Summary
PRRES20242079
Building Permit - Residential
Issued
HAWTHORN RIDGE HOMES ASSOCIATION INC
NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED BASEMENT. UNCOVERED DECK. ROOF TRUSSES. STOP WORK ORDER generated on 09/09/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 10/01/2024 12:00 AM by username 'Khanh Nguyen'. STOP WORK ORDER generated on 11/27/2024 12:00 AM by username 'Mark Harding'. STOP WORK ORDER removed on 12/09/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER generated on 03/03/2025 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER removed on 04/11/2025 12:00 AM by username 'Drew Fischer'.
04/25/2024
05/02/2024
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
HAWTHORN RIDGE HOMES ASSOCIATION INC, Address:120 SE 30TH ST  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
TYLER@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 05/02/2024
7232302-Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 05/02/2024
8331401-Water Tap Fee $3,760.00 $3,760.00 Paid 05/02/2024
8350015-Water Meter Fee $680.46 $680.46 Paid 05/02/2024
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 05/02/2024
9110078-Valuation Fee New Single Family $1,804.93 $1,804.93 Paid 05/02/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 12/04/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 12/04/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 12/04/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 12/04/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 12/04/2024
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 01/24/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Residential Pending
Misc
Corrective Action Required
08/05/2024
Piers are not to plans.
Plot Plan Inspection Pending
Misc
Corrective Action Required
01/21/2025
- Final grading - uncover manhole - uncover water meter
Occupancy Inspection - Codes Residential Pending
Misc
Corrective Action Required
01/23/2025
- Upload engineer report on pier changes from plans - Uncover manhole - Uncover water meter for inspection - Pending sidewalk inspection - Final grading and sod - Install gutters and downspouts - Provide splash pads - Sump discharge to be 36” away from foundation
Sidewalk Inspection Pending
Misc
Corrective Action Required
01/29/2025
1/22/25 Dustin A, Cannot perform due to snow/ice still on sidewalk. There is also dirt debris on sidewalk on left side that needs to be cleaned off. There is no erosion control as well. Recall when corrected 1/29/25 Jamie S, Can not perform inspection due to mud still coving the sidewalk. Recall when corrected.
Erosion Control Inspection Residential Pending
Misc
Informational
04/11/2025
Erosion control in compliance at time of inspection
Sidewalk Inspection Pending
Sewer Service Inspection - R Passed 5/20/2024 5/20/2024 05/20/2024
Footing Inspection - Residential Passed 5/29/2024 05/29/2024
Underslab Plumbing Inspection - Residential Passed 5/29/2024 5/29/2024 05/29/2024
Water Service Inspection - R Passed 6/3/2024 6/3/2024 06/03/2024
All Rough Inspection - Residential Failed 7/29/2024 7/29/2024 07/29/2024
Misc
Corrective Action Required
07/29/2024
Erosion control, not in compliance inspection denied
Erosion Control Inspection Residential Failed 7/29/2024 07/29/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/29/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM5 ESC INSP DENIED
Corrective Action Required
07/29/2024
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION.
Piers/Caissons Inspection - Residential Failed 7/30/2024 07/30/2024
Misc
Corrective Action Required
07/30/2024
Erosion control not in compliance inspection denied
Erosion Control Inspection Residential Failed 7/31/2024 07/31/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/29/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM5 ESC INSP DENIED
Corrective Action Required
07/29/2024
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION.
Misc
Corrective Action Required
07/31/2024
- REMOVE TRASH FROM LOT.
Piers/Caissons Inspection - Residential Not Ready 8/5/2024 8/5/2024 08/05/2024
Misc
Corrective Action Required
07/30/2024
Piers are not to plans.
Erosion Control Inspection Residential Partial 8/5/2024 08/05/2024
DCM3 ESC REQUIRED 2 DAY
Resolved
08/05/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM5 ESC INSP DENIED
Resolved
08/05/2024
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION.
Misc
Resolved
08/05/2024
- REMOVE TRASH FROM LOT.
