Permit Application Status

PRRES20216114


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20216114
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE. WALK OUT BASEMENT. FINISHED/UNFNISHED BASEMENT. ENGINEERED FLOOR SYSTEM - DEFERRED.
11/29/2021
01/07/2022
05/31/2022
03/21/2023
Locations
Contacts
JFE CONSTRUCTION INC, Address:1314 SW MARKET ST, Phone:(816) 470-0074  
Angie Mendenhall, Address:1314 SW Market Street  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
A BRIGHT PLUMBING LLC, Address:18107 E 18TH TER N, Phone:(816) 215-0730  
PERMITTING@JFECONSTRUCTION.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $630.00 $630.00 Paid 01/07/2022
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 01/07/2022
8350015-Water Meter Fee $479.24 $479.24 Paid 01/07/2022
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 01/07/2022
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 01/07/2022
9110078-Valuation Fee New Single Family $1,929.83 $1,929.83 Paid 01/07/2022
9110078-Valuation Fee New Single Family $88.37 $88.37 Paid 12/13/2022
$2,018.20
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 12/13/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 01/12/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 02/20/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 2/11/2022 02/11/2022
Sewer Service Inspection - R Passed 2/23/2022 (10:15) 2/23/2022 02/23/2022
Underslab Plumbing Inspection - Residential Passed 2/24/2022 2/24/2022 02/24/2022
Erosion Control Inspection Residential Passed 2/24/2022 02/24/2022
Misc
Informational
02/24/2022
erosion contron in compliance Mitchell Schwarz 02/24/2022 9:40 AM
Water Service Inspection - R Passed 3/3/2022 (11:00) 3/3/2022 03/03/2022
Electrical Service Inspection Passed 7/25/2022 7/25/2022 07/25/2022
Gas Service Inspection - Residential Passed 7/25/2022 7/25/2022 07/25/2022
All Rough Inspection - Residential Failed 7/25/2022 7/25/2022 07/25/2022
Misc
Corrective Action Required
07/25/2022
-complete cspf at ding room missing -fireblock master bed furr down into fireplace -snow blocking master bed W wall -seal top plate penetrations master closet -fire block wall space to ceiling space 2nd floor loft walls to ceiling space -protect NM with 6’ of attic access -seal penetrations in 2nd floor hvac room -fire block basement bathroom into basement bedroom closet furr down -fire block left of basement door into furr down -security blocking at basement door -anchor bolts through out basement to be within the middle 1/3 of sill plate -fire block vertically to horizontally basement family room S wall and E wall -fire block basement family room furr out wall to ceiling space -fireblock vertical to horizontal every 10’ at stairwell
All Rough Inspection - Residential Passed 7/29/2022 7/29/2022 07/29/2022
Misc
Resolved
07/29/2022
Driveway Inspection Partial 10/3/2022 10/3/2022 10/03/2022
Misc
Informational
10/03/2022
10-3-22 RH. Driveway is formed up and aggregate is placed and compacted.
Sidewalk Inspection Partial 10/3/2022 10/3/2022 10/03/2022
Misc
Informational
10/03/2022
10-3-22 RH. Sidewalk is formed up and aggregate is placed and compacted.
Sidewalk Inspection Passed 10/10/2022 10/10/2022 10/10/2022
Misc
Informational
10/03/2022
10-3-22 RH. Sidewalk is formed up and aggregate is placed and compacted. 10-10-22 RH. Sidewalk meets LS and ADA specification.
Driveway Inspection Passed 10/10/2022 10/10/2022 10/10/2022
Misc
Informational
10/03/2022
10-3-22 RH. Driveway is formed up and aggregate is placed and compacted. 10-10-22 RH. Driveway meets LS and ADA specification.
Occupancy Inspection - Codes Residential Failed 12/7/2022 12/7/2022 12/07/2022
Misc
Corrective Action Required
12/07/2022
INPECTION DENIED, NO GAURDS OR HANDRAILS
Occupancy Inspection - Codes Residential Not Ready 12/13/2022 12/13/2022 12/13/2022
Misc
Resolved
12/13/2022
INPECTION DENIED, NO GAURDS OR HANDRAILS
Misc
Corrective Action Required
12/13/2022
inspection denied no erosion control in place.
