Permit Application Status

PRRESRES20191301


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRESRES20191301
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - COVERED DECK - PARTIAL FINISHED BASEMENT
05/21/2019
06/11/2019
04/15/2020
Locations
Contacts
NICK ZVACEK CONSTRUCTION LLC, Address:1009 INDUSTRIAL DR, Phone:(816) 213-7204  
NZVACEK@GMAIL.COM  
COMFORT SYSTEMS HTG/CLG, Address:128 W Markey Rd, Phone:(816) 322-1013  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 05/23/2019 05/29/2019
Steve Conrick
Lot elevations
Corrective Action Required
05/23/2019

Existing and finish elevations at all property corners must be provided on the plot plan. *relook at the NW lot corner elevation.
Foundation elevation
Corrective Action Required
05/23/2019

The top of foundation elevation must be provided on the plot plan.
Spot elevations
Corrective Action Required
05/23/2019

Spot elevations and/or drainage flow arrows shall be provided throughout the lot. *Please update the contours to proposed.
Residential Plan Review Approved 05/23/2019 05/22/2019
Dylan Eppert
Miscellaneous Correction
Corrective Action Required
05/22/2019

The plans must reference 2018 building code as of April 1st 2019. On Sheet # Braced Wall Details it references the 2012 building code toward the bottom left hand corner of the page. As well any think thing that states 2012 building code.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,029.68 $1,029.68 Paid 06/11/2019
8331507-Sewer Connection Fee $360.00 $360.00 Paid 06/11/2019
Water Tap Fee $3,409.00 $3,409.00 Paid 06/11/2019
Water Meter Fee $408.37 $408.37 Paid 06/11/2019
Right of Way Permit Fee $80.00 $80.00 Paid 06/11/2019
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 06/11/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 6/17/2019 (3:30) 6/17/2019 at 3:35 PM 06/17/2019
Underslab Plumbing Inspection - Residential Failed 7/5/2019 7/5/2019 at 9:45 AM 07/05/2019
Misc
Corrective Action Required
07/05/2019
-VENT THE SHOWER TRAP
Underslab Plumbing Inspection - Residential Passed 7/12/2019 7/11/2019 at 2:15 PM 07/11/2019
Misc
Resolved
07/11/2019
-VENT THE SHOWER TRAP
Sewer Service Inspection - R Passed 07/17/2019
Water Service Inspection - R Passed 7/19/2019 (11:00) 7/19/2019 at 11:35 AM 07/19/2019
Piers/Caissons Inspection - Residential Failed 8/12/2019 (1:00) 8/12/2019 at 1:40 PM 08/12/2019
Misc
Corrective Action Required
08/12/2019
-DIG OUT ROCKS FROM PIER HOLES TO MIN 36" FROST DEPTH
Erosion Control Inspection Residential Failed 9/13/2019 09/13/2019
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
09/13/2019
DEFICIENT EROSION CONTROL INSTALLATION. -PROVIDE MIN 3/4" GRAVEL FILTER AT LOT ENTRANCE -REESTABLISH EROSION CONTROL ALONG STREET NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Electrical Service Inspection Passed 9/13/2019 9/13/2019 09/13/2019
Gas Service Inspection - Residential Passed 9/13/2019 9/13/2019 09/13/2019
Piers/Caissons Inspection - Residential Passed 9/13/2019 (8:00) 9/13/2019 09/13/2019
Misc
Resolved
09/13/2019
-DIG OUT ROCKS FROM PIER HOLES TO MIN 36" FROST DEPTH
All Rough Inspection - Residential Failed 9/13/2019 9/13/2019 at 9:10 AM 09/13/2019
Misc
Corrective Action Required
09/13/2019
** NO FURTHER INSPECTION WILL BE GRANTED UNTIL EROSION CONTROL IS IN COMPLIANCE FRAMING: -Anchor sill plate within 12” of breaks -Nail corner studs per code -Provide full support for roof beam at stair/foyer wall -Install hangers for foyer ceiling beam connections -Nail ceiling joists to rafters -Solid block cantilevered joists -Take off deck floor load from cantilevered joists. Install double trimmer and header joists -Install security blocking for basement exterior door -Insulation used as fire blocking material shall be secured in place -Misplaced steel column near stair wall; same I beam, install missing column support at bedroom wall corner MECHANICAL: -Pan off return air space from ceiling furdown space. Seal holes and penetrations of RA space ELECTRICAL: -Close openings above service panel enclosure -Protect wiring running across bottom of joists -Securely fasten all wiring at max 4.5 ft interval, not just resting on framing **OK TO INSULATE
Driveway Inspection Partial 9/18/2019 9/18/2019 09/18/2019
Misc
Informational
09/18/2019
Driveway- pre-inspection forms and materials passed.
Driveway Inspection Passed 09/23/2019
Misc
Informational
09/18/2019
Driveway- pre-inspection forms and materials passed.
Misc
Informational
09/23/2019
Driveway passed final inspection.
All Rough Inspection - Residential Failed 9/24/2019 9/24/2019 at 10:10 AM 09/24/2019
Misc
Corrective Action Required
09/13/2019
