Permit Application Status

PRRES20245421


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20245421
Building Permit - Residential
Issued
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED DECK STOP WORK ORDER generated on 12/16/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 12/23/2024 12:00 AM by username 'Mitchell Schwarz'.
10/14/2024
10/18/2024
04/12/2025
Locations
Contacts
ELEVATE DESIGN & BUILD LLC, Address:350 SW LONGVIEW BLVD, Phone:(816) 622-8826  
Elevate Design + Build , Address:350 Longview Blvd.   
Sara Ladd, Address:350 SW Longview Blvd, Phone:(816) 622-8826  
Bill Seachrest, Address:350 SW Longview Blvd, Phone:(816) 786-8876  
SARA@ELEVATEDESIGNBUILDKC.COM  
5 STAR MECHANICAL, LLC, Address:PO BOX 793, Phone:(816) 679-0375  
ELECTRICAL CONNECTIONS, Address:20112 HOPS CREEK DR, Phone:(816) 838-6946  
S&B Plumbing, Inc., Address:PO Box 101, Phone:(913) 850-3445  
Harish Mucharla, Address:350 SW Longview Blvd.  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 10/18/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 10/18/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 10/18/2024
8331401-Water Tap Fee $3,973.00 $3,973.00 Paid 10/18/2024
8350015-Water Meter Fee $748.03 $748.03 Paid 10/18/2024
9110078-Valuation Fee New Single Family $1,542.08 $1,542.08 Paid 10/18/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 12/17/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Occupancy Inspection - Codes Residential Pending
Erosion Control Inspection Residential Pending
Driveway Inspection Pending
Misc
Informational
04/22/2025
3-27-25 Dustin A, dw is formed and compacted. Informed builder it needed expansion joints. Approved to pour 4-4-25 Dustin A dw has been poured. It is not ada compliant on right side of approach @ 4%. Fail 4-22-25 Dustin A, DW has been ripped out, formed and compacted. Approved to pour . Cross slopes will need to be ADA compliant ( under 2% ) .
Sewer Service Inspection - R Passed 12/16/2024 12/16/2024 12/16/2024
Footing Inspection - Residential Failed - Stop Work 12/16/2024 12/16/2024 12/16/2024
Misc
Corrective Action Required
12/16/2024
No footing inspection performed.
Footing Inspection - Residential Not Ready 12/17/2024 12/17/2024 12/17/2024
Misc
Corrective Action Required
12/16/2024
No footing inspection performed.
Footing Inspection - Residential Failed - Stop Work 12/18/2024 12/18/2024 12/18/2024
Misc
Corrective Action Required
12/17/2024
3rd party inspection report denied. -3rd party report state inspection performed after footing was poured -3rd party report does not state ufer ground location.
Footing Inspection - Residential Passed 12/23/2024 12/23/2024 12/23/2024
Misc
Resolved
12/23/2024
3rd party inspection report denied. -3rd party report state inspection performed after footing was poured -3rd party report does not state ufer ground location.
Misc
Informational
12/23/2024
3rd party footing inspection submitted.
Underslab Plumbing Inspection - Residential Passed 12/24/2024 12/24/2024 12/24/2024
Water Service Inspection - R Passed 1/3/2025 1/3/2025 01/03/2025
Gas Service Inspection - Residential Failed 2/6/2025 2/6/2025 02/06/2025
Misc
Corrective Action Required
02/06/2025
Complete gas line for inspection
Electrical Service Inspection Failed 2/6/2025 2/6/2025 02/06/2025
Misc
Corrective Action Required
02/06/2025
Identify ufer ground connection at each end
All Rough Inspection - Residential Failed 2/6/2025 2/6/2025 02/06/2025
Misc
Corrective Action Required
02/06/2025
Install all windows and doors -nail exterior wall corners together to code see single car garage -fire block top of furr out at garage/laundry -fireblock fireplace wall space to ceiling space -fire block primary bed window wall to ceiling space -cspf sheathing breaks to occur in the middle 24” of the portal leg -nail plate under header at cspf to header 3” O.C -seal penetration in. Bottom plate pantry/kitchen wall Fire block furr down ends in basement at S plumbing stack in basement -complete electrical at cspf wall in basement -strap cspf wall in basement -fire block basement bath wall to furr down -add support for furr down to floor joist above jn bed 3 -identify ufer ground connection at each end -provide bearing for ridge at deck (deck not built yet) -complete gas line installation
Electrical Service Inspection Passed 2/11/2025 2/11/2025 02/11/2025
Misc
Resolved
02/11/2025
Identify ufer ground connection at each end
Gas Service Inspection - Residential Failed 2/11/2025 2/11/2025 02/11/2025
Misc
Corrective Action Required
02/06/2025
Bond gas line.
