Permit Application Status

PRSGN20222460


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRSGN20222460
Sign Permit
Final Completion
SIGN
Install (1) 46.3 sq ft illuminated letter set on the East Elevation; Install (1) 26 sq ft illuminated letter set on the West Elevation; Install (1) 26 sq ft illuminated letter set on the North Elevation; Install tenant panels on existing multi-tenant sign ***Original approval included a wall sign on the south elevation, which has been relocated to the west elevation. HSOTO 10/13/22
06/06/2022
06/06/2022
05/09/2023
Locations
Contacts
INFINITY SIGN SYSTEMS INC, Address:4900 Lister Ave, Phone:(816) 252-3337  
Infinity Signs, LLC, Address:4900 Lister Ave, Phone:(816) 252-3337  
Reviews
Review Type Outcome Est. Completion Date Completed
Sign Permit Review Approved 06/08/2022 06/06/2022
Victoria Nelson
Fees
Paid Fees Amount Paid Owing Date Paid
9110062-Sign Permit-Permanent Fee $400.00 $400.00 Paid 06/06/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sign Confirmation Inspection Not Ready 6/27/2022 06/27/2022
Sign Confirmation Inspection Not Ready 7/19/2022 07/19/2022
Sign Confirmation Inspection Not Ready 8/9/2022 08/09/2022
Sign Confirmation Inspection Not Ready 8/30/2022 08/31/2022
Sign Confirmation Inspection Not Ready 9/22/2022 09/22/2022
Sign Confirmation Inspection Not Ready 10/13/2022 10/13/2022
Final Electrical Inspection Not Ready 10/14/2022 10/13/2022
Sign Confirmation Inspection Not Ready 11/3/2022 11/03/2022
Final Electrical Inspection Not Ready 11/3/2022 11/03/2022
Sign Confirmation Inspection Not Ready 11/28/2022 11/28/2022
Final Electrical Inspection Not Ready 11/30/2022 11/30/2022 11/30/2022
Sign Confirmation Inspection Not Ready 12/19/2022 12/20/2022
Sign Confirmation Inspection Not Ready 1/13/2023 01/13/2023
Sign Confirmation Inspection Not Ready 2/6/2023 02/06/2023
Sign Confirmation Inspection Not Ready 2/28/2023 02/28/2023
Sign Confirmation Inspection Not Ready 3/21/2023 03/21/2023
Sign Confirmation Inspection Not Ready 4/11/2023 04/11/2023
Final Electrical Inspection Not Ready 4/12/2023 4/12/2023 04/12/2023
Final Electrical Inspection Not Ready 5/15/2023 5/15/2023 05/01/2023
Sign Confirmation Inspection Passed 5/2/2023 05/02/2023
Final Electrical Inspection Passed 5/9/2023 5/9/2023 05/09/2023
Documents & Images
Date Uploaded File Type Document Name
06/06/2022 23747-PNC Bank LSMO LL Auth
06/06/2022 23747-PNC Bank LSMO Permit Drwg
06/06/2022 Permit DS P/R Corrections Document
06/06/2022 Permit DS Building Permit
06/06/2022 Receipt Receipt for transaction:2022-004331
06/27/2022 Letter INSPECTION SUMMARY
07/19/2022 Letter INSPECTION SUMMARY
08/09/2022 Letter INSPECTION SUMMARY
08/31/2022 Letter INSPECTION SUMMARY
09/22/2022 Letter INSPECTION SUMMARY
10/13/2022 Letter INSPECTION SUMMARY
10/13/2022 23747-PNC Bank LSMO Relocation of S2
11/03/2022 Letter INSPECTION SUMMARY
11/03/2022 Letter INSPECTION SUMMARY
11/28/2022 Letter INSPECTION SUMMARY
11/30/2022 Letter INSPECTION SUMMARY
11/30/2022 Letter INSPECTION SUMMARY
12/20/2022 Letter INSPECTION SUMMARY
04/12/2023 Letter INSPECTION SUMMARY
05/01/2023 Letter INSPECTION SUMMARY
05/09/2023 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home