**RESTORE EROSION CONTROL AT BACK CORNER OF LOT. NO FURTHER INSPECTION WILL BE GRANTED UNTIL EROSION CONTROL IS IN COMPLIANCE FRAMING: -Anchor sill plate within 12" of break near garage I beam support studs -Take off deck floor load from cantilevered joists. **Install L bracket at of trimmer joists-ledger board connections and at header joist-trimmer joist connections -Insulation used as fire blocking material shall be secured in place -Misplaced steel column near stair wall; same I beam, install missing column support at bedroom wall corner
All Rough Inspection - Residential Failed 9/26/2019 at 9:35 AM 09/26/2019
Misc
Corrective Action Required
09/24/2019
**NOTHING DONE ESCEPT THE EROSION CONTROL. THIS IS A 3RD INSPECTION. FRAMING: -Anchor sill plate within 12" of break near garage I beam support studs -Take off deck floor load from cantilevered joists. **Install L bracket at of trimmer joists-ledger board connections and at header joist-trimmer joist connections -Insulation used as fire blocking material shall be secured in place -Misplaced steel column near stair wall; same I beam, install missing column support at bedroom wall corner
Erosion Control Inspection Residential Passed 10/01/2019
DCM2 ESC DEFICIENT INSTALLATION
Informational
10/01/2019
EROSION CONTROL IS IN COMPLIANCE. MAINTAIN EROSION CONTROL UNTIL SODDING
All Rough Inspection - Residential Passed 10/1/2019 10/1/2019 at 8:50 AM 10/01/2019
Misc
Resolved
10/01/2019
FRAMING: -Anchor sill plate within 12" of break near garage I beam support studs -Take off deck floor load from cantilevered joists. **Install L bracket at of trimmer joists-ledger board connections and at header joist-trimmer joist connections -Insulation used as fire blocking material shall be secured in place -Misplaced steel column near stair wall; same I beam, install missing column support at bedroom wall corner
Occupancy Inspection - Codes Residential Failed 2/11/2020 2/11/2020 at 9:20 AM 02/11/2020
Misc
Corrective Action Required
02/11/2020
-Final grade, sod, downspout and sump pump extensions. Make sure the final grade at rear not discharge onto neighboring house to the north. Check with Field Service inspection for master drainage -Make sure that the sewer tracer wire and port are installed and available at grade level -Seal exterior wall penetrations, seal above AC disconnect, meter, etc -Install tamper-proof caps at AC valves Seal -Tie down the deck roof to upper&lower posts with lags screws or straps -Install front entry outdoor receptacle. Secure and install weather-proof cover -Garage door not self closing -Basement exterior door strike plate not installed per code. -Provide AFCI protection for all outlets located in areas as required per NEC 210.12 -Provide gfci protection for dish washer outlet per NEC 210.8(D) -Furnace condensate drain pipe must be able to be cleaned out
Occupancy Inspection - Codes Residential Temporary C of O 2/14/2020 2/14/2020 02/14/2020
Misc
Corrective Action Required
02/11/2020
-Final grade, sod, downspout and sump pump extensions. Make sure the final grade at rear not discharge onto neighboring house to the north. Check with Field Service inspection for master drainage -Make sure that the sewer tracer wire and port are installed and available at grade level snow covered 2/14/20
Occupancy Inspection - Codes Residential Temporary C of O 4/13/2020 at 9:00 AM 04/13/2020
Misc
Corrective Action Required
02/14/2020
-Make sure the final grade at rear not discharge onto neighboring house to the north. Check with Field Service inspection for master drainage
Occupancy Inspection - Codes Residential Full C of O 4/15/2020 04/15/2020
Misc
Resolved
04/15/2020
-Make sure the final grade at rear not discharge onto neighboring house to the north. Check with Field Service inspection for master drainage
Documents & Images
Date Uploaded File Type Document Name
05/22/2019 Letter Residential Plan Review
05/23/2019 Letter Codes Residential Plan Review
06/11/2019 Receipt Receipt for transaction: 2019-003546
06/11/2019 Letter Codes Building Permit
06/12/2019 Plot Plan DOC061219-06122019082649
06/17/2019 Letter INSPECTION SUMMARY
07/05/2019 Letter INSPECTION SUMMARY
07/11/2019 Letter INSPECTION SUMMARY
07/17/2019 Letter INSPECTION SUMMARY
07/19/2019 Letter INSPECTION SUMMARY
08/12/2019 Letter INSPECTION SUMMARY
09/13/2019 Letter INSPECTION SUMMARY
09/13/2019 Letter INSPECTION SUMMARY
09/13/2019 Letter INSPECTION SUMMARY
09/13/2019 Letter INSPECTION SUMMARY
09/13/2019 Letter INSPECTION SUMMARY
09/18/2019 Letter INSPECTION SUMMARY
09/23/2019 Letter INSPECTION SUMMARY
09/24/2019 Letter INSPECTION SUMMARY
09/26/2019 Letter INSPECTION SUMMARY
10/01/2019 Letter INSPECTION SUMMARY
02/11/2020 Letter INSPECTION SUMMARY
02/14/2020 Letter Codes Temporary Certificate of Occupancy
04/13/2020 Letter Codes Temporary Certificate of Occupancy
04/15/2020 Letter Codes Final Certificate of Occupancy
04/15/2020 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home