Permit Application Status

PRRES20233464


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20233464
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED DECK - ENG FLOOR SYSTEM - RETAINING WALL
07/17/2023
08/23/2023
01/15/2024
06/05/2024
Locations
Contacts
JFE CONSTRUCTION INC, Address:1314 SW MARKET ST, Phone:(816) 470-0074  
Erin Skinner, Address:1314 SW Market Street  
PERMITTING@JFECONSTRUCTION.COM  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
Not shown for privacy reasons.
Not shown for privacy reasons.
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 08/23/2023
Right of Way Permit Fee $85.00 $85.00 Paid 08/23/2023
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 08/23/2023
Water Tap Fee $3,760.00 $3,760.00 Paid 08/23/2023
Water Meter Fee $680.46 $680.46 Paid 08/23/2023
Valuation Fee New Single Family $1,917.97 $1,917.97 Paid 08/23/2023
Temporary Occupancy Fee $50.00 $50.00 Paid 05/22/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 9/21/2023 09/21/2023
Misc
Informational
09/21/2023
- Footing inspection performed by thid party inspector
Underslab Electrical Inspection - Residential Passed 9/21/2023 9/21/2023 09/21/2023
Underslab Plumbing Inspection - Residential Passed 9/21/2023 9/21/2023 09/21/2023
Sewer Service Inspection - R Passed 9/25/2023 09/25/2023
Water Service Inspection - R Partial 9/25/2023 09/25/2023
Misc
Corrective Action Required
09/25/2023
- partial, out of foundation
Water Service Inspection - R Passed 9/26/2023 (11:15) 9/26/2023 09/26/2023
Misc
Resolved
09/26/2023
- partial, out of foundation
Erosion Control Inspection Residential Failed 11/08/2023
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
11/08/2023
11/8/23 DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -RE ESTABLISH EROSION CONTROL METHODS AND CLEAN SILT AND DEBRIS FROM STREET IMMEDIATELY.
Electrical Service Inspection Passed 12/21/2023 12/21/2023 12/21/2023
Gas Service Inspection - Residential Passed 12/21/2023 12/21/2023 12/21/2023
All Rough Inspection - Residential Failed 12/21/2023 12/21/2023 12/21/2023
Misc
Corrective Action Required
12/21/2023
-Anchor bolts be in middle third of plate at garage -Sister all stud’s over notched for anchor bolts -Protect nm less than 1.25” to face of framing at double car bay beam stud pack -Provide Bocca plate at top plate in owner’s entry dwv -Protect nm less than 1.25” to face of framing left side of sliding glass door -Nail studs at sliding glass door CSPF -Seal top plate penetration at pantry -Provide vertical fireblocking at double wall of stairwell/pantry no more than 10’ oc -Protect pex line min 2” below top plate and 2” above bottom plate at kitchen -Structural straps at over bored top plates of load bearing walls to extend 6” each direction beyond bore at kitchen -Fireblock wall space/ stringers at dead space by stairwell -Provide stud shoe at load bearing stud bored over 40% in laundry -Block between joists above load bearing wall in n bed 4 -Extend structural strap at over notched top plate at bed 3 to be 6” each way past notch-Strap is also required on both sides -Protect nm under window in bed 3 less than 1.25” to face of framing -Solid block between joists above load bearing wall in upstairs bath -Replace damaged stub in upstairs bath bearing wall and provide stud shoe where over bored -Anchor bolts to be in middle third of plate in basement -Sister over notched studs in basement exterior walls -Missing anchor bolts at wet bar windows end plate and by exterior receptacle -Provide anchor bolt at plate break in foundation wall near electrical panel -Provide hangers for dbl LVL stair header over 4’ -Block between I joists above beam-Missing in a few locations
All Rough Inspection - Residential Passed 1/5/2024 1/5/2024 01/05/2024
Misc
Resolved
01/05/2024
-Anchor bolts be in middle third of plate at garage -Sister all stud’s over notched for anchor bolts -Protect nm less than 1.25” to face of framing at double car bay beam stud pack -Provide Bocca plate at top plate in owner’s entry dwv -Protect nm less than 1.25” to face of framing left side of sliding glass door -Nail studs at sliding glass door CSPF -Seal top plate penetration at pantry -Provide vertical fireblocking at double wall of stairwell/pantry no more than 10’ oc -Protect pex line min 2” below top plate and 2” above bottom plate at kitchen -Structural straps at over bored top plates of load bearing walls to extend 6” each direction beyond bore at kitchen -Fireblock wall space/ stringers at dead space by stairwell -Provide stud shoe at load bearing stud bored over 40% in laundry -Block between joists above load bearing wall in n bed 4 -Extend structural strap at over notched top plate at bed 3 to be 6” each way past notch-Strap is also required on both sides -Protect nm under window in bed 3 less than 1.25” to face of framing -Solid block between joists above load bearing wall in upstairs bath -Replace damaged stud in upstairs bath bearing wall and provide stud shoe where over bored -Anchor bolts to be in middle third of plate in basement -Sister over notched studs in basement exterior walls -Missing anchor bolts at wet bar windows end plate and by exterior receptacle -Provide anchor bolt at plate break in foundation wall near electrical panel -Provide hangers for dbl LVL stair header over 4’ -Block between I joists above beam-Missing in a few locations
Driveway Inspection Passed 2/21/2024 2/21/2024 02/26/2024
Misc
Informational
02/21/2024
2-21-24 BR Driveway is formed up and aggregate is placed and compacted ready for concrete. 2-26-24 BR Driveway is constructed to LS specification.
