Summary
PRRES20223080
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED BASEMENT. ROOF TRUSSES. COVERED PATIO. STOP WORK ORDER generated on 08/05/2022 12:00 AM by username 'Patrick Schonfeldt'. STOP WORK ORDER removed on 08/09/2022 12:00 AM by username 'Patrick Schonfeldt'.
07/06/2022
07/11/2022
01/03/2023
03/10/2023
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
CMH PARKS INC, Address:5000 CLAYTON RD  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
KYLEP@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $3,730.00 $3,730.00 Paid 07/11/2022
8350015-Water Meter Fee $550.50 $550.50 Paid 07/11/2022
8331507-Sanitary Sewer Development Fee $1,384.00 $1,384.00 Paid 07/11/2022
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 07/11/2022
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 07/11/2022
9110078-Valuation Fee New Single Family $1,609.51 $1,609.51 Paid 07/11/2022
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 10/31/2022
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 01/24/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sewer Service Inspection - R Passed 8/1/2022 (8:30) 8/1/2022 08/01/2022
Water Service Inspection - R Passed 8/1/2022 (10:15) 8/1/2022 08/01/2022
Underslab Plumbing Inspection - Residential Not Ready 8/5/2022 8/5/2022 08/05/2022
Misc
Corrective Action Required
08/05/2022
INSPECTION DENIED - FOOTING POURED WITHOUT INSPECTION - ADDRESS EROSION CONTROL ON LOT - POST SITE ADDRESS -BACKFILL AT FOUNDATION TO ALLOW FOR COMPLETE INSPECTION
Erosion Control Inspection Residential Failed 8/5/2022 8/5/2022 08/05/2022
Misc
Corrective Action Required
08/05/2022
- ADDRESS EROSION CONTROL ON LOT
Footing Inspection - Residential Failed - Stop Work 8/5/2022 8/5/2022 08/05/2022
Misc
Corrective Action Required
08/05/2022
INSPECTION DENIED - FOOTING POURED WITHOUT INSPECTION, ENGINEER REPORT REQUIRED TO BE UPLOADED TO PORTAL WITHIN 48 HOURS OF INSPECTION - ADDRESS EROSION CONTROL ON LOT - POST SITE ADDRESS -BACKFILL AT FOUNDATION TO ALLOW FOR COMPLETE INSPECTION
Footing Inspection - Residential Passed 8/9/2022 8/9/2022 08/09/2022
Misc
Corrective Action Required
08/05/2022
FOOTING APPROVED PER BRADLEY HUXOL 7/27/22
Underslab Plumbing Inspection - Residential Passed 8/12/2022 8/12/2022 08/12/2022
Misc
Resolved
08/12/2022
INSPECTION DENIED - FOOTING POURED WITHOUT INSPECTION - ADDRESS EROSION CONTROL ON LOT - POST SITE ADDRESS -BACKFILL AT FOUNDATION TO ALLOW FOR COMPLETE INSPECTION
Gas Service Inspection - Residential Passed 10/21/2022 10/21/2022 10/21/2022
Electrical Service Inspection Passed 10/21/2022 10/21/2022 10/21/2022
All Rough Inspection - Residential Failed 10/21/2022 10/21/2022 10/21/2022
Miscellaneous Correction
Corrective Action Required
10/21/2022
No pier inspection on record Nail joist hangers at cantilever basement Provide 1" clearance to b vent at furnace low volt Nail side by side studs at front door corner 16" OC stud spacing exterior wall at above Joist hangers missing nails LVL foyer/ dining room Fire block DWV/ HVAC @ plumbing chase breakfast Install missing windows Nail exterior wall sheathing per code Provide 2 nails top & bottom plates and intersecting studs at LIBs Fire block DWV at soffit in dead space near refrigerator Seal upward penetration dining room/ garage Tighten anchor bolts garage Provide 3" SCH 40 column garage beam per plan Provide attic access garage per plan Nail stud to stud and abutting studs at intersecting wall corners ( at braced wall panels) per plan Provide 4 stud pack at GT bearing points per plan Solid block & nail exterior wall sheathing WAP per code corner bed 3 Seal upward penetration bed 4 / closet Seal upward penetrations HVAC chase laundry GT bearing point master water closet per plan Missing H2.5 or trusslok back patio & garage
Gas Service Inspection - Residential Passed 10/31/2022 10/31/2022
Electrical Service Inspection Passed 10/31/2022 10/31/2022
All Rough Inspection - Residential Failed 10/31/2022 10/31/2022 10/31/2022
Miscellaneous Correction
Corrective Action Required
10/21/2022
Install missing windows Nail exterior wall sheathing per code Provide 4 stud pack at GT bearing points per plan - see garage
All Rough Inspection - Residential Failed 11/2/2022 11/2/2022 11/02/2022
Miscellaneous Correction
Corrective Action Required
10/31/2022
Install missing windows **OK TO INSULATE**
Driveway Inspection Partial 11/3/2022 11/3/2022 11/03/2022
Misc
Informational
11/03/2022
11-3-22 RH. Driveway is formed up and aggregate is placed and compacted. approved to pour.
