Permit Application Status

PRRES20245176


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20245176
Building Permit - Residential
Stop Work
DOMAIN TIMBERLAKE MULTISTATE LLC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - UNCOVERED DECK - ROOF TRUSSES STOP WORK ORDER generated on 11/18/2024 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER removed on 11/27/2024 12:00 AM by username 'Mark Harding'. STOP WORK ORDER generated on 05/12/2025 12:00 AM by username 'Drew Fischer'.
10/01/2024
10/03/2024
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
DOMAIN TIMBERLAKE MULTISTATE LLC, Address:590 MADISON AVE FL 13TH  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
BRUCER@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 10/03/2024
Right of Way Permit Fee $85.00 $85.00 Paid 10/03/2024
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 10/03/2024
Water Tap Fee $3,973.00 $3,973.00 Paid 10/03/2024
Water Meter Fee $748.03 $748.03 Paid 10/03/2024
Valuation Fee New Single Family $1,571.73 $1,571.73 Paid 10/03/2024
Not Ready Inspection Fee $75.00 $75.00 Paid 01/07/2025
Not Ready Inspection Fee $75.00 $75.00 Paid 02/26/2025
Not Ready Inspection Fee $75.00 $75.00 Paid 02/26/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 04/14/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Occupancy Inspection - Codes Residential Pending
Misc
Corrective Action Required
04/14/2025
-provide as graded plot plan -final grade and sod -gutters missing -splash blocks and sump pump discharge to extend 36” from foundation -will check water meter at final -address over notched post at post to beam connection on deck, remove trex to allow inspection of post to bracket -seal top of ac disconnect
Erosion Control Inspection Residential Pending
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/12/2025
5/7/25 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -Provide BMPs at perimeter, clean silt and debris from street
Misc
Corrective Action Required
05/12/2025
5-12-25, Erosion control still not in compliance . Stop work order issued
Footing Inspection - Residential Passed 10/30/2024 10/30/2024 10/30/2024
Erosion Control Inspection Residential Partial 10/30/2024 10/30/2024 10/30/2024
Sewer Service Inspection - R Passed 11/12/2024 11/12/2024 11/12/2024
Erosion Control Inspection Residential Failed 11/13/2024 11/13/2024 11/13/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
11/13/2024
10-13-24 Dustin A, Gravel is out in curb line and road. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Water Service Inspection - R Passed 11/14/2024 11/14/2024 11/14/2024
Erosion Control Inspection Residential Failed - Stop Work 11/18/2024 11/18/2024 11/18/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
11/13/2024
10-13-24 Dustin A, Gravel is out in curb line and road. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 11-18-24 Dustin A, still not cleaned up
Erosion Control Inspection Residential Failed - Stop Work 11/26/2024 11/26/2024 11/26/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
11/18/2024
10-13-24 Dustin A, Gravel is out in curb line and road. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 11-18-24 Dustin A, still not cleaned up 11/26/24 -Erosion control still not in compliance. Stop work issued
Underslab Plumbing Inspection - Residential Passed 11/27/2024 11/27/2024
Erosion Control Inspection Residential Passed 11/27/2024 11/27/2024 11/27/2024
DCM3 ESC REQUIRED 2 DAY
Resolved
11/27/2024
10-13-24 Dustin A, Gravel is out in curb line and road. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 11-18-24 Dustin A, still not cleaned up 11/26/24 -Erosion control still not in compliance. Stop work issued
All Rough Inspection - Residential Not Ready 12/13/2024 12/13/2024 12/13/2024
Misc
Corrective Action Required
12/13/2024
No address visible inspection denied
All Rough Inspection - Residential Partial 12/16/2024 12/16/2024 12/16/2024
Misc
Informational
12/16/2024
Garage portal frame nailing inspection only. Okay to cover
Electrical Service Inspection Failed 1/28/2025 1/28/2025 01/28/2025
Misc
Corrective Action Required
01/28/2025
Connect ufer ground to main point of disconnect and identify at both ends
Gas Service Inspection - Residential Not Ready 1/28/2025 1/28/2025 01/28/2025
Misc
Corrective Action Required
01/28/2025
Not ready No gas line installed.
