Summary
PRRES20245915
Building Permit - Residential
Issued
NEW DUPLEX
NEW DUPLEX - SUSPENDED SLAB - FINISHED AND UNFINISHED BASEMENT - COVERED PORCH STOP WORK ORDER generated on 07/21/2025 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER removed on 08/04/2025 12:00 AM by username 'Dustin Agcopra'.
11/11/2024
12/03/2024
05/13/2025
Locations
Contacts
ROCK CREEK HOMES, Address:6126 METCALF LANE, Phone:(913) 522-1945  
Kevin Guinan, Address:6126 Metcalf Lane  
KEVIN@ROCKCREEKHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
PRIDE SERVICES INC, Address:3842 GEORGIA TERR, Phone:(785) 242-9700  
BILL'S PLUMBING SERVICE LLC, Address:308 E PARK STREET, Phone:(913) 829-8213  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Duplex $2,574.57 $2,574.57 Paid 12/03/2024
Sanitary Sewer Development Fee $4,570.00 $4,570.00 Paid 12/03/2024
Right of Way Permit Fee $85.00 $85.00 Paid 12/03/2024
Water Tap Fee $7,946.00 $7,946.00 Paid 12/03/2024
Water Meter Fee $1,496.06 $1,496.06 Paid 12/03/2024
Residential Excise Tax Fee $1,240.32 $1,240.32 Paid 12/03/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Foundation Inspection - Commercial Pending
Occupancy Inspection - Codes Residential Pending
Erosion Control Inspection Residential Pending 9/10/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
08/04/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/04/2025
7-17-25 Dustin A, Silt fence is down , Storm inlet needs cleaned out .EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 7-21-25 Dustin A, Silt fence has been stood up bur storm inlet still needs cleaned. 8-4-25 Dustin A, All corrections had been made, esc must be maintained throughout project.
Footing Inspection - Residential Failed 12/19/2024 12/19/2024
Miscellaneous Correction
Corrective Action Required
12/19/2024
Footing passed by a third party, but failed because of no address posted on site
Sewer Service Inspection - R Partial 3/6/2025 3/6/2025 03/06/2025
Misc
Informational
03/06/2025
- 1400 Approved only
Sewer Service Inspection - R Passed 3/6/2025 3/6/2025 03/06/2025
Misc
Informational
03/06/2025
- 1400 , 1402 Approved
Footing Inspection - Residential Passed 3/6/2025 03/06/2025
Miscellaneous Correction
Resolved
03/06/2025
Footing passed by a third party, but failed because of no address posted on site
Water Service Inspection - R Partial 3/6/2025 3/6/2025 03/06/2025
Misc
Corrective Action Required
03/06/2025
- PARTIAL POLY OUT OF FOUNDATION 30' BOTH UNITS
Erosion Control Inspection Residential Failed 3/6/2025 03/06/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
03/06/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED. - REMOVE GRAVEL AND DEBRIS FROM STREET.
Water Service Inspection - R Passed 3/7/2025 3/7/2025 03/07/2025
Misc
Informational
03/07/2025
1400 & 1402
Underslab Electrical Inspection - Residential Passed 3/12/2025 3/12/2025 03/12/2025
Misc
Resolved
03/12/2025
- for 1400 and 1402
Erosion Control Inspection Residential Failed 3/12/2025 03/12/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
03/06/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED. - REMOVE GRAVEL AND DEBRIS FROM STREET. - REMOVE GRAVEL AND DEBRIS FROM CURBS AND STORM INLETS.
Erosion Control Inspection Residential Failed 3/18/2025 03/18/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Resolved
03/18/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED. - REMOVE GRAVEL AND DEBRIS FROM STREET. - REMOVE GRAVEL AND DEBRIS FROM CURBS AND STORM INLETS.
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
03/18/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
Underslab Plumbing Inspection - Residential Passed 3/18/2025 3/18/2025 03/18/2025
Suspended Slab Inspection Passed 3/31/2025 03/31/2025
Misc
Informational
03/31/2025
- Third party slab inspection on file.
