Permit Application Status

PRRES20243943


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20243943
Building Permit - Residential
Issued
CHOYCE LLC
NEW 3 OR 4 FAMILY
NEW TRIPLEX - ROOF TRUSSES (DEF) - FINISHED AND UNFINISHED BASEMENT - COVERED PATIO - TILE ROOF
07/29/2024
12/04/2024
05/24/2025
Locations
Contacts
KEVIN HIGDON CONSTRUCTION, LLC, Address:P O BOX 847, Phone:(816) 524-9797  
CHOYCE LLC, Address:PO BOX 847  
kevin higdon, Address:po box 847  
KEVIN@HIGDONBUILDERS.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
INTERSTATE CONSTRUCTION SERVICES, Address:1450 SE BROADWAY DR, Phone:(816) 524-9797  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New 3 or 4 Family $4,025.48 $4,025.48 Paid 12/04/2024
Sanitary Sewer Development Fee $6,855.00 $6,855.00 Paid 12/04/2024
Right of Way Permit Fee $85.00 $85.00 Paid 12/04/2024
Water Tap Fee $11,919.00 $11,919.00 Paid 12/04/2024
Water Meter Fee $2,244.09 $2,244.09 Paid 12/04/2024
Residential Excise Tax Fee $1,860.48 $1,860.48 Paid 12/04/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Occupancy Inspection - Codes Residential Pending
Erosion Control Inspection Residential Pending
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
10/28/2025
Restore erosion control to compliance MISSING GRAVEL ENTRYS/PROTECTION AT ENTRYS FOR 718/720
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/28/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM5 ESC INSP DENIED
Corrective Action Required
10/28/2025
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION.
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
10/28/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
Sidewalk Inspection Pending
Misc
Informational
10/31/2025
10-31-25 NS Site Visted and with this sidewalk and ADA ramp it is impossible to get the ADA in on the sidewalk because of the street elevation. I am going to allow them to pour. They are going to try and get the ADA ramp as close to 2%
Erosion Control Inspection Residential Failed 2/4/2025 02/04/2025
Misc
Corrective Action Required
02/04/2025
Overall, erosion control is in compliance; however, repair erosion control where damaged by fallen trees
Footing Inspection - Residential Passed 2/4/2025 2/4/2025 02/04/2025
Informational
02/04/2025
Patio column pads formed at same time as footing
Erosion Control Inspection Residential Failed 3/25/2025 03/25/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
02/04/2025
EROSION CONTROL REQUIRED ALONG THE STREET AND AT STORM INLET. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Sewer Service Inspection - R Failed 3/25/2025 3/25/2025 03/25/2025
Misc
Corrective Action Required
03/25/2025
Sewer lines for units 720 & 722 only-Trench for the sewer dug right to the footing. Have engineer address.
Sewer Service Inspection - R Failed 3/25/2025 3/25/2025 03/25/2025
Misc
Corrective Action Required
03/25/2025
Sewer lines for units 720 & 722 only-Trench for the sewer dug right to the footing. Have engineer address. Sewer for 718-OK
Underslab Plumbing Inspection - Residential Failed 3/26/2025 3/25/2025 03/25/2025
Misc
Corrective Action Required
03/25/2025
Lav drain cannot be used to wet-vent both the water closet and shower trap. Each trap in a wet-vented configuration must individually connect to the horizontal drain
Water Service Inspection - R Passed 3/26/2025 3/26/2025 03/26/2025
Erosion Control Inspection Residential Partial 4/7/2025 04/07/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
03/25/2025
Erosion control in compliance
Underslab Electrical Inspection - Residential Passed 4/7/2025 4/7/2025 04/07/2025
Underslab Plumbing Inspection - Residential Failed 4/7/2025 4/7/2025 04/07/2025
Misc
Corrective Action Required
03/25/2025
Lav drain cannot be used to wet-vent both the water closet and shower trap. Each trap in a wet-vented configuration must individually connect to the horizontal drain
Underslab Plumbing Inspection - Residential Passed 4/8/2025 4/8/2025 04/08/2025
Misc
Resolved
04/08/2025
Lav drain cannot be used to wet-vent both the water closet and shower trap. Each trap in a wet-vented configuration must individually connect to the horizontal drain
Driveway Inspection Partial 5/14/2025 05/13/2025
Miscellaneous Correction
Informational
05/13/2025
5-13-25 NS Site visited just checking to see progress and not ready
Sewer Service Inspection - R Passed 07/29/2025
Misc
Resolved
07/29/2025
Sewer lines for units 720 & 722 only-Trench for the sewer dug right to the footing. Have engineer address. Sewer for 718-OK **See engineer letter
Electrical Service Inspection Passed 7/29/2025 7/29/2025 07/29/2025
Gas Service Inspection - Residential Failed 7/29/2025 7/29/2025 07/29/2025
Misc
Corrective Action Required
07/29/2025
Middle unit underground gas line not completed. Pressure test of interior gas lines for all 3 units-ok
Erosion Control Inspection Residential Failed 7/29/2025 07/29/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
04/07/2025
