Permit Application Status

PRRES20242625


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20242625
Building Permit - Residential
Certificate of Occupancy
DOMAIN TIMBERLAKE MULTISTATE LLC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - ROOF TRUSSES STOP WORK ORDER generated on 11/08/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 11/15/2024 12:00 AM by username 'Shawn Hoffman'.
05/22/2024
06/03/2024
04/10/2025
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
DOMAIN TIMBERLAKE MULTISTATE LLC, Address:590 MADISON AVE FL 13TH  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
BRUCER@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 06/03/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 06/03/2024
7232302-Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 06/03/2024
8331401-Water Tap Fee $3,760.00 $3,760.00 Paid 06/03/2024
8350015-Water Meter Fee $680.46 $680.46 Paid 06/03/2024
9110078-Valuation Fee New Single Family $1,805.59 $1,805.59 Paid 06/03/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 11/14/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 11/14/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 11/14/2024
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 01/09/2025
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 03/13/2025
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 03/13/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 7/17/2024 7/17/2024 07/17/2024
Sewer Service Inspection - R Passed 8/2/2024 08/02/2024
Water Service Inspection - R Passed 8/7/2024 08/07/2024
Underslab Plumbing Inspection - Residential Passed 8/12/2024 8/12/2024 08/12/2024
All Rough Inspection - Residential Partial 8/23/2024 8/23/2024 08/23/2024
Misc
Corrective Action Required
08/23/2024
Garage portal frame inspection only, okay to cover
All Rough Inspection - Residential Failed 10/14/2024 10/14/2024 10/14/2024
Misc
Resolved
10/14/2024
Garage portal frame inspection only, okay to cover
Misc
Corrective Action Required
10/14/2024
*NOT A COMPLETE INSPECTION, NO TRUSS PLANS ON SITE. MAINTAIN FLOOR ONLY INSPECTED.* No further inspections until this list is complete -uncover covered front porch and patio -missing stud at NW and SW garage corner -seal all penetrations into furr down -secure SE Cable within 12” of disconnect -nail plate under header to header at pfh -fire lock into further down at powder room -fireblock pantry hvac chase into fire down -fire lock kitchen wall into garage furr down (seal gaps) -seal hvac chase at kitchen/garage wall into furr down and ceiling space -fire lock hvac chase at great room windows -hold down at stairs not installed completely -and solid blocking under kitchen island to plans (missing N side)
All Rough Inspection - Residential Failed 10/18/2024 10/18/2024 10/18/2024
Misc
Corrective Action Required
10/14/2024
-uncover covered front porch -seal all penetrations into furr down -secure SE Cable within 12” of disconnect -fire lock into further down at powder room -fireblock pantry hvac chase into furr down -fire block kitchen wall into garage furr down (seal gaps) -seal hvac chase at kitchen/garage wall into furr down and ceiling space -fire block hvac chase at great room windows -and solid blocking under kitchen island to plans (missing N side) -solid block sheathing breaks 2nd floor -seal dead space at primary bath -Add stud where missing at 2nd floor hvac chase
All Rough Inspection - Residential Not Ready 10/22/2024 10/22/2024 10/22/2024
Misc
Corrective Action Required
10/18/2024
-uncover covered front porch -seal all penetrations into furr down -secure SE Cable within 12” of disconnect -fire block into furr down at powder room -fireblock pantry hvac chase into furr down -fire block kitchen wall into garage furr down (seal gaps) -seal hvac chase at kitchen/garage wall into furr down and ceiling space -fire block hvac chase at great room windows -solid block sheathing breaks 2nd floor -seal dead space at primary bath -Add stud where missing at 2nd floor hvac chase -nail exterior sheathing to code and plans
