Summary
PRRES20250070
Building Permit - Residential
Issued
NEW SINGLE FAMILY
NEW SINGLE FAMILY HOME - SLAB ON GRADE, COVERED PORCH
01/06/2025
06/25/2025
Locations
Contacts
Avital Homes, LLC, Address:7500 W 151st Street, #23100, Phone:(816) 914-7128  
Doug Jenson, Address:11010 Nora Dodge Dr, Phone:(816) 266-0685  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
RED DOG ELECTRIC SERVICES, Address:PO BOX 1, Phone:(913) 208-4816  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $984.12 $984.12 Paid 04/03/2025
Right of Way Permit Fee $85.00 $85.00 Paid 04/03/2025
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 04/03/2025
Water Tap Fee $3,973.00 $3,973.00 Paid 04/03/2025
Water Meter Fee $748.03 $748.03 Paid 04/03/2025
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 04/03/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Erosion Control Inspection Residential Pending
Misc
Corrective Action Required
02/09/2026
Maintain overgrown vegetation, being addressed under subd permit.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/09/2026
2-5-26 Dustin A, Silt fence needs repaired. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 2-9-26 Dustin A, corrections made
Occupancy Inspection - Codes Residential Pending
Miscellaneous Correction
Corrective Action Required
02/26/2026
-Door bell cover missing -door at mechanic room will not close properly -mechanic room wall needs for black at power line and a/c line - outlet cover missing in master bathroom -attic entry cover not in place -gfci outlet at a/c unit not working outside -no sod -no splash blocks
Erosion Control Inspection Residential Partial 5/14/2025 5/14/2025 05/14/2025
Misc
Corrective Action Required
05/14/2025
Maintain overgrown vegetation, being addressed under subd permit.
Footing Inspection - Residential Passed 5/22/2025 5/22/2025 05/22/2025
Underslab Plumbing Inspection - Residential Passed 6/3/2025 6/3/2025 06/03/2025
All Rough Inspection - Residential Failed 7/11/2025 7/11/2025 07/11/2025
Misc
Corrective Action Required
07/11/2025
PORTAL FRAME ONLY - EXTIERIOR SHEETING OK TO COVER ON PFH
Sewer Service Inspection - R Passed 8/18/2025 8/18/2025 08/18/2025
Water Service Inspection - R Passed 8/18/2025 8/18/2025 08/18/2025
Electrical Service Inspection Failed 9/11/2025 9/11/2025 09/11/2025
Misc
Corrective Action Required
09/11/2025
-land all grounds and neutrals -install bonding screw at panel
All Rough Inspection - Residential Failed 9/11/2025 9/11/2025 09/11/2025
Misc
Resolved
09/11/2025
PORTAL FRAME ONLY - EXTIERIOR SHEETING OK TO COVER ON PFH
Misc
Corrective Action Required
09/11/2025
-fireblock garage walls into garage furr down -seal penetrations in draft stoping -ensure all smoke and smoke/co are not closer than 3’ to a bathroom -provide hold down for each side of double truss above primary bedroom -missing hold downs on multiple trusses Primary bedroom -protect dryer vent 2” below top plate -T02 trusses entry above primary bedroom does not match plans -land all grounds and neutrals -install bonding screw at panel
Electrical Service Inspection Passed 9/18/2025 9/18/2025 09/18/2025
Misc
Resolved
09/18/2025
-land all grounds and neutrals -install bonding screw at panel
All Rough Inspection - Residential Failed 9/18/2025 9/18/2025 09/18/2025
Misc
Corrective Action Required
09/11/2025
no plans on site -fireblock garage walls into garage furr down - -ensure all smoke and smoke/co are not closer than 3’ to a bathroom - - -T02 trusses entry above primary bedroom does not match plans
All Rough Inspection - Residential Passed 12/12/2025 12/12/2025 12/12/2025
Misc
Resolved
12/12/2025
no plans on site -fireblock garage walls into garage furr down - -ensure all smoke and smoke/co are not closer than 3’ to a bathroom - - -T02 trusses entry above primary bedroom does not match plans
Driveway Inspection Partial 12/30/2025 12/30/2025 12/30/2025
Misc
Informational
12/30/2025
12-30-25 Dustin A, Dw has been formed and compacted. Good to pour as long as ground temp is above 32 degrees . Please call to have ground temp checked before pouring.
Driveway Inspection Partial 1/5/2026 1/5/2026 01/05/2026
Misc
Informational
12/30/2025
12-30-25 Dustin A, Dw has been formed and compacted. Good to pour as long as ground temp is above 32 degrees . Please call to have ground temp checked before pouring. 1-5-26 Dustin A, 12-30-25 Dustin A, Dw has been formed and compacted. Good to pour as long as ground temp is above 32 degrees .
