Summary
PRRES20250161
Building Permit - Residential
Issued
NEW SINGLE FAMILY
NEW HOUSE. FINISHED/UNFINISHED BASEMENT. COVERED PATIO. STOP WORK ORDER generated on 04/07/2025 12:00 AM by username 'Drew Fischer'. STOP WORK ORDER removed on 04/08/2025 12:00 AM by username 'Drew Fischer'.
01/15/2025
02/27/2025
07/15/2025
Locations
Contacts
ELEVATE DESIGN & BUILD LLC, Address:350 SW LONGVIEW BLVD, Phone:(816) 622-8826  
Elevate Design + Build , Address:350 Longview Blvd.   
5 STAR MECHANICAL, LLC, Address:PO BOX 793, Phone:(816) 679-0375  
ELECTRICAL CONNECTIONS, Address:20112 HOPS CREEK DR, Phone:(816) 838-6946  
S&B Plumbing, Inc., Address:PO Box 101, Phone:(913) 850-3445  
BILL@ELEVATEDESIGNBUILDKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Water Tap Fee $3,973.00 $3,973.00 Paid 02/27/2025
Water Meter Fee $748.03 $748.03 Paid 02/27/2025
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 02/27/2025
Right of Way Permit Fee $85.00 $85.00 Paid 02/27/2025
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 02/27/2025
Valuation Fee New Single Family $1,286.04 $1,286.04 Paid 02/27/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Occupancy Inspection - Codes Residential Pending
Erosion Control Inspection Residential Pending
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/13/2025
Porta Potty to be removed from lid of street inlet
Sewer Service Inspection - R Passed 4/7/2025 4/7/2025 04/07/2025
Footing Inspection - Residential Failed - Stop Work 4/7/2025 04/07/2025
Misc
Corrective Action Required
04/07/2025
Footing not inspected. Upload 3rd party inspection report. Stop work issued.
Erosion Control Inspection Residential Failed 4/7/2025 04/07/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
04/07/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Water Service Inspection - R Partial 4/8/2025 4/8/2025 04/08/2025
Misc
Informational
04/08/2025
Poly out of foundation with 12’ of copper
Footing Inspection - Residential Passed 4/8/2025 04/08/2025
Misc
Resolved
04/08/2025
Footing not inspected. Upload 3rd party inspection report. Stop work issued.
Water Service Inspection - R Passed 4/9/2025 4/9/2025 04/09/2025
Misc
Resolved
04/09/2025
Poly out of foundation with 12’ of copper
Underslab Plumbing Inspection - Residential Passed 4/10/2025 4/10/2025 04/10/2025
Erosion Control Inspection Residential Failed 04/10/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
04/07/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
04/10/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. Maintain lot access.
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
04/10/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
All Rough Inspection - Residential Failed 4/22/2025 4/22/2025 04/22/2025
Misc
Corrective Action Required
04/22/2025
PORTAL FRAME AND CS-PF ONLY PFH APPROVED CS-PF Nailing pattern approved - Missing straps on inside.
Erosion Control Inspection Residential Partial 4/22/2025 04/22/2025
DCM3 ESC REQUIRED 2 DAY
Resolved
04/22/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
04/22/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. Maintain lot access.
DCM6 ESC INSP DENIED STREET CLEAN UP
Resolved
04/22/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
Misc
Corrective Action Required
04/22/2025
- Erosion control in place at time of inspection.
All Rough Inspection - Residential Failed 4/24/2025 4/24/2025 04/24/2025
Misc
Corrective Action Required
04/22/2025
PORTAL FRAME AND CS-PF ONLY PFH APPROVED CS-PF Approved
Gas Service Inspection - Residential Passed 5/13/2025 05/13/2025
Electrical Service Inspection Failed 5/13/2025 05/13/2025
Misc
Corrective Action Required
05/13/2025
Ground wire not green marked on ends Wrong Ufer clamp used, not compatible
Erosion Control Inspection Residential Failed 5/13/2025 05/13/2025
Misc
Resolved
05/13/2025
- Erosion control in place at time of inspection.