Misc
Corrective Action Required
08/05/2024
Erosion control in compliance at time of inspection
All Rough Inspection - Residential Not Ready 9/9/2024 9/9/2024 09/09/2024
Misc
Resolved
09/09/2024
Erosion control, not in compliance inspection denied
Misc
Corrective Action Required
09/09/2024
INSPECTION DENIED Home insulated without inspection. Remove insulation for inspection
Electrical Service Inspection Passed 9/9/2024 9/9/2024 09/09/2024
Gas Service Inspection - Residential Not Ready 9/9/2024 9/9/2024 09/09/2024
Misc
Corrective Action Required
09/09/2024
No gas line installed
All Rough Inspection - Residential Failed - Stop Work 9/9/2024 9/9/2024 09/09/2024
Misc
Corrective Action Required
09/09/2024
INSPECTION DENIED Home insulated without inspection. Remove insulation for inspection
Erosion Control Inspection Residential Partial 10/1/2024 10/01/2024
Misc
Corrective Action Required
08/05/2024
Erosion control in compliance at time of inspection
Gas Service Inspection - Residential Failed 10/1/2024 10/01/2024
Misc
Corrective Action Required
09/09/2024
No gas line installed **Install pressure gauge with range no more than 30 psi.
All Rough Inspection - Residential Not Ready 10/1/2024 10/01/2024
Misc
Corrective Action Required
09/09/2024
INSPECTION DENIED Home insulated without inspection. Remove insulation for inspection **10/1-Not ready fee assessed. All insulation shall be removed, including the insulation at the floor rim. Do not schedule another inspection until full visual access is provided
All Rough Inspection - Residential Failed 10/2/2024 10/2/2024 10/02/2024
Misc
Resolved
10/02/2024
INSPECTION DENIED Home insulated without inspection. Remove insulation for inspection **10/1-Not ready fee assessed. All insulation shall be removed, including the insulation at the floor rim. Do not schedule another inspection until full visual access is provided
Misc
Corrective Action Required
10/02/2024
-anchor bolts to be in the middle 1/3 of sill plate -strap top plate where lapped less than 24”(see N garage wall) -fire block wall space into furr down in garage -provide (2) 2x10 above garage per plans -missing libs throughout -complete bath fan wiring -provide stud pack at foyer/garage wall -install LGT2 at girder R1 -provide lateral bracing through out -missing truss hangers per plans. Plans do not specify certain hangers identified in key -missing hold downs on multiple trusses -provide hold down device at stair landing -add studs where overmatched for anchor bolt in basement -anchor bolts to be tight -provide 3 studs at exterior wall corners in basement -under ground connection not properly installed
All Rough Inspection - Residential Failed 10/14/2024 10/14/2024 10/14/2024
Misc
Corrective Action Required
10/02/2024
-fire block wall space into furr down in garage (see hvac chases) -addressed electrical in garage no landed -complete bath fan wiring -provide stud pack at foyer closet /garage wall -protect wiring at garage N wall -install LGT2 at girder R1 -provide lateral bracing through out -missing truss hangers per plans. Plans do not specify certain hangers identified in key -provide hold down device at stair landing -anchor bolts to be tight -provide 3 studs at exterior wall corners in basement -ufer ground connection not properly installed
Gas Service Inspection - Residential Failed 10/18/2024 10/18/2024 10/18/2024
Misc
Corrective Action Required
10/01/2024
No gas line installed **Install pressure gauge with range no more than 30 psi.