Sidewalk Inspection Passed 2/21/2024 2/21/2024 02/26/2024
Misc
Informational
02/21/2024
2-21-24 BR Sidewalk is formed up and aggregate is placed and compacted ready for concrete. 2-26-24 BR Sidewalk is constructed to LS specification.
Driveway Inspection Passed 2/29/2024 2/29/2024 02/29/2024
Misc
Informational
02/21/2024
2-21-24 BR Drivewalk is formed up and aggregate is placed and compacted ready for concrete. 2-29-24 Dustin A, DW is formed to city specs. Passed
Sidewalk Inspection Partial 02/29/2024
Misc
Corrective Action Required
02/29/2024
2-21-24 BR Sidewalk is formed up and aggregate is placed and compacted ready for concrete. 2-29-24 Dustin A, SW is poured on left side of drive. Right side is not framed or poured yet. Will need to call in a pre pour for right side
Sidewalk Inspection Partial 3/7/2024 3/7/2024 03/07/2024
Misc
Corrective Action Required
02/29/2024
2-21-24 BR Sidewalk is formed up and aggregate is placed and compacted ready for concrete. 2-29-24 Dustin A, SW is poured on left side of drive. Right side is not framed or poured yet. Will need to call in a pre pour for right side 3-7-24 Dustin A, no activity
Sidewalk Inspection Partial 3/14/2024 3/14/2024 03/14/2024
Misc
Corrective Action Required
03/07/2024
2-21-24 BR Sidewalk is formed up and aggregate is placed and compacted ready for concrete. 2-29-24 Dustin A, SW is poured on left side of drive. Right side is not framed or poured yet. Will need to call in a pre pour for right side 3-7-24 Dustin A, no activity 3-14-24 Dustin A, conditions have not changed
Sidewalk Inspection Partial 3/21/2024 3/21/2024 03/21/2024
Misc
Corrective Action Required
03/14/2024
2-21-24 BR Sidewalk is formed up and aggregate is placed and compacted ready for concrete. 2-29-24 Dustin A, SW is poured on left side of drive. Right side is not framed or poured yet. Will need to call in a pre pour for right side 3-7-24 Dustin A, no activity 3-14-24 Dustin A, conditions have not changed 3-21-24 Dustin A, conditions have not changed
Sidewalk Inspection Partial 4/11/2024 4/11/2024 04/11/2024
Misc
Corrective Action Required
03/21/2024
2-21-24 BR Sidewalk is formed up and aggregate is placed and compacted ready for concrete. 2-29-24 Dustin A, SW is poured on left side of drive. Right side is not framed or poured yet. Will need to call in a pre pour for right side 3-7-24 Dustin A, no activity 3-14-24 Dustin A, conditions have not changed 3-21-24 Dustin A, conditions have not changed 4-11-24, Dustin A, right side of dw is formed to city specs, approved to pour
Sidewalk Inspection Passed 4/16/2024 (8:00) 4/16/2024 04/16/2024
Misc
Informational
04/16/2024
2-21-24 BR Sidewalk is formed up and aggregate is placed and compacted ready for concrete. 2-29-24 Dustin A, SW is poured on left side of drive. Right side is not framed or poured yet. Will need to call in a pre pour for right side 3-7-24 Dustin A, no activity 3-14-24 Dustin A, conditions have not changed 3-21-24 Dustin A, conditions have not changed 4-11-24, Dustin A, right side of dw is formed to city specs, approved to pour 4-16-24 PS Sidewalk meets LS and ADA specs
Occupancy Inspection - Codes Residential Failed 5/20/2024 5/20/2024 05/20/2024
Misc
Corrective Action Required
05/20/2024
-Complete final grade, sod, splash blocks, foundation drainage -Exterior lighting at back walkout below 8' must be sealed type fixture -Label all dedicated non GFCI receptacles -AFCI breakers at microwave, fridge and freezer will not trip (breakers 21,23,25) -Hanging light not permitted within 3' horizontal and 8" vertical from lip of tub. Any fixture in this area must be marked for damp location
Occupancy Inspection - Codes Residential Ready for Temp CO 5/22/2024 5/22/2024 05/22/2024
Misc
Corrective Action Required
05/20/2024
-Complete final grade, sod, splash blocks, foundation drainage
Erosion Control Inspection Residential Partial 05/22/2024
DCM2 ESC DEFICIENT INSTALLATION
Resolved
05/22/2024
11/8/23 DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -RE ESTABLISH EROSION CONTROL METHODS AND CLEAN SILT AND DEBRIS FROM STREET IMMEDIATELY.