All Rough Inspection - Residential Failed 1/28/2025 1/28/2025 01/28/2025
Misc
Resolved
01/28/2025
Garage portal frame nailing inspection only. Okay to cover
Misc
Corrective Action Required
01/28/2025
-anchor bolts to be in middle 1/3 of sill plate -missing washers and nuts at pfh -nail plate under header to header at pfh -address trusses b8, b7 attached to blocking and siding block above garage -strap top plate where lapped less than 25” above primary walk in closet -address over board exterior wall studs in primary bath -install roof boots throughout -provide anchor bolts within 12” of plate breaks -no gas line installed -identify ufer ground connection at both ends and connect to main point of disconnect
All Rough Inspection - Residential Failed 1/30/2025 1/30/2025 01/30/2025
Misc
Corrective Action Required
01/28/2025
-address trusses b8, b7 attached to blocking and siding block above garage -strap top plate where lapped less than 24” above primary walk in closet -address over board exterior wall studs in primary bath -provide anchor bolts within 12” of plate breaks in basement -identify ufer ground connection at both ends and connect to main point of disconnect
Gas Service Inspection - Residential Passed 1/30/2025 1/30/2025 01/30/2025
Misc
Resolved
01/30/2025
Not ready No gas line installed.
Electrical Service Inspection Not Ready 1/30/2025 1/30/2025 01/30/2025
Misc
Corrective Action Required
01/28/2025
Connect ufer ground to main point of disconnect and identify at both ends
Electrical Service Inspection Failed 2/3/2025 2/3/2025 02/03/2025
Misc
Resolved
02/03/2025
Connect ufer ground to main point of
Miscellaneous Correction
Corrective Action Required
02/03/2025
Connect Ufer to bonding wires
All Rough Inspection - Residential Failed 2/3/2025 2/3/2025 02/03/2025
Misc
Resolved
02/03/2025
-address trusses b8, b7 attached to blocking and siding block above garage -strap top plate where lapped less than 24” above primary walk in closet -address over board exterior wall studs in primary bath -provide anchor bolts within 12” of plate breaks in basement -identify ufer ground connection at both ends and connect to main point of disconnect
Miscellaneous Correction
Corrective Action Required
02/03/2025
address trusses B6-8 attached to blocking and siding block above garage (have engineer address) -Attach bonding wires to UFER
All Rough Inspection - Residential Passed 2/5/2025 2/5/2025 02/05/2025
Miscellaneous Correction
Resolved
02/05/2025
address trusses B6-8 attached to blocking and siding block above garage (have engineer address) -Attach bonding wires to UFER
Electrical Service Inspection Passed 2/5/2025 2/5/2025 02/05/2025
Miscellaneous Correction
Resolved
02/05/2025
Connect Ufer to bonding wires
Driveway Inspection Partial 3/27/2025 3/27/2025 03/27/2025
Misc
Informational
03/27/2025
3-27-25 Dustin A, Dw is formed and compacted. Approved to pour.
