Summary
PRRES20244071
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED BASEMENT. WALKOUT/WALKUP. COVERED DECK. STOP WORK ORDER generated on 08/26/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 08/27/2024 12:00 AM by username 'Mitchell Schwarz'.
08/05/2024
08/14/2024
02/08/2025
05/14/2025
Locations
Contacts
SAB CONSTRUCTION INC, Address:PO BOX 942, Phone:(816) 524-3855  
Joseph Matthew Schartz, Address:PO Box 942, Phone:(816) 524-3855  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
zbryant@sabhomes.com  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $3,973.00 $3,973.00 Paid 08/14/2024
8350015-Water Meter Fee $748.03 $748.03 Paid 08/14/2024
8331507-Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 08/14/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 08/14/2024
7232302-Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 08/14/2024
9110078-Valuation Fee New Single Family $2,276.34 $2,276.34 Paid 08/14/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sewer Service Inspection - R Passed 8/26/2024 08/26/2024
Footing Inspection - Residential Failed - Stop Work 8/26/2024 8/26/2024 08/26/2024
Misc
Corrective Action Required
08/26/2024
Footing poured without inspection
Footing Inspection - Residential Passed 8/27/2024 08/27/2024
Misc
Resolved
08/27/2024
Footing poured without inspection
Water Service Inspection - R Partial 8/29/2024 08/29/2024
Misc
Informational
08/29/2024
Copper ran from foundation
Water Service Inspection - R Passed 8/30/2024 8/30/2024 08/30/2024
Misc
Resolved
08/30/2024
Copper ran from foundation
Erosion Control Inspection Residential Partial 8/30/2024 08/30/2024
Misc
Informational
08/30/2024
Erosion control in compliance at time of inspection
Underslab Plumbing Inspection - Residential Passed 9/3/2024 9/3/2024 09/03/2024
Underslab Plumbing Inspection - Residential Passed 9/26/2024 09/26/2024
Piers/Caissons Inspection - Residential Passed 10/28/2024 10/28/2024 10/28/2024
Erosion Control Inspection Residential Passed 2/4/2025 02/04/2025
Misc
Resolved
02/04/2025
Erosion control in compliance at time of inspection
Misc
Corrective Action Required
02/04/2025
- Erosion control in place at time of inspection.
All Rough Inspection - Residential Failed 2/4/2025 2/4/2025 02/04/2025
Misc
Corrective Action Required
02/04/2025
- Fire block top of HVAC chase in mud hall around 4” DWV - Support top of hip rafter in master bedroom - Fire block gap at top of HVAC chase behind upstairs shower - Fire block top of fur out exterior wall basement stairs - Address deck ledger attachment and anchor to code
Electrical Service Inspection Passed 2/4/2025 2/4/2025 02/04/2025
Gas Service Inspection - Residential Passed 2/4/2025 2/4/2025 02/04/2025
All Rough Inspection - Residential Passed 2/7/2025 2/7/2025 02/07/2025
Misc
Resolved
02/07/2025
- Fire block top of HVAC chase in mud hall around 4” DWV - Support top of hip rafter in master bedroom - Fire block gap at top of HVAC chase behind upstairs shower - Fire block top of fur out exterior wall basement stairs - Address deck ledger attachment and anchor to code
Driveway Inspection Partial 4/2/2025 4/2/2025 04/02/2025
Misc
Informational
04/02/2025
4-2-25 RH. Approach is formed up and approved to pour.
Sidewalk Inspection Failed 5/7/2025 5/7/2025 05/07/2025
Misc
Corrective Action Required
05/07/2025
5-7-25 Dustin A, Sw has been formed and compacted. Up against the approach on left side there is no gravel, on right side of the approach there is a section thhat is over 2% cross slope which in non compliant. Fail
Occupancy Inspection - Codes Residential Failed 5/7/2025 5/7/2025 05/07/2025
Misc
Corrective Action Required
05/07/2025
2614 sw Tracker - sidewalk completed and inspected - Single outlet in garage must be labeled as non gfi - Electrical panel cover not properly secured - Gas line not connected to stove top - Install floor receptacle in upstairs loft area floor - Install light in upstairs bedroom closets - Install security screws jamb brace to studs on basement walkout door - Make sure grade is 6” below siding on exterior of home - Post to beam connections on deck need 2. 1/2” thru bolts or approved bracket - Label on gfi outlet in basement at sump pump - Seal penetrations in exterior of home - Ground rod must be driven into ground, can’t be protruding - Sod yard, install 36” splash blocks - Install sump discharge at least 36” from house -
Plot Plan Inspection Failed 5/7/2025 05/07/2025
Misc
Corrective Action Required
05/07/2025
Final grade must be 6” below bottom of siding
Sidewalk Inspection Partial 5/7/2025 5/7/2025 05/07/2025
Misc
Informational
05/07/2025
5-7-25 Dustin A, SW is formed and compacted and slopes are in compliance. Approved to pour
Erosion Control Inspection Residential Failed 05/07/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/07/2025
5/7/25 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -Install BMP methods at perimeter, protect storm inlet, clean silt from the streets