Misc
Corrective Action Required
05/22/2024
In compliance at time of inspection
Erosion Control Inspection Residential Passed 05/29/2024
Misc
Resolved
05/29/2024
In compliance at time of inspection
Occupancy Inspection - Codes Residential Failed 5/29/2024 5/29/2024 05/29/2024
Misc
Corrective Action Required
05/22/2024
Obtain lawn irrigation permit and backflow certification
Plot Plan Inspection Passed 05/29/2024
Occupancy Inspection - Codes Residential Full C of O 6/5/2024 6/5/2024 06/05/2024
Misc
Resolved
06/05/2024
Obtain lawn irrigation permit and backflow certification
Documents & Images
Date Uploaded File Type Document Name
07/17/2023 WR 171 - 2109 NW OBRIEN RD_PRELIM_7-11-23
07/17/2023 WR-171
07/17/2023 WR171 - Permit App
07/17/2023 WR171 - Tax App
07/19/2023 Permit Codes Residential Plan Review
07/19/2023 Plot Plan approved plot plan
08/21/2023 WR 171 - 2109 NW OBRIEN RD_PERMIT_8-18-23
08/22/2023 WR-171 Revised
08/22/2023 Plot Plan approved plot plan
08/22/2023 Approved Plans approved plans
08/22/2023 Permit Codes Residential Plan Review
08/23/2023 Permit DS Building Permit
08/23/2023 Receipt Receipt for transaction:2023-006555
09/15/2023 Wilmoth 2109 NW Obrien Rd LSMO Woodside Ridge Lot 171 Footing Inspection Report 9-12-23
09/21/2023 Letter INSPECTION SUMMARY
09/21/2023 Letter INSPECTION SUMMARY
09/21/2023 Letter INSPECTION SUMMARY
09/25/2023 Letter INSPECTION SUMMARY
09/25/2023 Letter INSPECTION SUMMARY
09/26/2023 Letter INSPECTION SUMMARY
11/07/2023 wr 171 - 2109 nw obrien rd_i jst layout_9-8-23
11/07/2023 Approved Plans APPROVED FLOOR JOIST PACKAGE
11/08/2023 Letter INSPECTION SUMMARY
11/10/2023 2109 nw o'brien rd_sus front stoop slab & gar slab insp_2023-11-08
12/11/2023 2109 nw o'brien rd ls mo wall drawings
12/11/2023 Approved Plans approved retaining wall plans
12/21/2023 Letter INSPECTION SUMMARY
12/21/2023 Letter INSPECTION SUMMARY
12/21/2023 Letter INSPECTION SUMMARY
01/04/2024 2109 NW OBrien St__Framing Evaluation Report_1-4-24
01/05/2024 Letter INSPECTION SUMMARY
02/21/2024 Letter INSPECTION SUMMARY
02/21/2024 Letter INSPECTION SUMMARY
02/26/2024 Letter INSPECTION SUMMARY
02/26/2024 Letter INSPECTION SUMMARY
02/26/2024 Letter INSPECTION SUMMARY
02/29/2024 Letter INSPECTION SUMMARY
02/29/2024 Letter INSPECTION SUMMARY
02/29/2024 Letter INSPECTION SUMMARY
03/01/2024 2109 nw o'brien rd ls mo 02-27-2024 ret wall review letter
03/07/2024 Letter INSPECTION SUMMARY
03/12/2024 2109 NW O'Brien Rd_DECK PIER INSP_2023-10-04 (1)
03/14/2024 Letter INSPECTION SUMMARY
03/21/2024 Letter INSPECTION SUMMARY
04/11/2024 Letter INSPECTION SUMMARY
04/11/2024 Letter INSPECTION SUMMARY
04/16/2024 Letter INSPECTION SUMMARY
05/20/2024 Letter INSPECTION SUMMARY
05/22/2024 Letter INSPECTION SUMMARY
05/22/2024 Letter INSPECTION SUMMARY
05/22/2024 Letter INSPECTION SUMMARY
05/22/2024 Certificate/License Codes Temporary Certificate of Occupancy
05/22/2024 Receipt Receipt for transaction:2024-003823
05/29/2024 Letter INSPECTION SUMMARY
05/29/2024 Letter INSPECTION SUMMARY
05/29/2024 Letter INSPECTION SUMMARY
06/05/2024 Letter Codes Final Certificate of Occupancy
06/05/2024 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home