Permit Application Status

PRRES20235234


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20235234
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
Construction of new single family home. STOP WORK ORDER generated on 06/10/2024 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER removed on 06/12/2024 12:00 AM by username 'Dustin Agcopra'.
10/10/2023
11/03/2023
04/14/2024
07/22/2024
Locations
Contacts
ROCK CREEK HOMES, Address:6126 METCALF LANE, Phone:(913) 522-1945  
Kevin Guinan, Address:6126 Metcalf Lane  
ROCKCREEKHOMESKC@GMAIL.COM  
PRAIRIE CENTER PLUMBING HEATING & A/C, Address:242 N MARION, Phone:(913) 829-6263  
PRIDE SERVICES INC, Address:3842 GEORGIA TERR, Phone:(785) 242-9700  
BILL'S PLUMBING SERVICE LLC, Address:308 E PARK STREET, Phone:(913) 829-8213  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 11/03/2023
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 11/03/2023
7232302-Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 11/03/2023
8331401-Water Tap Fee $3,760.00 $3,760.00 Paid 11/03/2023
8350015-Water Meter Fee $680.46 $680.46 Paid 11/03/2023
9110078-Valuation Fee New Single Family $1,488.26 $1,488.26 Paid 11/03/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 07/11/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 12/20/2023 12/20/2023
Sewer Service Inspection - R Passed 1/22/2024 1/22/2024 01/22/2024
Water Service Inspection - R Partial 1/22/2024 1/22/2024 01/22/2024
Water Service Inspection - R Passed 1/24/2024 01/24/2024
Underslab Plumbing Inspection - Residential Passed 2/13/2024 2/13/2024 02/13/2024
Suspended Slab Inspection Passed 2/15/2024 (1:00) 2/15/2024 02/15/2024
Suspended Slab Inspection Passed 3/6/2024 03/06/2024
Electrical Service Inspection Passed 5/8/2024 5/8/2024 05/08/2024
Gas Service Inspection - Residential Passed 5/8/2024 5/8/2024 05/08/2024
All Rough Inspection - Residential Passed 5/8/2024 5/8/2024 05/08/2024
Electrical Service Inspection Failed 5/13/2024 05/13/2024
Misc
Corrective Action Required
05/13/2024
-Incorrect grounding clamps used replace with ones approved for aluminum wire -Gas line grounding conductor should be equivalent to #4 copper 6 AWG is not please correct this
Electrical Service Inspection Passed 5/24/2024 05/24/2024
Misc
Resolved
05/24/2024
Driveway Inspection Failed 5/30/2024 5/30/2024 05/30/2024
Corrective Action Required
05/13/2024
5-30-24 Dustin A, Dw was formed up but not compacted, Said they would reschedule for tomorrow 5-31
Sidewalk Inspection Failed 5/30/2024 5/30/2024 05/30/2024
Misc
Informational
05/30/2024
5-30-24 Dustin A, Sw was not formed due to needing to ask a right away question . Will recall back in
Driveway Inspection Partial 5/31/2024 5/31/2024 05/31/2024
Misc
Informational
05/31/2024
5-31-24 Dustin A, DW has been formed and compacted to city specs. Approved to pour. Pointed out the chance of rain .
Sidewalk Inspection Failed 5/31/2024 5/31/2024 05/31/2024
Misc
Informational
05/30/2024
5-30-24 Dustin A, Sw was not formed due to needing to ask a right away question . Will recall back in 5-31-24 Dustin A, Sw was not formed still. Will need to call in for a pre pour sidewalk inspection before pouring
Erosion Control Inspection Residential Partial 06/03/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/03/2024
6-3-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Gravel pile in road needs to be removed and cleaned up.
Erosion Control Inspection Residential Passed 6/5/2024 6/5/2024 06/05/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/03/2024
6-3-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Gravel pile in road needs to be removed and cleaned up. 6-5-24 Dustin A, straw waddle installed, and gravel was removed. Passed
Erosion Control Inspection Residential Partial 06/05/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/05/2024
6-5-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. No erosion control on left side of approach. Trailer that is left on site is blocking a fire hydrant.
Sidewalk Inspection Partial 6/5/2024 6/5/2024 06/05/2024
Misc
Informational
05/31/2024
5-30-24 Dustin A, Sw was not formed due to needing to ask a right away question . Will recall back in 5-31-24 Dustin A, Sw was not formed still. Will need to call in for a pre pour sidewalk inspection before pouring 6-5-24 Dustin A, SW is formed to city specs. Approved to pour
Erosion Control Inspection Residential Passed 6/7/2024 6/7/2024 06/07/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/05/2024
6-5-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. No erosion control on left side of approach. Trailer that is left on site is blocking a fire hydrant. 6-7-24 Dustin A, Issues have been addressed
Erosion Control Inspection Residential Partial 06/07/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/07/2024
6-7-24 Dustin A,EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Please remove restroom off of driveway. Cannot be placed anywhere that contents could infiltrate storm drain or waterways if it was to fall over.
Driveway Inspection Passed 6/10/2024 6/10/2024 06/10/2024
Misc
Informational
05/31/2024
5-31-24 Dustin A, DW has been formed and compacted to city specs. Approved to pour. Pointed out the chance of rain . 6-10-24 Dustin A, DW is poured to city specs. Passed
Erosion Control Inspection Residential Passed 6/10/2024 6/10/2024 06/12/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/07/2024
6-7-24 Dustin A,EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Please remove restroom off of driveway. Cannot be placed anywhere that contents could infiltrate storm drain or waterways if it was to fall over. 6-12-24 Dustin A, restroom has been moved.
Sidewalk Inspection Passed 6/12/2024 6/13/2024 06/13/2024
Misc
Informational
06/05/2024
5-30-24 Dustin A, Sw was not formed due to needing to ask a right away question . Will recall back in 5-31-24 Dustin A, Sw was not formed still. Will need to call in for a pre pour sidewalk inspection before pouring 6-5-24 Dustin A, SW is formed to city specs. Approved to pour 6-13-24 Dustin A, SW is poured to city specs and slopes are in compliance. Passed
Plot Plan Inspection Passed 6/26/2024 06/26/2024
Misc
Informational
06/26/2024
-When laying sod make sure not to cover manhole lid
Occupancy Inspection - Codes Residential Ready for Temp CO 6/26/2024 6/26/2024 06/26/2024
Misc
Corrective Action Required
06/26/2024
-Missing sump pump extension tube -Missing splash blocks -Missing sod
Erosion Control Inspection Residential Passed 07/22/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/10/2024
6-7-24 Dustin A,EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Please remove restroom off of driveway. Cannot be placed anywhere that contents could infiltrate storm drain or waterways if it was to fall over.
Occupancy Inspection - Codes Residential Full C of O 7/22/2024 7/22/2024 07/22/2024
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home