Permit Application Status

PRRES20231491


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20231491
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE. WALKOUT BASEMENT. FINISHED/UNFINISHED BASEMENT. COVERED DECK.
04/07/2023
04/17/2023
10/08/2023
10/18/2023
Locations
Contacts
MCGRAW HOMES INC, Address:902 SE WILLOW PL, Phone:(816) 985-6909  
Chad McGraw, Address:902 SE Willow Pl  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
UNITED ELECTRIC COMPANY, Address:PO BOX 723, Phone:(816) 795-2744  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
chad@mcgraw-homes.com  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $3,730.00 $3,730.00 Paid 04/17/2023
8350015-Water Meter Fee $550.50 $550.50 Paid 04/17/2023
8331507-Sanitary Sewer Development Fee $1,384.00 $1,384.00 Paid 04/17/2023
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 04/17/2023
7232302-Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 04/17/2023
9110078-Valuation Fee New Single Family $1,741.69 $1,741.69 Paid 04/17/2023
Outstanding Fees Amount Paid Owing Date Paid
9110078-Temporary Occupancy Fee $50.00 $0.00 $50.00 Not Paid


$50.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Residential Passed 5/1/2023 5/1/2023 05/01/2023
Sewer Service Inspection - R Passed 5/5/2023 (1:00) 5/5/2023 05/05/2023
Water Service Inspection - R Passed 5/8/2023 (8:00) 5/8/2023 05/08/2023
Piers/Caissons Inspection - Residential Passed 5/30/2023 (8:45) 5/30/2023 05/30/2023
Electrical Service Inspection Passed 7/11/2023 7/11/2023 07/11/2023
Gas Service Inspection - Residential Passed 7/11/2023 7/11/2023 07/11/2023
Footing Inspection - Residential Passed 07/11/2023
Informational
07/11/2023
FOOTING APPROVED BY ENGINEER
All Rough Inspection - Residential Failed 7/11/2023 7/11/2023 07/11/2023
Misc
Corrective Action Required
07/11/2023
-Nail siding to sill plates @6” oc at east side of house -Provide two 1/2” through bolts or equivalent connections at deck beam-post connections. Do not cover -Protect wiring at bottom wall plate in kitchen where within 1.25” of surface -Support lvl hip rafter at ridge above doorway to pocket office -Reinforce non-continuous studs at bedroom 2 gable wall; block and nail seams -Provide min 12” horizontal clearance from luminaire to front bedroom 2 closet storage space -Fully nail master bedroom ceiling beam hanger (at rear corner) -Provide 2 stud support for master bedroom ceiling beam -Strap master bathroom wall top plates lapped less than 24” -Protect plumbing at master shower wall top plate -Fb basement wall space from soffit; Fb basement bathroom wall from soffit -Fill in void behind basement exterior door hinges; security blocking -Receptacle spacing at rear basement rec room not compliant -Provide 2-stud bearing for lvl beam at rear basement rec rm wall -Under master shower, extend the header cross beam from lvl to lvl. See plan detail 10/S4 -Protect plumbing at basement bedroom 4 closet -S-trap not allowed for master shower -Update the plan to reflected floor joists&beam change. Update roll-in shower detail **OK TO INSULATE
All Rough Inspection - Residential Failed 7/13/2023 7/13/2023 07/13/2023
Misc
Corrective Action Required
07/11/2023
-Support lvl hip rafter at ridge above doorway to pocket office -Strap master bathroom wall top plates lapped less than 24” -Fb basement wall space from soffit; Fb basement bathroom wall from soffit -Fill in void at basement door hinges -S-trap not allowed for master shower **OK TO INSULATE
All Rough Inspection - Residential Partial 7/14/2023 7/14/2023 07/14/2023
