Permit Application Status

PRRES20233908


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20233908
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED BASEMENT. WALKOUT BASEMENT. COVERED DECK.
08/10/2023
08/15/2023
02/07/2024
04/25/2024
Locations
Contacts
SAB CONSTRUCTION LLC, Address:200 NW COMMERCE CT  
Joseph Matthew Schartz, Address:PO Box 942, Phone:(816) 524-3855  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
zbryant@sabhomes.com  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $3,760.00 $3,760.00 Paid 08/15/2023
8350015-Water Meter Fee $680.46 $680.46 Paid 08/15/2023
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 08/15/2023
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 08/15/2023
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 08/15/2023
9110078-Valuation Fee New Single Family $2,711.95 $2,711.95 Paid 08/15/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 8/22/2023 08/22/2023
Underslab Plumbing Inspection - Residential Passed 9/1/2023 9/1/2023 09/01/2023
Sewer Service Inspection - R Passed 9/5/2023 (8:30) 9/5/2023 09/05/2023
Water Service Inspection - R Passed 9/6/2023 (10:00) 9/6/2023 09/06/2023
Piers/Caissons Inspection - Residential Passed 9/18/2023 (9:00) 9/18/2023 09/18/2023
Electrical Service Inspection Passed 12/28/2023 12/28/2023 12/28/2023
All Rough Inspection - Residential Partial 11/20/2023 11/20/2023 12/28/2023
Misc
Informational
11/20/2023
Portal Frame Inspection Only--Passed
Gas Service Inspection - Residential Failed 12/29/2023 12/29/2023 12/29/2023
Misc
Corrective Action Required
12/29/2023
-Missing CITY STAMPED plans at time of inspection
All Rough Inspection - Residential Failed 12/29/2023 12/29/2023 12/29/2023
Misc
Informational
12/28/2023
Portal Frame Inspection Only--Passed
Misc
Corrective Action Required
12/29/2023
-Missing CITY STAMPED plans at time of inspection
All Rough Inspection - Residential Failed 1/3/2024 1/3/2024 01/03/2024
Misc
Resolved
01/03/2024
Portal Frame Inspection Only--Passed
Misc
Resolved
01/03/2024
-Missing CITY STAMPED plans at time of inspection
Misc
Corrective Action Required
01/03/2024
-fireblock N garage wall to under stairs and ceiling space -fireblock dead space in mud hall to ceiling. Space. -secure csst in mud hall dead space -fireblock N great room wall to furr down -fireblock fireplace/master suite wall to ceiling space -double joist missing above sw basement -security blocking basement door -anchor bolt missing at plate break Ne basement -sister all over notched studs for anchor bolts in basement
Gas Service Inspection - Residential Passed 1/8/2024 1/8/2024 01/08/2024
Misc
Resolved
01/08/2024
-Missing CITY STAMPED plans at time of inspection
All Rough Inspection - Residential Failed 1/9/2024 1/9/2024 01/09/2024
Misc
Resolved
01/09/2024
-fireblock N garage wall to under stairs and ceiling space -fireblock dead space in mud hall to ceiling. Space. -secure csst in mud hall dead space -fireblock N great room wall to furr down -fireblock fireplace/master suite wall to ceiling space -double joist missing above sw basement -security blocking basement door -anchor bolt missing at plate break Ne basement -sister all over notched studs for anchor bolts in basement
Miscellaneous Correction
Corrective Action Required
01/09/2024
-fireblock N garage wall to under stairs and ceiling space in top plate and where 2x4 was notched out for wiring -fireblock N great room wall to furr down -security blocking basement door -sister all over notched studs for anchor bolts in basement
All Rough Inspection - Residential Failed 1/16/2024 1/16/2024 01/16/2024
Miscellaneous Correction
Corrective Action Required
01/09/2024
-fireblock N garage wall to under stairs area -fireblock N great room wall to furr down (seal penetrations)
All Rough Inspection - Residential Passed 1/17/2024 1/17/2024 01/17/2024
Miscellaneous Correction
Resolved
01/17/2024
-fireblock N garage wall to under stairs area -fireblock N great room wall to furr down (seal penetrations)
Erosion Control Inspection Residential Failed 2/6/2024 02/06/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/06/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. Maintain erosion control at front of lot Clean trash and debris from lot and surrounding
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/06/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Driveway Inspection Failed 3/11/2024 03/11/2024
Misc
Corrective Action Required
03/11/2024
3-11-24 Dustin A, Dw is formed. It is not compacted, not enough aggregate, and is water standing
Driveway Inspection Partial 3/12/2024 03/12/2024
Misc
Corrective Action Required
03/11/2024
3-11-24 Dustin A, Dw is formed. It is not compacted, not enough aggregate, and is water standing 3-12-24 Issues addressed. Approved to pour
Sidewalk Inspection Partial 3/12/2024 03/12/2024
Misc
Informational
03/12/2024
3-12-24 Dustin A, SW is formed and aggregate compacted. Slopes are to city spec approved to pour
Sidewalk Inspection Partial 3/19/2024 3/19/2024 03/19/2024
Misc
Informational
03/12/2024
3-12-24 Dustin A, SW is formed and aggregate compacted. Slopes are to city spec approved to pour 3-19-24 Dustin A, SW is not poured all the way. What is poured ( 2 panels right of drive ) slopes are in compliance but cure is not applied correctly. Will need to be corrected
Driveway Inspection Passed 3/19/2024 3/19/2024 03/19/2024
Misc
Corrective Action Required
03/12/2024
3-11-24 Dustin A, Dw is formed. It is not compacted, not enough aggregate, and is water standing 3-12-24 Issues addressed. Approved to pour 3-19-24 Dustin A, DW poured to city specs. Passed
Occupancy Inspection - Codes Residential Failed 4/19/2024 4/19/2024 04/19/2024
Miscellaneous Correction
Corrective Action Required
04/19/2024
-final grade and sod -splash blocks and sump pump discharge to extend 36” from foundation -address pending sidewalk inspection -provide as graded plot plan -stairs to loft area to be no greater than 3/8” difference.