All Rough Inspection - Residential Failed 2/11/2025 2/11/2025 02/11/2025
Misc
Corrective Action Required
02/06/2025
Will inspect gb bracing and deck ridge gusset At Later date okay to drywall and insulate.
Gas Service Inspection - Residential Passed 2/12/2025 2/12/2025 02/12/2025
Misc
Resolved
02/12/2025
Bond gas line.
All Rough Inspection - Residential Partial 2/18/2025 2/18/2025 02/18/2025
Misc
Corrective Action Required
02/11/2025
Will inspect gb bracing At Later date okay to drywall and insulate.
All Rough Inspection - Residential Passed 2/24/2025 2/24/2025 02/24/2025
Misc
Resolved
02/24/2025
Will inspect gb bracing At Later date okay to drywall and insulate.
Erosion Control Inspection Residential Partial 02/24/2025
Piers/Caissons Inspection - Residential Passed 3/26/2025 03/26/2025
Sidewalk Inspection Partial 3/27/2025 3/27/2025 03/27/2025
Misc
Informational
03/27/2025
3-27-25 Dustin A, sw is formed and compacted. Slopes are in compliance. Approved to pour
Driveway Inspection Partial 3/27/2025 3/27/2025 03/27/2025
Misc
Informational
03/27/2025
3-27-25 Dustin A, dw is formed and compacted. Informed builder it needed expansion joints. Approved to pour
Sidewalk Inspection Passed 4/4/2025 4/4/2025 04/04/2025
Misc
Informational
03/27/2025
3-27-25 Dustin A, sw is formed and compacted. Slopes are in compliance. Approved to pour 4-4-25 Dustin A sw has been poured to city specs. Slopes are in compliance. Pass
Driveway Inspection Failed 4/4/2025 4/4/2025 04/04/2025
Misc
Informational
03/27/2025
3-27-25 Dustin A, dw is formed and compacted. Informed builder it needed expansion joints. Approved to pour 4-4-25 Dustin A dw has been poured. It is not ada compliant on right side of approach @ 4%. Fail.
Driveway Inspection Partial 4/22/2025 4/22/2025 04/22/2025
Misc
Informational
04/04/2025
3-27-25 Dustin A, dw is formed and compacted. Informed builder it needed expansion joints. Approved to pour 4-4-25 Dustin A dw has been poured. It is not ada compliant on right side of approach @ 4%. Fail 4-22-25 Dustin A, DW has been ripped out, formed and compacted. Approved to pour . Cross slopes will need to be ADA compliant ( under 2% ) .
Documents & Images
Date Uploaded File Type Document Name
10/14/2024 Tax_Application-24-10-14
10/14/2024 Plot Plan APPROVED PLOT PLAN
10/14/2024 Permit Codes Residential Plan Review
10/14/2024 Permit Codes Residential Plan Review
10/15/2024 Application Form Application-24-10-15
10/15/2024 Approved Plans APPROVED PLANS
10/15/2024 Permit Codes Residential Plan Review
10/15/2024 Permit Codes Residential Plan Review
10/18/2024 Permit DS Building Permit
10/18/2024 Permit DS Building Permit
10/18/2024 Receipt Receipt for transaction:2024-008435
11/20/2024 Approved Plans APPROVED PIER PLAN
12/13/2024 Approved Plans APPROVED REVISED PLANS
12/16/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter Stop Work Order
12/16/2024 2226 SW Crown Dr_PIER INSP_2024-11-25
12/17/2024 198 Hook Farms-Footing-signed-stamped
12/17/2024 Receipt Receipt for transaction:2024-009570
12/18/2024 Letter Stop Work Order
12/18/2024 Letter Stop Work Order
12/20/2024 198 Hook Farms - FTG-signed-stamped
12/23/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter Stop Work Order
12/23/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
01/03/2025 Letter INSPECTION SUMMARY
01/03/2025 Letter INSPECTION SUMMARY
01/03/2025 Letter INSPECTION SUMMARY
02/06/2025 Letter INSPECTION SUMMARY
03/26/2025 Letter INSPECTION SUMMARY
03/26/2025 Letter INSPECTION SUMMARY
03/26/2025 Letter INSPECTION SUMMARY
03/26/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
04/04/2025 Letter INSPECTION SUMMARY
04/04/2025 Letter INSPECTION SUMMARY
04/04/2025 Letter INSPECTION SUMMARY
04/22/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home