Misc
Corrective Action Required
07/13/2023
-Fix broken duct above basement bathroom **OK TO ROCK
Driveway Inspection Partial 9/13/2023 9/13/2023 09/13/2023
Misc
Informational
09/13/2023
9-12-23 A.A DW is formed, aggregate is compacted. Will need to maintain 2% slope through driveway but conditions can change, approved to pour
Sidewalk Inspection Partial 9/13/2023 9/13/2023 09/13/2023
Misc
Informational
09/13/2023
A.A 9-13-23 SW is formed , aggregate is compacted and slopes are in compliance. Conditions can change, approved to pour.
Driveway Inspection Passed 9/20/2023 9/20/2023 09/20/2023
Misc
Informational
09/13/2023
9-12-23 A.A DW is formed, aggregate is compacted. Will need to maintain 2% slope through driveway but conditions can change, approved to pour 9-20-23 DW is poured. Slopes are in compliance. Forms are pulled . Passed
Sidewalk Inspection Passed 9/20/2023 9/20/2023 09/20/2023
Misc
Informational
09/13/2023
A.A 9-13-23 SW is formed , aggregate is compacted and slopes are in compliance. Conditions can change, approved to pour. 9-20-23 A.A SW is poured. Slopes are in compliance . Forms are pulled. Passed
All Rough Inspection - Residential Passed 10/11/2023
Misc
Resolved
10/11/2023
-Fix broken duct above basement bathroom **OK TO ROCK
Occupancy Inspection - Codes Residential Failed 10/11/2023 10/11/2023 10/11/2023
Misc
Corrective Action Required
10/11/2023
-Final grade, sod, downspout and sump pump extension -Install bedroom window cranks -Provide breaker lock for oven, cooktop, and kitchen hood -Install all 4 screws for the basement exterior door strike plate -Lag deck ledger board to floor rim per code -Attach deck beam to each post with two 1/2” through bolts/washers/nuts or equivalent connections -Rear basement bedroom smoke alarm not interconnected with other alarms
Occupancy Inspection - Codes Residential Ready for Temp CO 10/16/2023 10/16/2023 10/16/2023
Misc
Corrective Action Required
10/11/2023
-Final grade, sod, downspout and sump pump extension
Occupancy Inspection - Codes Residential Full C of O 10/18/2023 10/18/2023 10/18/2023
Misc
Resolved
10/18/2023
-Final grade, sod, downspout and sump pump extension
Documents & Images
Date Uploaded File Type Document Name
04/07/2023 Lot 391 Park Ridge Building Permit Application
04/07/2023 Lot 391 Park Ridge Excise Tax Application
04/11/2023 Plot Plan APPROVED PLOT PLAN
04/11/2023 Permit Codes Residential Plan Review
04/13/2023 Approved Plans APPROVED PLANS
04/13/2023 Permit Codes Residential Plan Review
04/17/2023 Permit DS Building Permit
04/17/2023 Receipt Receipt for transaction:2023-002112
04/19/2023 Wilmoth 1524 NE Park Springs Ter Pl LS MO Subgrade & Footing Report 4-19-23
05/01/2023 Letter INSPECTION SUMMARY
05/05/2023 Letter INSPECTION SUMMARY
05/05/2023 Letter INSPECTION SUMMARY
05/08/2023 Letter INSPECTION SUMMARY
05/30/2023 Letter INSPECTION SUMMARY
07/11/2023 Letter INSPECTION SUMMARY
07/11/2023 Letter INSPECTION SUMMARY
07/11/2023 Letter INSPECTION SUMMARY
07/11/2023 Letter INSPECTION SUMMARY
07/13/2023 DW Permit Plan Lot 391 Park Ridge Manor 1524 NE Park Springs Terr 5-15-23
07/13/2023 Letter INSPECTION SUMMARY
07/14/2023 Letter INSPECTION SUMMARY
07/14/2023 Approved Plans APPROVED PLANS
09/13/2023 Letter INSPECTION SUMMARY
09/13/2023 Letter INSPECTION SUMMARY
09/20/2023 Letter INSPECTION SUMMARY
09/20/2023 Letter INSPECTION SUMMARY
10/11/2023 Letter INSPECTION SUMMARY
10/11/2023 Letter INSPECTION SUMMARY
10/18/2023 Letter Codes Final Certificate of Occupancy
10/18/2023 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home