Piers/Caissons Inspection - Residential Passed 3/28/2025 3/28/2025 03/28/2025
Driveway Inspection Passed 4/4/2025 4/4/2025 04/04/2025
Misc
Informational
03/27/2025
3-27-25 Dustin A, Dw is formed and compacted. Approved to pour. 4-4-25 Dustin A dw poured to city specs. Pass
Occupancy Inspection - Codes Residential Failed 4/10/2025 4/10/2025 04/10/2025
Misc
Corrective Action Required
04/10/2025
-provide as graded plot plan -final grade and sod -gutters missing -splash blocks and sump pump discharge to extend 36” from foundation -will check water meter at final grade -missing attic access cover -missing water heater discharge relief valve pipe -address over notched post at post to beam connection on deck -seal top of ac disconnect
Occupancy Inspection - Codes Residential Ready for Temp CO 4/14/2025 4/14/2025 04/14/2025
Misc
Corrective Action Required
04/10/2025
-provide as graded plot plan -final grade and sod -gutters missing -splash blocks and sump pump discharge to extend 36” from foundation -will check water meter at final -address over notched post at post to beam connection on deck, remove trex to allow inspection of post to bracket -seal top of ac disconnect
Plot Plan Inspection Passed 4/29/2025 04/29/2025
Erosion Control Inspection Residential Failed 5/7/2025 5/7/2025 05/07/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/07/2025
5/7/25 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -Provide BMPs at perimeter, clean silt and debris from street
Erosion Control Inspection Residential Failed - Stop Work 5/12/2025 5/12/2025 05/12/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/07/2025
5/7/25 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -Provide BMPs at perimeter, clean silt and debris from street
Misc
Corrective Action Required
05/12/2025
5-12-25, Erosion control still not in compliance . Stop work order issued
Documents & Images
Date Uploaded File Type Document Name
10/01/2024 Application Form HT #187 - PERMIT APP
10/03/2024 Approved Plans APPROVED PLANS
10/03/2024 Plot Plan APPROVED PLOT PLAN
10/03/2024 Approved Plans APPROVED TRUSS LAYOUT
10/03/2024 Approved Plans APPROVED TRUSS PACKAGE
10/03/2024 Permit Codes Residential Plan Review
10/03/2024 Permit DS Building Permit
10/03/2024 Receipt Receipt for transaction:2024-008081
10/30/2024 M L Crose3219 SW Arbor Ridge Cir, LSMO 3rd Party Footing Inspection Report 10-29-24
10/30/2024 Letter INSPECTION SUMMARY
10/30/2024 Letter INSPECTION SUMMARY
11/12/2024 Letter INSPECTION SUMMARY
11/13/2024 Letter INSPECTION SUMMARY
11/14/2024 Letter INSPECTION SUMMARY
11/18/2024 Letter Stop Work Order
11/18/2024 Letter Stop Work Order
11/26/2024 Letter Stop Work Order
12/13/2024 Letter INSPECTION SUMMARY
12/13/2024 Letter INSPECTION SUMMARY
12/13/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
01/07/2025 Approved Plans APPROVED TRUSS PACKAGE
01/07/2025 Receipt Receipt for transaction:2025-000068
01/28/2025 Letter INSPECTION SUMMARY
01/28/2025 Letter INSPECTION SUMMARY
01/28/2025 Letter INSPECTION SUMMARY
01/30/2025 Letter INSPECTION SUMMARY
01/30/2025 Letter INSPECTION SUMMARY
01/30/2025 Letter INSPECTION SUMMARY
02/03/2025 Letter INSPECTION SUMMARY
02/03/2025 Letter INSPECTION SUMMARY
02/05/2025 Letter INSPECTION SUMMARY
02/05/2025 Letter INSPECTION SUMMARY
02/26/2025 Receipt Receipt for transaction:2025-001117
03/27/2025 Letter INSPECTION SUMMARY
03/28/2025 Letter INSPECTION SUMMARY
04/04/2025 Letter INSPECTION SUMMARY
04/10/2025 Letter INSPECTION SUMMARY
04/14/2025 Letter INSPECTION SUMMARY
04/14/2025 Certificate/License Codes Temporary Certificate of Occupancy
04/14/2025 Receipt Receipt for transaction:2025-002289
04/28/2025 HT 187 ASBUILT
04/28/2025 Plot Plan APPROVED AS GRADED PLOT PLAN
04/29/2025 Letter INSPECTION SUMMARY
05/06/2025 HT #187 - TCO Extension 5_6_25
05/07/2025 Letter INSPECTION SUMMARY
05/12/2025 Letter Stop Work Order
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home