Permit Application Status

PRSGN20213710


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRSGN20213710
Sign Permit
Final Completion
LBP III LLC
SIGN
J31 Dance Center - Single sided internally illuminated - Cloud Logo sign - Aluminum face and returns, push thru acrylic copy. LED Lighting. Flush mounted to building.
07/19/2021
07/29/2021
12/13/2021
Locations
Contacts
MIDTOWN SIGNS LLC, Address:2416 S 8TH ST, Phone:(816) 561-7446  
LBP III LLC, Address:3170 NE CARNEGIE DR STE 400  
Tiffanni Sanstra, Address:2416 S 8th St  
Meghan Ryan, Address:2740 NE Independence Ave  
Reviews
Review Type Outcome Est. Completion Date Completed
Sign Permit Review Approved 07/31/2021 07/29/2021
Jennifer Thompson
Fees
Paid Fees Amount Paid Owing Date Paid
9110062-Sign Permit-Permanent Fee $100.00 $100.00 Paid 07/29/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sign Confirmation Inspection Not Ready 8/19/2021 09/07/2021
Sign Confirmation Inspection Passed 9/28/2021 10/06/2021
Final Electrical Inspection Passed 12/13/2021
Documents & Images
Date Uploaded File Type Document Name
07/19/2021 J31 Elevation 7-2-21 2
07/19/2021 J31OwnerApproval
07/19/2021 J31 Plot Map 7-2-21 3
07/19/2021 J31 Sign Drawing 7-2-21 1
07/29/2021 Permit DS P/R Corrections Document
07/29/2021 Permit DS Building Permit
07/29/2021 Receipt Receipt for transaction:2021-006057
09/15/2021 Letter INSPECTION SUMMARY
10/06/2021 Letter INSPECTION SUMMARY
12/13/2021 Letter INSPECTION SUMMARY
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home