Restore erosion control to compliance
Rated Assembly Inspection Failed 7/29/2025 7/29/2025 07/29/2025
Misc
Corrective Action Required
07/29/2025
-Extend firewall to roof deck at front of garage -Seal gap at ridge with mineral wool -Secure firewall to frame with clips screwed to metal flange (720)
All Rough Inspection - Residential Failed 7/29/2025 7/29/2025 07/29/2025
Misc
Corrective Action Required
07/29/2025
**Provide truss package on site **Provide revised plan for floor under roll-in shower 718: -Nail garage PFH wall sheathing per 1/S3.0 -Nail ZIP sheathing to sill plate @ 6” and @ 12” oc in field -Nail corner studs 16d@ 12” or equivalent nailing -Protect wiring adjacent to fireplace -Secure gas line near fireplace -Tie down trusses above fireplace to beam and beam to wall -Nail together girder truss per truss detail; tie down girder at locations per detail -Install stud shoe at master bathroom exterior wall -Install strap at exterior wall and interior bearing wall top plates where bored more than 50% -Protect dryer duct at stud -Provide full support for stoop beam at front bedroom -Tie down girder truss at front; provide (4)2x4 support -Tie down trusses above entry door -Protect wiring at top plates outside front bathroom -Anchor columns to floor -Protect bar sink plumbing at basement wall; at bedroom closet -Fb wall from joist near NE window (right side) -Provide stud shoe at shower wall non-bearing wall stud bored more than 60%; protect plumbing -Replace cut joist below front bathroom **OK TO INSULATE 720: -Nail garage PFH wall sheathing per 1/S3.0 -Nail ZIP sheathing to sill plate @ 6” and @ 12” oc in field -Nail corner studs 16d@ 12” or equivalent nailing -Anchor garage sill plate within 12” of break at entry wall intersection -Protect wiring adjacent to fireplace -Secure gas line near fireplace -Tie down trusses above fireplace to beam and beam to wall -Support bath fan flexible duct every 5 ft -Install stud shoe for master bathroom wall stud bored more than 60% -Tie down girder truss at front; provide (4)2x4 support; Nail together girder truss per truss detail -Tie down trusses above entry door -Anchor columns to floor -Fb wall from joist near NE window (right side) -Fb bedroom/closet/bathroom wall from soffit and joist space **OK TO INSULATE 722: -Nail garage PFH wall sheathing per 1/S3.0 -Nail ZIP sheathing to sill plate @ 6” and @ 12” oc in field -Nail corner studs 16d@ 12” or equivalent nailing -Tie down girder truss above door to garage -Nail together girder truss per truss detail -Protect wiring adjacent to fireplace -Secure gas line near fireplace -Tie down trusses above fireplace to beam and beam to wall -Support bath fan flexible duct every 5 ft -Provide engineer repair for damaged truss above master bedroom -Protect laundry plumbing -Strap cut top plates at tub; fb top and bottom plate -Install stud shoe for master bathroom wall stud bored more than 60% -Tie down girder truss at front; Nail together girder truss per truss detail -Tie down trusses above entry door -Anchor columns to floor -Fb bedroom/closet/bathroom wall from soffit and joist space **OK TO INSULATE
Rated Assembly Inspection Passed 8/8/2025 8/8/2025 08/08/2025
Misc
Resolved
08/08/2025
-Extend firewall to roof deck at front of garage -Seal gap at ridge with mineral wool -Secure firewall to frame with clips screwed to metal flange (720)
All Rough Inspection - Residential Partial 8/8/2025 8/8/2025 08/08/2025
Misc
Corrective Action Required
07/29/2025
**Provide truss package on site 720: -Nail garage PFH wall sheathing per 1/S3.0 -Nail ZIP sheathing to sill plate @ 6” and @ 12” oc in field -Nail corner studs 16d@ 12” or equivalent nailing -Anchor garage sill plate within 12” of break at entry wall intersection -Protect wiring adjacent to fireplace -Secure gas line near fireplace -Tie down trusses above fireplace to beam and beam to wall -Support bath fan flexible duct every 5 ft -Install stud shoe for master bathroom wall stud bored more than 60% -Tie down girder truss at front; provide (4)2x4 support; Nail together girder truss per truss detail -Tie down trusses above entry door -Anchor columns to floor -Fb wall from joist near NE window (right side) -Fb bedroom/closet/bathroom wall from soffit and joist space **OK TO INSULATE 722: -Nail garage PFH wall sheathing per 1/S3.0 -Nail ZIP sheathing to sill plate @ 6” and @ 12” oc in field -Nail corner studs 16d@ 12” or equivalent nailing -Tie down girder truss above door to garage -Nail together girder truss per truss detail -Protect wiring adjacent to fireplace -Secure gas line near fireplace -Tie down trusses above fireplace to beam and beam to wall -Support bath fan flexible duct every 5 ft -Provide engineer repair for damaged truss above master bedroom -Protect laundry plumbing -Strap cut top plates at tub; fb top and bottom plate -Install stud shoe for master bathroom wall stud bored more than 60% -Tie down girder truss at front; Nail together girder truss per truss detail -Tie down trusses above entry door -Anchor columns to floor -Fb bedroom/closet/bathroom wall from soffit and joist space **OK TO INSULATE
All Rough Inspection - Residential Failed 8/12/2025 8/12/2025 08/12/2025
