Summary
PRRES20220427
Building Permit - Residential
Certificate of Occupancy
CLAYTON PROPERTIES GROUP INC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - UNCOVERED PATIO This permit was mistakenly issued to the wrong lot. The correct address is 3549 SE Corbin Dr, Lot 140 and has been corrected. Mike Weisenborn 03/17/2022 11:37 AM
02/02/2022
02/07/2022
08/02/2022
10/13/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
TAYLOR@CLOVERANDHIVE.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $953.47 $953.47 Paid 02/07/2022
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 02/07/2022
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 02/07/2022
8331507-Sewer Connection Fee $420.00 $420.00 Paid 02/07/2022
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 02/07/2022
8350015-Water Meter Fee $479.24 $479.24 Paid 02/07/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 07/25/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 07/25/2022
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 07/25/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 3/7/2022 3/7/2022 03/07/2022
Misc
Corrective Action Required
03/07/2022
APPROVED PER DAVID P AINSWORTH 2/21/22
Erosion Control Inspection Residential Failed 3/30/2022 03/30/2022
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
03/30/2022
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. MAINTAIN SILT FENCE MAINTAIN GRAVEL FILTER
Underslab Plumbing Inspection - Residential Failed 3/30/2022 3/30/2022 03/30/2022
Miscellaneous Correction
Corrective Action Required
03/30/2022
UNDERSLAB PLUMBING WATER COVERED RECALL WHEN VISIBLE
Underslab Plumbing Inspection - Residential Passed 4/6/2022 4/6/2022 04/06/2022
Miscellaneous Correction
Resolved
04/06/2022
Sewer Service Inspection - R Passed 4/21/2022 (11:00) 4/21/2022 04/21/2022
Water Service Inspection - R Passed 4/26/2022 (11:15) 4/26/2022 04/26/2022
Erosion Control Inspection Residential Failed 4/26/2022 4/26/2022 04/26/2022
DCM2 ESC DEFICIENT INSTALLATION
Resolved
04/26/2022
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. MAINTAIN SILT FENCE MAINTAIN GRAVEL FILTER
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
04/26/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Electrical Service Inspection Passed 6/3/2022 6/3/2022 06/03/2022
Gas Service Inspection - Residential Failed 6/3/2022 6/3/2022 06/03/2022
Misc
Corrective Action Required
06/03/2022
PRESSURE TEST REQUIRED
All Rough Inspection - Residential Failed 6/3/2022 6/3/2022 06/03/2022
Misc
Corrective Action Required
06/03/2022
-spread gravel pile on drive -fur down HVAC garage ceiling for R-19 insulation -provide bocca protection plate DWV 1st floor powder room -fireblock vertical to horizontal Al at furred down soffit end 1st floor powder room -fireblock mechanical/plumbing chase 1st floor rec room -provide anchor bolts within 12” of sill plate break at rec room -connect 2x4 laid flat at furred down rec room to floor joists above to support ceiling load -address floor joists bored for pex less than 2” from end of joist and bores for pex less than 2” apart, see north basement wall left of stairs -toenail all floor joists per code -address top plate to top plate corner lap connection, see exterior wall left of sliding glass door, different wall heights -fireblock between studs at great room foyer wall ceiling line -provide (4) 2x4 packs at all girder truss bearing ends per plans, continue stud pack to floor below to provide full bearing on foundation per plans -Have engineer with truss manufacture address A2 truss that has been damaged, bottom chord cut and gusset plates cut, see great room/pantry -fireblock soffit line above great room windows and right of front entry door -provide stud shoes master bath vanity exterior studs bored for DWV -provide structural strap at top plate bored for DWV master bath vanity -support all DWV 48” oc -protect all NM within 6’ of attic entry -provide H2.5 truss hold down at master bath girder truss -provide H2.5 truss hold downs at G1 girder truss ends -gas pressure test required
Erosion Control Inspection Residential Failed 06/03/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
04/26/2022
-spread gravel pile on drive
Gas Service Inspection - Residential Passed 6/9/2022 6/9/2022 06/09/2022
Misc
Resolved
06/09/2022
PRESSURE TEST REQUIRED
All Rough Inspection - Residential Not Ready 6/9/2022 6/9/2022 06/09/2022
Misc
Corrective Action Required
06/03/2022
-fireblock vertical to horizontal at furred down soffit end 1st floor powder room -fireblock mechanical/plumbing chase 1st floor rec room -connect 2x4 laid flat at furred down rec room to floor joists above to support ceiling load -address top plate to top plate corner lap connection, see exterior wall left of sliding glass door, different wall heights (REPAIR PER ENGINEER LETTER) -fireblock between studs at great room foyer wall ceiling line -Have engineer with truss manufacture address A2 truss that has been damaged, bottom chord cut and gusset plates cut, see great room/pantry (REPAIR WITH APPROVED MATERIALS, NO2 GRADED LUMBER NOT USED CONCRETE FORMS) -fireblock soffit line above great room windows and right of front entry door -provide H2.5 truss hold downs at G1 girder truss ends
