Permit Application Status

PRRES20241108


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20241108
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISED BASEMENT - COVERED DECK STOP WORK ORDER generated on 04/08/2024 12:00 AM by username 'Khanh Nguyen'. STOP WORK ORDER removed on 04/10/2024 12:00 AM by username 'Khanh Nguyen'. STOP WORK ORDER generated on 04/02/2025 12:00 AM by username 'Khanh Nguyen'. STOP WORK ORDER removed on 04/29/2025 12:00 AM by username 'Khanh Nguyen'.
03/11/2024
03/13/2024
05/14/2025
Locations
Contacts
WALKER CUSTOM HOMES, LLC, Address:PO BOX 3194, Phone:(913) 208-2026  
Jason walker, Address:PO Box 247, Phone:(913) 208-2026  
WALKERCUSTOMHOMESKC@GMAIL.COM  
5 STAR HEATING & COOLING, Address:211 NW 12TH, Phone:(816) 517-3341  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 03/13/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 03/13/2024
7232302-Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 03/13/2024
9110078-Valuation Fee New Single Family $1,710.76 $1,710.76 Paid 03/13/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 04/08/2024
Informational
04/08/2024
FOOTING APPROVED BY ENGINEER
Erosion Control Inspection Residential Failed 4/8/2024 04/08/2024
DCM5 ESC INSP DENIED
Corrective Action Required
04/08/2024
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. PROVIDE EROSION CONTROL ALONG THE STREET AND ALONG REAR SIDE OF THE LOT
Underslab Plumbing Inspection - Residential Failed - Stop Work 4/8/2024 4/8/2024 04/08/2024
Misc
Corrective Action Required
04/08/2024
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. PROVIDE EROSION CONTROL ALONG THE STREET AND ALONG REAR SIDE OF THE LOT
Erosion Control Inspection Residential Failed 4/10/2024 04/10/2024
DCM5 ESC INSP DENIED
Corrective Action Required
04/10/2024
MIGHT NEED TO EXTEND THE SILT FENCE A LITTLE AT REAR OF LOT TO CATCH ALL SILT RUNOFF
Underslab Plumbing Inspection - Residential Passed 4/10/2024 4/10/2024 04/10/2024
Misc
Resolved
04/10/2024
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. PROVIDE EROSION CONTROL ALONG THE STREET AND ALONG REAR SIDE OF THE LOT
Sewer Service Inspection - R Partial 4/15/2024 04/15/2024
Misc
Corrective Action Required
04/15/2024
Sewer connection to pit-OK
Sewer Service Inspection - R Partial 4/16/2024 04/16/2024
Misc
Corrective Action Required
04/15/2024
Sewer connection to pit -OK Remove extra check valve and reconnect to PE sewer stub. Take picture when done
Erosion Control Inspection Residential Failed 8/15/2024 8/15/2024 08/15/2024
DCM5 ESC INSP DENIED
Corrective Action Required
04/10/2024
Repair erosion control at rear of lot
Electrical Service Inspection Passed 8/15/2024 8/15/2024 08/15/2024
Gas Service Inspection - Residential Passed 8/15/2024 8/15/2024 08/15/2024
All Rough Inspection - Residential Failed 8/15/2024 8/15/2024 08/15/2024
Misc
Corrective Action Required
08/15/2024
-Nail siding per code -Nail garage PFH walls sheathing @3” oc to studs and sill plates -Equivalent nailing of rafters to wall top plates with 4-10d box nails -Provide security blockings at deck door at strike plate height to wall corner -Brace ends of roof lvl beam from rotation -Provide insulation shield for fireplace vent in attic -Support ceiling framing above master bedroom -Protect plumbing at front bathroom bottom wall plate -Nail wall corner studs w/16d@12” oc or equivalent nailing -Fb basement wall space vertically at maximum ten ft intervals; -Master and front bathroom shower traps and drainage shall be min 2” -Provide 5-studs pack at lvl support near fireplace **OK TO INSULATE
All Rough Inspection - Residential Failed 8/22/2024 8/22/2024 08/22/2024
Misc
Corrective Action Required
08/15/2024
-Equivalent nailing of rafters to wall top plates with 4-10d box nails -Provide 5-studs pack at lvl support near fireplace **Install strike plate to protect wiring **OK TO INSULATE
Driveway Inspection Partial 10/7/2024 10/7/2024 10/07/2024
Misc
Informational
10/07/2024
10-7-24 NS Site visit and it appears that driveway meets city standards will come back in a couple weeks to check after it is poured.
Sewer Service Inspection - R Passed 03/19/2025
Misc
Resolved
03/19/2025
Sewer connection to pit -OK Remove extra check valve and reconnect to PE sewer stub. Take picture when done
Erosion Control Inspection Residential Failed 3/19/2025 03/19/2025
DCM5 ESC INSP DENIED
Corrective Action Required
08/15/2024
INSPECTION DENIED. PROVIDE EROSION CONTROL ALONG THE REAR OF LOT
Occupancy Inspection - Codes Residential Failed 3/19/2025 3/19/2025 03/19/2025
Misc
Corrective Action Required
03/19/2025
INSPECTION DENIED. PROVIDE EROSION CONTROL ALONG THE REAR OF LOT
Erosion Control Inspection Residential Failed - Stop Work 4/2/2025 04/02/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/19/2025
EROSION CONTROL REQUIRED ALONG THE REAR OF LOT AND AT THE REAR LOT CORNER STORM INLET. FAILURE TO CORRECT THE EROSION CONTROL DEFICIENCY. LAST SCHEDULED INSPECTION WAS DENIED, BUT EROSION CONTROL DEFICIENCY HAS NOT BEEN CORRECTED. A STOP-WORK ORDER IS ISSUED.