Driveway Inspection Passed 1/22/2026 1/22/2026 01/22/2026
Misc
Informational
01/05/2026
12-30-25 Dustin A, Dw has been formed and compacted. Good to pour as long as ground temp is above 32 degrees . Please call to have ground temp checked before pouring. 1-5-26 Dustin A, 12-30-25 Dustin A, Dw has been formed and compacted. Good to pour as long as ground temp is above 32 degrees . 1-22-26 Dustin A, Dw has been poured to city specs.
Sidewalk Inspection Partial 1/22/2026 01/22/2026
Misc
Corrective Action Required
01/22/2026
1-22-26 Dustin A, SW has been formed and compacted approved to pour
Sidewalk Inspection Passed 2/5/2026 2/5/2026 02/05/2026
Misc
Corrective Action Required
01/22/2026
1-22-26 Dustin A, SW has been formed and compacted approved to pour 2-5-26 Dustin A, Sw has been poured to city specs and slopes are on compliance .
Erosion Control Inspection Residential Failed 2/5/2026 02/05/2026
Misc
Corrective Action Required
05/14/2025
Maintain overgrown vegetation, being addressed under subd permit.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/05/2026
2-5-26 Dustin A, Silt fence needs repaired. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Partial 2/9/2026 2/9/2026 02/09/2026
Misc
Corrective Action Required
02/05/2026
Maintain overgrown vegetation, being addressed under subd permit.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/05/2026
2-5-26 Dustin A, Silt fence needs repaired. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 2-9-26 Dustin A, corrections made
Occupancy Inspection - Codes Residential Failed 2/26/2026 2/26/2026 02/26/2026
Miscellaneous Correction
Corrective Action Required
02/26/2026
-Door bell cover missing -door at mechanic room will not close properly -mechanic room wall needs for black at power line and a/c line - outlet cover missing in master bathroom -attic entry cover not in place -gfci outlet at a/c unit not working outside -no sod -no splash blocks
Documents & Images
Date Uploaded File Type Document Name
01/06/2025 Application Form H Permit Application Signed
01/06/2025 Application Form H Tax application
02/21/2025 Approved Plans Approved Final Grading Plan Lots 1 -12 Reserve at Blackwell
04/03/2025 Receipt Receipt for transaction:2025-002030
04/07/2025 Plans 21075_Blackwell Reserve_Bldg H CDs_250312
04/18/2025 Approved Plans APPROVED H PLANS
04/18/2025 Letter DS Building Permit
05/14/2025 Letter INSPECTION SUMMARY
05/20/2025 25-0227_23090 Blackwell_Struct_Rev#3 (Footing Changes)
05/20/2025 25-0227_Reunion at Blackwell_Struct_Rev#3 Narrative (Footing Change)
05/22/2025 Letter INSPECTION SUMMARY
06/03/2025 Letter INSPECTION SUMMARY
06/03/2025 Letter INSPECTION SUMMARY
07/11/2025 Letter INSPECTION SUMMARY
08/18/2025 Letter INSPECTION SUMMARY
08/18/2025 Letter INSPECTION SUMMARY
09/11/2025 BUILDING H_F05_REVISED STAIR LANDING_06262025
09/11/2025 Letter INSPECTION SUMMARY
09/11/2025 Letter INSPECTION SUMMARY
09/11/2025 Building H Truss seals
09/11/2025 Building H Floor Truss
09/11/2025 Building H Roof Truss
09/12/2025 QU02700_RESERVE_BLDG H_LOT 11_LEVEL 2 Framing_09122025
09/12/2025 QLT QU02700_RESERVE_BLDG H_REFRESHED_11252024 MO 1
09/18/2025 Letter INSPECTION SUMMARY
09/18/2025 Letter INSPECTION SUMMARY
11/07/2025 Approved Plans Approved Trusses H
11/17/2025 Approved Plans Truss repair doc
12/03/2025 Approved Plans Approved - Gyp Board at Stair Stringer Struct Response_Reserves at Blackwell
12/11/2025 Approved Plans Approved trusses 11H
12/12/2025 Letter INSPECTION SUMMARY
12/30/2025 Letter INSPECTION SUMMARY
12/30/2025 Letter INSPECTION SUMMARY
01/05/2026 Letter INSPECTION SUMMARY
01/22/2026 Letter INSPECTION SUMMARY
01/22/2026 Letter INSPECTION SUMMARY
02/05/2026 Letter INSPECTION SUMMARY
02/05/2026 Letter INSPECTION SUMMARY
02/06/2026 Engineer Report/Study Stand engineering Structural letter for Reserve buildings
02/09/2026 Letter INSPECTION SUMMARY
02/26/2026 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.