Building Permit - Residential
Issued
NEW SINGLE FAMILY
NEW HOUSE. WALKOUT BASEMENT. FINISHED/UNFINISHED BASEMENT. COVERED DECK. PL2024189 APPROVED BZA FOR DECK. STOP WORK ORDER generated on 10/24/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 10/25/2024 12:00 AM by username 'Mitchell Schwarz'.
09/23/2024
10/01/2024
03/26/2025
Locations
Contacts
WALKER CUSTOM HOMES, LLC, Address:PO BOX 3194, Phone:(913) 208-2026  
Jason walker, Address:PO Box 247, Phone:(913) 208-2026  
5 STAR MECHANICAL, LLC, Address:PO BOX 793, Phone:(816) 679-0375  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
WALKERCUSTOMHOMESKC@GMAIL.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $3,973.00 $3,973.00 Paid 10/01/2024
8350015-Water Meter Fee $748.03 $748.03 Paid 10/01/2024
8331507-Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 10/01/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 10/01/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 10/01/2024
9110078-Valuation Fee New Single Family $2,486.03 $2,486.03 Paid 10/01/2024
Outstanding Fees Amount Paid Owing Date Paid
9110080-Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid


$75.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Driveway Inspection Pending
Plot Plan Inspection Pending
Occupancy Inspection - Codes Residential Pending
Sidewalk Inspection Pending
Sidewalk Inspection Pending
Erosion Control Inspection Residential Pending
All Rough Inspection - Residential Pending
Misc
Corrective Action Required
04/03/2025
-missing straps at PFH -anchor bolts to be in the middle 1/3 of sill plate and Tight -block sheathing breaks throughout garage where missing -furr around for sub panel service cable in ceiling space -strap top plate and protect dryer vent at top plate -furr down for bath vent at garage entry bath -missing nails in multiple hangers above kitchen -address beam separating kitchen and great room connection not to plans and LVL Notched into I beam -fire block furr out wall 2nd story floor height right of fireplace -ensure stairways comply with code section R311.7 of the 2018 IRC -add full length studs where missing at stairway/exterior wall -address rafters landing on osb throughout 2nd floor -3 studs at each exterior wall corner in basement -address holes drilled in joist for hvac intake/exhaust -fire block dead spaces at basement bathroom with approved fire blocking material
Footing Inspection - Residential Failed 10/21/2024 10/21/2024 10/21/2024
Misc
Corrective Action Required
10/21/2024
Inspection denied. No address posted Erosion control not in compliance
Erosion Control Inspection Residential Failed 10/21/2024 10/21/2024 10/21/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
10/21/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/21/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. REPAIR DOWN SILT FENCE
Underslab Plumbing Inspection - Residential Failed 10/24/2024 10/24/2024 10/24/2024
Misc
Corrective Action Required
10/24/2024
Erosion control still not in compliance, inspection denied
Erosion Control Inspection Residential Failed - Stop Work 10/24/2024 10/24/2024 10/24/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
10/21/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/21/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. REPAIR DOWN SILT FENCE 10/24/24-stop work issued, erosion control still not in compliance
Erosion Control Inspection Residential Partial 10/25/2024 10/25/2024 10/25/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
10/25/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Resolved
10/25/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. REPAIR DOWN SILT FENCE 10/24/24-stop work issued, erosion control still not in compliance
Underslab Plumbing Inspection - Residential Passed 10/28/2024 10/28/2024 10/28/2024
Misc
Resolved
10/28/2024
Erosion control still not in compliance, inspection denied
Footing Inspection - Residential Passed 10/29/2024 10/29/2024
Misc
Resolved
10/29/2024
Inspection denied. No address posted Erosion control not in compliance
Sewer Service Inspection - R Passed 11/1/2024 11/1/2024 11/01/2024
Water Service Inspection - R Partial 11/1/2024 11/1/2024 11/01/2024
Water Service Inspection - R Passed 11/4/2024 11/4/2024 11/04/2024
Erosion Control Inspection Residential Failed 12/11/2024 12/11/2024 12/11/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
12/11/2024
12-11-24 Jamie S, Silt fence is down on right side of lot. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Partial 12/16/2024 12/16/2024 02/27/2025
DCM3 ESC REQUIRED 2 DAY
Resolved
02/27/2025
12-11-24 Jamie S, Silt fence is down on right side of lot. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 02/27/25 - Jamie S, Silt fence is in place
Electrical Service Inspection Failed 4/1/2025 4/1/2025 04/01/2025
Misc
Corrective Action Required
04/01/2025
Provide ufer ground connection
Gas Service Inspection - Residential Failed 4/1/2025 4/1/2025 04/01/2025
Misc
Corrective Action Required
04/01/2025
G2417.4.1 Test Pressure
Corrective Action Required
04/01/2025
INSPECTION, TESTING AND PURGING. AMENDED 7-945. The test pressure to be used shall be not less than one and one-half times the proposed maximum working pressure, but not less than 10 psig (68.9kPa) irrespective of design pressure. For welded piping, and for piping carrying gas at pressures in excess of fourteen (14) inches water column pressure, the test pressure shall not be less than 60 psig. Where the test pressure exceeds 125 psig (862 kPa gauge), the test pressure shall not exceed a value that produces a hoop stress in the piping greater than 50 percent of the specified minimum yield strength of the pipe.
