Summary
PRRES20243344
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE. FINISHED/UNFINISHED BASEMENT. WALKOUT BASEMENT. COVERED DECK.
06/30/2024
07/15/2024
12/30/2024
04/17/2025
Locations
Contacts
WALKER CUSTOM HOMES, LLC, Address:PO BOX 3194, Phone:(913) 208-2026  
Jason walker, Address:PO Box 247, Phone:(913) 208-2026  
5 STAR MECHANICAL, LLC, Address:PO BOX 793, Phone:(816) 679-0375  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
WALKERCUSTOMHOMESKC@GMAIL.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $3,973.00 $3,973.00 Paid 07/15/2024
8350015-Water Meter Fee $748.03 $748.03 Paid 07/15/2024
8331507-Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 07/15/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 07/15/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 07/15/2024
9110078-Valuation Fee New Single Family $1,687.76 $1,687.76 Paid 07/15/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 7/31/2024 7/31/2024 07/31/2024
Sewer Service Inspection - R Passed 8/8/2024 8/8/2024 08/08/2024
Water Service Inspection - R Passed 8/9/2024 08/09/2024
Underslab Plumbing Inspection - Residential Passed 8/12/2024 8/12/2024 08/12/2024
Erosion Control Inspection Residential Partial 8/16/2024 8/16/2024 08/16/2024
Misc
Informational
08/16/2024
In compliance at time of inspection
Underslab Plumbing Inspection - Residential Passed 8/16/2024 8/16/2024 08/16/2024
Gas Service Inspection - Residential Passed 10/22/2024 10/22/2024 10/22/2024
Electrical Service Inspection Passed 10/22/2024 10/22/2024 10/22/2024
Erosion Control Inspection Residential Failed 10/22/2024 10/22/2024
Misc
Resolved
10/22/2024
In compliance at time of inspection
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
10/22/2024
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED. - CLEAN STORM INLET AND RAMOVE GRAVEL FROM STREET IN FRONT OF YOUR LOT
All Rough Inspection - Residential Failed 10/22/2024 10/22/2024 10/22/2024
Misc
Corrective Action Required
10/22/2024
- Provide window at master bedroom - Anchor bolts to be in middle third of sill plate basement throughout
All Rough Inspection - Residential Passed 10/29/2024 10/29/2024 10/29/2024
Misc
Resolved
10/29/2024
- Provide window at master bedroom - Anchor bolts to be in middle third of sill plate basement throughout
Driveway Inspection Partial 11/25/2024 11/25/2024
Misc
Informational
11/25/2024
11-25-24 Dustin A, DW is formed and compacted, Approved to pour
Driveway Inspection Partial 12/2/2024 12/2/2024 12/02/2024
Misc
Informational
11/25/2024
11-25-24 Dustin A, DW is formed and compacted, Approved to pour 12-2-24 Dustin A, DW was not poured. Will need another pre pour inspection before it can be poured
Driveway Inspection Partial 12/12/2024 12/12/2024 12/12/2024
Misc
Informational
12/02/2024
11-25-24 Dustin A, DW is formed and compacted, Approved to pour 12-2-24 Dustin A, DW was not poured. Will need another pre pour inspection before it can be poured 12-12-24 Dustin A, dw is formed and compacted. Approved to pour
Driveway Inspection Partial 12/20/2024 12/20/2024 12/20/2024
Misc
Informational
12/12/2024
11-25-24 Dustin A, DW is formed and compacted, Approved to pour 12-2-24 Dustin A, DW was not poured. Will need another pre pour inspection before it can be poured 12-12-24 Dustin A, dw is formed and compacted. Approved to pour. 12-20-24 Dustin A, dw is poured to city specs. Cannot pass until forms pulled
Occupancy Inspection - Codes Residential Failed 3/17/2025 3/17/2025 03/17/2025
Misc
Corrective Action Required
03/17/2025
-provide as graded plot plan -address missing sidewalk -final grade and sod -splash blocks and sump pump discharge to extend 36” from foundation -guard rail missing at deck (deck not completed -handrail missing at rear patio stairs -missing deck post to beam connections
Driveway Inspection Passed 03/20/2025
Misc
Informational
12/20/2024
11-25-24 Dustin A, DW is formed and compacted, Approved to pour 12-2-24 Dustin A, DW was not poured. Will need another pre pour inspection before it can be poured 12-12-24 Dustin A, dw is formed and compacted. Approved to pour. 12-20-24 Dustin A, dw is poured to city specs. Cannot pass until forms pulled 3-20-25 Dustin A. forms pulled. Passed
Sidewalk Inspection Partial 3/20/2025 03/20/2025
Misc
Informational
03/20/2025
3-20-25 Dustin A, Sw along tracker is formed and compacted. slopes are in compliance , Approved to pour
Sidewalk Inspection Partial 3/27/2025 3/27/2025 03/27/2025
Misc
Informational
03/20/2025
3-20-25 Dustin A, Sw along tracker is formed and compacted. slopes are in compliance , Approved to pour
Plot Plan Inspection Passed 4/16/2025 04/16/2025
Occupancy Inspection - Codes Residential Full C of O 4/17/2025 4/17/2025 04/17/2025
Misc
Resolved
04/17/2025
Erosion Control Inspection Residential Passed 04/17/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Resolved
04/17/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED. - CLEAN STORM INLET AND RAMOVE GRAVEL FROM STREET IN FRONT OF YOUR LOT
Sidewalk Inspection Passed 04/17/2025
Misc
Informational
03/27/2025
3-20-25 Dustin A, Sw along tracker is formed and compacted. slopes are in compliance , Approved to pour 4-17-25 Dustin A Sw has been poured to city specs. Pass
Documents & Images
Date Uploaded File Type Document Name
06/30/2024 2202 SW Tracker Ln CITY SIGNED DOCS
07/03/2024 Permit Codes Residential Plan Review
07/11/2024 Approved Plans APPROVED PLANS
07/11/2024 Plot Plan APPROVED PLOT PLAN
07/11/2024 Permit Codes Residential Plan Review
07/15/2024 Permit DS Building Permit
07/15/2024 Receipt Receipt for transaction:2024-005797
07/26/2024 Footing Inspection-2202 SW Hook Farms Dr_
07/31/2024 Letter INSPECTION SUMMARY
08/08/2024 Letter INSPECTION SUMMARY
08/09/2024 Letter INSPECTION SUMMARY
08/12/2024 Letter INSPECTION SUMMARY
08/16/2024 Letter INSPECTION SUMMARY
08/16/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/29/2024 Letter INSPECTION SUMMARY
11/25/2024 Letter INSPECTION SUMMARY
11/25/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/12/2024 Letter INSPECTION SUMMARY
12/20/2024 Letter INSPECTION SUMMARY
03/17/2025 Letter INSPECTION SUMMARY
03/20/2025 Letter INSPECTION SUMMARY
03/20/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
04/15/2025 Plot Plan APPROVED AS BUILT PLOT PLAN
04/16/2025 Letter INSPECTION SUMMARY
04/17/2025 Letter Field Certificate of Occupancy
04/17/2025 Letter Codes Final Certificate of Occupancy
04/17/2025 Letter INSPECTION SUMMARY
04/17/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home