Erosion Control Inspection Residential Passed 4/29/2025 4/29/2025 04/29/2025
DCM3 ESC REQUIRED 2 DAY
Resolved
04/29/2025
EROSION CONTROL REQUIRED ALONG THE REAR OF LOT AND AT THE REAR LOT CORNER STORM INLET. FAILURE TO CORRECT THE EROSION CONTROL DEFICIENCY. LAST SCHEDULED INSPECTION WAS DENIED, BUT EROSION CONTROL DEFICIENCY HAS NOT BEEN CORRECTED. A STOP-WORK ORDER IS ISSUED.
All Rough Inspection - Residential Passed 04/29/2025
Misc
Resolved
04/29/2025
Occupancy Inspection - Codes Residential Failed 5/2/2025 5/2/2025 05/02/2025
Misc
Corrective Action Required
03/19/2025
-Driveway not approved on record -Seal exterior wall penetrations; seal above meter, AC disconnect, seal exterior lights, etc -Provide sewer tracer wire port at grade -Provide box extension at floor receptacles -Provide wall receptacle at cabinet wall spaces adjacent to fireplace -Isolate low voltage wires from normal power wiring inside fireplace switch -Garage stair handrail profile not compliant. You can use 2x2 lumber as handrail and return both ends to post/rail -Rock opening in wall at 3rd car bay with 5/8” GB -Install bottom garage track support bracket at 10” above floor -Provide box extension at stair switch -Provide min 1.5” of clearance space at stair handrail -Move basement smoke/CO alarm min 4” away from ceiling trim -Screw the exterior door embedded jamb brace into studs through all four pre-drilled holes
Driveway Inspection Partial 5/5/2025 5/5/2025 05/05/2025
Misc
Informational
10/07/2024
10-7-24 NS Site visit and it appears that driveway meets city standards will come back in a couple weeks to check after it is poured. 5-5-25 DP. DW was poured, forms need removed before we can pass.
Occupancy Inspection - Codes Residential Failed 5/12/2025 5/12/2025 05/12/2025
Misc
Corrective Action Required
05/02/2025
-Driveway not approved on record -Provide sewer tracer wire port at grade **Where is the sewer shutoff valve? Locate and bring to final grade. Tracer wire/port as well -Isolate low voltage wires from normal power wiring inside fireplace switch
Driveway Inspection Passed 5/14/2025 05/13/2025
Misc
Informational
05/05/2025
10-7-24 NS Site visit and it appears that driveway meets city standards will come back in a couple weeks to check after it is poured. 5-5-25 DP. DW was poured, forms need removed before we can pass. 5-13-25 NS Site visited and it appears that driveway and sidewalk passed city standards
Occupancy Inspection - Codes Residential Full C of O 5/14/2025 5/14/2025 05/14/2025
Misc
Resolved
05/14/2025
-Driveway not approved on record -Provide sewer tracer wire port at grade **Where is the sewer shutoff valve? Locate and bring to final grade. Tracer wire/port as well -Isolate low voltage wires from normal power wiring inside fireplace switch
Documents & Images
Date Uploaded File Type Document Name
03/11/2024 2520 Woodland Oaks Permit Application Lee's Summit
03/12/2024 Approved Plans APPROVED PLANS
03/12/2024 Plot Plan approved plot plan
03/13/2024 Permit Codes Residential Plan Review
03/13/2024 Permit DS Building Permit
03/13/2024 Receipt Receipt for transaction:2024-001571
03/20/2024 3RD Party Insp Report Footing Inspection Report 3-19-24
04/08/2024 Letter INSPECTION SUMMARY
04/08/2024 Letter INSPECTION SUMMARY
04/08/2024 Letter Stop Work Order
04/10/2024 Letter INSPECTION SUMMARY
04/10/2024 Letter INSPECTION SUMMARY
04/15/2024 Letter INSPECTION SUMMARY
04/16/2024 Letter INSPECTION SUMMARY
08/15/2024 Letter INSPECTION SUMMARY
08/15/2024 Letter INSPECTION SUMMARY
08/15/2024 Letter INSPECTION SUMMARY
08/15/2024 Letter INSPECTION SUMMARY
08/22/2024 Letter INSPECTION SUMMARY
10/07/2024 Letter INSPECTION SUMMARY
03/19/2025 Letter INSPECTION SUMMARY
03/19/2025 Letter INSPECTION SUMMARY
03/19/2025 Letter INSPECTION SUMMARY
04/02/2025 Letter Stop Work Order
04/29/2025 Letter Stop Work Order
04/29/2025 Letter INSPECTION SUMMARY
04/29/2025 Letter INSPECTION SUMMARY
05/02/2025 Letter INSPECTION SUMMARY
05/05/2025 Letter INSPECTION SUMMARY
05/12/2025 Letter INSPECTION SUMMARY
05/13/2025 Letter INSPECTION SUMMARY
05/14/2025 Letter Codes Final Certificate of Occupancy
05/14/2025 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: