Summary
PRRES20245649
Building Permit - Residential
Issued
DJ23 INVESTMENTS LLC
NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED BASEMENT. ROOF TRUSSES - DEFERRED.
10/24/2024
11/05/2024
Locations
Contacts
Avital Homes, LLC, Address:7500 W 151st Street, #23100, Phone:(816) 914-7128  
DJ23 INVESTMENTS LLC, Address:7200 W 132ND ST  
Doug Jenson, Address:11010 Nora Dodge Dr, Phone:(816) 266-0685  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
CARUTHERS ELECTRICAL LLC, Address:30905 E TRUMAN RD, Phone:(816) 508-9050  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
DOUG@APGKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,576.50 $1,576.50 Paid 11/05/2024
8331401-Water Tap Fee $3,973.00 $3,973.00 Paid 11/05/2024
8350015-Water Meter Fee $748.03 $748.03 Paid 11/05/2024
8331507-Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 11/05/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 11/05/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 11/05/2024
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 03/17/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Occupancy Inspection - Codes Residential Pending
Erosion Control Inspection Residential Pending
Miscellaneous Correction
Informational
02/26/2025
Erosion control is in place at the time of inspection
Driveway Inspection Pending
Misc
Informational
04/23/2025
4-18-25 Dustin A, dw is formed and compacted. Approved to pour . 4-23-25 Dustin A, Dw was poured to city specs. Cannot pass until forms are pulled
Underslab Plumbing Inspection - Residential Passed 12/11/2024 12/11/2024 12/11/2024
Erosion Control Inspection Residential Partial 12/11/2024 12/11/2024
Misc
Corrective Action Required
12/11/2024
Erosion control is in compliance. Maintain erosion control throughout construction
Sewer Service Inspection - R Passed 12/18/2024 12/18/2024 12/18/2024
Water Service Inspection - R Partial 12/18/2024 12/18/2024
Miscellaneous Correction
Informational
12/18/2024
Poly ran about 15 feet out from the foundation and is okay to cover This is a partial pass only
Water Service Inspection - R Passed 12/19/2024 12/19/2024
Miscellaneous Correction
Resolved
12/19/2024
Poly ran about 15 feet out from the foundation and is okay to cover This is a partial pass only
Footing Inspection - Residential Passed 1/9/2025 01/09/2025
Miscellaneous Correction
Informational
01/09/2025
Footing inspected and passed by a third party
Erosion Control Inspection Residential Failed 1/9/2025 01/09/2025
Misc
Resolved
01/09/2025
Erosion control is in compliance. Maintain erosion control throughout construction
Miscellaneous Correction
Corrective Action Required
01/09/2025
Silt fence at the front of the lot has been damaged and needs to be replaced or repaired. Full erosion control must be in place and properly maintained until CofO
All Rough Inspection - Residential Failed 1/6/2025 1/9/2025 01/09/2025
Miscellaneous Correction
Corrective Action Required
01/09/2025
- Panel splice for the PFH is located in the wrong area. - 2018 IRC states that a PFH panel splice should be located within the middle 24 inches of the portal leg R692.10.6.1 This was a partial all rough inspection for the garage portal framing only
All Rough Inspection - Residential Failed 1/21/2025 1/21/2025 01/21/2025
Miscellaneous Correction
Resolved
01/21/2025
- Panel splice for the PFH is located in the wrong area. - 2018 IRC states that a PFH panel splice should be located within the middle 24 inches of the portal leg R692.10.6.1 This was a partial all rough inspection for the garage portal framing only
Misc
Informational
01/21/2025
- GARAGE PORTAL FRAME ONLY APPROVED
Electrical Service Inspection Passed 2/21/2025 02/21/2025
Gas Service Inspection - Residential Passed 2/21/2025 02/21/2025
Erosion Control Inspection Residential Partial 2/21/2025 02/21/2025
Miscellaneous Correction
Resolved
02/21/2025
Silt fence at the front of the lot has been damaged and needs to be replaced or repaired. Full erosion control must be in place and properly maintained until CofO
Miscellaneous Correction
Informational
02/21/2025
Erosion control is in place at the time of inspection
All Rough Inspection - Residential Failed 2/21/2025 2/21/2025 02/21/2025
Misc
Resolved
02/21/2025
- GARAGE PORTAL FRAME ONLY APPROVED
Miscellaneous Correction
Corrective Action Required
02/21/2025