All Rough Inspection - Residential Failed 10/18/2024 10/18/2024 10/18/2024
Misc
Corrective Action Required
10/14/2024
-install LGT2 at girder R1 -missing truss hangers per plans. Plans do not specify certain hangers identified in key -provide hold down device at stair landing -anchor bolts to be tight throughout -provide 3 studs at exterior wall corners in basement -ufer ground connection not properly installed
All Rough Inspection - Residential Not Ready 10/25/2024 10/25/2024 10/25/2024
Misc
Corrective Action Required
10/18/2024
-install LGT2 at girder R1 -missing truss hangers per plans. Plans do not specify certain hangers identified in key -provide hold down device at stair landing -anchor bolts to be tight throughout ( remove insulation for inspection) -provide 3 studs at exterior wall corners in basement(remove insulation for inspection) -ufer ground connection not properly installed
Driveway Inspection Partial 11/25/2024 11/25/2024 11/25/2024
Misc
Informational
11/25/2024
11-25-24 Dustin A, Dw is formed and compacted, Approved to pour
Sidewalk Inspection Partial 11/25/2024 11/25/2024 11/25/2024
Misc
Informational
11/25/2024
11-25-24 Dustin A, Sw is formed and compacted, Slopes are in compliance. Approved to pour 12-27-24 Dustin A, SW has dirt and debris on sw cannot due inspection
Miscellaneous Inspection Partial 11/25/2024 11/25/2024 11/25/2024
Misc
Informational
11/25/2024
11-25-24 Dustin A, Curb is formed , compacted and doweled, Approved to pour
All Rough Inspection - Residential Failed 11/26/2024 11/26/2024 11/26/2024
Misc
Resolved
11/26/2024
-install LGT2 at girder R1 -missing truss hangers per plans. Plans do not specify certain hangers identified in key -provide hold down device at stair landing -anchor bolts to be tight throughout ( remove insulation for inspection) -provide 3 studs at exterior wall corners in basement(remove insulation for inspection) -ufer ground connection not properly installed
Miscellaneous Correction
Corrective Action Required
11/26/2024
install LGT2 at girder R1 -missing truss hangers per plans. Plans do not specify certain hangers identified in key -provide hold down device at stair landing (tighten down bolt to newly installed hanger) -anchor bolts to be tight throughout ( remove insulation for inspection) -provide 3 studs at exterior wall corners in basement(remove insulation for inspection) - Plans are not on site at time of inspection to verify corrections - Expose all areas that are to be re inspected - Gas still needs to pass Not ready for inspection
Gas Service Inspection - Residential Failed 11/27/2024 11/27/2024 11/27/2024
Misc
Corrective Action Required
10/18/2024
No gas line installed **Install pressure gauge with range no more than 30 psi.
Misc
Corrective Action Required
11/27/2024
denied
All Rough Inspection - Residential Failed - Stop Work 11/27/2024 11/27/2024 11/27/2024
Miscellaneous Correction
Corrective Action Required
11/26/2024
install LGT2 at girder R1 -missing truss hangers per plans. Plans do not specify certain hangers identified in key -provide hold down device at stair landing (tighten down bolt to newly installed hanger) -anchor bolts to be tight throughout ( remove insulation for inspection) -provide 3 studs at exterior wall corners in basement(remove insulation for inspection) - Plans are not on site at time of inspection to verify corrections - Expose all areas that are to be re inspected - Gas still needs to pass Not ready for inspection
Misc
Corrective Action Required
11/27/2024
deinied- cut holes in sheetrock where all truss hangers are located and schduled when ready. this house was covered without approval. contact Mark Harding if you have questions.
Gas Service Inspection - Residential Passed 12/9/2024 12/9/2024 12/09/2024
Misc
Resolved
12/09/2024
No gas line installed **Install pressure gauge with range no more than 30 psi.
Misc
Resolved
12/09/2024
denied
All Rough Inspection - Residential Passed 12/9/2024 12/9/2024 12/09/2024
Miscellaneous Correction
Resolved
12/09/2024
install LGT2 at girder R1 -missing truss hangers per plans. Plans do not specify certain hangers identified in key -provide hold down device at stair landing (tighten down bolt to newly installed hanger) -anchor bolts to be tight throughout ( remove insulation for inspection) -provide 3 studs at exterior wall corners in basement(remove insulation for inspection) - Plans are not on site at time of inspection to verify corrections - Expose all areas that are to be re inspected - Gas still needs to pass Not ready for inspection
Misc
Resolved
12/09/2024
deinied- cut holes in sheetrock where all truss hangers are located and schduled when ready. this house was covered without approval. contact Mark Harding if you have questions.