Rated Assembly Inspection Partial 6/10/2025 6/10/2025 06/10/2025
Misc
Corrective Action Required
06/10/2025
Attic space and basement joist space-okay
Electrical Service Inspection Passed 6/10/2025 6/10/2025 06/10/2025
Gas Service Inspection - Residential Failed 6/10/2025 6/10/2025 06/10/2025
Misc
Corrective Action Required
06/10/2025
1400- no pressure 1402 - okay
All Rough Inspection - Residential Failed 6/10/2025 6/10/2025 06/10/2025
Misc
Resolved
06/10/2025
Engineer reporton roof beam on file
Misc
Corrective Action Required
06/10/2025
-address ceiling joist to rafters connections missing(N and S exterior walls) -rear garage wall sill plate. Anchor bolts to be in the middle 1/3 of sill plate 1400 -missing nails in in hanger above bath 2 -fire block W bath 2 wall to ceiling space -missing stud in stud pack E end LVL above kitchen -add stud under lvl bath2/entry wall -fire block bed 3 wall into furr down 1402
All Rough Inspection - Residential Failed 6/12/2025 6/12/2025 06/12/2025
Misc
Corrective Action Required
06/10/2025
Both sides -rear garage wall sill plate. Anchor bolts to be in the middle 1/3 of sill plate
Gas Service Inspection - Residential Passed 6/12/2025 6/12/2025 06/12/2025
Misc
Resolved
06/12/2025
1400- no pressure 1402 - okay
All Rough Inspection - Residential Passed 6/13/2025 6/13/2025 06/13/2025
Misc
Resolved
06/13/2025
Both sides -rear garage wall sill plate. Anchor bolts to be in the middle 1/3 of sill plate
Rated Assembly Inspection Passed 6/30/2025 6/30/2025 06/30/2025
Misc
Resolved
06/30/2025
Attic space and basement joist space-okay
Erosion Control Inspection Residential Failed 7/17/2025 7/17/2025 07/17/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
03/18/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/17/2025
7-17-25 Dustin A, Silt fence is down , Storm inlet needs cleaned out .EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed - Stop Work 7/21/2025 7/21/2025 07/31/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
07/17/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/17/2025
7-17-25 Dustin A, Silt fence is down , Storm inlet needs cleaned out .EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 7-21-25 Dustin A, Silt fence has been stood up bur storm inlet still needs cleaned. 7-31-25 Dustin A, All properties on Winthrop are STOP WORKED due to non compliance . 1. Concrete washout area is over flowing onto street. All concrete debris needs to be removed from street, washout needs to be maintained. 2. All silt needs to be cleaned from street and proper erosion control needs to be in place to keep this from happening. 3. Storm drains need to be protected, silt socks need to be replaced if they are compacted with mud or debris . Should not have grass growing out of them . After installed they need to be maintained . 4. All properties need to have erosion control in place and in working order. Must be maintained throughout 5. Before any work can be done on site an erosion control inspection will need to be scheduled. 6. NO WORK is allowed on site until these issues have been corrected.
Erosion Control Inspection Residential Partial 8/4/2025 8/4/2025 08/04/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
07/21/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/21/2025
7-17-25 Dustin A, Silt fence is down , Storm inlet needs cleaned out .EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 7-21-25 Dustin A, Silt fence has been stood up bur storm inlet still needs cleaned. 8-4-25 Dustin A, All corrections had been made, esc must be maintained throughout project.
Driveway Inspection Partial 8/7/2025 8/7/2025 08/07/2025
Misc
Informational
08/07/2025
08/07/25 Jamie S, DW is formed and compacted. Approved to pour.
Driveway Inspection Partial 8/14/2025 8/14/2025 08/14/2025
Misc
Informational
08/07/2025
08/07/25 Jamie S, DW is formed and compacted. Approved to pour. 08/14/25 Jamie S, DW still has forms attached, cannot inspect until forms have been pulled. Call in for reinspection once forms have been pulled.
Sidewalk Inspection Partial 8/18/2025 8/18/2025 08/18/2025
Misc
Informational
08/18/2025
08/18/25 Jamie S, SW is formed, compacted and slopes are compliant with city standards. Approved to pour. SW will stop short of connecting to the existing SW on Ward road. The builder is wanting to submit changes to the existing because of utilities.
Driveway Inspection Failed 8/20/2025 8/20/2025 08/20/2025
Misc
Informational
08/14/2025
08/07/25 Jamie S, DW is formed and compacted. Approved to pour. 08/14/25 Jamie S, DW still has forms attached, cannot inspect until forms have been pulled. Call in for reinspection once forms have been pulled. 8/20/25 Tyler S. DW inspection failed due to crack in the DW at the approach.
Driveway Inspection Passed 08/25/2025
Misc
Informational
08/20/2025
08/07/25 Jamie S, DW is formed and compacted. Approved to pour. 08/14/25 Jamie S, DW still has forms attached, cannot inspect until forms have been pulled. Call in for reinspection once forms have been pulled. 8/20/25 Tyler S. DW forms have been pulled. DW meets city standards.