DCM3 ESC REQUIRED 2 DAY
Resolved
05/13/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
04/24/2025
Porta Potty to be removed from lid of street inlet
All Rough Inspection - Residential Failed 5/13/2025 5/13/2025 05/13/2025
Misc
Informational
05/13/2025
PORTAL FRAME AND CS-PF ONLY PFH APPROVED CS-PF Approved
Misc
Corrective Action Required
05/13/2025
2623 SW Tracker - Install missing roof boots - Security blocking at front and back doors - Ufer clamp not correct - Grinding wire from panel to ufer must be green marked on both ends - Fire blocking at beam end in stairwell landing - Solid blocking at cantilever in basement - Remove porta potty from storm inlet lid -
All Rough Inspection - Residential Passed 5/15/2025 5/15/2025 05/15/2025
Misc
Informational
05/13/2025
PORTAL FRAME AND CS-PF ONLY PFH APPROVED CS-PF Approved
Misc
Resolved
05/15/2025
2623 SW Tracker - Install missing roof boots - Security blocking at front and back doors - Ufer clamp not correct - Grinding wire from panel to ufer must be green marked on both ends - Fire blocking at beam end in stairwell landing - Solid blocking at cantilever in basement - Remove porta potty from storm inlet lid -
Electrical Service Inspection Passed 5/15/2025 5/15/2025 05/15/2025
Misc
Resolved
05/15/2025
Ground wire not green marked on ends Wrong Ufer clamp used, not compatible
Piers/Caissons Inspection - Residential Passed 7/2/2025 7/2/2025 07/02/2025
Driveway Inspection Partial 7/3/2025 7/3/2025 07/03/2025
Misc
Informational
07/03/2025
07/03/25 Jamie S, DW are compacted and formed. Approved to Pour.
Driveway Inspection Failed 7/10/2025 7/10/2025 07/10/2025
Misc
Informational
07/03/2025
07/03/25 Jamie S, DW are compacted and formed. Approved to Pour. 07/10/25 Jamie S, DW does not have requested grout on the curb to patch damage of the curb during construction. All surfaces must be cleaned off for inspection. Call in for reinspection once curb is grouted.
Driveway Inspection Passed 7/25/2025 7/25/2025 07/25/2025
Misc
Informational
07/10/2025
07/03/25 Jamie S, DW are compacted and formed. Approved to Pour. 07/10/25 Jamie S, DW does not have requested grout on the curb to patch damage of the curb during construction. All surfaces must be cleaned off for inspection. Call in for reinspection once curb is grouted. 07/25/25 Jamie S, DW is in compliance with city standards.
Plot Plan Inspection Passed 8/1/2025 08/01/2025
Documents & Images
Date Uploaded File Type Document Name
01/15/2025 Permit Application-25-1-15
01/15/2025 Tax_Application-25-1-15
01/16/2025 Permit Codes Residential Plan Review
01/22/2025 Approved Plans APPROVED PLANS
01/22/2025 Plot Plan APPROVED PLOT PLAN
01/22/2025 Permit Codes Residential Plan Review
02/27/2025 Permit DS Building Permit
02/27/2025 Receipt Receipt for transaction:2025-001169
03/18/2025 Plot Plan 3-18-25 APPROVED PLOT PLAN
04/07/2025 Letter INSPECTION SUMMARY
04/07/2025 Letter Stop Work Order
04/07/2025 Letter INSPECTION SUMMARY
04/08/2025 136 Hook Farms - FTG-Stamped
04/08/2025 Letter INSPECTION SUMMARY
04/08/2025 Letter INSPECTION SUMMARY
04/09/2025 Letter INSPECTION SUMMARY
04/10/2025 Letter INSPECTION SUMMARY
04/10/2025 Letter INSPECTION SUMMARY
04/22/2025 Letter INSPECTION SUMMARY
04/22/2025 Letter INSPECTION SUMMARY
04/24/2025 Letter INSPECTION SUMMARY
05/13/2025 Letter INSPECTION SUMMARY
05/13/2025 Letter INSPECTION SUMMARY
05/13/2025 Letter INSPECTION SUMMARY
05/13/2025 Letter INSPECTION SUMMARY
05/13/2025 Letter INSPECTION SUMMARY
05/15/2025 Letter INSPECTION SUMMARY
05/15/2025 Letter INSPECTION SUMMARY
07/02/2025 Letter INSPECTION SUMMARY
07/03/2025 Letter INSPECTION SUMMARY
07/10/2025 Letter INSPECTION SUMMARY
07/25/2025 Letter INSPECTION SUMMARY
07/31/2025 136 Hook Farm As Graded 2623 Tracker
07/31/2025 Plot Plan APPROVED PLOT PLAN
08/01/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home