Sidewalk Inspection Partial 12/27/2024 12/27/2024 12/27/2024
Plot Plan Inspection Failed 1/21/2025 01/21/2025
Misc
Corrective Action Required
01/21/2025
- Final grading - uncover manhole - uncover water meter
Occupancy Inspection - Codes Residential Failed 1/21/2025 1/21/2025 01/21/2025
Misc
Corrective Action Required
01/21/2025
- Upload engineer report on pier changes from plans - Uncover manhole - Uncover water meter for inspection - Pending driveway inspection - Pending sidewalk inspection - Final grading and sod - Install gutters and downspouts - Provide splash pads - Sump discharge to be 36” away from foundation - Provide graspable handrail for deck stairs - Address notched beam at deck - Missing nails at deck joists hangers - Provide (2) 1/2” through bolts at post to beam connections on deck
Driveway Inspection Partial 1/22/2025 1/22/2025 01/22/2025
Misc
Informational
11/25/2024
11-25-24 Dustin A, Dw is formed and compacted, Approved to pour 1-22-25 Dustin A, cannot perform due to snow/ice still on approach . There is also no erosion control in place . Recall when corrected
Erosion Control Inspection Residential Failed 1/22/2025 1/22/2025 01/22/2025
Misc
Corrective Action Required
10/01/2024
Erosion control in compliance at time of inspection
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
01/22/2025
1/22/25 Dustin A, Dirt from a skid steer id on sidewalk and along curb . No erosion control in that spot. Road and curb along with sidewalk needs to be cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Miscellaneous Inspection Passed 12/2/2024 01/22/2025
Misc
Informational
11/25/2024
11-25-24 Dustin A, Curb is formed , compacted and doweled, Approved to pour 1/22/25 Dustin A, Curb is poured to city specs. PASS
Sidewalk Inspection Partial 1/22/2025 1/22/2025 01/22/2025
Misc
Corrective Action Required
01/22/2025
1/22/25 Dustin A, Cannot perform due to snow/ice still on sidewalk. There is also dirt debris on sidewalk on left side that needs to be cleaned off. There is no erosion control as well. Recall when corrected
Driveway Inspection Passed 01/22/2025
Misc
Informational
01/22/2025
11-25-24 Dustin A, Dw is formed and compacted, Approved to pour 1-22-25 Dustin A, cannot perform due to snow/ice still on approach . There is also no erosion control in place . Recall when corrected 1-22-25 Dustin A, Dw has been poured to city specs and slopes are in compliance. Pass
Occupancy Inspection - Codes Residential Ready for Temp CO 1/23/2025 1/23/2025 01/23/2025
Misc
Corrective Action Required
01/21/2025
- Upload engineer report on pier changes from plans - Uncover manhole - Uncover water meter for inspection - Pending sidewalk inspection - Final grading and sod - Install gutters and downspouts - Provide splash pads - Sump discharge to be 36” away from foundation
Sidewalk Inspection Failed 1/29/2025 1/29/2025 01/29/2025
Misc
Corrective Action Required
01/22/2025
1/22/25 Dustin A, Cannot perform due to snow/ice still on sidewalk. There is also dirt debris on sidewalk on left side that needs to be cleaned off. There is no erosion control as well. Recall when corrected 1/29/25 Jamie S, Can not perform inspection due to mud still coving the sidewalk. Recall when corrected.
Erosion Control Inspection Residential Failed 2/26/2025 2/26/2025 02/26/2025
Misc
Corrective Action Required
01/22/2025
Erosion control in compliance at time of inspection
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
01/22/2025
1/22/25 Dustin A, Dirt from a skid steer id on sidewalk and along curb . No erosion control in that spot. Road and curb along with sidewalk needs to be cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/26/2025
2-26-25 Dustin A, Waddles installed but sidewalk still needs cleaned as well as curb line. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Partial 2/28/2025 2/28/2025 02/28/2025
Misc
Corrective Action Required
02/26/2025
Erosion control in compliance at time of inspection
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/26/2025
1/22/25 Dustin A, Dirt from a skid steer id on sidewalk and along curb . No erosion control in that spot. Road and curb along with sidewalk needs to be cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/26/2025
2-26-25 Dustin A, Waddles installed but sidewalk still needs cleaned as well as curb line. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 2-28-25 Dustin A, Talked with Taylor and he said would be corrected today. Will extend out till monday the 3-3-25
Erosion Control Inspection Residential Failed - Stop Work 3/3/2025 3/3/2025 03/03/2025