Erosion Control Inspection Residential Failed 12/13/2022 12/13/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
12/13/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
12/13/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Occupancy Inspection - Codes Residential Ready for Temp CO 12/13/2022 12/13/2022
Misc
Corrective Action Required
12/13/2022
- obtain an irrigation permit and submit back flow certification - pay fees - final grading and sod - provide splash blocks - upload letter on basement finnish incomplete
Occupancy Inspection - Codes Residential Ready for Temp CO 1/12/2023 01/12/2023
Misc
Corrective Action Required
12/13/2022
- obtain an irrigation permit and submit back flow certification - pay fees - final grading and sod - provide splash blocks - upload letter on basement finnish incomplete
Erosion Control Inspection Residential Passed 03/17/2023
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
03/17/2023
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Resolved
03/17/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Plot Plan Inspection Passed 03/17/2023
Occupancy Inspection - Codes Residential Failed 3/17/2023 3/17/2023 03/17/2023
Misc
Corrective Action Required
01/12/2023
-upload third party pier inspection
Piers/Caissons Inspection - Residential Passed 03/21/2023
Occupancy Inspection - Codes Residential Full C of O 3/21/2023 3/21/2023 03/21/2023
Misc
Resolved
03/21/2023
-upload third party pier inspection
Documents & Images
Date Uploaded File Type Document Name
11/29/2021 HF 57 - Permit App
11/29/2021 HF 57 - Tax App
12/02/2021 Permit Codes Residential Plan Review
12/07/2021 Plot Plan APPROVED PLOT PLAN
12/07/2021 Approved Plans APPROVED DRAWINGS
12/07/2021 Permit Codes Residential Plan Review
01/07/2022 Permit DS Building Permit
01/07/2022 Receipt Receipt for transaction:2022-000128
02/11/2022 2202 SW Red Barn Ln LSMO Hook Farms Lot 57 Foundation Footing Inspection Report 2-10-22
02/11/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/24/2022 Letter INSPECTION SUMMARY
02/28/2022 Letter INSPECTION SUMMARY
03/03/2022 Letter INSPECTION SUMMARY
04/12/2022 HF57 - Basement Scope of Work
04/14/2022 Approved Plans APPROVED PLANS
07/21/2022 Letter Codes 140 Day Letter
07/25/2022 Letter INSPECTION SUMMARY
07/25/2022 Letter INSPECTION SUMMARY
07/25/2022 Letter INSPECTION SUMMARY
07/29/2022 Letter INSPECTION SUMMARY
07/29/2022 Letter INSPECTION SUMMARY
10/03/2022 Letter INSPECTION SUMMARY
10/03/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
12/13/2022 Letter INSPECTION SUMMARY
12/13/2022 Letter INSPECTION SUMMARY
12/13/2022 Photograph 1 OF 7 STATE OF BASEMENT
12/13/2022 Photograph 2
12/13/2022 Photograph 3
12/13/2022 Photograph 4
12/13/2022 Photograph 5
12/13/2022 Photograph 6
12/13/2022 Photograph 7
12/13/2022 Certificate/License Codes Temporary Certificate of Occupancy
12/13/2022 Receipt Receipt for transaction:2022-009476
01/04/2023 Extension Request Form
01/12/2023 Certificate/License Codes Temporary Certificate of Occupancy
01/12/2023 Receipt Receipt for transaction:2023-000201
02/08/2023 Extension Request Form
02/20/2023 Certificate/License Codes Temporary Certificate of Occupancy
02/20/2023 Receipt Receipt for transaction:2023-000941
03/16/2023 Mar 16, Doc 1
03/17/2023 Letter INSPECTION SUMMARY
03/17/2023 Letter INSPECTION SUMMARY
03/17/2023 Letter INSPECTION SUMMARY
03/17/2023 Letter INSPECTION SUMMARY
03/17/2023 Letter INSPECTION SUMMARY
03/20/2023 2202 SW Red Barn Ln_ALL SLAB & DECK PIER INSP_2023-03-17
03/21/2023 Letter INSPECTION SUMMARY
03/21/2023 Letter Field Certificate of Occupancy
03/21/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home