Sidewalk Inspection Partial 8/25/2025 8/25/2025 08/25/2025
Misc
Informational
08/25/2025
08/18/25 Jamie S, SW is formed, compacted and slopes are compliant with city standards. Approved to pour. SW will stop short of connecting to the existing SW on Ward road. The builder is wanting to submit changes to the existing because of utilities. 8-25-25 Dustin A, needed to make some changes to sw leading to ward rd due to meeting ada standards. Met With Colby and got it figured out . Also the ada ramp on ward needed to be adjusted to meet compliance . One panel transition will be allowed to meet compliance. . Approved to pour
Sidewalk Inspection Partial 8/25/2025 8/25/2025 08/25/2025
Plot Plan Inspection Passed 8/26/2025 08/26/2025
Sidewalk Inspection Passed 9/2/2025 9/2/2025 09/02/2025
Misc
Informational
08/25/2025
08/18/25 Jamie S, SW is formed, compacted and slopes are compliant with city standards. Approved to pour. SW will stop short of connecting to the existing SW on Ward road. The builder is wanting to submit changes to the existing because of utilities. 8-25-25 Dustin A, needed to make some changes to sw leading to ward rd due to meeting ada standards. Met With Colby and got it figured out . Also the ada ramp on ward needed to be adjusted to meet compliance . One panel transition will be allowed to meet compliance. . Approved to pour 9/2/25 Tyler S. SW is in compliance with city specs and meets ADA standards. Pass.
Documents & Images
Date Uploaded File Type Document Name
11/11/2024 Application Form Application - Lot 46
11/11/2024 Tax Form - Lot 46
11/14/2024 Permit Codes Residential Plan Review
11/21/2024 Approved Plans APPROVED PLANS
11/21/2024 Plot Plan APPROVED PLOT PLAN
11/21/2024 Permit Codes Residential Plan Review
12/03/2024 Permit DS Building Permit
12/03/2024 Receipt Receipt for transaction: 2024-009258
12/18/2024 Lot 46 Footing Inspection
12/19/2024 Letter INSPECTION SUMMARY
03/06/2025 Letter INSPECTION SUMMARY
03/06/2025 Letter INSPECTION SUMMARY
03/06/2025 Letter INSPECTION SUMMARY
03/06/2025 Letter INSPECTION SUMMARY
03/06/2025 Letter INSPECTION SUMMARY
03/07/2025 Letter INSPECTION SUMMARY
03/12/2025 Letter INSPECTION SUMMARY
03/12/2025 Letter INSPECTION SUMMARY
03/18/2025 Letter INSPECTION SUMMARY
03/18/2025 Letter INSPECTION SUMMARY
03/31/2025 2025_03_27_1400-02 SW Winthrop Ter_GSlab_Sealed
03/31/2025 Letter INSPECTION SUMMARY
05/21/2025 Engineer Report/Study ENGINEER LETTER
06/10/2025 Letter INSPECTION SUMMARY
06/10/2025 Letter INSPECTION SUMMARY
06/10/2025 Letter INSPECTION SUMMARY
06/10/2025 Letter INSPECTION SUMMARY
06/12/2025 Letter INSPECTION SUMMARY
06/12/2025 Letter INSPECTION SUMMARY
06/13/2025 Letter INSPECTION SUMMARY
06/30/2025 Letter INSPECTION SUMMARY
07/17/2025 Letter INSPECTION SUMMARY
07/17/2025 Letter INSPECTION SUMMARY
07/21/2025 Letter Stop Work Order
07/21/2025 Letter Stop Work Order
07/31/2025 Letter INSPECTION SUMMARY
07/31/2025 Letter Stop Work Order
07/31/2025 Letter Stop Work Order
08/04/2025 Letter INSPECTION SUMMARY
08/07/2025 Letter INSPECTION SUMMARY
08/14/2025 Letter INSPECTION SUMMARY
08/18/2025 Letter INSPECTION SUMMARY
08/18/2025 Plot Plan APPROVED PLOT PLAN
08/20/2025 Letter INSPECTION SUMMARY
08/20/2025 Letter INSPECTION SUMMARY
08/25/2025 Letter INSPECTION SUMMARY
08/25/2025 Letter INSPECTION SUMMARY
08/25/2025 Letter INSPECTION SUMMARY
08/25/2025 Plot Plan APPROVED AS GRADED PLOT PLAN
08/26/2025 Letter INSPECTION SUMMARY
09/02/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home