Permit Application Status

PRRESRES20210623


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRESRES20210623
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - ROOF TRUSSES - UNFINISHED BASEMENT
02/16/2021
02/18/2021
06/10/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
  
  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 02/19/2021 02/17/2021
Brandon Kalwei
Residential Plan Review Approved 02/19/2021 02/17/2021
Brandon Kalwei
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $864.73 $864.73 Paid 02/18/2021
8331507-Sewer Connection Fee $390.00 $390.00 Paid 02/18/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 02/18/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 02/18/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 02/18/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 02/18/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 05/24/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 05/24/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 05/24/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 05/24/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Not Ready 5/5/2021 (11:30) 5/5/2021 05/05/2021
Misc
Corrective Action Required
05/05/2021
-FOOTING NOT READY. JUST A HOLE IN THE GROUND
Footing Inspection - Residential Passed 5/6/2021 (10:45) 5/6/2021 05/06/2021
Misc
Resolved
05/06/2021
-FOOTING NOT READY. JUST A HOLE IN THE GROUND
Underslab Plumbing Inspection - Residential Passed 6/21/2021 6/21/2021 06/21/2021
All Rough Inspection - Residential Not Ready 11/19/2021 11/19/2021 11/19/2021
Miscellaneous Correction
Corrective Action Required
11/19/2021
11/19/21 THIS HOUSE IS NOT READY COMPLETE BELOW ITEMS BEFORE RESCHEDULING THIS LIST IS INCOMPLETE SUBJECT TO CHANGE AS TRADES COMPLETE WORK East wall needs to be rated as per section R302 2018 IRC Fire caulk soffit blocking west wall garage Seal all upward & exterior penetrations Fire blocking fireplace Secure fireplace
Sewer Service Inspection - R Passed 11/22/2021 (1:15) 11/22/2021 11/22/2021
Water Service Inspection - R Passed 11/23/2021 11/23/2021
Electrical Service Inspection Passed 12/15/2021 12/15/2021 12/15/2021
Gas Service Inspection - Residential Failed 12/15/2021 12/15/2021
Miscellaneous Correction
Corrective Action Required
12/15/2021
INSTALL FURNACE COMPLETE GAS LINES PROVIDE GAUGE WITH MINIMUM 10 PSI FOR 15 MINUTES
All Rough Inspection - Residential Failed 12/15/2021 12/15/2021 12/15/2021
Miscellaneous Correction
Corrective Action Required
12/15/2021
Provide H2.5s double girder above front door Provide H2.5s or truss locks master bed/bath above window near patio & above tub & above window east of fireplace Provide H2.5s double girder above single overhead door both ends Provide H2.5s SE corner garage Provide anchor bolt west side single overhead door Seal gap fire blocking B vent chase laundry Strap top plate above front door no overlap Strap top plate SE corner bedroom 2 Vent all bath exhaust to daylight Seal upward penetration pantry Provide CS-PF exterior bracing dining room per plan ( 2018 IRC R602.10) Install missing windows dining room Secure fireplace Nail studs at intersecting wall corners Address notched joist above basement stairs Install furnace Double joist per plan east foundation to tub stub out beam to beam basement Address crack in east foundation wall under beam pocket basement Provide anchor bolts SCH 40 columns basement Nail exterior wall sheathing per plan ( 2018 IRC table 602.3 (3) )
All Rough Inspection - Residential Failed 1/20/2022 1/20/2022 01/20/2022
Miscellaneous Correction
Corrective Action Required
12/15/2021
Provide CS-PF exterior bracing dining room per plan ( 2018 IRC R602.10) Install missing windows dining room Nail exterior wall sheathing per plan ( 2018 IRC table 602.3 (3) ) Okay to insulate
Gas Service Inspection - Residential Not Ready 1/26/2022 1/26/2022 01/26/2022
Miscellaneous Correction
Corrective Action Required
12/15/2021
PROVIDE GAUGE WITH MINIMUM 10 PSI FOR 15 MINUTES