Misc
Corrective Action Required
08/08/2025
*INSPECTION DENIED PROVIDE GRAVEL ENTRANCE AT OPENINGS WHERE MISSING * **Provide truss package on site 720: -Nail garage PFH wall sheathing per 1/S3.0 -Nail ZIP sheathing to sill plate @ 6” and @ 12” oc in field -Nail corner studs 16d@ 12” or equivalent nailing -Anchor garage sill plate within 12” of break at entry wall intersection -Protect wiring adjacent to fireplace -Secure gas line near fireplace -Tie down trusses above fireplace to beam and beam to wall -Support bath fan flexible duct every 5 ft -Install stud shoe for master bathroom wall stud bored more than 60% -Tie down girder truss at front; provide (4)2x4 support; Nail together girder truss per truss detail -Tie down trusses above entry door -Anchor columns to floor -Fb wall from joist near NE window (right side) -Fb bedroom/closet/bathroom wall from soffit and joist space **OK TO INSULATE 722: -Nail garage PFH wall sheathing per 1/S3.0 -Nail ZIP sheathing to sill plate @ 6” and @ 12” oc in field -Nail corner studs 16d@ 12” or equivalent nailing -Tie down girder truss above door to garage -Nail together girder truss per truss detail -Protect wiring adjacent to fireplace -Secure gas line near fireplace -Tie down trusses above fireplace to beam and beam to wall -Support bath fan flexible duct every 5 ft -Provide engineer repair for damaged truss above master bedroom -Protect laundry plumbing -Strap cut top plates at tub; fb top and bottom plate -Install stud shoe for master bathroom wall stud bored more than 60% -Tie down girder truss at front; Nail together girder truss per truss detail -Tie down trusses above entry door -Anchor columns to floor -Fb bedroom/closet/bathroom wall from soffit and joist space **OK TO INSULATE
Erosion Control Inspection Residential Failed 8/12/2025 8/12/2025 08/12/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
07/29/2025
Restore erosion control to compliance MISSING GRAVEL ENTRYS/PROTECTION AT ENTRYS FOR 718/720
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/12/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM5 ESC INSP DENIED
Corrective Action Required
08/12/2025
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION.
All Rough Inspection - Residential Passed 8/15/2025 8/15/2025 08/15/2025
Misc
Resolved
08/15/2025
*INSPECTION DENIED PROVIDE GRAVEL ENTRANCE AT OPENINGS WHERE MISSING * **Provide truss package on site 720: -Nail garage PFH wall sheathing per 1/S3.0 -Nail ZIP sheathing to sill plate @ 6” and @ 12” oc in field -Nail corner studs 16d@ 12” or equivalent nailing -Anchor garage sill plate within 12” of break at entry wall intersection -Protect wiring adjacent to fireplace -Secure gas line near fireplace -Tie down trusses above fireplace to beam and beam to wall -Support bath fan flexible duct every 5 ft -Install stud shoe for master bathroom wall stud bored more than 60% -Tie down girder truss at front; provide (4)2x4 support; Nail together girder truss per truss detail -Tie down trusses above entry door -Anchor columns to floor -Fb wall from joist near NE window (right side) -Fb bedroom/closet/bathroom wall from soffit and joist space **OK TO INSULATE 722: -Nail garage PFH wall sheathing per 1/S3.0 -Nail ZIP sheathing to sill plate @ 6” and @ 12” oc in field -Nail corner studs 16d@ 12” or equivalent nailing -Tie down girder truss above door to garage -Nail together girder truss per truss detail -Protect wiring adjacent to fireplace -Secure gas line near fireplace -Tie down trusses above fireplace to beam and beam to wall -Support bath fan flexible duct every 5 ft -Provide engineer repair for damaged truss above master bedroom -Protect laundry plumbing -Strap cut top plates at tub; fb top and bottom plate -Install stud shoe for master bathroom wall stud bored more than 60% -Tie down girder truss at front; Nail together girder truss per truss detail -Tie down trusses above entry door -Anchor columns to floor -Fb bedroom/closet/bathroom wall from soffit and joist space **OK TO INSULATE
Driveway Inspection Partial 10/6/2025 10/6/2025 10/06/2025
Miscellaneous Correction
Informational
05/13/2025
5-13-25 NS Site visited just checking to see progress and not ready 10-3-25 NS Site visited and it appears that the 3 driveways meet city standards for pre-pour
Erosion Control Inspection Residential Failed 10/28/2025 10/28/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
08/12/2025
Restore erosion control to compliance MISSING GRAVEL ENTRYS/PROTECTION AT ENTRYS FOR 718/720
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/12/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM5 ESC INSP DENIED
Corrective Action Required
08/12/2025
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION.
