Summary
PRRES20232219
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED PATIO
05/17/2023
07/12/2023
01/06/2024
04/04/2024
Locations
Contacts
BELLAH HOMES LLC, Address:P O BOX 346, Phone:(816) 697-2870  
Paul Miller, Address:P.O. Box 346, Phone:(816) 786-5050  
TROY@BELLAHHOMES.COM  
AFC HEATING AND COOLING, Address:824 NW MAIN ST , Phone:(816) 347-8388  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 07/12/2023
Right of Way Permit Fee $85.00 $85.00 Paid 07/12/2023
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 07/12/2023
Water Tap Fee $3,760.00 $3,760.00 Paid 07/12/2023
Water Meter Fee $680.46 $680.46 Paid 07/12/2023
Valuation Fee New Single Family $2,613.76 $2,613.76 Paid 07/12/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sewer Service Inspection - R Passed 7/26/2023 (1:45) 7/26/2023 07/26/2023
Water Service Inspection - R Passed 8/4/2023 (10:15) 8/4/2023 08/04/2023
Erosion Control Inspection Residential Failed 08/04/2023
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/04/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Underslab Plumbing Inspection - Residential Passed 8/8/2023 8/8/2023 08/08/2023
Suspended Slab Inspection Passed 8/17/2023 08/17/2023
Electrical Service Inspection Passed 11/15/2023 11/15/2023 11/15/2023
Gas Service Inspection - Residential Passed 11/15/2023 11/15/2023 11/15/2023
All Rough Inspection - Residential Failed 11/15/2023 11/15/2023 11/15/2023
Misc
Corrective Action Required
11/15/2023
- upload 3 rd party footing report - Nail off studs exterior corner at master closet - Complete exhaust vents at master bathroom - Fb penetrations at return air kitchens/ master bedroom - Security blocking to be 3 stud bays out at front entrance - Complete bathroom vent first floor near laundry - Protect NM garage near line set - Provide attic access garage - Fb top plate garage wall above owners entrance - Provide washers and nuts for anchor bolts at garage portal frame - Missing roof boot for radon - Nail off studs at exterior corner second floor storage near stairs - Provide roof boot for DWV second floor - Complete all bathroom vents second floor - Provide attic access second floor
Footing Inspection - Residential Passed 11/17/2023 11/17/2023
Misc
Informational
11/17/2023
Inspection performed by third party
All Rough Inspection - Residential Passed 11/20/2023 11/20/2023 11/20/2023
Misc
Resolved
11/20/2023
- upload 3 rd party footing report - Nail off studs exterior corner at master closet - Complete exhaust vents at master bathroom - Fb penetrations at return air kitchens/ master bedroom - Security blocking to be 3 stud bays out at front entrance - Complete bathroom vent first floor near laundry - Protect NM garage near line set - Provide attic access garage - Fb top plate garage wall above owners entrance - Provide washers and nuts for anchor bolts at garage portal frame - Missing roof boot for radon - Nail off studs at exterior corner second floor storage near stairs - Provide roof boot for DWV second floor - Complete all bathroom vents second floor - Provide attic access second floor
Piers/Caissons Inspection - Residential Passed 2/26/2024 2/26/2024 02/26/2024
Sidewalk Inspection Partial 2/29/2024 2/29/2024 02/29/2024
Misc
Informational
02/29/2024
2-29-24 DP. SW was formed, cross slopes are in compliance but conditions can change. Approved to pour.
Sidewalk Inspection Passed 3/22/2024 03/22/2024
Misc
Informational
02/29/2024
2-29-24 DP. SW was formed, cross slopes are in compliance but conditions can change. Approved to pour. 3-22-24 DP. SW was poured, cross slopes are in compliance, forms removed. Passed.
Erosion Control Inspection Residential Failed 3/22/2024 03/22/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/04/2023
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. FRONT OF LOT
Driveway Inspection Passed 3/7/2024 3/7/2024 03/22/2024
Plot Plan Inspection Passed 3/22/2024 03/22/2024
Occupancy Inspection - Codes Residential Failed 3/22/2024 3/22/2024 03/22/2024
Misc
Corrective Action Required
03/22/2024
3250 sw pergola park drive - Steps to patio out of compliance, 3/8” variance allowed - Final grading and sod - Provide steps for Egress window - Provide splash pads - Obtain an irrigation permit and submit a back flow certification - Provide anti tamper caps at A/C. Compressors - Seal top of electrical meter and a/c disconnects - Cover attic access - Stairs at garage entry out of 3/8” variance - Uncover all smoke detectors - Workout room to be afci protected - Pending sidewalk inspection
Erosion Control Inspection Residential Passed 4/3/2024 04/04/2024
DCM2 ESC DEFICIENT INSTALLATION
Resolved
04/04/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. FRONT OF LOT
Occupancy Inspection - Codes Residential Full C of O 4/4/2024 4/4/2024 04/04/2024
Misc
Resolved
04/04/2024
3250 sw pergola park drive - Steps to patio out of compliance, 3/8” variance allowed - Final grading and sod - Provide steps for Egress window - Provide splash pads - Obtain an irrigation permit and submit a back flow certification - Provide anti tamper caps at A/C. Compressors - Seal top of electrical meter and a/c disconnects - Cover attic access - Stairs at garage entry out of 3/8” variance - Uncover all smoke detectors - Workout room to be afci protected - Pending sidewalk inspection
Documents & Images
Date Uploaded File Type Document Name
05/17/2023 Lot 120 Tax Application
05/17/2023 PlotPlanLot120
05/17/2023 BluePrintsLot120FullSet
05/22/2023 Permit Codes Residential Plan Review
06/27/2023 PGP120 Overfelt - Sealed Plans (June 26, 2023)
06/27/2023 Approved Plans APPROVED PLANS
06/27/2023 Permit Codes Residential Plan Review
07/07/2023 Permit Codes Residential Plan Review
07/10/2023 Lot 120 permit application
07/10/2023 Permit Codes Residential Plan Review
07/10/2023 PlotPlanLot120
07/11/2023 Plot Plan approved plot plan
07/11/2023 Permit Codes Residential Plan Review
07/12/2023 Permit DS Building Permit
07/12/2023 Receipt Receipt for transaction: 2023-005401
07/26/2023 Letter INSPECTION SUMMARY
08/04/2023 Letter INSPECTION SUMMARY
08/04/2023 Letter INSPECTION SUMMARY
08/08/2023 Letter INSPECTION SUMMARY
08/17/2023 Letter INSPECTION SUMMARY
11/15/2023 Letter INSPECTION SUMMARY
11/15/2023 Letter INSPECTION SUMMARY
11/15/2023 Letter INSPECTION SUMMARY
11/17/2023 M L Crose 3250 SW Pergola Park Dr LSMO Permit 2023-2219 3rd Party Footing Inspection Report_7-21-23
11/20/2023 Letter INSPECTION SUMMARY
02/26/2024 Letter INSPECTION SUMMARY
02/29/2024 Letter INSPECTION SUMMARY
03/22/2024 Letter INSPECTION SUMMARY
03/22/2024 Letter INSPECTION SUMMARY
03/22/2024 Letter INSPECTION SUMMARY
03/22/2024 Letter INSPECTION SUMMARY
03/22/2024 Letter INSPECTION SUMMARY
03/22/2024 Letter INSPECTION SUMMARY
03/22/2024 Letter INSPECTION SUMMARY
04/04/2024 Letter Codes Final Certificate of Occupancy
04/04/2024 Letter Field Certificate of Occupancy
04/04/2024 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home