G2417.4 Test pressure measurement
Corrective Action Required
04/01/2025
INSPECTION, TESTING AND PURGING. Test pressure shall be measured with a manometer or with a pressure-measuring device designed and calibrated to read, record, or indicate a pressure loss caused by leakage during the pressure test period. The source of pressure shall be isolated before the pressure tests are made. Mechanical gauges used to measure test pressures shall have a range such that the highest end of the scale is not greater than five times the test pressure.
All Rough Inspection - Residential Not Ready 4/1/2025 4/1/2025 04/01/2025
Misc
Corrective Action Required
04/01/2025
Provide set of CITY STAMPED plans on site
All Rough Inspection - Residential Failed 4/3/2025 4/3/2025 04/03/2025
Misc
Resolved
04/03/2025
Provide set of CITY STAMPED plans on site
Misc
Corrective Action Required
04/03/2025
-missing straps at PFH -anchor bolts to be in the middle 1/3 of sill plate and Tight -block sheathing breaks throughout garage where missing -furr around for sub panel service cable in ceiling space -strap top plate and protect dryer vent at top plate -furr down for bath vent at garage entry bath -missing nails in multiple hangers above kitchen -address beam separating kitchen and great room connection not to plans and LVL Notched into I beam -fire block furr out wall 2nd story floor height right of fireplace -ensure stairways comply with code section R311.7 of the 2018 IRC -add full length studs where missing at stairway/exterior wall -address rafters landing on osb throughout 2nd floor -3 studs at each exterior wall corner in basement -address holes drilled in joist for hvac intake/exhaust -fire block dead spaces at basement bathroom with approved fire blocking material
Electrical Service Inspection Passed 4/3/2025 4/3/2025 04/03/2025
Misc
Resolved
04/03/2025
Provide ufer ground connection
Gas Service Inspection - Residential Passed 4/3/2025 4/3/2025 04/03/2025
Misc
Resolved
04/03/2025
G2417.4.1 Test Pressure
Resolved
04/03/2025
INSPECTION, TESTING AND PURGING. AMENDED 7-945. The test pressure to be used shall be not less than one and one-half times the proposed maximum working pressure, but not less than 10 psig (68.9kPa) irrespective of design pressure. For welded piping, and for piping carrying gas at pressures in excess of fourteen (14) inches water column pressure, the test pressure shall not be less than 60 psig. Where the test pressure exceeds 125 psig (862 kPa gauge), the test pressure shall not exceed a value that produces a hoop stress in the piping greater than 50 percent of the specified minimum yield strength of the pipe.
G2417.4 Test pressure measurement
Resolved
04/03/2025
INSPECTION, TESTING AND PURGING. Test pressure shall be measured with a manometer or with a pressure-measuring device designed and calibrated to read, record, or indicate a pressure loss caused by leakage during the pressure test period. The source of pressure shall be isolated before the pressure tests are made. Mechanical gauges used to measure test pressures shall have a range such that the highest end of the scale is not greater than five times the test pressure.
Documents & Images
Date Uploaded File Type Document Name
09/23/2024 VITER CITY SIGNED DOCS
09/27/2024 Permit Codes Residential Plan Review
10/01/2024 Approved Plans APPROVED PLOT PLAN
10/01/2024 Approved Plans APPROVED PLANS
10/01/2024 Permit Codes Residential Plan Review
10/01/2024 Permit DS Building Permit
10/01/2024 Receipt Receipt for transaction:2024-008039
10/21/2024 2739 SW HEARTLAND RD FTG INSP
10/21/2024 Letter INSPECTION SUMMARY
10/21/2024 Letter INSPECTION SUMMARY
10/24/2024 Letter INSPECTION SUMMARY
10/24/2024 Letter Stop Work Order
10/25/2024 Letter INSPECTION SUMMARY
10/28/2024 Letter INSPECTION SUMMARY
11/01/2024 Letter INSPECTION SUMMARY
11/01/2024 Letter INSPECTION SUMMARY
11/01/2024 Letter INSPECTION SUMMARY
11/04/2024 Letter INSPECTION SUMMARY
12/11/2024 Letter INSPECTION SUMMARY
12/11/2024 Letter INSPECTION SUMMARY
12/19/2024 2024_11_26_2739 SW Heartland Rd_LSMO_SusSlabObv_Sealed
12/27/2024 2024_12_12_2739 SW Heartland Dr_DP_Report_Sealed
02/27/2025 Letter INSPECTION SUMMARY
04/01/2025 Letter INSPECTION SUMMARY
04/01/2025 Letter INSPECTION SUMMARY
04/01/2025 Letter INSPECTION SUMMARY
04/03/2025 Letter INSPECTION SUMMARY
04/03/2025 Letter INSPECTION SUMMARY
04/03/2025 Letter INSPECTION SUMMARY
04/10/2025 2739 SW Heartland Road - Structural Letter (April 9, 2025)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home