Summary
PRRES20255132
Building Permit - Residential
Issued
HUNT MIDWEST RESIDENTIAL LLC
NEW SINGLE FAMILY
NEW HOUSE. SLAB ON GRADE. COVERED PATIO.
11/20/2025
01/16/2026
05/24/2026
Locations
Contacts
ELEVATE DESIGN & BUILD LLC, Address:350 SW LONGVIEW BLVD, Phone:(816) 622-8826  
HUNT MIDWEST RESIDENTIAL LLC, Address:1881 MAIN ST STE 200  
Elevate Design + Build , Address:350 Longview Blvd.   
COMFORT SYSTEMS HTG/CLG, Address:128 W Markey Rd, Phone:(816) 322-1013  
ELECTRICAL CONNECTIONS, Address:20112 HOPS CREEK DR, Phone:(816) 838-6946  
S&B Plumbing, Inc., Address:PO Box 101, Phone:(913) 850-3445  
BILL@ELEVATEDESIGNBUILDKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Water Tap Fee $4,080.00 $4,080.00 Paid 01/16/2026
Water Meter Fee $791.53 $791.53 Paid 01/16/2026
Sanitary Sewer Development Fee $2,398.00 $2,398.00 Paid 01/16/2026
Right of Way Permit Fee $85.00 $85.00 Paid 01/16/2026
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 01/16/2026
Valuation Fee New Single Family $1,970.15 $1,970.15 Paid 01/16/2026
Parks Impact Fee Residential Zone 5 $0.00 $0.00 $0.00 N/A
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Driveway Inspection Pending
Plot Plan Inspection Pending
Electrical Service Inspection Pending
Gas Service Inspection - Residential Pending
All Rough Inspection - Residential Pending
Occupancy Inspection - Codes Residential Pending
Erosion Control Inspection Residential Pending
Misc
Corrective Action Required
03/12/2026
3/2/26 Tyler S. No erosion control in place. Silt fence is all down. mud is in the road and needs to be cleaned up asap. Construction entrance needs to be established enough to where we are not tracking into the roadway. Fail. 3/3/26 Tyler S Silt fence is down. Contractor was cleaning tracks on the excavator in the road. Mud has been tracked everywhere. Also, need to get a good construction entrance established. Failure to correct this matter can result in a 2 day stop work order. Fail. 3/12/26 Tyler S Rod and mud has been tracked into the road and needs to be cleaned up asap. Board on the storm box needs to be removed and behind silt fence. Also the silt and mud in the curb inlet for storm box needs to be cleaned out. Fail.
Footing Inspection - Residential Passed 2/9/2026 02/09/2026
Erosion Control Inspection Residential Failed 3/2/2026 3/2/2026 03/02/2026
Misc
Corrective Action Required
03/02/2026
3/2/26 Tyler S. No erosion control in place. Silt fence is all down. mud is in the road and needs to be cleaned up asap. Construction entrance needs to be established enough to where we are not tracking into the roadway. Fail.
Sewer Service Inspection - R Passed 3/2/2026 3/2/2026 03/02/2026
Erosion Control Inspection Residential Failed 3/3/2026 3/3/2026 03/03/2026
Misc
Corrective Action Required
03/02/2026
3/2/26 Tyler S. No erosion control in place. Silt fence is all down. mud is in the road and needs to be cleaned up asap. Construction entrance needs to be established enough to where we are not tracking into the roadway. Fail. 3/3/26 Tyler S Silt fence is down. Contractor was cleaning tracks on the excavator in the road. Mud has been tracked everywhere. Also, need to get a good construction entrance established. Failure to correct this matter can result in a 2 day stop work order. Fail.
Water Service Inspection - R Passed 3/3/2026 3/3/2026 03/03/2026
Underslab Plumbing Inspection - Residential Passed 3/4/2026 3/4/2026 03/04/2026
Erosion Control Inspection Residential Failed 3/12/2026 3/12/2026 03/12/2026
Misc
Corrective Action Required
03/03/2026
3/2/26 Tyler S. No erosion control in place. Silt fence is all down. mud is in the road and needs to be cleaned up asap. Construction entrance needs to be established enough to where we are not tracking into the roadway. Fail. 3/3/26 Tyler S Silt fence is down. Contractor was cleaning tracks on the excavator in the road. Mud has been tracked everywhere. Also, need to get a good construction entrance established. Failure to correct this matter can result in a 2 day stop work order. Fail. 3/12/26 Tyler S Rod and mud has been tracked into the road and needs to be cleaned up asap. Board on the storm box needs to be removed and behind silt fence. Also the silt and mud in the curb inlet for storm box needs to be cleaned out. Fail.
Documents & Images
Date Uploaded File Type Document Name
11/20/2025 Permit Application-25-11-19
11/20/2025 Tax_Application-25-11-19
11/25/2025 Permit Codes Residential Plan Review
12/02/2025 Plot Plan APPROVED PLOT PLAN
12/02/2025 Approved Plans APPROVED PLANS
12/02/2025 Permit Codes Residential Plan Review
01/16/2026 Permit DS Building Permit
01/16/2026 Receipt Receipt for transaction:2026-000346
02/02/2026 Plot Plan 2-2-26 APPROVED PLOT PLAN
02/07/2026 3RD Party Insp Report 154 Hook Farms- FTNG - Stamped
02/09/2026 Letter INSPECTION SUMMARY
03/02/2026 Letter INSPECTION SUMMARY
03/02/2026 Letter INSPECTION SUMMARY
03/02/2026 Letter INSPECTION SUMMARY
03/03/2026 Letter INSPECTION SUMMARY
03/03/2026 Letter INSPECTION SUMMARY
03/03/2026 Letter INSPECTION SUMMARY
03/04/2026 Letter INSPECTION SUMMARY
03/12/2026 Letter INSPECTION SUMMARY
03/12/2026 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home