All Rough Inspection - Residential Not Ready 1/26/2022 1/26/2022 01/26/2022
Miscellaneous Correction
Corrective Action Required
01/20/2022
Provide CS-PF exterior bracing dining room per plan ( 2018 IRC R602.10) Install missing windows dining room Nail exterior wall sheathing per plan ( 2018 IRC table 602.3 (3) ) Okay to insulate
Gas Service Inspection - Residential Passed 1/28/2022 1/28/2022 01/28/2022
Miscellaneous Correction
Resolved
01/28/2022
PROVIDE GAUGE WITH MINIMUM 10 PSI FOR 15 MINUTES
All Rough Inspection - Residential Passed 1/28/2022 1/28/2022 01/28/2022
Miscellaneous Correction
Resolved
01/28/2022
Provide CS-PF exterior bracing dining room per plan ( 2018 IRC R602.10) Install missing windows dining room Nail exterior wall sheathing per plan ( 2018 IRC table 602.3 (3) ) Okay to insulate
Driveway Inspection Partial 3/8/2022 03/08/2022
Misc
Informational
03/08/2022
Forms were placed and aggregate was present and compacted. RP 3-8-22
Driveway Inspection Passed 3/11/2022 3/11/2022 03/22/2022
Misc
Informational
03/08/2022
Forms were placed and aggregate was present and compacted. RP 3-8-22
Misc
Informational
03/22/2022
Finished driveway meets LS specs. RP 3-22-22
Occupancy Inspection - Codes Residential Failed 5/19/2022 5/19/2022 05/19/2022
Informational
05/06/2021
5/5-NOT READY FEE ASSESSED.
Miscellaneous Correction
Corrective Action Required
05/19/2022
Pay not ready fees Seal top exterior light fixtures Provide clamp on ac whip AC max breaker 30 amp has 40 installed Lower Water meter pit lid to grade No covered patio pier inspection plan show (2) 16x36 piers
Plot Plan Inspection Passed 5/19/2022 05/19/2022
Piers/Caissons Inspection - Residential Passed 06/06/2022
Misc
Informational
06/06/2022
Pictures show piers done at time of footing.
Occupancy Inspection - Codes Residential Temporary C of O 6/6/2022 6/6/2022 06/06/2022
Misc
Corrective Action Required
06/06/2022
Seal top exterior light fixtures Lower Water meter pit lid to grade
Occupancy Inspection - Codes Residential Full C of O 6/10/2022 6/10/2022 06/10/2022
Misc
Resolved
06/10/2022
Documents & Images
Date Uploaded File Type Document Name
02/16/2021 Application Form APPLICATION
02/16/2021 36 WOODSIDE RIDGE ROOF LAYOUT
02/16/2021 LOT 36 FINAL
02/16/2021 2643945 RF SEALS 02122021
02/16/2021 W1 #36 - Palermo - Mediterranean - F15x12C - Sheets- signed
02/17/2021 Approved Plans APPROVED PLANS
02/17/2021 Approved Plans APPROVED TRUSS DRAWINGS
02/17/2021 Approved Plans APPROVED TRUSS LAYOUT
02/17/2021 Plot Plan APPROVED PLOT PLAN
02/18/2021 Receipt Receipt for transaction:2021-000780
02/18/2021 Letter DS Building Permit
03/01/2021 36 WOODSIDE RIDGE ROOF LAYOUT REVISED
03/01/2021 Scope of Work Statement - W1 #36
03/01/2021 2643945 RF SEALS 02262021
03/01/2021 W1 #36 - Revised Palermo - Mediterranean - F15x12C - Sheets- signed
03/01/2021 Approved Plans APPROVED PLANS
03/22/2021 Approved Plans APPROVED TRUSS DRAWINGS
03/22/2021 Approved Plans APPROVED TRUSS LAYOUT
05/05/2021 Letter INSPECTION SUMMARY
05/06/2021 Letter INSPECTION SUMMARY
06/21/2021 Letter INSPECTION SUMMARY
11/19/2021 Letter INSPECTION SUMMARY
11/22/2021 Letter INSPECTION SUMMARY
11/23/2021 Letter INSPECTION SUMMARY
12/15/2021 Letter INSPECTION SUMMARY
12/15/2021 Letter INSPECTION SUMMARY
12/15/2021 Letter INSPECTION SUMMARY
01/20/2022 Letter INSPECTION SUMMARY
01/26/2022 Letter INSPECTION SUMMARY
01/26/2022 Letter INSPECTION SUMMARY
01/28/2022 Letter INSPECTION SUMMARY
01/28/2022 Letter INSPECTION SUMMARY
03/08/2022 Letter INSPECTION SUMMARY
03/22/2022 Letter INSPECTION SUMMARY
05/19/2022 Letter INSPECTION SUMMARY
05/19/2022 Letter INSPECTION SUMMARY
05/24/2022 Receipt Receipt for transaction:2022-003900
06/04/2022 7610-5
06/04/2022 7610-7
06/06/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter Codes Temporary Certificate of Occupancy
06/10/2022 Letter Codes Final Certificate of Occupancy
06/10/2022 Letter Field Certificate of Occupancy
06/15/2022 Letter Field Certificate of Occupancy
06/15/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home