Erosion Control Inspection Residential Partial 5/12/2025 5/12/2025 05/12/2025
DCM3 ESC REQUIRED 2 DAY
Resolved
05/12/2025
5/7/25 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -Install BMP methods at perimeter, protect storm inlet, clean silt from the streets
Driveway Inspection Passed 5/13/2025 5/13/2025 05/13/2025
Misc
Informational
04/02/2025
4-2-25 RH. Approach is formed up and approved to pour. 5-13-25 Dustin A, Dw is poured to city specs
Sidewalk Inspection Passed 5/13/2025 5/13/2025 05/13/2025
Misc
Informational
05/07/2025
5-7-25 Dustin A, SW is formed and compacted and slopes are in compliance. Approved to pour 5-13-25 Dustin A, S has been poured to city specs
Plot Plan Inspection Passed 5/13/2025 05/13/2025
Occupancy Inspection - Codes Residential Failed 5/13/2025 5/13/2025 05/13/2025
Misc
Corrective Action Required
05/07/2025
2614 sw Tracker - sidewalk completed and inspected - Single outlet in garage must be labeled as non gfi - Electrical panel cover not properly secured - Gas line not connected to stove top - Install floor receptacle in upstairs loft area floor - Install light in upstairs bedroom closets - Install security screws jamb brace to studs on basement walkout door - Make sure grade is 6” below siding on exterior of home - Post to beam connections on deck need 2. 1/2” thru bolts or approved bracket - Label on gfi outlet in basement at sump pump - Seal penetrations in exterior of home - Ground rod must be driven into ground, can’t be protruding - Sod yard, install 36” splash blocks - Install sump discharge at least 36” from house -
Misc
Corrective Action Required
05/13/2025
2614 SW Tracker - Single outlet in garage must be labeled as non gfi - Seal penetrations in exterior of home , top of electrical service and around AC disconnect - install splash blocks - Install sump discharge at least 36” from house -
Occupancy Inspection - Codes Residential Full C of O 5/14/2025 5/14/2025 05/14/2025
Misc
Resolved
05/14/2025
2614 sw Tracker - sidewalk completed and inspected - Single outlet in garage must be labeled as non gfi - Electrical panel cover not properly secured - Gas line not connected to stove top - Install floor receptacle in upstairs loft area floor - Install light in upstairs bedroom closets - Install security screws jamb brace to studs on basement walkout door - Make sure grade is 6” below siding on exterior of home - Post to beam connections on deck need 2. 1/2” thru bolts or approved bracket - Label on gfi outlet in basement at sump pump - Seal penetrations in exterior of home - Ground rod must be driven into ground, can’t be protruding - Sod yard, install 36” splash blocks - Install sump discharge at least 36” from house -
Misc
Resolved
05/14/2025
2614 SW Tracker - Single outlet in garage must be labeled as non gfi - Seal penetrations in exterior of home , top of electrical service and around AC disconnect - install splash blocks - Install sump discharge at least 36” from house -
Documents & Images
Date Uploaded File Type Document Name
08/05/2024 HF123 - Air Combustion Calcs
08/05/2024 HF123 - Excise Tax Application
08/05/2024 HF123 - Permit Application
08/12/2024 Permit Codes Residential Plan Review
08/14/2024 Plot Plan APPROVED PLOT PLAN
08/14/2024 Approved Plans APPROVED PLANS
08/14/2024 Permit Codes Residential Plan Review
08/14/2024 Permit DS Building Permit
08/14/2024 Receipt Receipt for transaction:2024-006867
08/26/2024 Letter Stop Work Order
08/26/2024 Letter INSPECTION SUMMARY
08/26/2024 3RD Party Insp Report M_L_ Crose 2614 SW Tracker Ln Footing Inspection Report
08/27/2024 Letter INSPECTION SUMMARY
08/29/2024 Letter INSPECTION SUMMARY
08/30/2024 Letter INSPECTION SUMMARY
08/30/2024 Letter INSPECTION SUMMARY
09/03/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
10/18/2024 HF123 - Response Cover Letter
10/21/2024 Approved Plans 10-21-24 APPROVED PLANS
10/28/2024 Letter INSPECTION SUMMARY
11/07/2024 HF123 - Response Cover Letter
11/08/2024 Approved Plans APPROVED PLANS
02/04/2025 Letter INSPECTION SUMMARY
02/04/2025 Letter INSPECTION SUMMARY
02/04/2025 Letter INSPECTION SUMMARY
02/04/2025 Letter INSPECTION SUMMARY
02/07/2025 Letter INSPECTION SUMMARY
04/02/2025 Letter INSPECTION SUMMARY
05/07/2025 Letter INSPECTION SUMMARY
05/07/2025 Letter INSPECTION SUMMARY
05/07/2025 Letter INSPECTION SUMMARY
05/07/2025 Letter INSPECTION SUMMARY
05/07/2025 Letter INSPECTION SUMMARY
05/07/2025 Letter INSPECTION SUMMARY
05/07/2025 Letter INSPECTION SUMMARY
05/12/2025 Plot Plan APPROVED AS BUILT PLOT PLAN
05/12/2025 Letter INSPECTION SUMMARY
05/13/2025 Letter INSPECTION SUMMARY
05/13/2025 Letter INSPECTION SUMMARY
05/13/2025 Letter INSPECTION SUMMARY
05/13/2025 Letter INSPECTION SUMMARY
05/13/2025 Photograph HF123 Photos for Final Inspection
05/14/2025 Letter Codes Final Certificate of Occupancy
05/14/2025 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home