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
10/28/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
Gas Service Inspection - Residential Failed 10/28/2025 10/28/2025 10/28/2025
Misc
Corrective Action Required
07/29/2025
Middle unit underground gas line not completed. Pressure test of interior gas lines for all 3 units-ok **INSPECTION DENIED. SEE EROSION CONTROL **INSTALL PRESSURE GAUGE FOR UNDERGROUND LINE
Gas Service Inspection - Residential Passed 11/7/2025 11/7/2025 11/06/2025
Misc
Resolved
11/06/2025
Middle unit underground gas line not completed. Pressure test of interior gas lines for all 3 units-ok **INSPECTION DENIED. SEE EROSION CONTROL **INSTALL PRESSURE GAUGE FOR UNDERGROUND LINE
Driveway Inspection Passed 11/18/2025 11/24/2025
Miscellaneous Correction
Informational
10/06/2025
5-13-25 NS Site visited just checking to see progress and not ready 10-3-25 NS Site visited and it appears that the 3 driveways meet city standards for pre-pour 11-24-25 NS Site visited and it appears that driveway meets city standards. Passed
Sidewalk Inspection Passed 10/31/2025 10/31/2025 11/24/2025
Misc
Informational
10/31/2025
10-31-25 NS Site Visted and with this sidewalk and ADA ramp it is impossible to get the ADA in on the sidewalk because of the street elevation. I am going to allow them to pour. They are going to try and get the ADA ramp as close to 2% 11-24-25 NS Site visited and it appears that sidewalk has some spots that are above 2.1% but less then 2.3% because of grade. ADA Ramp could not meet ADA standards because of grade of road and land. Passed
Documents & Images
Date Uploaded File Type Document Name
08/01/2024 Permit Codes Residential Plan Review
08/01/2024 Approved Plans APPROVED PLANS
11/25/2024 Permit Codes Residential Plan Review
12/02/2024 Plot Plan APPROVED PLOT PLAN
12/02/2024 Application Form APPLICATION
12/02/2024 Application Form EXCISE TAX APP.
12/04/2024 Permit Codes Residential Plan Review
12/04/2024 Permit DS Building Permit
12/04/2024 Receipt Receipt for transaction:2024-009336
02/04/2025 Letter INSPECTION SUMMARY
02/04/2025 Letter INSPECTION SUMMARY
03/25/2025 Letter INSPECTION SUMMARY
03/25/2025 Letter INSPECTION SUMMARY
03/25/2025 Letter INSPECTION SUMMARY
03/25/2025 Letter INSPECTION SUMMARY
03/26/2025 Engineer Report/Study 718 Lone Hill
03/26/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter DS Building Permit
04/07/2025 Letter INSPECTION SUMMARY
04/07/2025 Letter INSPECTION SUMMARY
04/07/2025 Letter INSPECTION SUMMARY
04/08/2025 Letter INSPECTION SUMMARY
05/13/2025 Letter INSPECTION SUMMARY
07/29/2025 Letter INSPECTION SUMMARY
07/29/2025 Letter INSPECTION SUMMARY
07/29/2025 Letter INSPECTION SUMMARY
07/29/2025 Letter INSPECTION SUMMARY
07/29/2025 Letter INSPECTION SUMMARY
07/29/2025 Letter INSPECTION SUMMARY
08/08/2025 722 truss repair
08/08/2025 Letter INSPECTION SUMMARY
08/08/2025 Letter INSPECTION SUMMARY
08/12/2025 Letter INSPECTION SUMMARY
08/12/2025 Letter INSPECTION SUMMARY
08/15/2025 Letter INSPECTION SUMMARY
10/28/2025 Letter INSPECTION SUMMARY
10/28/2025 Letter INSPECTION SUMMARY
11/06/2025 Letter INSPECTION SUMMARY
11/06/2025 Letter INSPECTION SUMMARY
11/06/2025 Letter INSPECTION SUMMARY
11/24/2025 Letter INSPECTION SUMMARY
11/24/2025 Letter INSPECTION SUMMARY
03/19/2026 LOT 9 ASBUILT
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home