All Rough Inspection - Residential Failed 10/29/2024 10/29/2024 10/29/2024
Misc
Corrective Action Required
10/22/2024
-seal all penetrations into furr down in garage -secure SE Cable within 12” of disconnect -seal hvac chase at kitchen/garage wall into furr down and ceiling space
Electrical Service Inspection Failed 10/29/2024 10/29/2024 10/29/2024
Misc
Corrective Action Required
10/29/2024
Provide ufer ground connection
Gas Service Inspection - Residential Passed 10/29/2024 10/29/2024 10/29/2024
All Rough Inspection - Residential Failed 10/31/2024 10/31/2024 10/31/2024
Misc
Corrective Action Required
10/29/2024
-seal hvac chase at kitchen/garage into furr down and ceiling space
All Rough Inspection - Residential Not Ready 11/4/2024 11/4/2024 11/04/2024
Misc
Corrective Action Required
10/31/2024
-seal hvac chase at kitchen/garage into furr down and ceiling space NOT DONE, NOT READY
Electrical Service Inspection Not Ready 11/4/2024 11/4/2024 11/04/2024
Misc
Corrective Action Required
10/29/2024
Provide ufer ground connection NOT DONE, NOT READY
All Rough Inspection - Residential Passed 11/5/2024 11/5/2024 11/05/2024
Misc
Resolved
11/05/2024
-seal hvac chase at kitchen/garage into furr down and ceiling space NOT DONE, NOT READY
Erosion Control Inspection Residential Failed 11/5/2024 11/5/2024 11/05/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
11/05/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
11/05/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. CLEAN STREET ESTABLISH Erosion control at front of lot
Erosion Control Inspection Residential Failed - Stop Work 11/8/2024 11/8/2024 11/08/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
11/05/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
11/05/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. CLEAN STREET ESTABLISH Erosion control at front of lot
Erosion Control Inspection Residential Partial 11/15/2024 11/15/2024 11/15/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
11/15/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Resolved
11/15/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. CLEAN STREET ESTABLISH Erosion control at front of lot
Misc
Corrective Action Required
11/15/2024
EROSION CONTROL IN COMPLIANCE AT TIME OF INSPECTION.
Electrical Service Inspection Passed 11/18/2024 11/18/2024 11/18/2024
Misc
Resolved
11/18/2024
Provide ufer ground connection NOT DONE, NOT READY
Driveway Inspection Partial 12/4/2024 12/4/2024 12/04/2024
Misc
Informational
12/04/2024
12-4-24 Dustin A, Dw is framed and compacted approved to pour
Driveway Inspection Partial 12/11/2024 12/11/2024 12/11/2024
Misc
Informational
12/04/2024
12-4-24 Dustin A, Dw is framed and compacted approved to pour 12-11-24 Jamie S, DW is poured to city specs, cannot approve until forms are pulled.
Driveway Inspection Partial 12/23/2024 12/23/2024
Misc
Informational
12/11/2024
12-4-24 Dustin A, Dw is framed and compacted approved to pour 12-11-24 Jamie S, DW is poured to city specs, cannot approve until forms are pulled. 12-23-24 Dustin A, widened the approach out to wing. Pre pour passed
Driveway Inspection Partial 1/3/2025 1/3/2025 01/02/2025
Misc
Informational
12/23/2024
12-4-24 Dustin A, Dw is framed and compacted approved to pour 12-11-24 Jamie S, DW is poured to city specs, cannot approve until forms are pulled. 12-23-24 Dustin A, widened the approach out to wing. Pre pour passed 01-02-25 Jamie S, DW is poured to city specs. Cannot pass until forms are pulled.
Plot Plan Inspection Failed 1/8/2025 01/08/2025
Misc
Corrective Action Required
01/08/2025
- Possible wrog lot plot plan submitted.