Misc
Corrective Action Required
02/28/2025
Erosion control in compliance at time of inspection
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/28/2025
1/22/25 Dustin A, Dirt from a skid steer id on sidewalk and along curb . No erosion control in that spot. Road and curb along with sidewalk needs to be cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/28/2025
2-26-25 Dustin A, Waddles installed but sidewalk still needs cleaned as well as curb line. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 2-28-25 Dustin A, Talked with Taylor and he said would be corrected today. Will extend out till monday the 3-3-25 3-3-25 Dustin A, Has not been addressed. Fail
Erosion Control Inspection Residential Failed 3/14/2025 3/14/2025 03/14/2025
Misc
Resolved
03/14/2025
Erosion control in compliance at time of inspection
DCM3 ESC REQUIRED 2 DAY
Resolved
03/14/2025
1/22/25 Dustin A, Dirt from a skid steer id on sidewalk and along curb . No erosion control in that spot. Road and curb along with sidewalk needs to be cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/03/2025
2-26-25 Dustin A, Waddles installed but sidewalk still needs cleaned as well as curb line. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 2-28-25 Dustin A, Talked with Taylor and he said would be corrected today. Will extend out till monday the 3-3-25 3-3-25 Dustin A, Has not been addressed. Fail 3/14/25-sidewalk still needs cleaned
Erosion Control Inspection Residential Partial 4/11/2025 04/11/2025
DCM3 ESC REQUIRED 2 DAY
Resolved
04/11/2025
2-26-25 Dustin A, Waddles installed but sidewalk still needs cleaned as well as curb line. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 2-28-25 Dustin A, Talked with Taylor and he said would be corrected today. Will extend out till monday the 3-3-25 3-3-25 Dustin A, Has not been addressed. Fail 3/14/25-sidewalk still needs cleaned
Misc
Informational
04/11/2025
Erosion control in compliance at time of inspection
Documents & Images
Date Uploaded File Type Document Name
04/25/2024 HT #160 - ENGINEERED PLANS
04/25/2024 HT #160 - Permit App
04/25/2024 HT #160 - PLOT PLAN
04/25/2024 HT #160 - TRUSS DETAILS
04/25/2024 HT #160 - TRUSS LAYOUT
05/02/2024 Plot Plan APPROVED PLOT PLAN
05/02/2024 Plot Plan APPROVED PLANS
05/02/2024 Approved Plans APPROVED TRUSS PACKAGE
05/02/2024 Permit Codes Residential Plan Review
05/02/2024 Permit DS Building Permit
05/02/2024 Receipt Receipt for transaction:2024-002864
05/08/2024 3RD Party Insp Report THIRD PARTY FOOTING INSPECTION
05/20/2024 Letter INSPECTION SUMMARY
05/29/2024 Letter INSPECTION SUMMARY
05/29/2024 Letter INSPECTION SUMMARY
06/03/2024 Letter INSPECTION SUMMARY
06/06/2024 Approved Plans 6-6-24 APPROVED PLANS
06/06/2024 Plot Plan 6-6-24 APPROVED PLOT PLAN
06/06/2024 Approved Plans APPROVED TRUSS LAYOUT
06/06/2024 Approved Plans APPROVED TRUSS PACKAGE
07/29/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
07/30/2024 Letter INSPECTION SUMMARY
07/31/2024 Letter INSPECTION SUMMARY
08/05/2024 Letter INSPECTION SUMMARY
08/05/2024 Letter INSPECTION SUMMARY
09/09/2024 Letter INSPECTION SUMMARY
09/09/2024 Letter INSPECTION SUMMARY
09/09/2024 Letter INSPECTION SUMMARY
09/09/2024 Letter Stop Work Order
10/01/2024 Letter INSPECTION SUMMARY
10/01/2024 Letter INSPECTION SUMMARY
10/01/2024 Letter INSPECTION SUMMARY
10/02/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/18/2024 Letter INSPECTION SUMMARY
10/18/2024 Letter INSPECTION SUMMARY
10/25/2024 Letter INSPECTION SUMMARY
11/25/2024 Letter INSPECTION SUMMARY
11/25/2024 Letter INSPECTION SUMMARY
11/25/2024 Letter INSPECTION SUMMARY
11/26/2024 Letter INSPECTION SUMMARY
11/27/2024 Letter INSPECTION SUMMARY
12/03/2024 Approved Plans UPDATED APPROVED TRUSS LAYOUT
12/04/2024 Receipt Receipt for transaction:2024-009312
12/09/2024 Letter Stop Work Order
12/09/2024 Letter INSPECTION SUMMARY
12/09/2024 Letter INSPECTION SUMMARY
12/27/2024 Letter INSPECTION SUMMARY
12/27/2024 Letter INSPECTION SUMMARY
01/21/2025 Letter INSPECTION SUMMARY
01/21/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
01/23/2025 Letter INSPECTION SUMMARY
01/24/2025 Certificate/License Codes Temporary Certificate of Occupancy
01/24/2025 Receipt Receipt for transaction:2025-000437
01/29/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
02/28/2025 Letter INSPECTION SUMMARY
03/03/2025 Letter Stop Work Order
03/03/2025 Letter Stop Work Order
03/14/2025 Letter INSPECTION SUMMARY
04/11/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home