42FC-B242-BCFE671F1D06
11/02/2018 325A94AC-F560-4631-86A9-853B0FF45692
11/02/2018 687A4A3A-E96D-4F31-92D4-26E8F12CBE39
11/02/2018 Letter Inspection Summary
11/19/2018 image
11/19/2018 image0
11/19/2018 Letter INSPECTION SUMMARY
11/19/2018 Letter Inspection Summary
11/19/2018 Letter INSPECTION SUMMARY
11/19/2018 Letter INSPECTION SUMMARY
11/21/2018 C02796B7-8BD8-43E6-88C2-84EF2D3C4BFD
11/21/2018 089098FE-1422-4AA6-AFE1-87EF58A8DD0D
11/21/2018 Letter INSPECTION SUMMARY
12/24/2018 Letter INSPECTION SUMMARY
12/24/2018 Letter INSPECTION SUMMARY
12/24/2018 Letter INSPECTION SUMMARY
01/07/2019 Letter INSPECTION SUMMARY
01/07/2019 Curbs
01/07/2019 Curbs0
01/07/2019 Curbs1
01/09/2019 Letter INSPECTION SUMMARY
02/14/2019 Geo Grid Spec Sheet
04/01/2019 image1
04/01/2019 image2
04/01/2019 Letter INSPECTION SUMMARY
04/12/2019 Letter INSPECTION SUMMARY
04/17/2019 Letter INSPECTION SUMMARY
04/17/2019 Geo grid and MoDOT type 5 aggregate
04/17/2019 Geo grid and MoDOT type 5 aggregate 0
04/17/2019 Parking lot base and surface
04/17/2019 Finished parking lot
04/17/2019 Letter INSPECTION SUMMARY
04/18/2019 Letter INSPECTION SUMMARY
04/18/2019 Letter INSPECTION SUMMARY
04/18/2019 Letter INSPECTION SUMMARY
04/18/2019 Letter INSPECTION SUMMARY
04/26/2019 Letter DE-Punch List
04/26/2019 Letter DE-Certificate of Substantial Completion Multiple Lot
05/02/2019 Signed Certificate of Substantial Completion
05/02/2019 Signed Punch List
05/06/2019 Letter INSPECTION SUMMARY
05/06/2019 Letter DE-Certificate of Substantial Completion Multiple Lot
05/06/2019 Letter INSPECTION SUMMARY
05/14/2019 Letter INSPECTION SUMMARY
05/15/2019 GoodVets Substantial Completion and Punch List
05/17/2019 Curb section replaced
05/17/2019 Letter INSPECTION SUMMARY
05/23/2019 Letter INSPECTION SUMMARY
05/23/2019 Letter INSPECTION SUMMARY
05/28/2019 Letter INSPECTION SUMMARY
06/04/2019 Receipt Receipt for transaction: 2019-003259
06/04/2019 Letter DE-Certificate of Final Acceptance (Commercial)
06/05/2019 GoodVets Final Acceptance
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home