Sidewalk Inspection Passed 4/22/2024 04/19/2024
Misc
Informational
03/19/2024
3-12-24 Dustin A, SW is formed and aggregate compacted. Slopes are to city spec approved to pour 3-19-24 Dustin A, SW is not poured all the way. What is poured ( 2 panels right of drive ) slopes are in compliance but cure is not applied correctly. Will need to be corrected 4-19-24 Dustin A, SW has been poured to city specs. Passed
Erosion Control Inspection Residential Passed 4/25/2024 04/25/2024
DCM2 ESC DEFICIENT INSTALLATION
Resolved
04/25/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. Maintain erosion control at front of lot Clean trash and debris from lot and surrounding
DCM3 ESC REQUIRED 2 DAY
Resolved
04/25/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Plot Plan Inspection Passed 4/26/2024 04/25/2024
Occupancy Inspection - Codes Residential Full C of O 4/25/2024 4/25/2024 04/25/2024
Miscellaneous Correction
Resolved
04/25/2024
-final grade and sod -splash blocks and sump pump discharge to extend 36” from foundation -address pending sidewalk inspection -provide as graded plot plan -stairs to loft area to be no greater than 3/8” difference in rise.
Documents & Images
Date Uploaded File Type Document Name
08/10/2023 HFR193 - Air Combustion Calc
08/10/2023 HFR193 - Excise Tax Application
08/10/2023 HFR193 - Permit Application
08/11/2023 Permit Codes Residential Plan Review
08/15/2023 Plot Plan APPROVED PLOT PLAN
08/15/2023 Approved Plans APPROVED PLANS
08/15/2023 Permit Codes Residential Plan Review
08/15/2023 Permit DS Building Permit
08/15/2023 Receipt Receipt for transaction:2023-006336
08/22/2023 2731 SW Heartland Rd LSMO Osage Lot 193 Foundation Footing Inspection Report 8-21-23
08/22/2023 Letter INSPECTION SUMMARY
09/01/2023 Letter INSPECTION SUMMARY
09/05/2023 Letter INSPECTION SUMMARY
09/06/2023 Letter INSPECTION SUMMARY
09/18/2023 Letter INSPECTION SUMMARY
11/20/2023 Letter INSPECTION SUMMARY
12/28/2023 Letter INSPECTION SUMMARY
12/29/2023 Letter INSPECTION SUMMARY
12/29/2023 Letter INSPECTION SUMMARY
01/02/2024 Letter INSPECTION SUMMARY
01/03/2024 Letter INSPECTION SUMMARY
01/08/2024 Letter INSPECTION SUMMARY
01/09/2024 Letter INSPECTION SUMMARY
01/16/2024 Letter INSPECTION SUMMARY
01/17/2024 Letter INSPECTION SUMMARY
02/06/2024 Letter INSPECTION SUMMARY
03/11/2024 Letter INSPECTION SUMMARY
03/11/2024 Letter INSPECTION SUMMARY
03/12/2024 Letter INSPECTION SUMMARY
03/12/2024 Letter INSPECTION SUMMARY
03/12/2024 Letter INSPECTION SUMMARY
03/19/2024 Letter INSPECTION SUMMARY
03/19/2024 Letter INSPECTION SUMMARY
03/19/2024 Letter INSPECTION SUMMARY
04/19/2024 Letter INSPECTION SUMMARY
04/19/2024 Letter INSPECTION SUMMARY
04/25/2024 HFR193 ASBUILT
04/25/2024 Plot Plan approved as graded plot plan
04/25/2024 Letter INSPECTION SUMMARY
04/25/2024 Letter INSPECTION SUMMARY
04/25/2024 Letter Field Certificate of Occupancy
04/25/2024 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home