Occupancy Inspection - Codes Residential Failed 1/8/2025 1/8/2025 01/08/2025
Misc
Corrective Action Required
01/08/2025
16633 sw arborway ter - final grading and sod - Uncover water meter for inspection - Check plot plan - Provide gutters and downspouts - Provide splash pads - Sup discharge to be 36” away from foundation Missing screws - Pending driveway inspection Lower water - Entry from garage must be self closing and latch - Protect gaps in sheet rock above garage doorway ceiling
Occupancy Inspection - Codes Residential Ready for Temp CO 1/9/2025 1/9/2025 01/09/2025
Misc
Corrective Action Required
01/08/2025
16633 sw arborway ter - final grading and sod - Uncover water meter for inspection - Check plot plan - Provide gutters and downspouts - Provide splash pads - Sup discharge to be 36” away from foundation - Pending driveway inspection
Driveway Inspection Passed 4/10/2025 4/10/2025 04/10/2025
Misc
Informational
01/02/2025
12-4-24 Dustin A, Dw is framed and compacted approved to pour 12-11-24 Jamie S, DW is poured to city specs, cannot approve until forms are pulled. 12-23-24 Dustin A, widened the approach out to wing. Pre pour passed 01-02-25 Jamie S, DW is poured to city specs. Cannot pass until forms are pulled. 4-10-25 Dustin A, Forms pulled. Passed
Plot Plan Inspection Passed 04/10/2025
Misc
Resolved
04/10/2025
- Possible wrog lot plot plan submitted.
Erosion Control Inspection Residential Passed 04/10/2025
Misc
Resolved
04/10/2025
EROSION CONTROL IN COMPLIANCE AT TIME OF INSPECTION.
Occupancy Inspection - Codes Residential Full C of O 4/10/2025 4/10/2025 04/10/2025
Misc
Resolved
04/10/2025
1633 sw arborway ter - final grading and sod - Uncover water meter for inspection - Check plot plan - Provide gutters and downspouts - Provide splash pads - Sup discharge to be 36” away from foundation - Pending driveway inspection
Documents & Images
Date Uploaded File Type Document Name
05/22/2024 HT #178 - ENGINEERED PLANS
05/22/2024 Application Form HT #178 - PERMIT APP
05/22/2024 HT #178 - PLOT PLAN
05/22/2024 HT #178 - TRUSS DETAILS
05/22/2024 HT #178 - TRUSS LAYOUT
05/23/2024 Approved Plans APPROVED PLANS
05/23/2024 Plot Plan APPROVED PLOT PLAN
05/23/2024 Approved Plans APPROVED TRUSS LAYOUT
05/23/2024 Approved Plans APPROVED TRUSS PACKAGE
06/03/2024 Permit Codes Residential Plan Review
06/03/2024 Permit DS Building Permit
07/16/2024 3RD Party Insp Report THIRD PARTY INSPECTION REPORT
07/17/2024 Letter INSPECTION SUMMARY
08/02/2024 Letter INSPECTION SUMMARY
08/07/2024 Letter INSPECTION SUMMARY
08/12/2024 Letter INSPECTION SUMMARY
08/23/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/18/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/29/2024 Letter INSPECTION SUMMARY
10/29/2024 Letter INSPECTION SUMMARY
10/29/2024 Letter INSPECTION SUMMARY
10/31/2024 Letter INSPECTION SUMMARY
11/04/2024 Letter INSPECTION SUMMARY
11/04/2024 Letter INSPECTION SUMMARY
11/05/2024 Letter INSPECTION SUMMARY
11/05/2024 Letter INSPECTION SUMMARY
11/08/2024 Letter Stop Work Order
11/14/2024 Receipt Receipt for transaction:2024-008952
11/15/2024 Letter INSPECTION SUMMARY
11/18/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/11/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
01/02/2025 Letter INSPECTION SUMMARY
01/08/2025 Letter INSPECTION SUMMARY
01/08/2025 Letter INSPECTION SUMMARY
01/09/2025 Letter INSPECTION SUMMARY
01/09/2025 Certificate/License Codes Temporary Certificate of Occupancy
01/09/2025 Receipt Receipt for transaction:2025-000134
01/29/2025 Application Form TCO EXTENSION APPLICATION
03/13/2025 Certificate/License Codes Temporary Certificate of Occupancy
03/13/2025 Certificate/License Codes Temporary Certificate of Occupancy
03/13/2025 Receipt Receipt for transaction:2025-001545
04/10/2025 Letter INSPECTION SUMMARY
04/10/2025 Letter INSPECTION SUMMARY
04/10/2025 Letter INSPECTION SUMMARY
04/10/2025 Letter Field Certificate of Occupancy
04/10/2025 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home