Garage anchor bolts need to be installed in the middle 1/3 of the bottom plate Nail garage corners to code Double LVL supported the garage steel post is not fully supported under the Ibeam Fire block all top plate at furr down in garage Have engineer address ceiling above powder bathroom where floor joist have been drilled with holes closer than 2 inches apart LSTRA at front entrance is not installed Fire block cantilever above front entrance Electrical receptacle in back of fire place will not be accessible after installation of fireplace 2x6 stairwell wall is over 14 feet in height and is required to fire blocked Header in the primary bedroom south triple window is not the correct size according to the plans Non installed triple window in the primary bedroom west wall needs to have king studs installed from the floor to the top plate or to the correct size header along with full length jack studs Over 50 precent of the top plate in the master bathroom exterior wall has been removed for the DWV and needs to be strapped Support the first stair platform going upstairs underneath at the NW corner
Erosion Control Inspection Residential Partial 2/26/2025 02/26/2025
Miscellaneous Correction
Informational
02/21/2025
Erosion control is in place at the time of inspection
All Rough Inspection - Residential Failed 2/26/2025 2/26/2025 02/26/2025
Miscellaneous Correction
Resolved
02/26/2025
Garage anchor bolts need to be installed in the middle 1/3 of the bottom plate Nail garage corners to code Double LVL supported the garage steel post is not fully supported under the Ibeam Fire block all top plate at furr down in garage Have engineer address ceiling above powder bathroom where floor joist have been drilled with holes closer than 2 inches apart LSTRA at front entrance is not installed Fire block cantilever above front entrance Electrical receptacle in back of fire place will not be accessible after installation of fireplace 2x6 stairwell wall is over 14 feet in height and is required to fire blocked Header in the primary bedroom south triple window is not the correct size according to the plans Non installed triple window in the primary bedroom west wall needs to have king studs installed from the floor to the top plate or to the correct size header along with full length jack studs Over 50 precent of the top plate in the master bathroom exterior wall has been removed for the DWV and needs to be strapped Support the first stair platform going upstairs underneath at the NW corner
Miscellaneous Correction
Corrective Action Required
02/26/2025
Garage anchor bolts need to be installed in the middle 1/3 of the bottom plate (not completed) Have engineer address ceiling above powder bathroom where floor joist have been drilled with holes closer than 2 inches apart LSTRA at front entrance is not installed Electrical receptacle in back of fire place will not be accessible after installation of fireplace Header in the primary bedroom south triple window is not the correct size according to the plans (plans are not on site to verify) Non installed triple window in the primary bedroom west wall needs to have king studs installed from the floor to the top plate or to the correct size header along with full length jack studs. (Have engineer verify field modifications)(plans are not on site to verify header size)
All Rough Inspection - Residential Failed 2/28/2025 2/28/2025 02/28/2025
Miscellaneous Correction
Corrective Action Required
02/26/2025
-LSTRA at front entrance is not installed
All Rough Inspection - Residential Passed 3/3/2025 3/3/2025 03/03/2025
Miscellaneous Correction
Resolved
03/03/2025
-LSTRA at front entrance is not installed
Driveway Inspection Partial 4/18/2025 4/18/2025 04/18/2025
Misc
Informational
04/18/2025
4-18-25 Dustin A, dw is formed and compacted. Approved to pour .
Driveway Inspection Partial 4/23/2025 4/23/2025 04/23/2025
Misc
Informational
04/18/2025
4-18-25 Dustin A, dw is formed and compacted. Approved to pour . 4-23-25 Dustin A, Dw was poured to city specs. Cannot pass until forms are pulled
Documents & Images
Date Uploaded File Type Document Name
10/24/2024 RS 125 License_Tax_Application
10/24/2024 RS 125 LS Residental Permit Application_1
10/24/2024 Serenity - Craftsman 3-Car GR
11/01/2024 Approved Plans APPROVED PLANS
11/01/2024 Plot Plan APPROVED PLOT PLAN
11/01/2024 Permit Codes Residential Plan Review
11/05/2024 Permit DS Building Permit
11/05/2024 Receipt Receipt for transaction:2024-008763
12/11/2024 Letter INSPECTION SUMMARY
12/11/2024 Letter INSPECTION SUMMARY
12/18/2024 Letter INSPECTION SUMMARY
12/18/2024 Letter INSPECTION SUMMARY
12/19/2024 Letter INSPECTION SUMMARY
01/08/2025 125 Reserve at Stoney Creek - FTG-signed-stamped (1)
01/09/2025 Letter INSPECTION SUMMARY
01/09/2025 Letter INSPECTION SUMMARY
01/09/2025 Letter INSPECTION SUMMARY
01/21/2025 Letter INSPECTION SUMMARY
02/21/2025 Letter INSPECTION SUMMARY
02/21/2025 Letter INSPECTION SUMMARY
02/21/2025 Letter INSPECTION SUMMARY
02/21/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
02/27/2025 125 Reserve at Stoney Creek Field issue- Stamped
02/28/2025 Letter INSPECTION SUMMARY
03/03/2025 Letter INSPECTION SUMMARY
03/17/2025 Receipt Receipt for transaction:2025-001612
04/18/2025 Letter INSPECTION SUMMARY
04/23/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home