Sidewalk Inspection Partial 11/3/2022 11/3/2022 11/03/2022
Misc
Informational
11/03/2022
11-3-22 RH. Sidewalk is formed up and aggregate is placed and compacted. Approved to pour.
Driveway Inspection Passed 11/10/2022 11/10/2022 11/10/2022
Misc
Informational
11/03/2022
11-3-22 RH. Driveway is formed up and aggregate is placed and compacted. approved to pour. 11-10-22 RH. Driveway meets LS and ADA specification.
All Rough Inspection - Residential Failed 1/23/2023 1/23/2023 01/23/2023
Miscellaneous Correction
Corrective Action Required
11/02/2022
Install missing windows **OK TO INSULATE**
Misc
Corrective Action Required
01/23/2023
inspection denied no address posted
Occupancy Inspection - Codes Residential Not Ready 1/23/2023 1/23/2023 01/23/2023
Misc
Corrective Action Required
01/23/2023
inspection denied no address posted.
Occupancy Inspection - Codes Residential Failed 1/25/2023 1/25/2023 01/25/2023
Misc
Resolved
01/25/2023
inspection denied no address posted.
Misc
Corrective Action Required
01/25/2023
- final grading and sod - Gutters and down spouts, splash blocks - Sidewalk inspection pending please call it in - Exposed electrical dining room - R312.1.2 stairs over 30” in height must have guards and handrail - Uncover all smoke detectors - Install handrail at lower portion of basement stairs - Steps at Egress window ( bottom step no more than 18” from grade - Protect electrical panel from water line above - Uncover water meter, could not locate with snow
All Rough Inspection - Residential Passed 1/25/2023 1/25/2023 01/25/2023
Miscellaneous Correction
Resolved
01/25/2023
Install missing windows **OK TO INSULATE**
Misc
Resolved
01/25/2023
inspection denied no address posted
Occupancy Inspection - Codes Residential Failed 3/8/2023 3/8/2023 03/08/2023
Misc
Corrective Action Required
01/25/2023
- Install handrail at lower portion of basement stairs , handrail needs to extend nosing of last tread and return to wall. other items that need corrected- single wall flue to water heater is in contact with pex water line at foundation wall. provide correct clearance. - open junction box ceiling left of the furnace , provide outlet and coverer plate.
Occupancy Inspection - Codes Residential Full C of O 3/10/2023 3/10/2023 03/10/2023
Misc
Resolved
03/10/2023
Documents & Images
Date Uploaded File Type Document Name
07/06/2022 MN #118 - PERMIT APP
07/07/2022 Permit Codes Residential Plan Review
07/08/2022 Approved Plans APPROVED PLANS
07/08/2022 Plans APPROVED PLOT PLAN
07/08/2022 Approved Plans APPROVED TRUSS LAYOUT
07/08/2022 Approved Plans APPROVED TRUSS PACKAGE
07/08/2022 Permit Codes Residential Plan Review
07/11/2022 Permit DS Building Permit
07/11/2022 Receipt Receipt for transaction:2022-005644
08/01/2022 Letter INSPECTION SUMMARY
08/01/2022 Letter INSPECTION SUMMARY
08/05/2022 Letter INSPECTION SUMMARY
08/05/2022 Letter INSPECTION SUMMARY
08/05/2022 Letter Stop Work Order
08/05/2022 118 Manor at Stoney Creek FTNG
08/05/2022 118 Manor at Stoney Creek Walls
08/09/2022 118 Manor Stoney Creek FTNG Revised
08/09/2022 Letter INSPECTION SUMMARY
08/12/2022 Letter INSPECTION SUMMARY
08/12/2022 Letter INSPECTION SUMMARY
10/21/2022 Letter INSPECTION SUMMARY
10/21/2022 Letter INSPECTION SUMMARY
10/21/2022 Letter INSPECTION SUMMARY
10/31/2022 Letter INSPECTION SUMMARY
10/31/2022 Letter INSPECTION SUMMARY
10/31/2022 Letter INSPECTION SUMMARY
10/31/2022 Receipt Receipt for transaction:2022-008616
11/02/2022 Letter INSPECTION SUMMARY
11/03/2022 Letter INSPECTION SUMMARY
11/03/2022 Letter INSPECTION SUMMARY
11/10/2022 Letter INSPECTION SUMMARY
01/23/2023 Letter INSPECTION SUMMARY
01/23/2023 Letter INSPECTION SUMMARY
01/24/2023 Receipt Receipt for transaction:2023-000466
01/25/2023 Letter INSPECTION SUMMARY
01/25/2023 Letter INSPECTION SUMMARY
03/08/2023 Letter INSPECTION SUMMARY
03/10/2023 Letter Codes Final Certificate of Occupancy
03/10/2023 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home