All Rough Inspection - Residential Not Ready 6/10/2022 6/10/2022 06/10/2022
Misc
Corrective Action Required
06/09/2022
-fireblock vertical to horizontal at furred down soffit end 1st floor powder room -fireblock mechanical/plumbing chase 1st floor rec room -connect 2x4 laid flat at furred down rec room to floor joists above to support ceiling load -address top plate to top plate corner lap connection, see exterior wall left of sliding glass door, different wall heights (REPAIR PER ENGINEER LETTER) -fireblock between studs at great room foyer wall ceiling line -Have engineer with truss manufacture address A2 truss that has been damaged, bottom chord cut and gusset plates cut, see great room/pantry (REPAIR WITH APPROVED MATERIALS, NO2 GRADED LUMBER NOT USED CONCRETE FORMS) -fireblock soffit line above great room windows and right of front entry door -provide H2.5 truss hold downs at G1 girder truss ends
All Rough Inspection - Residential Failed 6/13/2022 6/13/2022 06/13/2022
Misc
Corrective Action Required
06/10/2022
-fireblock vertical to horizontal at furred down soffit end 1st floor powder room -address top plate to top plate corner lap connection, see exterior wall left of sliding glass door, different wall heights (REPAIR PER ENGINEER LETTER) -Have engineer with truss manufacture address A2 truss that has been damaged, bottom chord cut and gusset plates cut, see great room/pantry (REPAIR WITH APPROVED MATERIALS, NO2 GRADED LUMBER NOT USED CONCRETE FORMS)
All Rough Inspection - Residential Passed 6/15/2022 6/15/2022 06/15/2022
Misc
Resolved
06/15/2022
Erosion Control Inspection Residential Partial 6/15/2022 06/15/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
06/15/2022
-spread gravel pile on drive
Driveway Inspection Partial 7/20/2022 7/20/2022 07/20/2022
Misc
Informational
07/20/2022
7-20-22 RH. Forms were up and aggregate was placed and compacted.
Driveway Inspection Passed 7/27/2022 7/27/2022 07/27/2022
Misc
Informational
07/20/2022
7-20-22 RH. Forms were up and aggregate was placed and compacted. 7-27-22 RH. Driveway meets LS and ADA specification.
Sidewalk Inspection Passed 8/2/2022 08/02/2022
Misc
Informational
08/02/2022
On Tuesday, 8-02-2022. I performed a sidewalk inspection and passed sub-grade for placement of concrete.
Plot Plan Inspection Passed 9/22/2022 9/22/2022 09/22/2022
Occupancy Inspection - Codes Residential Failed 9/22/2022 9/22/2022 09/22/2022
Misc
Corrective Action Required
09/22/2022
-basement stairs, handrail required to start at point above top rise of flight -provide anti siphon device at spigot main water line basement, shear off set screw head after tightening -label all dedicated receptacles at unfinished spaces as not GFCI protected -seal all penetrations in siding, seal across top of AC disconnect and meter can -downspouts and sump pump min 36” discharge from foundation
Erosion Control Inspection Residential Passed 10/13/2022 10/13/2022 10/13/2022
Occupancy Inspection - Codes Residential Full C of O 10/13/2022 10/13/2022 10/13/2022
Misc
Resolved
10/13/2022
Documents & Images
Date Uploaded File Type Document Name
02/02/2022 CB #140 - PERMIT APPLICATION
02/03/2022 Permit Codes Residential Plan Review
02/03/2022 Approved Plans Approved Truss Layout
02/03/2022 Approved Plans Approved Truss Package
02/03/2022 Permit Codes Residential Plan Review
02/07/2022 Permit DS Building Permit
02/07/2022 Receipt Receipt for transaction:2022-000637
02/16/2022 Approved Plans Approved Drawings
02/28/2022 M L Crose 3449 SE Corbin Dr LSMO Cobey Creek Lot 8 Clayton Permit 2022-0427 Footing Inspection Report 2-21-22
03/07/2022 Letter INSPECTION SUMMARY
03/18/2022 Plot Plan APPROVED PLOT PLAN
03/18/2022 Letter DS Building Permit
03/30/2022 Letter INSPECTION SUMMARY
04/06/2022 Letter INSPECTION SUMMARY
04/21/2022 Letter INSPECTION SUMMARY
04/26/2022 Letter INSPECTION SUMMARY
04/26/2022 Letter INSPECTION SUMMARY
04/27/2022 Letter INSPECTION SUMMARY
06/03/2022 Letter INSPECTION SUMMARY
06/03/2022 Letter INSPECTION SUMMARY
06/03/2022 Letter INSPECTION SUMMARY
06/03/2022 Letter INSPECTION SUMMARY
06/08/2022 Approved Plans Truss Repair letter
06/08/2022 140 Cobey Creek Letter
06/09/2022 Letter INSPECTION SUMMARY
06/09/2022 Letter INSPECTION SUMMARY
06/10/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
07/20/2022 Letter INSPECTION SUMMARY
07/25/2022 Receipt Receipt for transaction:2022-006041
07/27/2022 Letter INSPECTION SUMMARY
08/02/2022 Letter INSPECTION SUMMARY
09/22/2022 Letter INSPECTION SUMMARY
09/22/2022 Letter INSPECTION SUMMARY
10/13/2022 Letter INSPECTION SUMMARY
10/13/2022 Letter Field Certificate of Occupancy
10/13/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home